CN107938852B - Construction method for large-scale inhaul cable lock head node - Google Patents
Construction method for large-scale inhaul cable lock head node Download PDFInfo
- Publication number
- CN107938852B CN107938852B CN201711237660.1A CN201711237660A CN107938852B CN 107938852 B CN107938852 B CN 107938852B CN 201711237660 A CN201711237660 A CN 201711237660A CN 107938852 B CN107938852 B CN 107938852B
- Authority
- CN
- China
- Prior art keywords
- main truss
- cable
- upper chord
- plate
- hoop
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/35—Extraordinary methods of construction, e.g. lift-slab, jack-block
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/35—Extraordinary methods of construction, e.g. lift-slab, jack-block
- E04B2001/3583—Extraordinary methods of construction, e.g. lift-slab, jack-block using permanent tensioning means, e.g. cables or rods, to assemble or rigidify structures (not pre- or poststressing concrete), e.g. by tying them around the structure
Abstract
The invention particularly relates to a construction method of a large-scale cable lock head node; the method is characterized in that: longitudinally splitting the end part of an upper chord of an installed main truss, wherein the specific section is split along the arrangement surface of a gusset plate, and taking down the split arc-shaped half pipe; installing a cable gusset plate on the section of the upper chord of the main truss, resetting the end arc-shaped half pipe to the end part of the upper chord of the main truss, and installing a sealing plate of the upper chord of the main truss; an annular hoop is arranged at a joint of the arc-shaped half pipe and the upper chord of the main truss, the hoop is surrounded by two semicircular steel pipes, the hoop and the steel pipes are fillet welds, and the hoop surface and the steel pipes form a whole by plug welding; the stiffening plate between the cable node plate and the main truss is an annular stiffening plate. The node is installed by adopting the method, the cable node plate is arranged in an inclined mode, so that the tensile force can be directly transmitted to the main pipe and each branch pipe below the main pipe through the cable node plate, and the force transmission is direct and definite; the appearance is graceful, construction convenience, greatly reduced the cost, shortened the time limit for a project.
Description
Technical Field
The invention relates to the field of steel structure buildings, in particular to a construction method of a large-scale cable lock head node.
Background
In modern large building structures, the application of the zipper is more and more extensive, and among them, the lock head of the large guy cable is mostly cast, and such parts have high requirements on casting process in manufacturing, and also have the problem of difficult installation in subsequent construction and often cause the delay of the whole construction period.
Disclosure of Invention
The invention aims to overcome the defects and provides a construction method of a large-scale cable lock head node, which is scientific in structure and convenient to install.
In order to achieve the above object, the present invention is realized by:
a construction method for large-scale stay cable lock head nodes comprises
step 2, installing a cable node plate on the section of the upper chord of the main truss,
step 4, installing a sealing plate of the main truss chord member;
step 5, arranging an annular hoop at a joint of the arc-shaped half pipe and the upper chord of the main truss, wherein the hoop is surrounded by two semicircular steel pipes, the hoop and the steel pipes are fillet welds, and the hoop surface is integrally formed with the steel pipes by plug welding;
and 6, the stiffening plates between the cable node plates and the main truss are annular stiffening plates.
According to the construction method of the large-scale cable lock head node, the cable node plate and the upper chord member of the main truss are obliquely arranged, and particularly the cable node plate is inclined towards the extension direction of the cable.
The node is installed by adopting the method, the cable node plate is arranged in an inclined mode, so that the tensile force can be directly transmitted to the main pipe and each branch pipe below the main pipe through the cable node plate, and the force transmission is direct and definite; the appearance is graceful, construction convenience, greatly reduced the cost, shortened the time limit for a project.
Drawings
Fig. 1 is a schematic diagram of the present node.
Fig. 2 is a schematic diagram of the node usage state.
Detailed Description
The invention is further illustrated by the following specific examples.
As shown in figures 1 and 2, the construction method of the large-scale cable lock head node comprises the following steps
step 2, installing a cable node plate 2 on the section of the upper chord 1 of the main truss,
step 4, installing a sealing plate of the main truss chord member;
step 5, arranging an annular hoop 3 at a joint of the arc-shaped half pipe and the upper chord 1 of the main truss, wherein the hoop is surrounded by two semicircular steel pipes, the hoop and the steel pipes are fillet welds, and the hoop surface is integrally formed with the steel pipes by plug welding;
and 6, the stiffening plates 4 between the cable node plates 2 and the main truss are annular stiffening plates.
According to the construction method of the large-scale cable lock head node, the cable node plate 2 and the main truss upper chord member 1 are obliquely arranged, and specifically the cable node plate is inclined towards the cable extending direction.
The node is installed by adopting the method, the cable node plate is arranged in an inclined mode, so that the tensile force can be directly transmitted to the main pipe and each branch pipe below the main pipe through the cable node plate, and the force transmission is direct and definite; the appearance is graceful, construction convenience, greatly reduced the cost, shortened the time limit for a project.
Claims (2)
1. A large-scale cable lock head node construction method is characterized in that: comprises that
Step 1, longitudinally splitting the end part of an upper chord of an installed main truss, wherein the specific section is split along the arrangement surface of a gusset plate, and taking down the split arc-shaped half pipe;
step 2, installing a cable node plate on the section of the upper chord of the main truss,
step 3, resetting the end arc-shaped half pipe to the end part of the upper chord member of the main truss,
step 4, installing a sealing plate of the main truss chord member;
step 5, arranging an annular hoop at a joint of the arc-shaped half pipe and the upper chord of the main truss, wherein the hoop is surrounded by two semicircular steel pipes, the hoop and the steel pipes are fillet welds, and the hoop surface is integrally formed with the steel pipes by plug welding;
and 6, the stiffening plates between the cable node plates and the main truss are annular stiffening plates.
2. The construction method of the large-scale cable lock head node according to claim 1, characterized in that: the cable gusset plate and the upper chord of the main truss are obliquely arranged, and particularly the cable gusset plate is inclined towards the extension direction of the stay cable.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711237660.1A CN107938852B (en) | 2017-11-30 | 2017-11-30 | Construction method for large-scale inhaul cable lock head node |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711237660.1A CN107938852B (en) | 2017-11-30 | 2017-11-30 | Construction method for large-scale inhaul cable lock head node |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107938852A CN107938852A (en) | 2018-04-20 |
CN107938852B true CN107938852B (en) | 2020-03-06 |
Family
ID=61947014
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711237660.1A Active CN107938852B (en) | 2017-11-30 | 2017-11-30 | Construction method for large-scale inhaul cable lock head node |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107938852B (en) |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203559338U (en) * | 2013-11-06 | 2014-04-23 | 中铁第一勘察设计院集团有限公司 | Node connecting structure for upper chord of steel truss and web members |
CN205530678U (en) * | 2016-01-28 | 2016-08-31 | 上海宝冶工程技术有限公司 | Connected node structure of main couple and jack truss among pipe truss of space |
CN106836497A (en) * | 2016-12-22 | 2017-06-13 | 浙江精工钢结构集团有限公司 | A kind of pair of rope separate type truss string structure and its construction method |
CN107100318B (en) * | 2017-04-13 | 2019-04-16 | 中建钢构江苏有限公司 | A kind of production method of binode complexity inverted triangle main couple |
-
2017
- 2017-11-30 CN CN201711237660.1A patent/CN107938852B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN107938852A (en) | 2018-04-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104195950A (en) | Steel-concrete composite beam cable-stayed bridge glued joint connecting method | |
CN107299683B (en) | Compound concrete-filled tubular column assembled docks node and connection method | |
CN103924674A (en) | High-strength bolt shear key structure and constructing method thereof | |
CN103205937B (en) | The mounting method of the pre-buried node of a kind of universal rod body | |
CN103161224A (en) | Rectangular concrete filled steel tubular column - steel beam connection node and construction methods thereof | |
CN111022072A (en) | Combined joint for reinforcing secondary lining of tunnel constructed by mining method and mounting method | |
CN105756089A (en) | Transverse laminated connection type single compartment precast multiple-compartment assembled comprehensive pipe gallery | |
CN103103926B (en) | Connection method of inhaul cable protecting bush | |
CN203820287U (en) | Composite steel carrying pole for hoisting roof tiles of steel structure workshops | |
CN102493553B (en) | Construction method of member for connection node of reinforced beam and steel beam | |
CN204112525U (en) | Band perps precast shear wall structure in strong concrete precast frame | |
CN205954965U (en) | Novel node of light -duty floor of steel skeleton | |
CN205224288U (en) | Connection node of reinforced concrete superposed beam and steel pipe column | |
CN107938852B (en) | Construction method for large-scale inhaul cable lock head node | |
CN104314105B (en) | The connection vertical piece structure of the basement wall and cast-in-place buttress and construction method | |
KR101577327B1 (en) | Hybrid composite girder | |
CN113719029A (en) | Assembly type beam-column connecting joint based on hidden corbels and construction method thereof | |
CN210529936U (en) | Steel pipe concrete column-I-shaped steel beam connecting node | |
CN204431470U (en) | A kind of concrete pipe pile tensioning system | |
CN204151835U (en) | The vertical piece structure of connection of the basement wall and cast-in-place buttress | |
CN110952994A (en) | Bent bolt combined joint for secondary lining of mine method construction tunnel and reinforcing method | |
KR101709989B1 (en) | Smart steel pipe girder for composition pipe | |
CN203878779U (en) | Rectangular concrete-filled steel tube column and I-steel beam rebar penetrating type joint | |
CN204960324U (en) | Suspension type floor formwork support device | |
CN204112548U (en) | A kind of integrated form flooring module |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |