CN107945511A - 一种交叉口延误时间的计算方法 - Google Patents

一种交叉口延误时间的计算方法 Download PDF

Info

Publication number
CN107945511A
CN107945511A CN201711159975.9A CN201711159975A CN107945511A CN 107945511 A CN107945511 A CN 107945511A CN 201711159975 A CN201711159975 A CN 201711159975A CN 107945511 A CN107945511 A CN 107945511A
Authority
CN
China
Prior art keywords
section
time
intersection
delay time
stop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711159975.9A
Other languages
English (en)
Inventor
赵顺晶
汤夕根
王伟
闫珺
李�浩
马荣叶
刘小华
刘四奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTEsoft Technology Co Ltd
Original Assignee
ZTEsoft Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTEsoft Technology Co Ltd filed Critical ZTEsoft Technology Co Ltd
Priority to CN201711159975.9A priority Critical patent/CN107945511A/zh
Publication of CN107945511A publication Critical patent/CN107945511A/zh
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G08SIGNALLING
    • G08GTRAFFIC CONTROL SYSTEMS
    • G08G1/00Traffic control systems for road vehicles
    • G08G1/01Detecting movement of traffic to be counted or controlled
    • G08G1/0104Measuring and analyzing of parameters relative to traffic conditions
    • G08G1/0137Measuring and analyzing of parameters relative to traffic conditions for specific applications
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/10Internal combustion engine [ICE] based vehicles
    • Y02T10/40Engine management systems

Landscapes

  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Traffic Control Systems (AREA)

Abstract

本发明根据电警卡口一段时间内路段每辆进入且离开车辆所需的实际时间,求出路段通行时间的平均值,由此与路段理论通行时间形成的差值即为路段延误时间,四个路段延误时间求出的平均值即为交叉口延误时间,延误时间不仅反映了车辆通过交叉口时的动态特性,同时也作为交叉口信号配时参数优化的依据,用于建立优化模型和目标函数,配以适当的周期时长,让通行能力稍高于交通需求,并且使得通过交叉口的全部车辆总延误时间最短。

Description

一种交叉口延误时间的计算方法
技术领域
本发明涉及交通技术领域,尤其涉及一种交叉口延误时间的计算方法。
背景技术
合理科学的信号配时方案可以有效提高城市交通系统的运营效率和缓解城市交通拥堵两难问题,交叉口信号配时技术对于组织、指挥和控制交通流的流向、流量、流速、维护交通秩序等均有重要的作用,从时间上将相互冲突的交通流予以分离,使其在不同时间通过,以保证行车安全,同时迫使车流有序的通过路口,提高了路口通过效率和通过能力,并且减小了噪声,降低了汽车尾气对环境的污染,信号交叉口车辆延误是反映驾驶员不舒适性和受阻程度,评价信号交叉口配时方案的运行效率和服务水平的重要度量,延误不仅反映了车辆通过交叉口时的动态特性,同时也作为交叉口信号配时参数优化的依据,用于建立优化模型和目标函数,换言之,信号配时参数优化的目标就是在一定的道路条件下,配以适当的周期时长,让通行能力稍高于交通需求,并且使得通过交叉口的全部车辆总延误时间最短。
发明内容
本发明旨在提供一种交叉口延误时间的计算方法。
为实现上述技术目的,本发明采用以下技术方案,一种交叉口延误时间的计算方法,包括以下步骤:
S1、获取交叉口的上游路段信息,根据路网中交叉口与路段的拓扑信息,得到与目标交叉口相连的路段信息,包括路段编号、路段的长度L;
S2、计算路段自由流速度,根据该路段前30天所有车辆通过该路段的速度V,并对V从大到小排列,取前10%的路段速度数据,对该前10%的速度取均值该均值即为通过该路段的自由流速度;
S3、计算路段的理论通行时间,根据路段长度和自由流速度计算路段的理论通行时间
S4、获取路段的实际通行时间,根据电警卡口实时X min内路段过车数据统计从上游路口进入该路段的车辆车牌以及进入时刻t1,以上述车辆统计这些车辆中从目标交叉口下游路口离开的车辆以及离开时刻t2,根据进入时刻与离开时刻,计算该路段X min内每辆进入且离开车辆所需的实际时间
S5、将步骤S4中纳入统计范围的车辆的实际通行时间全部求出,随后求路段实际Xmin内通行时间的平均值
S6、计算路段延误时间:D1=T1-T;
S7、重复步骤S2-S6的计算方式获取交叉口各个路段(共4个)的延误时间:D1、D2、D3、D4
S8、根据步骤S7的计算结果,计算交叉口延误D=AVG(D1、D2、D3、D4)即四个路段延误时间的平均值。
作为优选,步骤S4、S5中的X=15。
本发明根据电警卡口一段时间内路段每辆进入且离开车辆所需的实际时间,求出路段通行时间的平均值,由此与路段理论通行时间形成的差值即为路段延误时间,四个路段延误时间求出的平均值即为交叉口延误时间,延误时间不仅反映了车辆通过交叉口时的动态特性,同时也作为交叉口信号配时参数优化的依据,用于建立优化模型和目标函数,配以适当的周期时长,让通行能力稍高于交通需求,并且使得通过交叉口的全部车辆总延误时间最短。
附图说明
图1为本发明的流程图。
具体实施方式
下面详细描述本发明的实施例,所述实施例的示例在附图中示出,其中自始至终相同或类似的标号表示相同或类似的元件或具有相同或类似功能的元件。下面通过参考附图描述的实施例是示例性的,仅用于解释本发明,而不能理解为对本发明的限制。
在本发明的描述中,除非另有规定和限定,需要说明的是,术语“安装”、“相连”、“连接”应做广义理解,例如,可以是机械连接或电连接,也可以是两个元件内部的连通,可以是直接相连,也可以通过中间媒介间接相连。对于本领域的普通技术人员而言,可以根据具体情况理解上述术语的具体含义。
下面参照图1描述根据本发明实施例的一种交叉口延误时间的计算方法,包括以下步骤:
S1、获取交叉口的上游路段信息,根据路网中交叉口与路段的拓扑信息,得到与目标交叉口相连的路段信息,包括路段编号、路段的长度L;
S2、计算路段自由流速度,根据该路段前30天所有车辆通过该路段的速度V,并对V从大到小排列,取前10%的路段速度数据,对该前10%的速度取均值该均值即为通过该路段的自由流速度;
S3、计算路段的理论通行时间,根据路段长度和自由流速度计算路段的理论通行时间
S4、获取路段的实际通行时间,根据电警卡口实时X min内路段过车数据统计从上游路口进入该路段的车辆车牌以及进入时刻t1,以上述车辆统计这些车辆中从目标交叉口下游路口离开的车辆以及离开时刻t2,根据进入时刻与离开时刻,计算该路段X min内每辆进入且离开车辆所需的实际时间
S5、将步骤S4中纳入统计范围的车辆的实际通行时间全部求出,随后求路段实际Xmin内通行时间的平均值
S6、计算路段延误时间:D1=T1-T;
S7、重复步骤S2-S6的计算方式获取交叉口各个路段(共4个)的延误时间:D1、D2、D3、D4
S8、根据步骤S7的计算结果,计算交叉口延误D=AVG(D1、D2、D3、D4)即四个路段延误时间的平均值。
作为优选,步骤S4、S5中的X=15。
本发明根据电警卡口一段时间内路段每辆进入且离开车辆所需的实际时间,求出路段通行时间的平均值,由此与路段理论通行时间形成的差值即为路段延误时间,四个路段延误时间求出的平均值即为交叉口延误时间,延误时间不仅反映了车辆通过交叉口时的动态特性,同时也作为交叉口信号配时参数优化的依据,用于建立优化模型和目标函数,配以适当的周期时长,让通行能力稍高于交通需求,并且使得通过交叉口的全部车辆总延误时间最短。
在本说明书的描述中,参考术语“一个实施例”、“示例”、或“一些示例”等的描述意指结合该实施例或示例描述的具体特征、结构、材料或者特点包含于本发明的至少一个实施例或示例中。在本说明书中,对上述术语的示意性表述不一定指的是相同的实施例或示例。而且,描述的具体特征、结构、材料或者特点可以在任何的一个或多个实施例或示例中以合适的方式结合。
尽管已经示出和描述了本发明的实施例,本领域的普通技术人员可以理解:在不脱离本发明的原理和宗旨的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由权利要求及其等同物限定。

Claims (2)

1.一种交叉口延误时间的计算方法,其特征在于,包括以下步骤:
S1、获取交叉口的上游路段信息,根据路网中交叉口与路段的拓扑信息,得到与目标交叉口相连的路段信息,包括路段编号、路段的长度L;
S2、计算路段自由流速度,根据该路段前30天所有车辆通过该路段的速度V,并对V从大到小排列,取前10%的路段速度数据,对该前10%的速度取均值该均值即为通过该路段的自由流速度;
S3、计算路段的理论通行时间,根据路段长度和自由流速度计算路段的理论通行时间
S4、获取路段的实际通行时间,根据电警卡口实时X min内路段过车数据统计从上游路口进入该路段的车辆车牌以及进入时刻t1,以上述车辆统计这些车辆中从目标交叉口下游路口离开的车辆以及离开时刻t2,根据进入时刻与离开时刻,计算该路段X min内每辆进入且离开车辆所需的实际时间
S5、将步骤S4中纳入统计范围的车辆的实际通行时间全部求出,随后求路段实际X min内通行时间的平均值
S6、计算路段延误时间:D1=T1-T;
S7、重复步骤S2-S6的计算方式获取交叉口各个路段(共4个)的延误时间:D1、D2、D3、D4
S8、根据步骤S7的计算结果,计算交叉口延误D=AVG(D1、D2、D3、D4)即四个路段延误时间的平均值。
2.根据权利要求1所述的计算方法,其特征在于,步骤S4、S5中的X=15。
CN201711159975.9A 2017-11-20 2017-11-20 一种交叉口延误时间的计算方法 Pending CN107945511A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711159975.9A CN107945511A (zh) 2017-11-20 2017-11-20 一种交叉口延误时间的计算方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711159975.9A CN107945511A (zh) 2017-11-20 2017-11-20 一种交叉口延误时间的计算方法

Publications (1)

Publication Number Publication Date
CN107945511A true CN107945511A (zh) 2018-04-20

Family

ID=61930387

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711159975.9A Pending CN107945511A (zh) 2017-11-20 2017-11-20 一种交叉口延误时间的计算方法

Country Status (1)

Country Link
CN (1) CN107945511A (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108389404A (zh) * 2018-04-25 2018-08-10 招商局重庆交通科研设计院有限公司 道路交通拥堵治理方法
CN108777068A (zh) * 2018-06-13 2018-11-09 西华大学 一种基于多维检测线圈采集周期的交通流瓶颈识别方法
CN108985503A (zh) * 2018-07-02 2018-12-11 上海理工大学 一种快速公交时刻表编制方法
CN110782662A (zh) * 2019-09-19 2020-02-11 重庆交通大学 道路信号交叉口车辆通行时间估算方法
CN113112816A (zh) * 2021-04-06 2021-07-13 安徽百诚慧通科技有限公司 一种车辆在路段平均行驶延误的提取方法
CN113936454A (zh) * 2021-09-22 2022-01-14 上海宝康电子控制工程有限公司 一种基于轨迹融合的信息处理方法及系统
CN114023065A (zh) * 2021-11-03 2022-02-08 沈阳世纪高通科技有限公司 一种利用视频解析数据智能诊断路口服务等级的算法
CN114373310A (zh) * 2022-01-19 2022-04-19 京东方科技集团股份有限公司 车辆行驶路段的指标数据处理方法、装置及电子设备
CN115019525A (zh) * 2022-06-20 2022-09-06 杭州海康威视数字技术股份有限公司 行程时间数据的筛选方法和交通信号控制方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101702262A (zh) * 2009-11-06 2010-05-05 北京交通大学 一种城市交通流畅通性指标的数据融合方法
CN101751777A (zh) * 2008-12-02 2010-06-23 同济大学 基于空间聚类分析的城市路网交通小区动态划分方法
CN102930718A (zh) * 2012-09-20 2013-02-13 同济大学 基于浮动车数据和线圈流量融合的间断流路段行程时间估计方法
CN104751650A (zh) * 2013-12-31 2015-07-01 中国移动通信集团公司 一种对道路交通信号进行控制的方法和设备
CN105279967A (zh) * 2015-10-15 2016-01-27 深圳市城市交通规划设计研究中心有限公司 交通运行指数计算系统及方法
CN107085952A (zh) * 2017-06-28 2017-08-22 北京数行健科技有限公司 一种评价区域信号灯配时方案的方法、装置及系统
CN107085955A (zh) * 2016-08-25 2017-08-22 苏州华川交通科技有限公司 基于车辆排队长度的交叉口信号配时优化方法

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101751777A (zh) * 2008-12-02 2010-06-23 同济大学 基于空间聚类分析的城市路网交通小区动态划分方法
CN101702262A (zh) * 2009-11-06 2010-05-05 北京交通大学 一种城市交通流畅通性指标的数据融合方法
CN102930718A (zh) * 2012-09-20 2013-02-13 同济大学 基于浮动车数据和线圈流量融合的间断流路段行程时间估计方法
CN104751650A (zh) * 2013-12-31 2015-07-01 中国移动通信集团公司 一种对道路交通信号进行控制的方法和设备
CN105279967A (zh) * 2015-10-15 2016-01-27 深圳市城市交通规划设计研究中心有限公司 交通运行指数计算系统及方法
CN107085955A (zh) * 2016-08-25 2017-08-22 苏州华川交通科技有限公司 基于车辆排队长度的交叉口信号配时优化方法
CN107085952A (zh) * 2017-06-28 2017-08-22 北京数行健科技有限公司 一种评价区域信号灯配时方案的方法、装置及系统

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108389404A (zh) * 2018-04-25 2018-08-10 招商局重庆交通科研设计院有限公司 道路交通拥堵治理方法
CN108777068A (zh) * 2018-06-13 2018-11-09 西华大学 一种基于多维检测线圈采集周期的交通流瓶颈识别方法
CN108985503A (zh) * 2018-07-02 2018-12-11 上海理工大学 一种快速公交时刻表编制方法
CN108985503B (zh) * 2018-07-02 2021-07-09 上海理工大学 一种快速公交时刻表编制方法
CN110782662A (zh) * 2019-09-19 2020-02-11 重庆交通大学 道路信号交叉口车辆通行时间估算方法
CN113112816B (zh) * 2021-04-06 2022-07-08 安徽百诚慧通科技股份有限公司 一种车辆在路段平均行驶延误的提取方法
CN113112816A (zh) * 2021-04-06 2021-07-13 安徽百诚慧通科技有限公司 一种车辆在路段平均行驶延误的提取方法
CN113936454A (zh) * 2021-09-22 2022-01-14 上海宝康电子控制工程有限公司 一种基于轨迹融合的信息处理方法及系统
CN113936454B (zh) * 2021-09-22 2023-02-21 上海宝康电子控制工程有限公司 一种基于轨迹融合的信息处理方法及系统
CN114023065A (zh) * 2021-11-03 2022-02-08 沈阳世纪高通科技有限公司 一种利用视频解析数据智能诊断路口服务等级的算法
CN114373310A (zh) * 2022-01-19 2022-04-19 京东方科技集团股份有限公司 车辆行驶路段的指标数据处理方法、装置及电子设备
CN115019525A (zh) * 2022-06-20 2022-09-06 杭州海康威视数字技术股份有限公司 行程时间数据的筛选方法和交通信号控制方法
CN115019525B (zh) * 2022-06-20 2024-06-11 杭州海康威视数字技术股份有限公司 行程时间数据的筛选方法和交通信号控制方法

Similar Documents

Publication Publication Date Title
CN107945511A (zh) 一种交叉口延误时间的计算方法
CN101968929B (zh) 一种饱和交通状态下单路口信号优化控制方法
CN104778845B (zh) 多相位跳变和车辆全动态诱导交通控制方法
CN201716860U (zh) 交通信号灯控制系统
CN103186984B (zh) 一种城市交叉口可变导向车道转向功能变换触发方法
CN103810868A (zh) 一种基于高空视频信息的交通溢流抑制方法
TWI704533B (zh) 以起訖旅次樹劃分交通路網的方法
CN103208191A (zh) 一种城市道路交叉口过饱和条件下信号协调控制的优化方法
CN103985263A (zh) 一种能减少路口停车次数的视频跟踪检测方法及系统
CN102496264A (zh) 一种高速公路突发交通事件影响范围的确定方法
CN113053142B (zh) 一种基于车载定位和车路协同技术的公交优先控制系统
CN108122420A (zh) 一种路中型动态公交专用道清空距离设置方法
DE102015215605A1 (de) Verfahren zum Steuern einer Verkehrssteueranlage
CN102005122A (zh) 多匝道调节方法及其系统
Hou et al. Cooperative and integrated vehicle and intersection control for energy efficiency (CIVIC-E 2)
CN103198679A (zh) 一种城市灯控路口智能防溢出系统
CN103150894A (zh) 消除交通拥堵的高速公路主线收费站通过流量控制方法
CN112991726B (zh) 一种城市快速路交织区道路标线设置方法
CN203573495U (zh) 一种城市灯控路口智能防溢出系统
Yi-Fei et al. Research on polling based traffic signal control strategy with fuzzy control
CN105575135A (zh) 一种高密度路网地区的干线公交站间绿波设计系统
CN108806286A (zh) 用于控制通行时间的远程通信控制系统
Al-Mashhadani et al. Enhancing traffic flow using vehicle dashboard traffic lights with v2i networks
Bhouri et al. An intermodal traffic control strategy for private vehicle and public transport
CN110766958B (zh) 交通信号灯智能控制系统

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 210012 room 627, Ning Shuang Road, Yuhuatai District, Nanjing, Jiangsu, 627

Applicant after: Ho whale cloud computing Polytron Technologies Inc

Address before: 210012 No. 68 Bauhinia Road, Yuhuatai District, Jiangsu, Nanjing

Applicant before: ZTEsoft Technology Co., Ltd.

SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180420