CN107968269A CN201711301868.5A CN201711301868A CN107968269A CN 107968269 A CN107968269 A CN 107968269A CN 201711301868 A CN201711301868 A CN 201711301868A CN 107968269 A CN107968269 A CN 107968269A
Authority
CN
China
Prior art keywords
water tank
transmission line
top plate
construction method
foundation pit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711301868.5A
Other languages
Chinese (zh)
Other versions
CN107968269B (en
Inventor
邓佳美
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Changzheng Electrical Engineering Co., Ltd.
Original Assignee
Chengdu Science And Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Science And Technology Co Ltd filed Critical Chengdu Science And Technology Co Ltd
Priority to CN201711301868.5A priority Critical patent/CN107968269B/en
Publication of CN107968269A publication Critical patent/CN107968269A/en
Application granted granted Critical
Publication of CN107968269B publication Critical patent/CN107968269B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01RELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
    • H01R4/00Electrically-conductive connections between two or more conductive members in direct contact, i.e. touching one another; Means for effecting or maintaining such contact; Electrically-conductive connections having two or more spaced connecting locations for conductors and using contact members penetrating insulation
    • H01R4/58Electrically-conductive connections between two or more conductive members in direct contact, i.e. touching one another; Means for effecting or maintaining such contact; Electrically-conductive connections having two or more spaced connecting locations for conductors and using contact members penetrating insulation characterised by the form or material of the contacting members
    • H01R4/66Connections with the terrestrial mass, e.g. earth plate, earth pin
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01RELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
    • H01R43/00Apparatus or processes specially adapted for manufacturing, assembling, maintaining, or repairing of line connectors or current collectors or for joining electric conductors

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Sewage (AREA)

Abstract

The present invention provides a kind of transmission line of electricity grounding construction method, belong to field of electricity construction, comprise the following steps:Excavation pit:In construction area excavation pit;Bury case:Water tank is buried in foundation pit, water tank is hollow structure, and water tank bottom is bottom plate, and top is top plate, and water tank bottom is provided with multiple leakage holes, and tank top is provided with inlet opening;Wiring:The bottom of ground wire is connected to ceiling location;Landfill:Foundation pit is filled, and is tamped.The ground connection work of earth wire is completed by this construction method, ground wire can be made to be securely attached in the foundation pit on ground, and the ponding above the inner water tank of foundation pit position can be penetrated down into quickly in water tank, it is stored temporarily in water tank and gradually passes through the leakage hole exudation of water tank, the fast quick-recovery in position of embedded ground wire is dried, ground wire is more securely disposed at the position, further ensure that the safety of transmission line of electricity.

Description

A kind of transmission line of electricity grounding construction method
Technical field
The present invention relates to field of electricity construction, in particular to a kind of transmission line of electricity grounding construction method.
Background technology
Power engineering is one of foundation engineering important at present.The ground connection of transmission line of electricity is essential in power construction One procedure.
In the prior art, when transmission line of electricity is grounded, construction method is fairly simple, and used structure is also fairly simple, Substantially extra connector is not used to be grounded, even with being also relatively simple connector.In practice process not More preferably effect can be brought.
The content of the invention
The present invention provides a kind of transmission line of electricity grounding construction method, it is intended to solves the above problem of the prior art.
What the present invention was realized in:
A kind of transmission line of electricity grounding construction method, comprises the following steps:
Excavation pit:In construction area excavation pit, foundation depth is at least 1m, and diameter range is at least 60cm;
Bury case:Water tank is buried in foundation pit, water tank is hollow structure, and water tank bottom is bottom plate, and top is top plate, and water tank bottom is set Multiple leakage holes are equipped with, tank top is provided with inlet opening;
Wiring:The bottom of ground wire is connected to ceiling location;
Landfill:Foundation pit is filled, and is tamped.
More preferably, the bottom of foundation pit is flattened in excavation pit;The side of water tank is filled in soil after case is buried In gap between wall and foundation pit, water tank is set to be fixed in foundation pit.
More preferably, the water tank is tubular, and the sidepiece of water tank is side plate;Shape between the top plate and the side plate Into four connecting portions, four connecting portions are distributed in " ten " font so that four inlet openings are formed between side plate and top plate, each Inlet opening is arcuate structure;Edge on top plate close to each inlet opening is provided with the deflector flipped up, deflector It is obliquely installed, and the top margin of deflector is towards the center of top plate;
After the wiring, to the top filling soil of top plate, the mound of formation taper, mound will connect between four deflectors Bury junction between ground wire and top plate;
Flow guide sleeve is set above mound afterwards, and flow guide sleeve includes two half bodies being mutually clamped, and flow guide sleeve is integrally conical, leads Through hole is formed on stream set top;
The connection of two and half bodies is first removed when setting flow guide sleeve, two and half bodies are fitted on the mound of taper and by two A half body clamping, makes ground wire through through hole.
More preferably, the side plate and top plate are separate structure;Side plate interior sides form four supporting tables, top plate side Edge forms four outwardly protrusions;The protrusion is positioned in the supporting table so that side plate is connected with top plate.
More preferably, half body has opposite the first side and the second side, the top and bottom of first side Portion forms outwardly fixture block, and the top and bottom of second side open up the card slot being adapted with the fixture block;Connecting The fixture block of one of them half body is clamped the card slot into another half body during two and half bodies.
More preferably, the bottom margin of the flow guide sleeve is located at the surface of the deflector, and flow guide sleeve bottom Diameter be less than top plate diameter.
More preferably, the height of the water tank is 20-40cm.
More preferably, the flow guide sleeve is made of plastic.
Transmission line of electricity grounding construction method provided by the invention, the ground connection work of earth wire is completed by this construction method Make, ground wire can be made to be securely attached in the foundation pit on ground, and the ponding above the inner water tank of foundation pit position can quickly to In lower infiltration water tank, it is stored temporarily in water tank and gradually passes through the leakage hole exudation of water tank so that the position of embedded ground wire It quick-recovery can dry soon, ground wire is more securely disposed at the position, further ensure that the safety of transmission line of electricity.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is attached drawing needed in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, without creative efforts, can be with Other attached drawings are obtained according to these attached drawings.
Fig. 1 is structural representation of the transmission line of electricity grounding construction method provided in an embodiment of the present invention after flow guide sleeve is set Figure;
Fig. 2 is the schematic top plan view of water tank used in transmission line of electricity grounding construction method provided in an embodiment of the present invention;
Fig. 3 is the schematic cross-sectional view of water tank used in transmission line of electricity grounding construction method provided in an embodiment of the present invention;
Fig. 4 is the schematic top plan view of flow guide sleeve used in transmission line of electricity grounding construction method provided in an embodiment of the present invention;
Fig. 5 is that water conservancy diversion used in transmission line of electricity grounding construction method provided in an embodiment of the present invention is set on above water tank Schematic top plan view afterwards;
Fig. 6 is the structure diagram of half body used in transmission line of electricity grounding construction method provided in an embodiment of the present invention.
Reference numeral collects:Foundation pit 11, water tank 12, bottom plate 13, top plate 14, leakage hole 15, inlet opening 16, side plate 17, connecting portion 18th, deflector 19, mound 20, flow guide sleeve 21, half body 22, through hole 23, supporting table 24, the first side 25, the second side 26, fixture block 27th, card slot 28, ground wire 29.
Embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other without making creative work Embodiment, belongs to the scope of protection of the invention.
Embodiment, please refers to Fig.1-6.
A kind of transmission line of electricity grounding construction method is present embodiments provided, earth wire 29 is completed by this construction method Ground connection work, ground wire 29 can be made to be securely attached in the foundation pit 11 on ground, and the top of 11 position inner water tank of foundation pit 12 Ponding can quickly penetrate down into water tank 12, the leakage hole 15 for being stored temporarily in water tank 12 and gradually passing through water tank 12 oozes Go out so that the position of embedded ground wire 29 quick-recovery can be dried soon, ground wire 29 is more securely disposed at the position Put, further ensure that the safety of transmission line of electricity.
As shown in Figure 1, this transmission line of electricity grounding construction method, comprises the following steps:
Excavation pit 11:In construction area excavation pit 11,11 depth of foundation pit is at least 1m, and diameter range is at least 60cm;
Bury case:Water tank 12 is buried in foundation pit 11, water tank 12 is hollow structure, and 12 bottom of water tank is bottom plate 13, and top is top plate 14,12 bottom of water tank is provided with multiple leakage holes 15, and the top of water tank 12 is provided with inlet opening 16;
Wiring:The bottom for being grounded 29 is connected to 14 position of top plate;
Landfill:Foundation pit 11 is filled, and is tamped.
Relatively deep larger foundation pit 11 enables 29 inbuilt positions of ground wire deeper, more firm after burying, it is ensured that defeated The safety of electric line.
Water tank 12 is arranged on inside foundation pit 11, has the effect for accelerating infiltration.In the rainy day, rainwater permeates downwards from ground; In the soil of the top of water tank 12, rainwater permeates gradually downward, since water tank 12 is hollow structure, and can contain more water, Water tank 12 can not seep water the soil of top and produce resistance, additionally it is possible to play the role of drainage, make in 12 top soil of water tank Ponding can quickly penetrate down into water tank 12, be stored temporarily in water tank 12, pass through 12 bottom of water tank set leakage hole 15 slowly permeate to the lower section of water tank 12.
By setting water tank 12, the discharge of the ponding at the embedded position of ground wire 29 can speed up, it is ensured that 29 positions of ground wire Drying, the position is not steeped for a long time in water, enable the position be easier keep drying, can be with respect to other regions Intensity with higher so that transmission line of electricity is safer.
The bottom of ground wire 29 is connected to 14 position of top plate, can be connected on top plate 14 or be embedded in top 14 top position of plate is simultaneously arranged at intervals with top plate 14.
As shown in Figure 1, the bottom of foundation pit 11 is flattened in excavation pit 11;After case is buried water tank 12 is filled in soil In gap between side wall and foundation pit 11, water tank 12 is set to be fixed in foundation pit 11.
The bottom of foundation pit 11 is flattened, water tank 12 is more steadily placed;Water tank 12 is fixed in foundation pit 11 with soil, Ground wire 29 is set more firmly to bury.
As shown in Figures 2 and 3, the water tank 12 is tubular, and the sidepiece of water tank 12 is side plate 17;The top plate 14 with it is described Four connecting portions 18 are formed between side plate 17, four connecting portions 18 are distributed in " ten " font so that between side plate 17 and top plate 14 Four inlet openings 16 are formed, each inlet opening 16 is arcuate structure;Close to the edge of each inlet opening 16 on top plate 14 The deflector 19 flipped up is provided with, deflector 19 is obliquely installed, and the top margin of deflector 19 is towards the centre bit of top plate 14 Put;
After the wiring, to the top filling soil of top plate 14, the mound 20 of taper is formed between four deflectors 19, it is native Heap 20 buries the junction being grounded between 29 and top plate 14;
Flow guide sleeve 21 is set above mound 20 afterwards, and flow guide sleeve 21 includes two half bodies 22 being mutually clamped, and flow guide sleeve 21 is whole Body is tapered, and through hole 23 is formed on the top of flow guide sleeve 21;
The connection of two and half bodies 22 is first removed when setting flow guide sleeve 21, two and half bodies 22 are fitted in the mound 20 of taper Above and by two and half bodies 22 it is clamped, ground wire 29 is passed through through hole 23.
Top plate 14 and side plate 17 are arranged to separate structure, are conducive to the processing and assembling of water tank 12.In construction, first Bottom plate 13 and side plate 17 are placed in foundation pit 11;If ground wire 29 is connected on top plate 14,29 will be first grounded It is connected with top plate 14, then top plate 14 is placed on side plate 17, is buried soil again afterwards and be compacted top plate 14;
If need not be connected ground wire 29 with top plate 14, first top plate 14 is placed on side plate 17, buries ground connection afterwards Line 29, form mound 20.
Four connecting portions 18 and the setting of four inlet openings 16, make each modular construction design reasonable, what inlet opening 16 was set It is larger, facilitate water flowing.The deflector 19 being obliquely installed can enable water in larger scope quickly through inlet opening 16 into Enter in water tank 12.
14 top position of top plate is buried in by being grounded 29 with mound 20, and flow guide sleeve 21 is set, makes embedded ground wire 29 The soil at position more tamp, be more not readily susceptible to the immersion of ponding, can preferably keep its flintiness.Flow guide sleeve 21 It is arranged on mound 20, ground wire 29 is passed through the through hole 23 of flow guide sleeve 21, is grounded 29 bottom part in mound 20, leads Stream set 21 and water tank 12 are protected from each orientation earth wire 29.In rainwater day, the ponding of top flows downward to water conservancy diversion 21 positions are covered, are flowed along the outer wall of inclined half body 22, and flow to deflector 19, water tank 12 is entered by inlet opening 16 It is interior.
By these structures and construction procedure, the ponding of the top of water tank 12 can be made to be easier to enter in water tank 12, buried The intensity that can keep higher at the position of ground wire 29, transmission line of electricity can be safer.
As shown in figure 3, the side plate 17 and top plate 14 are separate structure;The inner side of side plate 17 forms four supporting tables 24, 14 edge of top plate forms four outwardly protrusions;The protrusion is positioned in the supporting table 24 so that side plate 17 It is connected with top plate 14.
Supporting table 24 can play a supporting role top plate 14, enable top plate 14 convenient and efficient and rest easily within branch Support 24 position of platform.
As shown in Fig. 4 and Fig. 6, half body 22 has opposite the first side 25 and the second side 26, first side 25 Top and bottom form outwardly fixture block 27, the top and bottom of second side 26 are opened up fits with 27 phase of fixture block The card slot 28 matched somebody with somebody;The fixture block 27 of one of them half body 22 is clamped into another half body 22 when connecting two and half bodies 22 Card slot 28.
Two half bodies 22 being mutually clamped, can be more convenient in construction, ground wire 29 is easily threaded through and leads The through hole 23 of stream set 21, plays the role of the protection of earth wire 29.In the fixture block 27 and card slot 28 that half body, 22 sidepiece is set, side Just connect, fixture block 27 and card slot 28 are directly docked to during construction the clamping that can complete two and half bodies 22.
As shown in figure 5, the bottom margin of the flow guide sleeve 21 is located at the surface of the deflector 19, and 21 bottom of flow guide sleeve The diameter in portion is less than the diameter of top plate 14.
This set enables the top of water tank 12, the ponding that is left through flow guide sleeve 21 quickly and accurately to pass through deflector 19 And then flow to water tank 12.
The height of the water tank 12 is 20-40cm.This water tank 12 facilitates water storage, and cause the position of ground wire 29 also compared with It is deep, it is inbuilt more stable.
The flow guide sleeve 21 is made of plastic.
The foregoing description of the disclosed embodiments, enables professional and technical personnel in the field to realize or use the present invention. A variety of modifications to these embodiments will be apparent for those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, it is of the invention The embodiments shown herein is not intended to be limited to, and is to fit to and the principles and novel features disclosed herein phase one The most wide scope caused.

Claims (8)

  1. A kind of 1. transmission line of electricity grounding construction method, it is characterised in that comprise the following steps:
    Excavation pit:In construction area excavation pit, foundation depth is at least 1m, and diameter range is at least 60cm;
    Bury case:Water tank is buried in foundation pit, water tank is hollow structure, and water tank bottom is bottom plate, and top is top plate, and water tank bottom is set Multiple leakage holes are equipped with, tank top is provided with inlet opening;
    Wiring:The bottom of ground wire is connected to ceiling location;
    Landfill:Foundation pit is filled, and is tamped.
  2. 2. transmission line of electricity grounding construction method according to claim 1, it is characterised in that in excavation pit by foundation pit Bottom flattens;In the gap being filled in after burying case with soil between the side wall of water tank and foundation pit, water tank is set to be fixed in foundation pit.
  3. 3. transmission line of electricity grounding construction method according to claim 2, it is characterised in that the water tank is tubular, water tank Sidepiece be side plate;Four connecting portions are formed between the top plate and the side plate, four connecting portions are distributed in " ten " font, make Obtain and four inlet openings are formed between side plate and top plate, each inlet opening is arcuate structure;Close to each water inlet on top plate The edge in hole is provided with the deflector flipped up, and deflector is obliquely installed, and the top margin of deflector is towards the centre bit of top plate Put;
    After the wiring, to the top filling soil of top plate, the mound of formation taper, mound will connect between four deflectors Bury junction between ground wire and top plate;
    Flow guide sleeve is set above mound afterwards, and flow guide sleeve includes two half bodies being mutually clamped, and flow guide sleeve is integrally conical, leads Through hole is formed on stream set top;
    The connection of two and half bodies is first removed when setting flow guide sleeve, two and half bodies are fitted on the mound of taper and by two A half body clamping, makes ground wire through through hole.
  4. 4. transmission line of electricity grounding construction method according to claim 3, it is characterised in that the side plate is to separate with top plate Formula structure;Side plate interior sides form four supporting tables, and ceiling edge forms four outwardly protrusions;The protrusion is put It is placed in the supporting table so that side plate is connected with top plate.
  5. 5. transmission line of electricity grounding construction method according to claim 4, it is characterised in that half body has opposite Outwardly fixture block, the top and bottom of second side are formed on the first side and the second side, the top and bottom of first side Portion opens up the card slot being adapted with the fixture block;The fixture block of one of them half body is clamped into another when connecting two and half bodies The card slot of one and half bodies.
  6. 6. transmission line of electricity grounding construction method according to claim 5, it is characterised in that the bottom margin of the flow guide sleeve Positioned at the surface of the deflector, and the diameter of flow guide sleeve bottom is less than the diameter of top plate.
  7. 7. transmission line of electricity grounding construction method according to claim 6, it is characterised in that the height of the water tank is 20- 40cm。
  8. 8. transmission line of electricity grounding construction method according to claim 7, it is characterised in that the flow guide sleeve plastics system Into.
CN201711301868.5A 2017-12-10 2017-12-10 A kind of transmission line of electricity grounding construction method Expired - Fee Related CN107968269B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711301868.5A CN107968269B (en) 2017-12-10 2017-12-10 A kind of transmission line of electricity grounding construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711301868.5A CN107968269B (en) 2017-12-10 2017-12-10 A kind of transmission line of electricity grounding construction method

Publications (2)

Publication Number Publication Date
CN107968269A true CN107968269A (en) 2018-04-27
CN107968269B CN107968269B (en) 2019-07-09

Family

ID=61998504

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711301868.5A Expired - Fee Related CN107968269B (en) 2017-12-10 2017-12-10 A kind of transmission line of electricity grounding construction method

Country Status (1)

Country Link
CN (1) CN107968269B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3582531A (en) * 1969-12-18 1971-06-01 Albert P Sheelor Electrochemical grounding rod
CN2602497Y (en) * 2003-01-17 2004-02-04 苏鹤声 Grounding apparatus
CN101719602A (en) * 2009-12-31 2010-06-02 刘义 Long-acting earthing device
CN204230524U (en) * 2014-12-17 2015-03-25 应夏英 A kind of architectural engineering grounding system
CN105514750A (en) * 2015-11-19 2016-04-20 国家电网公司 Power transmission line grounding construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3582531A (en) * 1969-12-18 1971-06-01 Albert P Sheelor Electrochemical grounding rod
CN2602497Y (en) * 2003-01-17 2004-02-04 苏鹤声 Grounding apparatus
CN101719602A (en) * 2009-12-31 2010-06-02 刘义 Long-acting earthing device
CN204230524U (en) * 2014-12-17 2015-03-25 应夏英 A kind of architectural engineering grounding system
CN105514750A (en) * 2015-11-19 2016-04-20 国家电网公司 Power transmission line grounding construction method

Also Published As

Publication number Publication date
CN107968269B (en) 2019-07-09

Similar Documents

Publication Publication Date Title
CN206245326U (en) A kind of drainage system of building foundation pit
CN108951649B (en) Foundation pit supporting structure
CN205511107U (en) A pergola for flowers cultivated in a pot are cultivated
CN102383408A (en) Greening method for high water level impermeable saline and alkaline lands and greening system
CN107968269A (en) A kind of transmission line of electricity grounding construction method
CN205975639U (en) Side slope drainage structure
CN218540581U (en) Slope protection structure
CN208995864U (en) Sponge urban ecology road foundation structure
CN206844095U (en) Grid type rain-water drainage and collection system
CN205756135U (en) A kind of trees irrigation rig
CN210695276U (en) Afforestation trees support
CN111807663B (en) Self-suction type semi-permeable membrane drainage network and implementation method thereof
CN212714810U (en) Ecological bank slope protective structure of hydraulic engineering
CN108265894A (en) Look for slope ditching type drainage system
CN210668712U (en) Earthing device for loess plateau
CN208604973U (en) A kind of underground space ground pavement infiltration white-out structure
CN208701650U (en) A kind of anti-extrusion soil structure of PHC tube pile construction
CN216598449U (en) Buried transformer substation for power system
CN207211173U (en) CFRD reverse drainage system
CN206941573U (en) Artificial digging pile
CN205100351U (en) Preparation simple process's draining shaft structure
CN219741448U (en) High-efficiency energy-saving irrigation device
CN109355995A (en) A kind of road greenbelt and its construction method
CN212723758U (en) Pond water level control device
CN219973213U (en) Foundation pit supporting structure with seepage prevention function

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190611

Address after: 528437 No.9 No.2 Shiyong Road, Zhongshan Torch Development Zone, Guangdong Province

Applicant after: Guangdong Changzheng Electrical Engineering Co., Ltd.

Address before: 610041 No. 39 Jinfeng Street, Wuhou District, Chengdu City, Sichuan Province, with No. 11

Applicant before: Chengdu science and Technology Co., Ltd.

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190709

Termination date: 20201210