Prior art keywords
foundation pit
cleaning
underwater
diver
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710928276.XA
Other languages
Chinese (zh)
Inventor
潘秀明
赵宗智
林平
雷崇红
孙建平
王贵和
吕高峰
汪岩
申小兵
张鸿雁
衣绍彦
孔保德
徐会斌
刘铁柱
李明磊
付波
韩云哲
刘宝林
任军
冯屾
许洋
徐中圣
李辉
张文良
王宏斌
张真
周波
李文聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing City Construction Survey And Design Institute LLC
Beijing Construction Safety And Quality Supervision Center
Beijing Zhengyuan Supervision Consulting Co Ltd
China University of Geosciences Beijing
CCCC Tunnel Engineering Co Ltd
Ranken Railway Construction Group Co Ltd
CRTG Survey and Design Institute Co Ltd
Beijing MTR Construction Administration Corp
Original Assignee
Beijing City Construction Survey And Design Institute LLC
Beijing Construction Safety And Quality Supervision Center
Beijing Zhengyuan Supervision Consulting Co Ltd
China University of Geosciences Beijing
CCCC Tunnel Engineering Co Ltd
Ranken Railway Construction Group Co Ltd
CRTG Survey and Design Institute Co Ltd
Beijing MTR Construction Administration Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing City Construction Survey And Design Institute LLC, Beijing Construction Safety And Quality Supervision Center, Beijing Zhengyuan Supervision Consulting Co Ltd, China University of Geosciences Beijing, CCCC Tunnel Engineering Co Ltd, Ranken Railway Construction Group Co Ltd, CRTG Survey and Design Institute Co Ltd, Beijing MTR Construction Administration Corp filed Critical Beijing City Construction Survey And Design Institute LLC
Priority to CN201710928276.XA priority Critical patent/CN107938678A/en
Publication of CN107938678A publication Critical patent/CN107938678A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

This application involves a kind of subway foundation pit underwater excavation method, it comprises the following steps, and more than (1) water level line excavates;(2) drainage below water level line excavates;(3) underwater excavation mobile platform is built, carries out underwater excavation;(4) underwater casting platform is built, carries out concrete sealing bottom.A kind of subway station foundation ditch excavation method described herein; Deep Foundation Pit of Metro Stations underwater excavation and underwater concrete back cover technique are not only with the obvious advantage in terms of duration and cost saving; and can effectively protect the groundwater resources of preciousness and ensure the normal life of nearby residents, realize environmental protection and security requirement.

Description

A kind of subway foundation pit underwater excavation method
Technical field
This application involves a kind of subway foundation pit underwater excavation method.
Background technology
In the prior art, foundation pit is the soil excavated in basic engineering position by substrate absolute altitude and basic plane size Hole.Excavation plan with reference to live nearby buildings situation, should be determined, and perform waterproof row according to geology hydrological data before excavation Water conservancy project is made.Excavate not deep person and can use the method for putting side slope, make Stability of Earth Slopes, its gradient size is determined by related construction regulation.Open The relatively deep and neighbouring person that has building is dug, can use foundation pit walls method for protecting support, gunite concrete wall protecting method, Large Foundation Pit even use The methods of diaphram wall and chain colonnade formula cast-in-situ bored pile, protection outside soil layer collapse into;No influencer is nearby built, can With well-point method lowering of watertable, using slope open cut;Natural cold air freezing process excavation etc. can be used in cold district.
The content of the invention
The technical problems to be solved by the invention are to overcome the deficiencies of the prior art and provide a kind of subway foundation pit underwater excavation Method.
To solve above technical problem, the present invention adopts the following technical scheme that:
A kind of subway station foundation ditch excavation method, it comprises the following steps, and more than (1) water level line excavates;(2) below water level line Drainage excavate;(3) underwater excavation mobile platform is built, carries out underwater excavation;(4) underwater casting platform is built, carries out coagulation Grave bottom.
Preferably, step (1) specifically, foundation pit enclosure structure diaphram wall and divide Cang Qiang construction complete, carry out foundation pit Water level line above earth excavation, is excavated to level of ground water line position.
Preferably, step (2) is specifically, set interim catch pit in foundation pit, and catchment bright row, and excavator coordinates gravity type to grab Bucket vertically transports the soil body after drainage.
Preferably, for step (3) specifically, after the completion of foundation pit drainage excavates, water level recharge is high-order to phreatic line table When putting, underwater excavation mobile platform is built, carries out underwater excavation, and foundation pit is cleared up.
Preferably, include in the foundation pit cleaning of step (3) to waist rail, the concrete support lower part soil body and shearing groove cleaning, Later stage is cleared up by diver's cooperative mechanical.
Preferably, the foundation pit in step (3) is cleared up specifically, when under excavating to waist rail hypomere waterline, stops excavating, by Diver supports the downside soil body using High Pressure Gun cleaning waist rail and plate, and cooperation is grabbed except cleaning thing, when transverse plane on excavation to shearing groove When, stop excavating, grabbed by diver using the remaining soil body of High Pressure Gun cleaning waist rail and plate support downside, cooperation except cleaning thing.
Preferably, further included in the foundation pit cleaning of step (3), building enclosure wall in the range of underwater concreting, Cobble and satholith at inner corner trim are rushed, inhaled under water by diver, are cleared up with excavation progress, water under diver's dressing, operation Air compressor carries out inner corner trim processing, and cobble and residue water suction are standby to be removed in grab bucket operation into storehouse, by diving under water after removing The lower water of member use steel brush operation, and the formula of arranging brushes the viscous thing for clearing up building enclosure wall, and the inspection after being brushed, Yi Houzai Rinsed with giant, it is ensured that wall cleans in place, does not stay attachment.
Preferably, further included in the foundation pit cleaning of step (3), when excavating under shearing groove, stop excavating, by diver Lower water, cleaning shearing groove, and check the cleaning effect of shearing groove.
Preferably, diver is to shearing the cleaning of groove specifically, water, hand strap drill rod are dived to shearing groove portion under diver's dressing Position.Diver, which feels, determines mouth under shearing groove, and drill rod is cocked upwards from the insertion of lower mouth, filling foam is damaged and takes off Open.Then prized with hand or drill rod, untill foam is cleaned out.After shearing groove foam cleans out, diver slips into water Under, cement mortar is removed with underwater air pressure gun the cleaning effect for totally, feeling and checking shearing groove.After, contact water surface work Platform personnel, floating water outlet.
Preferably, further included in the foundation pit cleaning of step (3), cleaning leveling, cleaning ground-connecting-wall side are carried out to bottom of foundation ditch Wall, after completing above-mentioned underwater operation, diver only starches horizontal plane following wall cleaning situation, wall iron sheet cutting situation, cuts Cleaning situation carries out underwater self-test in power groove notch, self-test and after confirming that above-mentioned operation meets the requirements, diver coordinate under water into The cleaning leveling of row bottom of foundation ditch.Before foundation pit back cover, due to grabbing bucket, when capturing bottom of foundation ditch, caused male and fomale(M&F) must be by diving Water person implements screed operation under water, after leveling, after the silt that base plane produces is native, including cleaning is rinsed below wall horizontal plane Sediment, it is clean to pull out suction with Special diving slush pump.
Due to the use of above technical scheme, the present invention has the following advantages that compared with prior art:
A kind of subway station foundation ditch excavation method described herein, Deep Foundation Pit of Metro Stations underwater excavation and underwater concrete Back cover technique is not only with the obvious advantage in terms of duration and cost saving, and can effectively protect the groundwater resources of preciousness and guarantee The normal life of nearby residents, realizes environmental protection and security requirement.
Embodiment
The present invention is described in further details below in conjunction with specific embodiment.It is to be understood that these embodiments are to be used to say The bright basic principles, principal features and advantages of the present invention, and the present invention limits from the scope of following embodiments.Adopted in embodiment Implementation condition can do further adjustment according to specific requirement, and the implementation condition being not specified is usually the bar in normal experiment Part.
A kind of subway station foundation ditch excavation method, it comprises the following steps, and more than (1) water level line excavates;Foundation pit enclosure structure Diaphram wall and divide Cang Qiang construction complete, carry out Water Level in Foundation Pit line above earth excavation, be excavated to level of ground water line position. (2) drainage below water level line excavates;Interim catch pit is set in foundation pit, and catchment bright row, and excavator coordinates gravity type grab bucket will The soil body after drainage vertically transports.(3) underwater excavation mobile platform is built, carries out underwater excavation;Completed when foundation pit drainage excavates Afterwards, during high to the phreatic line table position of water level recharge, underwater excavation mobile platform is built, carries out underwater excavation, and to foundation pit Cleared up.(4) underwater casting platform is built, carries out concrete sealing bottom.
Include in the foundation pit cleaning of step (3) to waist rail, the concrete support lower part soil body and shearing groove cleaning, the later stage is by diving Water person's cooperative mechanical is cleared up.When under excavating to waist rail hypomere waterline, stop excavating, cleared up by diver using High Pressure Gun Waist rail and the plate support downside soil body, cooperation are grabbed except cleaning thing, when excavating to transverse plane on shearing groove, stop excavating, by diver The remaining soil body of waist rail and plate support downside is cleared up using High Pressure Gun, cooperation is grabbed except cleaning thing.Enclosing in the range of underwater concreting Cobble and satholith at protection structure wall, inner corner trim are rushed, inhaled under water by diver, are cleared up with excavation progress, diver Water is loaded, operation air compressor carries out inner corner trim processing, and cobble and residue water suction are standby to be removed in grab bucket operation into storehouse, Steel brush operation is used by water under diver after removing, the formula of arranging brushes the viscous thing of cleaning building enclosure wall, and after being brushed Inspection, rinsed again with giant later, it is ensured that wall clean in place, do not stay attachment.
When excavating under shearing groove, stop excavating, by water under diver, cleaning shearing groove, and check the clear of shearing groove Manage effect.Diver is to shearing the cleaning of groove specifically, water, hand strap drill rod are dived to shearing groove location under diver's dressing.Diving Member, which feels, determines mouth under shearing groove, and drill rod is cocked upwards from the insertion of lower mouth, filling foam is damaged and disengages.Then use Hand or drill rod prize, untill foam is cleaned out.After shearing groove foam cleans out, diver dives beneath the water, with underwater Air pressure gun removes cement mortar the cleaning effect for totally, feeling and checking shearing groove.After, water surface workbench personnel are contacted, Floating water outlet.
When cleaning leveling is carried out to bottom of foundation ditch, ground-connecting-wall side wall is cleared up, after completing above-mentioned underwater operation, diver is to water The following wall of plane clears up situation, wall and only starches iron sheet cutting situation, shears the underwater self-test of cleaning situation progress in groove notch, from After examining and confirming that above-mentioned operation meets the requirements, diver coordinates under water carries out bottom of foundation ditch cleaning leveling.Before foundation pit back cover, due to Grab bucket caused male and fomale(M&F) when capturing bottom of foundation ditch must implement screed operation under water by diver, and after leveling, bottom is put down The silt soil that face produces, including the sediment after cleaning flushing below wall horizontal plane, it is dry to pull out suction with Special diving slush pump Only.
A kind of subway station foundation ditch excavation method described herein, Deep Foundation Pit of Metro Stations underwater excavation and underwater concrete Back cover technique is not only with the obvious advantage in terms of duration and cost saving, and can effectively protect the groundwater resources of preciousness and guarantee The normal life of nearby residents, realizes environmental protection and security requirement.
The present invention is described in detail above, the explanation of embodiment be only intended to help the method for understanding the present invention and Its core concept, its object is to allow the personage for being familiar with this field technology to understand present disclosure and implement according to this, and It cannot be limited the scope of the invention with this.Any equivalent change or modification in accordance with the spirit of the invention, should all contain Cover within protection scope of the present invention.

Claims (10)

  1. A kind of 1. subway foundation pit underwater excavation method, it is characterised in that:It comprises the following steps,
    (1) more than water level line excavate;(2) drainage below water level line excavates;(3) underwater excavation mobile platform is built, carries out water Lower excavation;(4) underwater casting platform is built, carries out concrete sealing bottom.
  2. A kind of 2. subway foundation pit underwater excavation method according to claim 1, it is characterised in that:Step (1) is specifically, base Pit enclosure structure diaphram wall and divide Cang Qiang construction complete, carry out Water Level in Foundation Pit line above earth excavation, be excavated to underground water Bit line position.
  3. A kind of 3. subway foundation pit underwater excavation method according to claim 1, it is characterised in that:Step (2) is specifically, base Interim catch pit is set in hole, and catchment bright row, and excavator coordinates gravity type grab bucket vertically to transport the soil body after drainage.
  4. A kind of 4. subway foundation pit underwater excavation method according to claim 1, it is characterised in that:Step (3) is specifically, work as After the completion of foundation pit drainage excavates, during high to the phreatic line table position of water level recharge, underwater excavation mobile platform is built, carries out water Lower excavation, and foundation pit is cleared up.
  5. A kind of 5. subway foundation pit underwater excavation method according to claim 4, it is characterised in that:Foundation pit in step (3) Cleaning includes clearing up waist rail, the concrete support lower part soil body and shearing groove cleaning, later stage by diver's cooperative mechanical.
  6. A kind of 6. subway foundation pit underwater excavation method according to claim 5, it is characterised in that:Foundation pit in step (3) Cleaning stops excavating specifically, when under excavating to waist rail hypomere waterline, and High Pressure Gun cleaning waist rail and plate support are used by diver The downside soil body, cooperation are grabbed except cleaning thing, when excavating to transverse plane on shearing groove, stop excavating, High Pressure Gun is used by diver The remaining soil body of waist rail and plate support downside is cleared up, cooperation is grabbed except cleaning thing.
  7. A kind of 7. subway foundation pit underwater excavation method according to claim 6, it is characterised in that:Foundation pit in step (3) Cleaning further includes, and the cobble at building enclosure wall, inner corner trim and satholith in the range of underwater concreting are by diver's water Undershoot, suction, are cleared up with excavation progress, water under diver's dressing, and operation air compressor carries out inner corner trim processing, cobble and residual Thing water suction is stayed into storehouse, it is standby to be removed in grab bucket operation, steel brush operation is used by water under diver after removing, the formula of arranging brushes clearly The viscous thing of building enclosure wall, and the inspection after being brushed are managed, is rinsed again with giant later, it is ensured that wall cleaning is arrived Position, does not stay attachment.
  8. A kind of 8. subway foundation pit underwater excavation method according to claim 6, it is characterised in that:Foundation pit in step (3) Cleaning further includes, and when excavating under shearing groove, stops excavating, and by water under diver, cleaning shearing groove, and checks shearing groove Cleaning effect.
  9. A kind of 9. subway foundation pit underwater excavation method according to claim 6, it is characterised in that:Diver is to shearing groove Cleaning is specifically, water, hand strap drill rod are dived to shearing groove location under diver's dressing.Diver, which feels, determines mouth under shearing groove, Drill rod is cocked upwards from the insertion of lower mouth, filling foam is damaged and disengages.Then prized with hand or drill rod, until foam is clear Untill reason is clean.After shearing groove foam cleans out, diver dives beneath the water, and cement mortar is removed clean, spy with underwater air pressure gun Touch and check the cleaning effect of shearing groove.After, contact water surface workbench personnel, floating water outlet.
  10. A kind of 10. subway foundation pit underwater excavation method according to claim 6, it is characterised in that:Foundation pit in step (3) Cleaning further includes, and cleaning leveling is carried out to bottom of foundation ditch, clears up ground-connecting-wall side wall, after completing above-mentioned underwater operation, diver couple The following wall of horizontal plane clears up situation, wall and only starches iron sheet cutting situation, shears the underwater self-test of cleaning situation progress in groove notch, Self-test and after confirming that above-mentioned operation meets the requirements, diver coordinates under water carries out bottom of foundation ditch cleaning leveling.Before foundation pit back cover, by Caused male and fomale(M&F) must implement screed operation under water by diver when grab bucket is capturing bottom of foundation ditch, after leveling, bottom The silt soil that plane produces, including the sediment after cleaning flushing below wall horizontal plane, suction is pulled out with Special diving slush pump Totally.
CN201710928276.XA 2017-10-09 2017-10-09 A kind of subway foundation pit underwater excavation method Pending CN107938678A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710928276.XA CN107938678A (en) 2017-10-09 2017-10-09 A kind of subway foundation pit underwater excavation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710928276.XA CN107938678A (en) 2017-10-09 2017-10-09 A kind of subway foundation pit underwater excavation method

Publications (1)

Publication Number Publication Date
CN107938678A true CN107938678A (en) 2018-04-20

Family

ID=61936040

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710928276.XA Pending CN107938678A (en) 2017-10-09 2017-10-09 A kind of subway foundation pit underwater excavation method

Country Status (1)

Country Link
CN (1) CN107938678A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110029686A (en) * 2019-04-01 2019-07-19 广州地铁设计研究院股份有限公司 A kind of station construction method of underground station and processing water gushing in pit
CN115198758A (en) * 2022-07-05 2022-10-18 中铁四局集团有限公司 Novel method for sealing bottom of foundation pit underwater concrete

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101139838A (en) * 2007-10-15 2008-03-12 上海市隧道工程轨道交通设计研究院 Construction method for high artesian area ultra-deep foundation pit
CN103225306A (en) * 2013-03-26 2013-07-31 西安建筑科技大学 Method of preventing foundation pit leakage during excavation of foundation pit close to water source
CN107119691A (en) * 2017-06-22 2017-09-01 中交二航局第四工程有限公司 One kind is applied to the square deep basal pit of the high pressure-bearing of rich water sand gravel layer and its excavation method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101139838A (en) * 2007-10-15 2008-03-12 上海市隧道工程轨道交通设计研究院 Construction method for high artesian area ultra-deep foundation pit
CN103225306A (en) * 2013-03-26 2013-07-31 西安建筑科技大学 Method of preventing foundation pit leakage during excavation of foundation pit close to water source
CN107119691A (en) * 2017-06-22 2017-09-01 中交二航局第四工程有限公司 One kind is applied to the square deep basal pit of the high pressure-bearing of rich water sand gravel layer and its excavation method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘仁松: "《建筑工程施工工艺》", 30 September 2002, 重庆大学出版社 *
龚晓南等: "《地基处理理论与实践新进展:第八届全国地基处理学术讨论会论文集》", 31 October 2004, 合肥工业大学出版社 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110029686A (en) * 2019-04-01 2019-07-19 广州地铁设计研究院股份有限公司 A kind of station construction method of underground station and processing water gushing in pit
CN115198758A (en) * 2022-07-05 2022-10-18 中铁四局集团有限公司 Novel method for sealing bottom of foundation pit underwater concrete
CN115198758B (en) * 2022-07-05 2023-05-30 中铁四局集团有限公司 Underwater concrete bottom sealing method for foundation pit

Similar Documents

Publication Publication Date Title
CN103806464B (en) Large-scale high ferro station and subway cross top-down construction method up and down
CN111139852A (en) Water-rich sandy gravel stratum high-permeability ultra-deep foundation pit dewatering construction method
CN107938678A (en) A kind of subway foundation pit underwater excavation method
CN109339084A (en) Underwater big depth open caisson passes through the construction method of the hard soil layer for being difficult to abolish
CN102605791A (en) Method for excavating soil from soft soil foundation
CN207277344U (en) Guiding tool for the backfill of narrow Deep Foundation Pit Excavation
CN109056767A (en) A kind of rich water powder land floor precipitation and recharge construction method
CN101319501B (en) Construction method of deep foundation ditch
CN106638675A (en) Reverse structural steel and bamboo splint soil retaining construction method
CN204099720U (en) The protective housing that under soil stone combination geological condition, artificial pipe jacking construction method is used
RU2386755C1 (en) Method for arrangement of shallow subway at water area bottom
TW201200683A (en) Static pressure implant method for precast retaining wall
CN110924407A (en) Construction method for maintaining water and soil on lower slope without disturbance
CN103953054B (en) A kind of dry sealing concrete pile foundation and construction method thereof protecting pile crown reinforcing bar
CN105332382A (en) River-adjacent-foundation-pit island-building cofferdam clay sealing construction method
CN206956731U (en) One kind is applied to the square deep basal pit of the high pressure-bearing of rich water sand gravel layer
CN104315251A (en) Manual pipe jacking construction method for earth and rock combined geological conditions
CN106988345A (en) A kind of excavation method of reverse construction foundation ditch
CN105507322A (en) Drying cutting method for foundation pit steel tube plug pile in immersed tube tunnel cofferdam
CN110965487A (en) Down-through channel high-flow inverted siphon sewage pipe and encapsulation treatment construction method
CN108978669A (en) One kind is combined for ultra-deep foundation pit freezes back cover construction method
CN114809010B (en) Construction method of elevator shaft and pit foundation retaining wall in easy-collapse soil
CN216150552U (en) Building foundation pit operation device
CN210395390U (en) Foundation ditch is outer to fall drainage composite set
CN111997008A (en) Construction method for underwater non-blasting demolition of reserved rock ridge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180420