CN205530678U - Connected node structure of main couple and jack truss among pipe truss of space - Google Patents
Connected node structure of main couple and jack truss among pipe truss of space Download PDFInfo
- Publication number
- CN205530678U CN205530678U CN201620083674.7U CN201620083674U CN205530678U CN 205530678 U CN205530678 U CN 205530678U CN 201620083674 U CN201620083674 U CN 201620083674U CN 205530678 U CN205530678 U CN 205530678U
- Authority
- CN
- China
- Prior art keywords
- socket pipe
- truss
- main couple
- jack truss
- boom
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model discloses a connected node structure of main couple and jack truss among pipe truss of space, the socket pipe one end of this node structure is equipped with passes through mouthful or the groove mutually, and the socket pipe other end is equipped with the notch along the circumferencial direction, and lower chord on the jack truss is gone into and through notch welded connection to socket pipe notch pot head, and arcwall face and the welded connection who leans on lower chord on the main couple mouthful is supported to the passing through mutually of socket pipe, or socket pipe's bevel end supports and depends on main couple upper chord welded ball and welded connection. Traditional primary and secondary truss installation mode defect has been overcome to this connected node structure, simple structure, and the preparation is convenient, has effectively improved construction and installation efficiency, quality and cost.
Description
Technical field
The utility model relates to building element, particularly relates to main couple and the connecting joint of jack truss in a kind of space tube truss
Dot structure.
Background technology
Truss is the support beam structure being formed by connecting by welding, riveting or bolt by rod member, and it is widely used in greatly
In all kinds of buildings such as the factory building of span, exhibition center, gymnasium and bridge.As it is shown in figure 1, space tube truss is in installation process,
First the main couple 1 installing both sides is in place, and the relative coordinate in space, main couple 1 place, physical dimension, spacing all must schools simultaneously
Just arriving in specification allowed band, then welding the jack truss 2 linked between the main couple 1 of both sides, during installation, jack truss 2 is upper
Corresponding top boom 11 that chord member 21 two ends are welded in main couple 1 by intersecting mouth or the solder sphere 13 being positioned on top boom 11, secondary
Lower boom 22 two ends of truss 2 are welded in the corresponding lower boom 12 of main couple 1 by intersecting mouth.But at main couple and jack truss
In installation process, it will face the characteristic passed through because of space tube truss Guan Guanxiang and limit, and cause linking jack truss and cannot directly pacify
Fill in place.Its main cause has jack truss chord member intersecting mouth conflict overlapping with main couple chord member, chord member intersecting mouth angular misalignment, secondary
The dislocation of chord member of truss locus, primary and secondary truss in specification allowed band be assembled and alignment error etc..As follows chord member of truss phase
Pass through mouth conflict overlapping with main couple chord member, cause the jack truss chord member cannot dropping place;Jack truss chord member intersecting mouth angle and main couple
Chord member arcwall face misplaces, intersecting mouth and arcwall face do not fit and cannot welding;Primary and secondary truss is spelled alignment error and is caused jack truss string
Bar is short or has grown and does not connects.
For the installation question of above-mentioned main couple Yu jack truss, current common construction method is the upper lower edge at jack truss
The tube head not less than 500mm is blocked to facilitate jack truss to install by specification in bar one end, carries out whole after waiting jack truss in place in high-altitude
Mouth docking, has so been significantly greatly increased workload and the difficulty of site operation, has reduced efficiency of construction.This construction method must assure that
Jack truss deflection when ground spliced is the least, but also jack truss chord member intersecting mouth to be ensured can be with main couple string
The arcwall face of bar is corresponding, owing to the pipe of jack truss own is with regard to thinner easy welding deformation, so brings the biggest to installation on ground
Control difficulty.And jack truss is in place extremely difficult in installation process, the installation of rear jack truss chord member tube head in place is installed
The biggest with high-altitude adjustment amount, as follows chord member of truss tube head installs mismatch and bias, jack truss chord member tube head away from main couple string
Bar length or short cause the weld width inconsistent, owing to when mounting process needs the tube head blocked to return dress, weld seam is necessary for
Full penetration weld, thus overhead welding workload doubles, and has welded rear pipe and easily deformed, and docking port is relatively
Many, welding quality is difficult to ensure card, and welded rear chord member may not point-blank simultaneously, and jack truss quality and outward appearance are difficult to protect
Card, installation progress is slow, and security risk increases.The most important thing is long construction period, add personnel, crane, safety measure etc.
Construction cost.
Summary of the invention
Technical problem to be solved in the utility model is to provide main couple and the company of jack truss in a kind of space tube truss
Connecing node structure, this structure overcomes tradition main couple and the defect of jack truss mounting means in space tube truss, and this node is tied
Structure is simple, easy to make, is effectively increased installation efficiency, quality and cost.
For solving above-mentioned technical problem, main couple and the connecting joint structure of jack truss in the utility model space tube truss
Including main couple top boom or top boom solder sphere, main couple lower boom, jack truss top boom, jack truss lower boom, also include
Socket pipe, described socket pipe one end is provided with the intersecting mouth or groove mated with main couple top boom and lower boom arcwall face, described
The socket pipe other end is the most equidistantly provided with four notches, described in be provided with the socket pipe other end of four notches and be inserted in described
Jack truss top boom and lower boom and weld company with jack truss top boom and lower boom by four notches and socket pipe end face
Connect, the intersecting mouth of described socket pipe one end against main couple top boom and the arcwall face of lower boom and by being welded to connect, or
The groove of described socket pipe one end is against described main couple top boom solder sphere and by being welded to connect.
Further, described socket pipe a length of 500~800mm, a length of 150mm of described notch, width are 10mm, institute
Stating bevel angle is that 25 ° of described socket pipe wall thickness are more than described main couple top boom, lower boom and jack truss top boom, lower edge
Bar wall thickness 2mm.
Further, described jack truss top boom, lower boom at least stretch into 200mm in described socket pipe.
Owing in the utility model space tube truss, the connecting joint structure of main couple and jack truss have employed above-mentioned technology
Socket pipe one end of scheme, i.e. this node structure is provided with the intersecting mouth or groove mated with main couple top-bottom chord arcwall face, set
The adapter other end is the most equidistantly provided with four notches, and socket pipe notch end is inserted in jack truss top-bottom chord and passes through groove
Mouth is welded to connect with jack truss top-bottom chord, and the intersecting mouth of socket pipe is against the arcwall face of main couple top-bottom chord and by weldering
Connect in succession, or the bevel end of socket pipe is against main couple top boom solder sphere and by being welded to connect.This structure overcomes sky
Between the defect of tradition main couple and jack truss mounting means in tubular truss, simple in construction, easy to make, be effectively increased installation and execute
Work efficiency rate, quality and cost.
Accompanying drawing explanation
The utility model is described in further detail with embodiment below in conjunction with the accompanying drawings:
Fig. 1 is main couple and the connection diagram of jack truss in space tube truss;
Fig. 2 is main couple and the connecting joint structure schematic diagram of jack truss in space tube truss of the present invention;
Fig. 3 is that the utility model socket pipe, jack truss top-bottom chord show with the connecting joint structure of main couple top-bottom chord
It is intended to;
Fig. 4 is the connecting joint structure of the utility model socket pipe, jack truss top boom and main couple top boom solder sphere
Schematic diagram.
Detailed description of the invention
Embodiment as shown in Figure 2, Figure 3 and Figure 4, the connecting joint of main couple and jack truss in the utility model space tube truss
Dot structure includes main couple top boom 11 or top boom solder sphere 13, main couple lower boom 12, jack truss top boom 21, jack truss
Lower boom 22, also includes that socket pipe 3, described socket pipe 3 one end are provided with and main couple top boom 11 and lower boom 12 arcwall face
The intersecting mouth 32 joined or groove 33, described socket pipe 3 other end is the most equidistantly provided with four notches 31, described in be provided with four
Socket pipe 3 other end of root notch 31 is inserted in described jack truss top boom 21 and lower boom 22 and by four notches 31 and set
Adapter 3 end face is welded to connect with jack truss top boom 21 and lower boom 22, and the intersecting mouth 32 of described socket pipe 3 one end is against main truss
Frame top boom 11 and the arcwall face of lower boom 12 and by being welded to connect, or the groove 33 of described socket pipe 3 one end is against institute
State main couple top boom solder sphere 13 and by being welded to connect.
Preferably, described socket pipe 3 a length of 500~800mm, a length of 150mm of described notch 31, width are
10mm, described groove 33 angle is 25 ° of described socket pipe 3 wall thickness more than described main couple top boom 11, lower boom 12 and secondary
Pricncipal rafter 21, lower boom 22 wall thickness 2mm.
Preferably, described jack truss top boom 21, lower boom 22 at least stretch into 200mm in described socket pipe 3.
Above-mentioned node structure can use following steps to be attached:
Step one, splice jack truss in advance on ground, and adjust its welding deformation, at top boom and the lower edge of jack truss
Socket pipe is inserted at bar two ends the most in advance, is cleaned out by the foreign material in notch and socket pipe before installing socket pipe;
Jack truss is lifted between two main couples and adjusts in place by step 2, employing crane;
Socket pipe on step 3, outer shifting jack truss top boom, makes the intersecting mouth of socket pipe against main couple top boom
Arcwall face and rotary sleeve adapter make the groove of the laminating of intersecting mouth and arcwall face or socket pipe against main couple top boom solder sphere,
Weld socket pipe notch and end face and jack truss top boom, welding socket pipe intersecting mouth and main couple top boom arcwall face or socket
Pipe bevel and main couple top boom solder sphere;
Socket pipe on step 4, outer shifting jack truss lower boom, makes the intersecting mouth of socket pipe against main couple lower boom
Arcwall face and rotary sleeve adapter make intersecting mouth fit with arcwall face, welding socket pipe notch and end face and jack truss lower boom,
Welding socket pipe intersecting mouth and main couple lower boom arcwall face;
Step 5, removal crane, weld the solder joint full weld of each socket pipe.
In step 3 and step 4, the notch of socket pipe at least welds twice, the set on jack truss top boom and lower boom
After the outer shifting of adapter, its superposition section is at least 50mm.
This connecting joint structure employing socket pipe replacement tradition jack truss top-bottom chord one end is blocked by specification and is not less than
500mm tube head, the shortcoming overcoming conventional construction method, fundamentally solve steel construction space tube truss and link truss, company
The high-altitude installation question of binder etc..
Compared with the mounting technique of connecting joint structure existing with space tube truss, there is the following aspects feature:
1, construction speed aspect: the lifting stage of tubular truss, the installation of jack truss often governs main couple and overall knot
The installation progress of structure.After using socket pipe, high-altitude is installed and is had only to socket pipe is extracted into the position specified, welding intersecting mouth and groove
Mouth can position, and just can remove crane after fixing temporarily.
2, construction quality aspect: when conventional jack truss is installed, docking port quantity is more, and intersecting mouth needs high-altitude to adjust,
When chord member docks with the steel pipe blocked, the gap size stayed differs, and the excessive overhead welding amount caused of weld bond increases, welding quality
It is difficult to ensure card;The utility model has only to weld at the two ends of socket pipe and notch, and major part is all angle welding, and welding difficulty is low,
Weld strength is big, and chord member is unlikely to deform, and truss quality and outward appearance are easily guaranteed that.
3, construction cost aspect: while improving lifting efficiency, reduce the machine-team expense of big machinery, save people
Expenses of labour and the auxiliary material such as oxygen, acetylene take, it is ensured that weldquality, reduce Weld Seam Repairation rate, reduce construction cost.
For this connecting joint structure, its Calculation and Analysis of Force is as follows:
1, the top-bottom chord of jack truss a size of Φ 159 × 6, uses the socket pipe of Φ 180 × 8, at conventional mounting arrangements
In, jack truss top-bottom chord with the strength failure criterion of cut tube butt weld is, its stress size is:
Wherein:For the effective length of weld seam,Top-bottom chord wall thickness for jack truss;
After using this connecting joint structure and method, the strength failure criterion of its angle welding is, weld seam is high
Degree is 8mm, and socket pipe end face right angle welding seam stress size is:
Wherein:For the height of weld seam, and take 0.7 times,Strength failure criterion for socket pipe end face right angle welding seam increases
Coefficient, and take 1.22,
Socket pipe notch fillet weld in parallel shear stress size is:
Wherein: the effective length of weld seamTake socket pipe notch length and deduct 2 times of weld bead heights, and socket pipe has four
Notch,
Then total stress size of socket pipe welding is
Visible, total stress of socket pipe welding, more than the stress of jack truss top-bottom chord with cut tube butt weld, is protected
Demonstrate,prove the stress-bearing capability of jack truss.
2, the top-bottom chord of jack truss a size of Φ 180 × 6, uses the socket pipe of Φ 203 × 8, at conventional mounting arrangements
In, jack truss top-bottom chord with the strength failure criterion of cut tube butt weld is, its stress size is:
Wherein:For the effective length of weld seam,Top-bottom chord wall thickness for jack truss;
After using this connecting joint structure and method, the strength failure criterion of its angle welding is, weld seam is high
Degree is 8mm, and socket pipe end face right angle welding seam stress size is:
Wherein:For the height of weld seam, and take 0.7 times,Strength failure criterion for socket pipe end face right angle welding seam increases
Coefficient, and take 1.22,
Socket pipe notch fillet weld in parallel shear stress size is:
Wherein: the effective length of weld seamTake socket pipe notch length and deduct 2 times of weld bead heights, and socket pipe has four
Notch,
Then total stress size of socket pipe welding is
Visible, total stress of socket pipe welding, more than the stress of jack truss top-bottom chord with cut tube butt weld, is protected
Demonstrate,prove the stress-bearing capability of jack truss.
3, the top-bottom chord of jack truss a size of Φ 219 × 8, uses the socket pipe of Φ 245 × 10, at conventional mounting arrangements
In, jack truss top-bottom chord with the strength failure criterion of cut tube butt weld is, its stress size is:
Wherein:For the effective length of weld seam,Top-bottom chord wall thickness for jack truss;
After using this connecting joint structure and method, the strength failure criterion of its angle welding is, weld seam is high
Degree is 10mm, and socket pipe end face right angle welding seam stress size is:
Wherein:For the height of weld seam, and take 0.7 times,Strength failure criterion for socket pipe end face right angle welding seam increases
Coefficient, and take 1.22,
Socket pipe notch fillet weld in parallel shear stress size is:
Wherein: the effective length of weld seamTake socket pipe notch length and deduct 2 times of weld bead heights, and socket pipe has four
Notch,
Then total stress size of socket pipe welding is
Visible, total stress of socket pipe welding, more than the stress of jack truss top-bottom chord with cut tube butt weld, is protected
Demonstrate,prove the stress-bearing capability of jack truss.
4, the top-bottom chord of jack truss a size of Φ 245 × 10, uses the socket pipe of Φ 273 × 12, in conventional mounting side
In method, jack truss top-bottom chord with the strength failure criterion of cut tube butt weld is, its stress size
For:
Wherein:For the effective length of weld seam,Top-bottom chord wall thickness for jack truss;
After using this connecting joint structure and method, the strength failure criterion of its angle welding is, weld seam is high
Degree is 12mm, and socket pipe end face right angle welding seam stress size is:
Wherein:For the height of weld seam, and take 0.7 times,Strength failure criterion for socket pipe end face right angle welding seam increases
Coefficient, and take 1.22,
Socket pipe notch fillet weld in parallel shear stress size is:
Wherein: the effective length of weld seamTake socket pipe notch length and deduct 2 times of weld bead heights, and socket pipe has four
Notch,
Then total stress size of socket pipe welding is
Visible, total stress of socket pipe welding, more than the stress of jack truss top-bottom chord with cut tube butt weld, is protected
Demonstrate,prove the stress-bearing capability of jack truss.
Calculation and Analysis of Force after above-mentioned socket pipe welds, it was demonstrated that socket pipe can be used completely to replace traditional secondary purlin
Frame mounting means, it is ensured that the stress performance of whole truss structure.
This connecting joint structure is applied to certain Air-cooled Unit engineering coal yard and closes Steel Structure Installation engineering, and its floor space is about
4.6 ten thousand square meters, building height 54 meters, this project subject structure uses prestressing force Stretching chord arch truss structure form, longitudinal length
242m, horizontal span 192m, by 17 Pin main couples and 112 Pin jack truss and the structure several times such as both sides frontispiece wall struss, packway, transom window
Part forms, total steel using amount about 4000 tons.Linking jack truss quantity more, pipe kind is more, and jack truss is longer, and top boom is long
Degree is 11 meters, and a length of 15 meters of lower boom, site operation difficulty is big.
On-the-spot this structure construction of employing so that link the installation of connecting rod between jack truss, linking beam, skylight the most convenient
Rapidly, construction quality and installation rate are effectively ensured, especially more prominent on outward appearance and structural safety.The peace of jack truss
Dress speed improves about 2.5 times, has saved big machinery machine-team and artificial construction's cost, has shortened the construction period about 35 days, take
Economic benefit that must be bigger.
Claims (3)
1. main couple and a connecting joint structure for jack truss in space tube truss, weld including main couple top boom or top boom
Receive, main couple lower boom, jack truss top boom, jack truss lower boom, it is characterised in that: also include socket pipe, described socket
Pipe one end is provided with the intersecting mouth or groove mated with main couple top boom and lower boom arcwall face, and the described socket pipe other end is along circle
Circumferential direction is equidistantly provided with four notches, described in be provided with the socket pipe other end of four notches be inserted in described jack truss top boom and under
Chord member and being welded to connect with jack truss top boom and lower boom by four notches and socket pipe end face, described socket pipe one end
Intersecting mouth against main couple top boom and the arcwall face of lower boom and by being welded to connect, or the slope of described socket pipe one end
Mouth is against described main couple top boom solder sphere and by being welded to connect.
Main couple and the connecting joint structure of jack truss in space tube truss the most according to claim 1, it is characterised in that:
Described socket pipe a length of 500~800mm, a length of 150mm of described notch, width are 10mm, and described bevel angle is 25 °
Described socket pipe wall thickness is more than described main couple top boom, lower boom and jack truss top boom, lower boom wall thickness 2mm.
Main couple and the connecting joint structure of jack truss in space tube truss the most according to claim 2, it is characterised in that:
Described jack truss top boom, lower boom at least stretch into 200mm in described socket pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620083674.7U CN205530678U (en) | 2016-01-28 | 2016-01-28 | Connected node structure of main couple and jack truss among pipe truss of space |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620083674.7U CN205530678U (en) | 2016-01-28 | 2016-01-28 | Connected node structure of main couple and jack truss among pipe truss of space |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205530678U true CN205530678U (en) | 2016-08-31 |
Family
ID=56771630
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620083674.7U Withdrawn - After Issue CN205530678U (en) | 2016-01-28 | 2016-01-28 | Connected node structure of main couple and jack truss among pipe truss of space |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205530678U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106545085A (en) * | 2017-01-18 | 2017-03-29 | 华电重工股份有限公司 | A kind of spatial steel structure and its connecting node |
CN107012951A (en) * | 2016-01-28 | 2017-08-04 | 上海宝冶工程技术有限公司 | The connecting joint structure and method of main couple and jack truss in space tube truss |
CN107938852A (en) * | 2017-11-30 | 2018-04-20 | 上海宝冶集团有限公司 | A kind of large-scale drag-line tapered end joint construction method |
CN111236435A (en) * | 2020-02-20 | 2020-06-05 | 赛尔特建筑科技(广东)有限公司 | Covering or awning on a car, boat, etc. room and prestressed structure truss thereof |
CN112411748A (en) * | 2020-10-28 | 2021-02-26 | 上海二十冶建设有限公司 | Method for assembling through opening of truss structure of spatial curved surface pipe |
-
2016
- 2016-01-28 CN CN201620083674.7U patent/CN205530678U/en not_active Withdrawn - After Issue
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107012951A (en) * | 2016-01-28 | 2017-08-04 | 上海宝冶工程技术有限公司 | The connecting joint structure and method of main couple and jack truss in space tube truss |
CN107012951B (en) * | 2016-01-28 | 2023-09-29 | 上海宝冶工程技术有限公司 | Connection node structure and method for main truss and secondary truss in space pipe truss |
CN106545085A (en) * | 2017-01-18 | 2017-03-29 | 华电重工股份有限公司 | A kind of spatial steel structure and its connecting node |
CN107938852A (en) * | 2017-11-30 | 2018-04-20 | 上海宝冶集团有限公司 | A kind of large-scale drag-line tapered end joint construction method |
CN111236435A (en) * | 2020-02-20 | 2020-06-05 | 赛尔特建筑科技(广东)有限公司 | Covering or awning on a car, boat, etc. room and prestressed structure truss thereof |
CN111236435B (en) * | 2020-02-20 | 2021-07-06 | 赛尔特建筑科技(广东)有限公司 | Covering or awning on a car, boat, etc. room and prestressed structure truss thereof |
CN112411748A (en) * | 2020-10-28 | 2021-02-26 | 上海二十冶建设有限公司 | Method for assembling through opening of truss structure of spatial curved surface pipe |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205530678U (en) | Connected node structure of main couple and jack truss among pipe truss of space | |
CN104929373B (en) | Large span Square Steel Tubes Truss and its accumulation slippage construction method | |
CN101988308A (en) | Non-support installation method of long-span spatial bolt ball steel reticulated shell dome | |
CN208650540U (en) | The fixed device of the adjustment of steel column butt joint installation | |
CN106192776A (en) | A kind of big Span Continuous Flexible arch bridge with steel truss beam free cantilever erection construction technology | |
CN206752698U (en) | A kind of steel construction single-layer latticed shell rice font node | |
CN108104267A (en) | H profile steel column and I-beam flat push type dovetail assembling frame Joint design method | |
CN111255138B (en) | Construction method of continuous multi-span large-span high-altitude aluminum alloy latticed shell structure | |
CN109680619A (en) | A kind of steel truss beam sling Arch Bridge Construction method big suitable for environmental restrictions | |
CN108643572A (en) | Concrete crossbeam support, shellfish thunder platform construction and steel strand wires combined installation method | |
CN114775882B (en) | Membrane-stainless steel-aluminum alloy-inhaul cable combined structure | |
CN108979168A (en) | Steel girder erection bracket and its installation and application | |
CN107012951A (en) | The connecting joint structure and method of main couple and jack truss in space tube truss | |
CN109518877A (en) | A kind of assembled H-shaped triangular steel truss and its assembly method | |
CN108086478A (en) | Quadrate steel pipe column and I-beam flat push type dovetail assembling frame Joint design method | |
CN106150518A (en) | A kind of simulation assembling method of duct pieces of shield tunnel | |
CN209066900U (en) | Steel girder erection bracket | |
CN208594732U (en) | Easy-to-dismount steelwork tower truss outrigger platform | |
CN103495793A (en) | Improved construction method for hoisting and welding large-tonnage cast steel component complex joints | |
CN207107918U (en) | It is provided with the coal transporting trestle bearing of horizontal support device | |
CN205421562U (en) | H type cantilever girder steel post mosaic structure | |
CN110184919B (en) | Construction method of low leaning tower cable saddle positioning system | |
CN205476079U (en) | Major diameter reinforcing bar net piece | |
CN201817811U (en) | Mechanical connecting structure of heads of anti-floating piles | |
CN104310234B (en) | Outer outstanding climbing tower crane support system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20160831 Effective date of abandoning: 20230929 |
|
AV01 | Patent right actively abandoned |
Granted publication date: 20160831 Effective date of abandoning: 20230929 |