CN107965054A - A kind of prestressed assembly formula truss-like steel reinforced concrete structure system and its assembling method - Google Patents

A kind of prestressed assembly formula truss-like steel reinforced concrete structure system and its assembling method Download PDF

Info

Publication number
CN107965054A
CN107965054A CN201711183517.9A CN201711183517A CN107965054A CN 107965054 A CN107965054 A CN 107965054A CN 201711183517 A CN201711183517 A CN 201711183517A CN 107965054 A CN107965054 A CN 107965054A
Authority
CN
China
Prior art keywords
steel
concrete
section
truss
reinforced concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711183517.9A
Other languages
Chinese (zh)
Other versions
CN107965054B (en
Inventor
曹大富
陆航
陆一航
刘强
韩志先
张鑫
李喆
钱芮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yangzhou University
Original Assignee
Yangzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yangzhou University filed Critical Yangzhou University
Priority to CN201711183517.9A priority Critical patent/CN107965054B/en
Publication of CN107965054A publication Critical patent/CN107965054A/en
Application granted granted Critical
Publication of CN107965054B publication Critical patent/CN107965054B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/30Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts being composed of two or more materials; Composite steel and concrete constructions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • E04B1/22Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material with parts being prestressed
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/58Connections for building structures in general of bar-shaped building elements
    • E04B1/5825Connections for building structures in general of bar-shaped building elements with a closed cross-section

Abstract

A kind of prestressed assembly formula truss-like steel reinforced concrete structure system and its assembling method, it is made of steel reinforced concrete girder segment, bean column node section, deformed bar, anchorage etc., the various load actions that steel bone joist frame should be able to undertake dead load and the construction stage occurs, deformed bar improves structural integrity and crack crotrol requirement to bear secondary dead load and live load effect.The present invention is with that can greatly improve the industrialization of steel reinforced concrete structure, assembling degree, convenient construction, accelerate the construction speed and production efficiency of structure, save duration and project cost, reduce the scantling size of large-span structure by applying prestressing force at the same time, structural strength is improved, improves structural integrity and crack resistance.

Description

A kind of prestressed assembly formula truss-like steel reinforced concrete structure system and its assembling method
Technical field
The present invention relates to a kind of frame structure system, especially with prestressed assembly formula truss-like steel reinforced concrete knot Structure system and its assembling method.
Background technology
1974, what the United Nations published《The policy of building industrialization is done step-by-step in government and measure is guided》Defined in build Build industrialization:Construction industry is transformed according to big industrial mode of production, is allowed to progressively turn to the big production of socialization from handicraft production Process, its implementation process are architectural design standard, component and fitting production plant, mechanization of building operation and organization and administration science Change, and progressively use the new results of modern science and technology, to raise labour productivity, Accelerating The Construction speed, reduce engineering cost, Improve construction quality.
In recent years, China's economic total volume quickly increases, and the scale of infrastructure occupy world forefront, building industry work always The demand of industry is more and more urgent.Precast assembly structural system can embody industrialized production feature well, be recent heat Point studies a question.However, the assembly of concrete structure needs wet construction, substantial amounts of wet construction can not embody the excellent of assembled system again More property;Steel construction optimum is used to industrialize assembled production, but its anti-corrosion, fire safety problem allow people's headache again.This is just needed will be mixed Solidifying soil and steel construction mix to form the shortcomings that steel reinforced concrete system is to evade when it works independently.
Design for steel reinforced concrete system,《Steel reinforced concrete structure technical regulation》(YB 9082-2006)Deng one Related design code and detailing requiments are all proposed to it in a little technical specification codes.The technical problem that presently, there are is:Steel The industrialization of bone concrete system, assembling degree be not also high, causes construction speed and production efficiency relatively low, simultaneously for some Span is relatively large and the building for the load that takes the weight, the reinforcing bar coagulation gone out in design using such design discipline and Specification Design Often there are the problems such as size is larger, amount of deflection is larger for soil body system.
The content of the invention
It the object of the present invention is to provide a kind of pin-connected panel reinforcing bar concrete structural system, can build steel reinforced concrete structure Build field more industrialize, assembling, to improve its construction speed and production efficiency.Another object of the present invention is to solve Span is relatively large and the building for the load that takes the weight in, the scantling designed according to common reinforcing bar concrete design method Larger, the problems such as degree of disturbing is larger, propose that one kind applies prestressed method in steel reinforced concrete structure system.
Technical scheme is as follows:A kind of prestressed assembly formula truss-like steel reinforced concrete structure system, its feature It is, including steel reinforced concrete girder segment, steel framed concrete section and the deformed bar formed by prefabrication, institute State steel reinforced concrete girder segment, the end of steel framed concrete section is equipped with gusset plate and is connected for wet joint;The steel Bone beams of concrete segment, the beam section part of steel framed concrete section are equipped with prestressed pore passage, and the gusset plate uses high Strength bolt connects after-pouring concrete, forms wet joint, deformed bar is installed with the prestressed pore passage, and tight with anchorage anchor It is fixed, form integral frame structure system.
Further, the prestressed pore passage is located at lower part, positioned at upper at bearing into undulated arrangement at span centre Portion, all the time in tension position.
Further, the steel framed concrete section includes joist steel truss, column steel truss, and the joist steel truss is worn The hole reserved on column steel truss, pouring concrete after positioning are crossed, the gusset plate for reserving end is connected for wet joint.
A kind of assembling method of prestressed assembly formula truss-like steel reinforced concrete structure system, it is characterized in that, including it is following Step:
1)Prefabricated steel framed concrete beam segment, steel framed concrete section in the factory, steel reinforced concrete girder segment and steel The beam section part of bone concrete beam and column node section need to reserve prestressed pore passage, steel reinforced concrete girder segment, steel in advance when making Leave gusset plate and connected for wet joint in the end of bone concrete beam and column node section;
Wherein, prestressed pore passage is located at lower part into undulated arrangement in beam section at span centre, and top is located at bearing, begins It is in tension position eventually;When making the truss-like reinforcing bar of steel framed concrete section, joist steel truss is passed through into column steel truss Upper reserved hole, pouring concrete after positioning, reserves endpoint node plate and is connected for wet joint;
2)After prefabricated components transport to scene, prefabricated steel reinforced concrete girder segment, steel framed concrete section are lifted into Position;Steel framed concrete section is first lifted, is connected at the gusset plate of its end by wet joint, the wet joint in end by connecting The place's of connecing gusset plate is formed using high-strength bolt connection after-pouring concrete;
After the installation of steel framed concrete section fixes, then lift the steel reinforced concrete girder segment between node, girder segment Particular number depending on the specific span of engineering structure system, equally, connected at the gusset plate of its end by wet joint, one layer One layer of assembling;
3)After intensity needed for concrete at wet joint reaches, deformed bar is worn in prestressed pore passage reserved before, and Fastened with anchorage anchor, form integral frame structure system, complete whole prestressed assembly formula truss-like steel reinforced concrete structure The assembly of system.
The present invention is made of steel reinforced concrete girder segment, bean column node section, deformed bar, anchorage etc., its Basic Design Theory is exactly:Steel bone joist frame should be able to undertake the various load actions occurred dead load and construction stage, deformed bar to Secondary dead load and live load effect are born, and improves structural integrity and crack crotrol requirement.Steel reinforced concrete girder segment and beam Column border node section is formed by prefabrication, and end reserves certain length gusset plate for connection, while reserves presstressed reinforcing steel duct; At the construction field (site), by steel reinforced concrete girder segment and the lifting of bean column node section in place, termination junction gusset plate uses high-strength spiral shell Tether and connect after-pouring concrete, form wet joint;After after joint, concrete reaches some strength, in prestressing force reserved before Deformed bar is worn in duct, and is fastened with anchorage anchor, forms integral frame structure system.
Compared with prior art, the present invention its remarkable advantage is:It can make industrialization, the assembling journey of steel reinforced concrete structure Degree greatly improves, and convenient construction, accelerates the construction speed and production efficiency of structure, save duration and project cost, pass through at the same time Apply the scantling size that prestressing force reduces large-span structure, improve structural strength, improve structural integrity and crack resistance.Therefore The structural system promoting the use in assembled arthitecutral structure, can produce good economic benefit.
Brief description of the drawings
Fig. 1 is prestressed assembly formula truss-like steel reinforced concrete structure system elevation of the present invention;
Fig. 2 is 1-1 partial sectional views in Fig. 1;
Fig. 3 is 2-2 partial sectional views in Fig. 1;
Fig. 4 is steel framed concrete section steel truss figure;
Fig. 5 is the column steel truss figure in steel framed concrete section;
Fig. 6, Fig. 7 are wet joint detail drawing;
Fig. 8 is frame system assembly flow chart;
In figure:1 is steel reinforced concrete girder segment, and 2 be steel framed concrete section, and 3 be deformed bar, and 4 be wet joint.
Embodiment
As shown in the figure, a kind of prestressed assembly formula truss-like steel reinforced concrete structure system, including formed by prefabrication Steel reinforced concrete girder segment 1, steel framed concrete section 2 and deformed bar 3.Steel reinforced concrete girder segment, steel The end of bone concrete beam and column node section is equipped with gusset plate and is connected for wet joint 4, steel reinforced concrete girder segment, steel reinforced concrete The beam section part of bean column node section is equipped with prestressed pore passage.
Gusset plate is formed wet joint 4, prestressing force is installed with prestressed pore passage using high-strength bolt connection after-pouring concrete Reinforcing bar, and fastened with anchorage anchor, form integral frame structure system.
Prestressed pore passage is located at lower part at span centre, top is located at bearing, all the time in tension into undulated arrangement Position.Steel framed concrete section includes joist steel truss, column steel truss, and joist steel truss passes through the hole reserved on column steel truss Hole, pouring concrete after positioning, the gusset plate for reserving end are connected for wet joint.
A kind of assembling method of prestressed assembly formula truss-like steel reinforced concrete structure system, as shown in Fig. 1-3, reinforcing bar mixes Solidifying soil girder segment 1, steel framed concrete section 2 is prefabricated in the factory forms, steel reinforced concrete girder segment 1 and reinforcing bar coagulation The beam section part of native bean column node section 2 need to reserve prestressed pore passage in advance when making;
Prestressed pore passage position is located at lower part as shown in Figure 1, into undulated arrangement in beam section at span centre, the position at bearing In top, all the time in tension position;
The truss-like reinforcing bar of steel framed concrete section 2 as shown in Figure 4, Figure 5, joist steel truss is passed through pre- on column steel truss The hole stayed, pouring concrete after positioning, reserves endpoint node plate and is connected for wet joint 4;
After prefabricated components transport to scene, assembly is carried out according to assembled flow shown in Fig. 8, first lifts steel framed concrete section 2, connected by wet joint 4, installation lifts the steel reinforced concrete girder segment 1 between node, the specific number of girder segment again after fixing Amount is equally connected by wet joint 4, assembled in layer, finally reserved before depending on the specific span of engineering structure system Prestressed pore passage in wear deformed bar and fastened with anchorage anchor, complete whole prestressed assembly formula truss-like reinforcing bar coagulation The assembly of soil structure system;
The specific connection mode of 4 steel truss of wet joint as shown in Figure 6, Figure 7, consolidate after being connected with gusset plate with high-strength bolt by pouring concrete It is fixed.
According to said method assembled prestressed assembly formula truss-like steel reinforced concrete structure system can make steel reinforced concrete The industrialization of structure, assembling degree greatly improve, and convenient construction, accelerates the construction speed and production efficiency of structure, save work Phase and project cost, while by applying the scantling size of prestressing force reduction large-span structure, improve structural strength, improve knot Structure globality and crack resistance.Therefore the structural system promoting the use in assembled arthitecutral structure, can produce good economy Benefit.

Claims (4)

1. a kind of prestressed assembly formula truss-like steel reinforced concrete structure system, it is characterized in that, including formed by prefabrication Steel reinforced concrete girder segment(1), steel framed concrete section(2)And deformed bar(3), the steel framed concrete beam Segment, the end of steel framed concrete section supply wet joint equipped with gusset plate(4)Connection is used;The steel framed concrete beam section Section, the beam section part of steel framed concrete section are equipped with prestressed pore passage, after the gusset plate is using high-strength bolt connection Casting concrete, forms wet joint(4), deformed bar is installed with the prestressed pore passage, and fastened with anchorage anchor, formed Integral frame structure system.
2. a kind of prestressed assembly formula truss-like steel reinforced concrete structure system according to claim 1, it is characterized in that, institute Prestressed pore passage is stated into undulated arrangement, lower part is located at span centre, top is located at bearing, all the time in tension position.
3. a kind of prestressed assembly formula truss-like steel reinforced concrete structure system according to claim 1, it is characterized in that, institute Stating steel framed concrete section includes joist steel truss, column steel truss, and the joist steel truss passes through what is reserved on column steel truss Hole, pouring concrete after positioning, the gusset plate for reserving end are connected for wet joint.
A kind of 4. spelling of prestressed assembly formula truss-like steel reinforced concrete structure system as any one of claim 1-3 Dress method, it is characterized in that, comprise the following steps:
1)Prefabricated steel framed concrete beam segment in the factory(1), steel framed concrete section(2), steel framed concrete beam section The beam section part of section and steel framed concrete section need to reserve prestressed pore passage, steel framed concrete beam section in advance when making Section, the end of steel framed concrete section leave gusset plate and supply wet joint(4)Connection is used;
Wherein, prestressed pore passage is located at lower part into undulated arrangement in beam section at span centre, and top is located at bearing, begins It is in tension position eventually;When making the truss-like reinforcing bar of steel framed concrete section, joist steel truss is passed through into column steel truss Upper reserved hole, pouring concrete after positioning, reserves endpoint node plate and is connected for wet joint;
2)After prefabricated components transport to scene, prefabricated steel reinforced concrete girder segment, steel framed concrete section are lifted into Position;Steel framed concrete section is first lifted, is connected at the gusset plate of its end by wet joint, the wet joint in end by connecting The place's of connecing gusset plate is formed using high-strength bolt connection after-pouring concrete;
After the installation of steel framed concrete section fixes, then lift the steel reinforced concrete girder segment between node, girder segment Particular number depending on the specific span of engineering structure system, equally, connected at the gusset plate of its end by wet joint, one layer One layer of assembling;
3)After intensity needed for concrete at wet joint reaches, deformed bar is worn in prestressed pore passage reserved before(3), And fastened with anchorage anchor, integral frame structure system is formed, completes whole prestressed assembly formula truss-like steel reinforced concrete knot The assembly of structure system.
CN201711183517.9A 2017-11-23 2017-11-23 A kind of prestressed assembly formula truss-like steel reinforced concrete structure system and its assembling method Active CN107965054B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711183517.9A CN107965054B (en) 2017-11-23 2017-11-23 A kind of prestressed assembly formula truss-like steel reinforced concrete structure system and its assembling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711183517.9A CN107965054B (en) 2017-11-23 2017-11-23 A kind of prestressed assembly formula truss-like steel reinforced concrete structure system and its assembling method

Publications (2)

Publication Number Publication Date
CN107965054A true CN107965054A (en) 2018-04-27
CN107965054B CN107965054B (en) 2019-09-20

Family

ID=62000621

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711183517.9A Active CN107965054B (en) 2017-11-23 2017-11-23 A kind of prestressed assembly formula truss-like steel reinforced concrete structure system and its assembling method

Country Status (1)

Country Link
CN (1) CN107965054B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109057012A (en) * 2018-07-22 2018-12-21 北京工业大学 Self-resetting can assemble multistage beam center pre-loaded support struts steel frame after shake
CN111719693A (en) * 2020-06-30 2020-09-29 扬州大学 Prestress assembly type steel-concrete sleeved beam-column joint

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0967857A (en) * 1995-08-30 1997-03-11 Shimizu Corp Construction method for structural steel-reinforced concrete structure
CN2595904Y (en) * 2003-01-02 2003-12-31 浙江杭萧钢构股份有限公司 Self bearing type steel skeleton concrete combined beam
CN106567458A (en) * 2016-10-27 2017-04-19 绍兴文理学院 Assembly type steel-concrete combined beam column frame structure system
CN106592777A (en) * 2016-10-27 2017-04-26 绍兴文理学院 Assembly type steel-concrete combined beam column joint structure and implementation method thereof
CN106948548A (en) * 2017-04-26 2017-07-14 广西大学 A kind of precast concrete frame beam structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0967857A (en) * 1995-08-30 1997-03-11 Shimizu Corp Construction method for structural steel-reinforced concrete structure
CN2595904Y (en) * 2003-01-02 2003-12-31 浙江杭萧钢构股份有限公司 Self bearing type steel skeleton concrete combined beam
CN106567458A (en) * 2016-10-27 2017-04-19 绍兴文理学院 Assembly type steel-concrete combined beam column frame structure system
CN106592777A (en) * 2016-10-27 2017-04-26 绍兴文理学院 Assembly type steel-concrete combined beam column joint structure and implementation method thereof
CN106948548A (en) * 2017-04-26 2017-07-14 广西大学 A kind of precast concrete frame beam structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109057012A (en) * 2018-07-22 2018-12-21 北京工业大学 Self-resetting can assemble multistage beam center pre-loaded support struts steel frame after shake
CN111719693A (en) * 2020-06-30 2020-09-29 扬州大学 Prestress assembly type steel-concrete sleeved beam-column joint

Also Published As

Publication number Publication date
CN107965054B (en) 2019-09-20

Similar Documents

Publication Publication Date Title
CN107143034A (en) A kind of assembly concrete frame structure beam column rigid connection node
CN104988844B (en) Two times tensioning prestressing force assembled Wavelike steel webplate combination beam
KR20010078870A (en) Development and construction methods of the prestressed composite truss beams
CN208917657U (en) Prefabricated assembled ultra-high performance concrete prestressing force i-shaped beams
CN108755962A (en) A kind of partial precast assembly hollow profile steel concrete hollow column and construction method
CN106567458A (en) Assembly type steel-concrete combined beam column frame structure system
CN106481023B (en) Assembled steel-concrete composite beam structure and its implementation method
CN212773147U (en) Prefabricated assembly part outsourcing honeycomb steel-concrete combination beam
CN108775084B (en) Steel-concrete combined precast beam and precast column connecting structure and construction method
CN107965054B (en) A kind of prestressed assembly formula truss-like steel reinforced concrete structure system and its assembling method
CN112922237A (en) Take telescopic assembled reinforced concrete post and girder steel connected node
CN103122691A (en) Tower crane standard knot bearing upper air supporting formwork steel platform structure and construction method
CN207891714U (en) Abdomen packet bottom is trapezoidal/corrugated sheet steel combined box beam
CN103924676B (en) Prestressing force connects beams of concrete concrete-filled circular steel tube column node
CN203034799U (en) Tower hoist standard knot bearing overhead support formwork steel platform structure
CN106948495A (en) The prestressing force integral node and its construction method of steel core concrete column and beams of concrete
CN208472957U (en) A kind of partial precast assembly hollow profile steel concrete hollow column
CN107142830A (en) Steel pipe web prestressing force steel reinforced concrete combines main beam structure and construction method
CN215716567U (en) Take telescopic assembled reinforced concrete post and girder steel connected node
CN206815548U (en) The prestressing force integral node of steel core concrete column and beams of concrete
CN105951984A (en) High-ductility assembled integral type frame exterior joint connection structure and construction method thereof
CN207032474U (en) A kind of assembly concrete frame structure beam column rigid connection node
CN220433424U (en) Prefabricated hollow type steel reinforced concrete pier column and integral combined beam connecting node
CN205894491U (en) Permanent template of ultra high performance concrete cylinder
CN217711096U (en) Post-tensioned prestressing beam column connecting structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant