CN205530678U - Connected node structure of main couple and jack truss among pipe truss of space - Google Patents

Connected node structure of main couple and jack truss among pipe truss of space Download PDF

Info

Publication number
CN205530678U
CN205530678U CN201620083674.7U CN201620083674U CN205530678U CN 205530678 U CN205530678 U CN 205530678U CN 201620083674 U CN201620083674 U CN 201620083674U CN 205530678 U CN205530678 U CN 205530678U
Authority
CN
China
Prior art keywords
socket pipe
truss
main couple
jack truss
boom
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620083674.7U
Other languages
Chinese (zh)
Inventor
廖小翔
林昌
阳刚
翟喻
徐高成
张东方
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Engineering Technology Co Ltd
Original Assignee
Shanghai Baoye Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Engineering Technology Co Ltd filed Critical Shanghai Baoye Engineering Technology Co Ltd
Priority to CN201620083674.7U priority Critical patent/CN205530678U/en
Application granted granted Critical
Publication of CN205530678U publication Critical patent/CN205530678U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a connected node structure of main couple and jack truss among pipe truss of space, the socket pipe one end of this node structure is equipped with passes through mouthful or the groove mutually, and the socket pipe other end is equipped with the notch along the circumferencial direction, and lower chord on the jack truss is gone into and through notch welded connection to socket pipe notch pot head, and arcwall face and the welded connection who leans on lower chord on the main couple mouthful is supported to the passing through mutually of socket pipe, or socket pipe's bevel end supports and depends on main couple upper chord welded ball and welded connection. Traditional primary and secondary truss installation mode defect has been overcome to this connected node structure, simple structure, and the preparation is convenient, has effectively improved construction and installation efficiency, quality and cost.

Description

Main couple and the connecting joint structure of jack truss in space tube truss
Technical field
The utility model relates to building element, particularly relates to main couple and the connecting joint of jack truss in a kind of space tube truss Dot structure.
Background technology
Truss is the support beam structure being formed by connecting by welding, riveting or bolt by rod member, and it is widely used in greatly In all kinds of buildings such as the factory building of span, exhibition center, gymnasium and bridge.As it is shown in figure 1, space tube truss is in installation process, First the main couple 1 installing both sides is in place, and the relative coordinate in space, main couple 1 place, physical dimension, spacing all must schools simultaneously Just arriving in specification allowed band, then welding the jack truss 2 linked between the main couple 1 of both sides, during installation, jack truss 2 is upper Corresponding top boom 11 that chord member 21 two ends are welded in main couple 1 by intersecting mouth or the solder sphere 13 being positioned on top boom 11, secondary Lower boom 22 two ends of truss 2 are welded in the corresponding lower boom 12 of main couple 1 by intersecting mouth.But at main couple and jack truss In installation process, it will face the characteristic passed through because of space tube truss Guan Guanxiang and limit, and cause linking jack truss and cannot directly pacify Fill in place.Its main cause has jack truss chord member intersecting mouth conflict overlapping with main couple chord member, chord member intersecting mouth angular misalignment, secondary The dislocation of chord member of truss locus, primary and secondary truss in specification allowed band be assembled and alignment error etc..As follows chord member of truss phase Pass through mouth conflict overlapping with main couple chord member, cause the jack truss chord member cannot dropping place;Jack truss chord member intersecting mouth angle and main couple Chord member arcwall face misplaces, intersecting mouth and arcwall face do not fit and cannot welding;Primary and secondary truss is spelled alignment error and is caused jack truss string Bar is short or has grown and does not connects.
For the installation question of above-mentioned main couple Yu jack truss, current common construction method is the upper lower edge at jack truss The tube head not less than 500mm is blocked to facilitate jack truss to install by specification in bar one end, carries out whole after waiting jack truss in place in high-altitude Mouth docking, has so been significantly greatly increased workload and the difficulty of site operation, has reduced efficiency of construction.This construction method must assure that Jack truss deflection when ground spliced is the least, but also jack truss chord member intersecting mouth to be ensured can be with main couple string The arcwall face of bar is corresponding, owing to the pipe of jack truss own is with regard to thinner easy welding deformation, so brings the biggest to installation on ground Control difficulty.And jack truss is in place extremely difficult in installation process, the installation of rear jack truss chord member tube head in place is installed The biggest with high-altitude adjustment amount, as follows chord member of truss tube head installs mismatch and bias, jack truss chord member tube head away from main couple string Bar length or short cause the weld width inconsistent, owing to when mounting process needs the tube head blocked to return dress, weld seam is necessary for Full penetration weld, thus overhead welding workload doubles, and has welded rear pipe and easily deformed, and docking port is relatively Many, welding quality is difficult to ensure card, and welded rear chord member may not point-blank simultaneously, and jack truss quality and outward appearance are difficult to protect Card, installation progress is slow, and security risk increases.The most important thing is long construction period, add personnel, crane, safety measure etc. Construction cost.
Summary of the invention
Technical problem to be solved in the utility model is to provide main couple and the company of jack truss in a kind of space tube truss Connecing node structure, this structure overcomes tradition main couple and the defect of jack truss mounting means in space tube truss, and this node is tied Structure is simple, easy to make, is effectively increased installation efficiency, quality and cost.
For solving above-mentioned technical problem, main couple and the connecting joint structure of jack truss in the utility model space tube truss Including main couple top boom or top boom solder sphere, main couple lower boom, jack truss top boom, jack truss lower boom, also include Socket pipe, described socket pipe one end is provided with the intersecting mouth or groove mated with main couple top boom and lower boom arcwall face, described The socket pipe other end is the most equidistantly provided with four notches, described in be provided with the socket pipe other end of four notches and be inserted in described Jack truss top boom and lower boom and weld company with jack truss top boom and lower boom by four notches and socket pipe end face Connect, the intersecting mouth of described socket pipe one end against main couple top boom and the arcwall face of lower boom and by being welded to connect, or The groove of described socket pipe one end is against described main couple top boom solder sphere and by being welded to connect.
Further, described socket pipe a length of 500~800mm, a length of 150mm of described notch, width are 10mm, institute Stating bevel angle is that 25 ° of described socket pipe wall thickness are more than described main couple top boom, lower boom and jack truss top boom, lower edge Bar wall thickness 2mm.
Further, described jack truss top boom, lower boom at least stretch into 200mm in described socket pipe.
Owing in the utility model space tube truss, the connecting joint structure of main couple and jack truss have employed above-mentioned technology Socket pipe one end of scheme, i.e. this node structure is provided with the intersecting mouth or groove mated with main couple top-bottom chord arcwall face, set The adapter other end is the most equidistantly provided with four notches, and socket pipe notch end is inserted in jack truss top-bottom chord and passes through groove Mouth is welded to connect with jack truss top-bottom chord, and the intersecting mouth of socket pipe is against the arcwall face of main couple top-bottom chord and by weldering Connect in succession, or the bevel end of socket pipe is against main couple top boom solder sphere and by being welded to connect.This structure overcomes sky Between the defect of tradition main couple and jack truss mounting means in tubular truss, simple in construction, easy to make, be effectively increased installation and execute Work efficiency rate, quality and cost.
Accompanying drawing explanation
The utility model is described in further detail with embodiment below in conjunction with the accompanying drawings:
Fig. 1 is main couple and the connection diagram of jack truss in space tube truss;
Fig. 2 is main couple and the connecting joint structure schematic diagram of jack truss in space tube truss of the present invention;
Fig. 3 is that the utility model socket pipe, jack truss top-bottom chord show with the connecting joint structure of main couple top-bottom chord It is intended to;
Fig. 4 is the connecting joint structure of the utility model socket pipe, jack truss top boom and main couple top boom solder sphere Schematic diagram.
Detailed description of the invention
Embodiment as shown in Figure 2, Figure 3 and Figure 4, the connecting joint of main couple and jack truss in the utility model space tube truss Dot structure includes main couple top boom 11 or top boom solder sphere 13, main couple lower boom 12, jack truss top boom 21, jack truss Lower boom 22, also includes that socket pipe 3, described socket pipe 3 one end are provided with and main couple top boom 11 and lower boom 12 arcwall face The intersecting mouth 32 joined or groove 33, described socket pipe 3 other end is the most equidistantly provided with four notches 31, described in be provided with four Socket pipe 3 other end of root notch 31 is inserted in described jack truss top boom 21 and lower boom 22 and by four notches 31 and set Adapter 3 end face is welded to connect with jack truss top boom 21 and lower boom 22, and the intersecting mouth 32 of described socket pipe 3 one end is against main truss Frame top boom 11 and the arcwall face of lower boom 12 and by being welded to connect, or the groove 33 of described socket pipe 3 one end is against institute State main couple top boom solder sphere 13 and by being welded to connect.
Preferably, described socket pipe 3 a length of 500~800mm, a length of 150mm of described notch 31, width are 10mm, described groove 33 angle is 25 ° of described socket pipe 3 wall thickness more than described main couple top boom 11, lower boom 12 and secondary Pricncipal rafter 21, lower boom 22 wall thickness 2mm.
Preferably, described jack truss top boom 21, lower boom 22 at least stretch into 200mm in described socket pipe 3.
Above-mentioned node structure can use following steps to be attached:
Step one, splice jack truss in advance on ground, and adjust its welding deformation, at top boom and the lower edge of jack truss Socket pipe is inserted at bar two ends the most in advance, is cleaned out by the foreign material in notch and socket pipe before installing socket pipe;
Jack truss is lifted between two main couples and adjusts in place by step 2, employing crane;
Socket pipe on step 3, outer shifting jack truss top boom, makes the intersecting mouth of socket pipe against main couple top boom Arcwall face and rotary sleeve adapter make the groove of the laminating of intersecting mouth and arcwall face or socket pipe against main couple top boom solder sphere, Weld socket pipe notch and end face and jack truss top boom, welding socket pipe intersecting mouth and main couple top boom arcwall face or socket Pipe bevel and main couple top boom solder sphere;
Socket pipe on step 4, outer shifting jack truss lower boom, makes the intersecting mouth of socket pipe against main couple lower boom Arcwall face and rotary sleeve adapter make intersecting mouth fit with arcwall face, welding socket pipe notch and end face and jack truss lower boom, Welding socket pipe intersecting mouth and main couple lower boom arcwall face;
Step 5, removal crane, weld the solder joint full weld of each socket pipe.
In step 3 and step 4, the notch of socket pipe at least welds twice, the set on jack truss top boom and lower boom After the outer shifting of adapter, its superposition section is at least 50mm.
This connecting joint structure employing socket pipe replacement tradition jack truss top-bottom chord one end is blocked by specification and is not less than 500mm tube head, the shortcoming overcoming conventional construction method, fundamentally solve steel construction space tube truss and link truss, company The high-altitude installation question of binder etc..
Compared with the mounting technique of connecting joint structure existing with space tube truss, there is the following aspects feature:
1, construction speed aspect: the lifting stage of tubular truss, the installation of jack truss often governs main couple and overall knot The installation progress of structure.After using socket pipe, high-altitude is installed and is had only to socket pipe is extracted into the position specified, welding intersecting mouth and groove Mouth can position, and just can remove crane after fixing temporarily.
2, construction quality aspect: when conventional jack truss is installed, docking port quantity is more, and intersecting mouth needs high-altitude to adjust, When chord member docks with the steel pipe blocked, the gap size stayed differs, and the excessive overhead welding amount caused of weld bond increases, welding quality It is difficult to ensure card;The utility model has only to weld at the two ends of socket pipe and notch, and major part is all angle welding, and welding difficulty is low, Weld strength is big, and chord member is unlikely to deform, and truss quality and outward appearance are easily guaranteed that.
3, construction cost aspect: while improving lifting efficiency, reduce the machine-team expense of big machinery, save people Expenses of labour and the auxiliary material such as oxygen, acetylene take, it is ensured that weldquality, reduce Weld Seam Repairation rate, reduce construction cost.
For this connecting joint structure, its Calculation and Analysis of Force is as follows:
1, the top-bottom chord of jack truss a size of Φ 159 × 6, uses the socket pipe of Φ 180 × 8, at conventional mounting arrangements In, jack truss top-bottom chord with the strength failure criterion of cut tube butt weld is, its stress size is:
Wherein:For the effective length of weld seam,Top-bottom chord wall thickness for jack truss;
After using this connecting joint structure and method, the strength failure criterion of its angle welding is, weld seam is high Degree is 8mm, and socket pipe end face right angle welding seam stress size is:
Wherein:For the height of weld seam, and take 0.7 times,Strength failure criterion for socket pipe end face right angle welding seam increases Coefficient, and take 1.22,
Socket pipe notch fillet weld in parallel shear stress size is:
Wherein: the effective length of weld seamTake socket pipe notch length and deduct 2 times of weld bead heights, and socket pipe has four Notch,
Then total stress size of socket pipe welding is
Visible, total stress of socket pipe welding, more than the stress of jack truss top-bottom chord with cut tube butt weld, is protected Demonstrate,prove the stress-bearing capability of jack truss.
2, the top-bottom chord of jack truss a size of Φ 180 × 6, uses the socket pipe of Φ 203 × 8, at conventional mounting arrangements In, jack truss top-bottom chord with the strength failure criterion of cut tube butt weld is, its stress size is:
Wherein:For the effective length of weld seam,Top-bottom chord wall thickness for jack truss;
After using this connecting joint structure and method, the strength failure criterion of its angle welding is, weld seam is high Degree is 8mm, and socket pipe end face right angle welding seam stress size is:
Wherein:For the height of weld seam, and take 0.7 times,Strength failure criterion for socket pipe end face right angle welding seam increases Coefficient, and take 1.22,
Socket pipe notch fillet weld in parallel shear stress size is:
Wherein: the effective length of weld seamTake socket pipe notch length and deduct 2 times of weld bead heights, and socket pipe has four Notch,
Then total stress size of socket pipe welding is
Visible, total stress of socket pipe welding, more than the stress of jack truss top-bottom chord with cut tube butt weld, is protected Demonstrate,prove the stress-bearing capability of jack truss.
3, the top-bottom chord of jack truss a size of Φ 219 × 8, uses the socket pipe of Φ 245 × 10, at conventional mounting arrangements In, jack truss top-bottom chord with the strength failure criterion of cut tube butt weld is, its stress size is:
Wherein:For the effective length of weld seam,Top-bottom chord wall thickness for jack truss;
After using this connecting joint structure and method, the strength failure criterion of its angle welding is, weld seam is high Degree is 10mm, and socket pipe end face right angle welding seam stress size is:
Wherein:For the height of weld seam, and take 0.7 times,Strength failure criterion for socket pipe end face right angle welding seam increases Coefficient, and take 1.22,
Socket pipe notch fillet weld in parallel shear stress size is:
Wherein: the effective length of weld seamTake socket pipe notch length and deduct 2 times of weld bead heights, and socket pipe has four Notch,
Then total stress size of socket pipe welding is
Visible, total stress of socket pipe welding, more than the stress of jack truss top-bottom chord with cut tube butt weld, is protected Demonstrate,prove the stress-bearing capability of jack truss.
4, the top-bottom chord of jack truss a size of Φ 245 × 10, uses the socket pipe of Φ 273 × 12, in conventional mounting side In method, jack truss top-bottom chord with the strength failure criterion of cut tube butt weld is, its stress size For:
Wherein:For the effective length of weld seam,Top-bottom chord wall thickness for jack truss;
After using this connecting joint structure and method, the strength failure criterion of its angle welding is, weld seam is high Degree is 12mm, and socket pipe end face right angle welding seam stress size is:
Wherein:For the height of weld seam, and take 0.7 times,Strength failure criterion for socket pipe end face right angle welding seam increases Coefficient, and take 1.22,
Socket pipe notch fillet weld in parallel shear stress size is:
Wherein: the effective length of weld seamTake socket pipe notch length and deduct 2 times of weld bead heights, and socket pipe has four Notch,
Then total stress size of socket pipe welding is
Visible, total stress of socket pipe welding, more than the stress of jack truss top-bottom chord with cut tube butt weld, is protected Demonstrate,prove the stress-bearing capability of jack truss.
Calculation and Analysis of Force after above-mentioned socket pipe welds, it was demonstrated that socket pipe can be used completely to replace traditional secondary purlin Frame mounting means, it is ensured that the stress performance of whole truss structure.
This connecting joint structure is applied to certain Air-cooled Unit engineering coal yard and closes Steel Structure Installation engineering, and its floor space is about 4.6 ten thousand square meters, building height 54 meters, this project subject structure uses prestressing force Stretching chord arch truss structure form, longitudinal length 242m, horizontal span 192m, by 17 Pin main couples and 112 Pin jack truss and the structure several times such as both sides frontispiece wall struss, packway, transom window Part forms, total steel using amount about 4000 tons.Linking jack truss quantity more, pipe kind is more, and jack truss is longer, and top boom is long Degree is 11 meters, and a length of 15 meters of lower boom, site operation difficulty is big.
On-the-spot this structure construction of employing so that link the installation of connecting rod between jack truss, linking beam, skylight the most convenient Rapidly, construction quality and installation rate are effectively ensured, especially more prominent on outward appearance and structural safety.The peace of jack truss Dress speed improves about 2.5 times, has saved big machinery machine-team and artificial construction's cost, has shortened the construction period about 35 days, take Economic benefit that must be bigger.

Claims (3)

1. main couple and a connecting joint structure for jack truss in space tube truss, weld including main couple top boom or top boom Receive, main couple lower boom, jack truss top boom, jack truss lower boom, it is characterised in that: also include socket pipe, described socket Pipe one end is provided with the intersecting mouth or groove mated with main couple top boom and lower boom arcwall face, and the described socket pipe other end is along circle Circumferential direction is equidistantly provided with four notches, described in be provided with the socket pipe other end of four notches be inserted in described jack truss top boom and under Chord member and being welded to connect with jack truss top boom and lower boom by four notches and socket pipe end face, described socket pipe one end Intersecting mouth against main couple top boom and the arcwall face of lower boom and by being welded to connect, or the slope of described socket pipe one end Mouth is against described main couple top boom solder sphere and by being welded to connect.
Main couple and the connecting joint structure of jack truss in space tube truss the most according to claim 1, it is characterised in that: Described socket pipe a length of 500~800mm, a length of 150mm of described notch, width are 10mm, and described bevel angle is 25 ° Described socket pipe wall thickness is more than described main couple top boom, lower boom and jack truss top boom, lower boom wall thickness 2mm.
Main couple and the connecting joint structure of jack truss in space tube truss the most according to claim 2, it is characterised in that: Described jack truss top boom, lower boom at least stretch into 200mm in described socket pipe.
CN201620083674.7U 2016-01-28 2016-01-28 Connected node structure of main couple and jack truss among pipe truss of space Withdrawn - After Issue CN205530678U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620083674.7U CN205530678U (en) 2016-01-28 2016-01-28 Connected node structure of main couple and jack truss among pipe truss of space

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620083674.7U CN205530678U (en) 2016-01-28 2016-01-28 Connected node structure of main couple and jack truss among pipe truss of space

Publications (1)

Publication Number Publication Date
CN205530678U true CN205530678U (en) 2016-08-31

Family

ID=56771630

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620083674.7U Withdrawn - After Issue CN205530678U (en) 2016-01-28 2016-01-28 Connected node structure of main couple and jack truss among pipe truss of space

Country Status (1)

Country Link
CN (1) CN205530678U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106545085A (en) * 2017-01-18 2017-03-29 华电重工股份有限公司 A kind of spatial steel structure and its connecting node
CN107012951A (en) * 2016-01-28 2017-08-04 上海宝冶工程技术有限公司 The connecting joint structure and method of main couple and jack truss in space tube truss
CN107938852A (en) * 2017-11-30 2018-04-20 上海宝冶集团有限公司 A kind of large-scale drag-line tapered end joint construction method
CN111236435A (en) * 2020-02-20 2020-06-05 赛尔特建筑科技(广东)有限公司 Covering or awning on a car, boat, etc. room and prestressed structure truss thereof
CN112411748A (en) * 2020-10-28 2021-02-26 上海二十冶建设有限公司 Method for assembling through opening of truss structure of spatial curved surface pipe

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107012951A (en) * 2016-01-28 2017-08-04 上海宝冶工程技术有限公司 The connecting joint structure and method of main couple and jack truss in space tube truss
CN107012951B (en) * 2016-01-28 2023-09-29 上海宝冶工程技术有限公司 Connection node structure and method for main truss and secondary truss in space pipe truss
CN106545085A (en) * 2017-01-18 2017-03-29 华电重工股份有限公司 A kind of spatial steel structure and its connecting node
CN107938852A (en) * 2017-11-30 2018-04-20 上海宝冶集团有限公司 A kind of large-scale drag-line tapered end joint construction method
CN111236435A (en) * 2020-02-20 2020-06-05 赛尔特建筑科技(广东)有限公司 Covering or awning on a car, boat, etc. room and prestressed structure truss thereof
CN111236435B (en) * 2020-02-20 2021-07-06 赛尔特建筑科技(广东)有限公司 Covering or awning on a car, boat, etc. room and prestressed structure truss thereof
CN112411748A (en) * 2020-10-28 2021-02-26 上海二十冶建设有限公司 Method for assembling through opening of truss structure of spatial curved surface pipe

Similar Documents

Publication Publication Date Title
CN205530678U (en) Connected node structure of main couple and jack truss among pipe truss of space
CN104929373B (en) Large span Square Steel Tubes Truss and its accumulation slippage construction method
CN101988308A (en) Non-support installation method of long-span spatial bolt ball steel reticulated shell dome
CN208650540U (en) The fixed device of the adjustment of steel column butt joint installation
CN106192776A (en) A kind of big Span Continuous Flexible arch bridge with steel truss beam free cantilever erection construction technology
CN206752698U (en) A kind of steel construction single-layer latticed shell rice font node
CN108104267A (en) H profile steel column and I-beam flat push type dovetail assembling frame Joint design method
CN111255138B (en) Construction method of continuous multi-span large-span high-altitude aluminum alloy latticed shell structure
CN109680619A (en) A kind of steel truss beam sling Arch Bridge Construction method big suitable for environmental restrictions
CN108643572A (en) Concrete crossbeam support, shellfish thunder platform construction and steel strand wires combined installation method
CN114775882B (en) Membrane-stainless steel-aluminum alloy-inhaul cable combined structure
CN108979168A (en) Steel girder erection bracket and its installation and application
CN107012951A (en) The connecting joint structure and method of main couple and jack truss in space tube truss
CN109518877A (en) A kind of assembled H-shaped triangular steel truss and its assembly method
CN108086478A (en) Quadrate steel pipe column and I-beam flat push type dovetail assembling frame Joint design method
CN106150518A (en) A kind of simulation assembling method of duct pieces of shield tunnel
CN209066900U (en) Steel girder erection bracket
CN208594732U (en) Easy-to-dismount steelwork tower truss outrigger platform
CN103495793A (en) Improved construction method for hoisting and welding large-tonnage cast steel component complex joints
CN207107918U (en) It is provided with the coal transporting trestle bearing of horizontal support device
CN205421562U (en) H type cantilever girder steel post mosaic structure
CN110184919B (en) Construction method of low leaning tower cable saddle positioning system
CN205476079U (en) Major diameter reinforcing bar net piece
CN201817811U (en) Mechanical connecting structure of heads of anti-floating piles
CN104310234B (en) Outer outstanding climbing tower crane support system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20160831

Effective date of abandoning: 20230929

AV01 Patent right actively abandoned

Granted publication date: 20160831

Effective date of abandoning: 20230929