CN114809010B - Construction method of elevator shaft and foundation retaining wall of sump pit in easy-to-collapse soil - Google Patents

Construction method of elevator shaft and foundation retaining wall of sump pit in easy-to-collapse soil Download PDF

Info

Publication number
CN114809010B
CN114809010B CN202210487570.2A CN202210487570A CN114809010B CN 114809010 B CN114809010 B CN 114809010B CN 202210487570 A CN202210487570 A CN 202210487570A CN 114809010 B CN114809010 B CN 114809010B
Authority
CN
China
Prior art keywords
pit
concrete
sump
retaining wall
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202210487570.2A
Other languages
Chinese (zh)
Other versions
CN114809010A (en
Inventor
牛兴
李强
王龙
李红标
邢鸽
王兆林
杨杨
程丹
郝禹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Shoufeng Construction Engineering Co ltd
Shanxi Sanjian Group Co Ltd
Original Assignee
Shanxi Sanjian Group Construction Engineering Co ltd
Shanxi Sanjian Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Sanjian Group Construction Engineering Co ltd, Shanxi Sanjian Group Co Ltd filed Critical Shanxi Sanjian Group Construction Engineering Co ltd
Priority to CN202210487570.2A priority Critical patent/CN114809010B/en
Publication of CN114809010A publication Critical patent/CN114809010A/en
Application granted granted Critical
Publication of CN114809010B publication Critical patent/CN114809010B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/22Lining sumps in trenches or other foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D23/00Caissons; Construction or placing of caissons
    • E02D23/08Lowering or sinking caissons
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D23/00Caissons; Construction or placing of caissons
    • E02D23/08Lowering or sinking caissons
    • E02D23/14Decreasing the skin friction while lowering
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0007Production methods using a mold
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The invention discloses a construction method of a lift shaft and a water pit foundation wall in easy collapse soil, which solves the problem of how to construct the lift shaft foundation and the surrounding wall of the water pit foundation in easy collapse quicksand soil; firstly, cast-in-place concrete is used for constructing a closed concrete retaining wall well wall outside the two pits on the pit bottom surface of the building foundation pit, namely a two pit shared open caisson, and the two pit shared open caisson is driven out to sink to the designed elevation of the elevator shaft foundation pit; and constructing a cast-in-place concrete template system of a pit bottom surface of the two pits sharing open caisson, wherein in the cast-in-place concrete template system of the pit outside sinking protection wall, an outer template which is abutted with three inner side surfaces in the pit outside concrete protection wall is formed, a foam board is adopted as an outer wall template, concrete is cast in situ, an inner sleeve open caisson is formed, and the construction of the elevator shaft and the pit foundation protection wall is completed through the secondary open caisson.

Description

易坍塌土质中电梯井及集水坑基础护壁的施做方法Construction method of elevator shaft and foundation retaining wall of sump pit in easy-to-collapse soil

技术领域technical field

本发明涉及一种建筑物基础的构建方法,特别涉及一种在易坍塌土质条件下构筑电梯井基础和集水坑基础的四周护壁的方法。The invention relates to a building foundation construction method, in particular to a method for constructing elevator shaft foundations and surrounding retaining walls of sump foundations under easy-to-collapse soil conditions.

背景技术Background technique

一些高层建筑的电梯井基础和集水坑基础,被设计为相邻一体式,电梯井基础坑的深度为1.8米,集水坑基础坑的底面低于电梯井基础坑底面1.4米,该两基础坑的施工过程为:先将基坑开挖到楼体基础的设计标高,然后,在楼体基础设计标高的基坑坑底,放线出电梯井基础坑和集水坑基础坑的开挖位置,再进行电梯井基础坑和集水坑基础坑的基坑开挖,在开挖完成的电梯井基础坑和集水坑基础坑的基坑坑底面的四周,使用机制砖砌筑砖胎膜,并在砖胎膜上抹灰做防水,形成电梯井基础坑及集水坑基础坑的四周护壁,在构筑好的四周护壁内,再构筑电梯井混凝土基础和集水坑混凝土基础;但是,当在楼体基础基坑内继续下挖电梯井基础坑和集水坑基础坑时,有时会遇到易塌陷的流沙土质和地下水,继续下挖电梯井基础坑和集水坑基础坑的基坑时,土体塌陷严重,使基坑成型困难;如何构筑电梯井基础及集水坑基础混凝土构筑的四周护壁,成为现场需要解决的一个问题。The elevator shaft foundation and sump foundation of some high-rise buildings are designed to be adjacent to each other. The depth of the elevator shaft foundation pit is 1.8 meters, and the bottom surface of the sump pit foundation pit is 1.4 meters lower than the bottom surface of the elevator shaft foundation pit. The construction process of the foundation pit is as follows: first excavate the foundation pit to the design elevation of the building foundation, and then, at the bottom of the foundation pit at the design elevation of the building foundation, set out the opening of the elevator shaft foundation pit and the sump foundation pit. Excavate the location, then excavate the foundation pit of the elevator shaft foundation pit and the sump pit foundation pit, and use machine-made bricks to build bricks around the bottom of the foundation pit of the elevator shaft foundation pit and sump pit foundation pit after excavation Membrane, and plastered on the membrane of bricks for waterproofing, forming the surrounding walls of the foundation pit of the elevator shaft and the foundation pit of the sump pit, and building the concrete foundation of the elevator shaft and the concrete foundation of the sump pit in the surrounding walls constructed; But, when continuing to dig the elevator shaft foundation pit and the sump pit foundation pit in the building body foundation pit, sometimes encounter the quicksand soil and groundwater that are easy to collapse, and continue to dig the elevator shaft foundation pit and the sump pit foundation pit. During the foundation pit, the soil collapsed severely, making it difficult to form the foundation pit; how to construct the surrounding walls of the elevator shaft foundation and the concrete foundation of the sump pit became a problem that needed to be solved on site.

发明内容Contents of the invention

本发明提供了一种易坍塌土质中电梯井及集水坑基础护壁的施做方法,解决了在易塌陷的流沙土质中如何构筑电梯井基础及集水坑基础的四周护壁的技术问题。The invention provides a construction method for an elevator shaft and sump foundation retaining walls in easy-to-collapse soil, and solves the technical problem of how to construct the elevator shaft foundation and surrounding retaining walls of the sump foundation in easy-to-collapse quicksand soil.

本发明是通过以下技术方案解决以上技术问题的:The present invention solves the above technical problems through the following technical solutions:

本发明的总体构思是:在楼体基坑的坑底面上,先现浇混凝土构筑封闭的二坑外侧混凝土护壁井壁,即二坑共用沉井,通过掏出二坑共用沉井下方的土体,使二坑共用沉井下沉到电梯井基础坑设计标高处;然后,清理二坑共用沉井内的土体,在二坑共用沉井的坑底面,构筑集水坑外侧下沉护壁井壁的现浇混凝土模板体系,在该集水坑外侧下沉护壁井壁的现浇混凝土模板体系中,与二坑外侧混凝土护壁井壁中的三个内侧面靠接在一起的外侧模板,采用泡沫板,作为外侧墙体模板,现场浇筑混凝土,形成集水坑外侧混凝土护壁井壁,即内套沉井,拆除集水坑外侧下沉护壁井壁的现浇混凝土模板体系,其中对泡沫板外模板,采用喷灯烧除,使内套沉井的外侧壁与二坑共用沉井的内侧壁分离,通过掏出内套沉井下方的土体,使内套沉井下沉到集水坑的坑底的设计标高处,通过二次沉井完成电梯井及集水坑基础护壁的施做。The general idea of the present invention is: on the bottom surface of the foundation pit of the building body, first cast-in-situ concrete is constructed to construct the closed concrete retaining wall well wall on the outside of the second pit, that is, the common caisson of the second pit, and the soil below the common caisson of the second pit is taken out. The common caisson of the second pit is sunk to the design elevation of the foundation pit of the elevator shaft; then, the soil in the common caisson of the second pit is cleaned, and the outer sinking wall of the sump is constructed on the bottom of the common caisson of the second pit In the cast-in-place concrete formwork system for sinking the retaining wall well wall outside the sump, the outer formwork that abuts with the three inner sides of the outer concrete retaining wall well wall of the second pit uses foam As the formwork of the outer wall, concrete is poured on site to form the outer concrete wall of the sump, that is, the inner caisson, and the cast-in-place concrete formwork system for the sinking of the outer wall of the sump is removed. The template is burnt with a blowtorch, so that the outer wall of the inner caisson is separated from the inner wall of the common caisson of the second pit, and the inner caisson is sunk to the pit of the sump by pulling out the soil below the inner caisson At the design elevation of the bottom, the construction of the elevator shaft and the foundation wall of the sump pit is completed through the secondary caisson.

一种易坍塌土质中电梯井及集水坑基础护壁的施做方法,在楼体基坑内设计有连接在一起的电梯井基础基坑和集水坑基础基坑,其特征在于以下步骤:A method for constructing elevator shaft and sump foundation retaining wall in easy-to-collapse soil, in which an elevator shaft foundation pit and a sump pit foundation pit connected together are designed in the foundation pit of the building body, characterized in the following steps:

第一步、在楼体基坑的基坑底面上,放线出预设置的电梯井基础基坑和集水坑基础基坑的二坑外侧封闭护壁的构建轮廓;Step 1. On the bottom surface of the foundation pit of the building body, set out the construction outline of the pre-set elevator shaft foundation pit and the second pit outside the second pit of the sump foundation pit;

第二步、在二坑外侧封闭护壁的构建轮廓上,搭设二坑外侧下沉护壁井壁的现浇混凝土模板体系,并浇筑混凝土,形成二坑外侧混凝土护壁井壁;The second step is to set up a cast-in-place concrete formwork system for the sinking wall of the outer wall of the second pit on the construction contour of the outer closed wall of the second pit, and pour concrete to form the outer concrete wall of the second pit;

第三步、将二坑外侧混凝土护壁井壁下方的土体掏出,使二坑外侧混凝土护壁井壁,依靠自身的重力,下沉到电梯井基础基坑的设计标高位置处;将下沉到位的二坑外侧混凝土护壁井壁内的土体挖出,形成电梯井基础基坑坑底面;The third step is to dig out the soil below the outer concrete retaining wall of the second pit, so that the outer concrete retaining wall of the second pit will sink to the design elevation of the foundation pit of the elevator shaft by its own gravity; Excavate the soil in the outer concrete retaining wall of the second pit in place to form the bottom of the foundation pit of the elevator shaft;

第四步、在电梯井基础基坑坑底面上,放线出预设置的集水坑基础基坑外侧封闭护壁的构建轮廓,该集水坑外侧护壁的构建轮廓是靠接在二坑外侧混凝土护壁井壁内一侧的,即,长方形的集水坑外侧护壁的构建轮廓中的三条边,是与二坑外侧混凝土护壁井壁中的三个内侧面靠接在一起的;Step 4: On the bottom surface of the foundation pit of the elevator shaft, set out the construction outline of the closed retaining wall outside the foundation pit of the pre-set sump pit. The inner side of the retaining wall, that is, the three sides in the construction outline of the outer retaining wall of the rectangular sump are abutted against the three inner sides of the outer concrete retaining wall of the second pit;

第五步、在集水坑外侧护壁的构建轮廓上,搭设集水坑外侧下沉护壁井壁的现浇混凝土模板体系,在该集水坑外侧下沉护壁井壁的现浇混凝土模板体系中,与二坑外侧混凝土护壁井壁中的三个内侧面靠接在一起的外侧模板,采用泡沫板;The fifth step is to set up the cast-in-place concrete formwork system of the sinking wall and well wall outside the sump on the construction contour of the outer retaining wall of the sump, and set up the cast-in-place concrete formwork system of sinking the retaining wall and well wall outside the sump , the outer formwork that abuts against the three inner sides of the outer concrete wall of the second pit uses foam boards;

第六步、在集水坑外侧下沉护壁井壁的现浇混凝土模板体系中,浇筑混凝土,形成封闭的集水坑外侧混凝土护壁井壁;The sixth step is to pour concrete in the cast-in-place concrete formwork system for sinking the retaining wall well wall outside the sump pit to form a closed concrete retaining wall well wall outside the sump pit;

第七步、将集水坑外侧下沉护壁井壁的现浇混凝土模板体系中的模板拆除,并采用喷灯,将与二坑外侧混凝土护壁井壁中的三个内侧面靠接在一起的泡沫板烧除,在集水坑外侧混凝土护壁井壁与二坑外侧混凝土护壁井壁之间,形成有两沉井间隔缝隙;The seventh step is to remove the formwork in the cast-in-situ concrete formwork system of the sinking wall and well wall on the outside of the sump pit, and use a blowtorch to abut the foam on the three inner sides of the concrete wall on the outside of the second pit The plate is burnt out, and there is a gap between the two caissons between the outer concrete wall of the sump and the outer concrete wall of the second pit;

第八步、将集水坑外侧混凝土护壁井壁下方的土体掏出,使集水坑外侧混凝土护壁井壁,依靠自身的重力,下沉到集水坑基础基坑的设计标高位置处,将集水坑外侧混凝土护壁井壁内的土体挖出,形成集水坑基坑坑底面;Step 8: Take out the soil below the concrete retaining wall on the outside of the sump, so that the concrete retaining wall on the outside of the sump sinks to the design elevation of the foundation pit of the sump by its own gravity. Excavate the soil in the concrete retaining wall outside the sump pit to form the bottom of the sump pit foundation pit;

第九步、在下沉到位的集水坑外侧混凝土护壁井壁的顶端面与二坑外侧混凝土护壁井壁的底端面之间的两沉井间隔缝隙中,设置水泥净浆浇筑层,将两沉井间隔缝隙封闭;Step 9: In the interval gap between the two caissons between the top surface of the concrete retaining wall well wall outside the sump that has sunk in place and the bottom end surface of the concrete retaining wall well wall outside the second pit, set a cement slurry pouring layer, and place the two Well interval gap sealing;

第十步、在电梯井基础基坑坑底面上,以及集水坑基坑坑底面上,分别构筑200毫米厚的砂石褥垫层,并布设排水管。Step 10: On the bottom of the foundation pit of the elevator shaft foundation and the bottom of the foundation pit of the sump pit, respectively construct a 200 mm thick sandstone cushion, and arrange drainage pipes.

二坑外侧混凝土护壁井壁的高度为1.8米,集水坑外侧混凝土护壁井壁的高度为1.4米;二坑外侧混凝土护壁井壁中的混凝土强度与集水坑外侧混凝土护壁井壁中的混凝土强度是相同的,水泥净浆浇筑层中的混凝土强度比二坑外侧混凝土护壁井壁中的混凝土强度高一个等级。The height of the concrete retaining well wall outside the second pit is 1.8 meters, and the height of the concrete retaining wall well wall outside the sump pit is 1.4 meters; The strength is the same, and the concrete strength in the cement paste pouring layer is one level higher than that in the concrete wall well wall outside the second pit.

本发明采用先后两次现场浇筑沉井,并分次进行沉井的方法解决了下挖基坑时遇到的流沙及坍塌的问题,两沉井兼做结构侧壁,提升了施工质量的同时,还节约了成本;特别是在两套接的沉井之间设置泡沫板,作为内套沉井混凝土浇筑外模板,并在内套沉井成型后下沉前,用喷灯将其烧除的方法,解决了内套沉井下沉过程中,两沉井壁之间的滑动摩擦力过大,影响到内套沉井正常下沉的难题。In the present invention, the caissons are poured on site twice successively, and the caissons are carried out in stages to solve the problems of quicksand and collapse encountered when excavating foundation pits. The two caissons also serve as structural side walls, which improves the construction quality while , also saves cost; especially, the foam board is set between the two caissons, which is used as the outer formwork for the inner caisson to be concreted, and the inner caisson is formed and before it sinks, it is burned off with a blowtorch The method solves the problem that the sliding friction force between the two caisson walls is too large during the sinking process of the inner casing caisson, which affects the normal sinking of the inner casing caisson.

附图说明Description of drawings

图1是本发明的结构示意图;Fig. 1 is a structural representation of the present invention;

图2是在楼体基坑1的基坑底面上设置下沉前二坑外侧混凝土护壁井壁3的结构示意图;Fig. 2 is the structural representation of setting the outer concrete retaining wall shaft wall 3 of the second pit before sinking on the foundation pit bottom surface of the building body foundation pit 1;

图3是二坑外侧混凝土护壁井壁3下沉到位时的结构示意图;Fig. 3 is a structural schematic diagram when the outer concrete retaining wall 3 of the second pit is sunk in place;

图4是二坑外侧混凝土护壁井壁3下沉到位时在俯视方向上的结构示意图;Fig. 4 is a structural schematic diagram in the direction of looking down when the concrete retaining wall well wall 3 outside the second pit sinks in place;

图5是在电梯井基础基坑坑底面4上构筑的集水坑外侧下沉护壁井壁的现浇混凝土模板体系6和集水坑外侧混凝土护壁井壁7的结构示意图;Fig. 5 is the structure schematic diagram of the cast-in-place concrete formwork system 6 and the concrete retaining wall well wall 7 outside the sump pit outside the sinking pit wall built on the bottom surface 4 of the elevator shaft foundation pit;

图6是集水坑外侧下沉护壁井壁的现浇混凝土模板体系6和集水坑外侧混凝土护壁井壁7在俯视方向上的结构示意图;Fig. 6 is a structural schematic diagram of the cast-in-place concrete formwork system 6 of the sinking retaining wall well wall outside the sump pit and the concrete retaining wall well wall 7 outside the sump pit in the direction of looking down;

图7是集水坑外侧混凝土护壁井壁7下沉到位时的结构示意图。Fig. 7 is a schematic diagram of the structure when the concrete retaining wall 7 outside the sump sinks in place.

具体实施方式Detailed ways

下面结合附图对本发明进行详细说明:The present invention is described in detail below in conjunction with accompanying drawing:

一种易坍塌土质中电梯井及集水坑基础护壁的施做方法,在楼体基坑1内设计有连接在一起的电梯井基础基坑和集水坑基础基坑,即,长方形的电梯井基础基坑与长方形的集水坑基础基坑,是并排设置在一起,组成一个大长方形,其特征在于以下步骤:A method for constructing elevator shaft and sump foundation retaining walls in easy-to-collapse soil, in which the elevator shaft foundation pit and sump foundation pit connected together are designed in the foundation pit 1 of the building body, that is, a rectangular elevator shaft The well foundation pit and the rectangular sump foundation pit are arranged side by side to form a large rectangle, which is characterized by the following steps:

第一步、在楼体基坑1的基坑底面上,放线出预设置的电梯井基础基坑和集水坑基础基坑的二坑外侧封闭护壁的构建轮廓2,即划出两并列基坑的外侧大长方形轮廓线;Step 1: On the bottom surface of the foundation pit 1 of the building body, set out the construction outline 2 of the closed retaining wall outside the second pit of the foundation pit of the elevator shaft and the foundation pit of the sump pit, that is, draw two parallel Outer large rectangular outline of the foundation pit;

第二步、在二坑外侧封闭护壁的构建轮廓2上,搭设二坑外侧下沉护壁井壁的现浇混凝土模板体系,并浇筑混凝土,形成二坑外侧混凝土护壁井壁3,即二坑共用沉井;The second step is to set up a cast-in-place concrete formwork system for the sinking wall of the outer wall of the second pit on the construction outline 2 of the outer closed wall of the second pit, and pour concrete to form the outer concrete wall of the second pit and the wall 3, which is shared by the second pit caisson;

第三步、将二坑外侧混凝土护壁井壁3下方的土体掏出,使二坑外侧混凝土护壁井壁3,依靠自身的重力,下沉到电梯井基础基坑的设计标高位置处;将下沉到位的二坑外侧混凝土护壁井壁3内的土体挖出,形成电梯井基础基坑坑底面4;The 3rd step, the soil body below the concrete retaining wall shaft wall 3 outside the second pit is pulled out, and the concrete retaining wall shaft wall 3 outside the second pit is sunk to the design elevation position of the elevator shaft foundation pit by its own gravity; Excavate the soil in the outer concrete retaining wall 3 of the second pit that has sunk in place to form the bottom 4 of the foundation pit of the elevator shaft;

第四步、在电梯井基础基坑坑底面4上,放线出预设置的集水坑基础基坑外侧封闭护壁的构建轮廓5,即划出内套沉井的混凝土建筑轮廓线,该集水坑外侧护壁的构建轮廓5是靠接在二坑外侧混凝土护壁井壁3内一侧的,即,长方形的集水坑外侧护壁的构建轮廓5中的三条边,是与二坑外侧混凝土护壁井壁3中的三个内侧面靠接在一起的,即,预浇筑的内套沉井有三外侧面是靠接在二坑共用沉井的内侧面上的;Step 4: On the bottom surface 4 of the foundation pit of the elevator shaft, set out the construction outline 5 of the closed retaining wall outside the foundation pit of the pre-set sump pit, that is, draw the outline of the concrete building of the inner caisson. The construction outline 5 of the outer retaining wall of the water pit is abutted against the inner side of the concrete retaining wall well wall 3 outside the second pit, that is, the three sides of the building outline 5 of the rectangular sump outer retaining wall are the same as the outer concrete retaining wall of the second pit. The three inner sides of the shaft wall 3 are abutted together, that is, the precast inner caisson has three outer sides that are abutted against the inner side of the common caisson of the second pit;

第五步、在集水坑外侧护壁的构建轮廓5上,搭设集水坑外侧下沉护壁井壁的现浇混凝土模板体系6,在该集水坑外侧下沉护壁井壁的现浇混凝土模板体系6中,与二坑外侧混凝土护壁井壁3中的三个内侧面靠接在一起的外侧模板,采用泡沫板;The fifth step, on the construction outline 5 of the outer retaining wall of the sump, set up the cast-in-place concrete formwork system 6 for sinking the retaining wall and well wall outside the sump, and sink the cast-in-place concrete formwork for the retaining wall and well wall outside the sump In system 6, foam boards are used for the outer formwork that abuts the three inner sides of the outer concrete wall 3 of the second pit;

第六步、在集水坑外侧下沉护壁井壁的现浇混凝土模板体系6中,浇筑混凝土,形成封闭的集水坑外侧混凝土护壁井壁7,即集水坑外侧混凝土护壁井壁7(内套沉井),是套接在二坑外侧混凝土护壁井壁3(二坑共用沉井)内;In the sixth step, in the cast-in-situ concrete formwork system 6 for sinking the retaining wall well wall outside the sump pit, pour concrete to form a closed concrete retaining wall well wall 7 outside the sump pit, that is, the concrete retaining wall well wall 7 outside the sump pit ( Inner casing caisson) is socketed in the outer concrete wall 3 of the second pit (the second pit shares the caisson);

第七步、将集水坑外侧下沉护壁井壁的现浇混凝土模板体系6中的模板拆除,并采用喷灯,将与二坑外侧混凝土护壁井壁3中的三个内侧面靠接在一起的泡沫板烧除,在集水坑外侧混凝土护壁井壁7与二坑外侧混凝土护壁井壁3之间,形成有两沉井间隔缝隙8,使后续内套沉井下沉时,两者之间不会有摩擦力存在;The seventh step is to remove the formwork in the cast-in-place concrete formwork system 6 of the sunken wall protection well wall on the outside of the sump pit, and use a blowtorch to abut against the three inner sides of the concrete wall protection well wall 3 on the outside of the second pit The foam board is burnt out, and between the concrete wall 7 outside the sump pit and the concrete wall 3 outside the second pit, there is a gap 8 between the two caissons, so that when the subsequent inner caisson sinks, the gap between the two There will be no friction;

第八步、将集水坑外侧混凝土护壁井壁7下方的土体掏出,使集水坑外侧混凝土护壁井壁7,依靠自身的重力,下沉到集水坑基础基坑的设计标高位置处,将集水坑外侧混凝土护壁井壁7内的土体挖出,形成集水坑基坑坑底面9;Step 8: Take out the soil below the concrete retaining wall 7 on the outside of the sump, so that the concrete retaining wall 7 on the outside of the sump sinks to the design elevation of the foundation pit of the sump by its own gravity At the place, excavate the soil in the concrete retaining wall 7 outside the sump to form the bottom 9 of the foundation pit of the sump;

第九步、在下沉到位的集水坑外侧混凝土护壁井壁7的顶端面与二坑外侧混凝土护壁井壁3的底端面之间的两沉井间隔缝隙8中,设置水泥净浆浇筑层10,将两沉井间隔缝隙8封闭,将两沉井的外侧渗水封闭;The ninth step, in the gap 8 between the two caissons between the top surface of the concrete retaining wall well wall 7 outside the sump pit and the bottom end surface of the concrete retaining wall well wall 3 outside the second pit, set the cement paste pouring layer 10 , the gap 8 between the two caissons is closed, and the outer seepage of the two caissons is sealed;

第十步、在电梯井基础基坑坑底面4上,以及集水坑基坑坑底面9上,分别构筑200毫米厚的砂石褥垫层,并布设排水管,方便将两沉井井底水排出。The tenth step, on the bottom surface 4 of the foundation pit of the elevator shaft foundation, and on the bottom surface 9 of the foundation pit pit of the sump pit, respectively build a 200 mm thick sandstone cushion, and lay drainage pipes to facilitate the bottom of the two caissons. Water drains.

二坑外侧混凝土护壁井壁3的高度为1.8米,集水坑外侧混凝土护壁井壁7的高度为1.4米;二坑外侧混凝土护壁井壁3中的混凝土强度与集水坑外侧混凝土护壁井壁7中的混凝土强度是相同的,水泥净浆浇筑层10中的混凝土强度比二坑外侧混凝土护壁井壁3中的混凝土强度高一个等级;最后封底,两沉井,在施工期间作为支撑四周土体的护壁,竣工后即为永久性的深基础埋入土中。The height of the concrete retaining wall well wall 3 outside the second pit is 1.8 meters, and the height of the concrete retaining wall well wall 7 outside the sump pit is 1.4 meters; The concrete strength in 7 is the same, and the concrete strength in the cement slurry pouring layer 10 is one grade higher than the concrete strength in the concrete retaining wall shaft wall 3 outside the second pit; the final back cover, the two caissons, are used as supporting surrounding soil during construction The retaining wall of the body is buried in the soil as a permanent deep foundation after completion.

Claims (1)

1.一种易坍塌土质中电梯井及集水坑基础护壁的施做方法,在楼体基坑(1)内设计有连接在一起的电梯井基础基坑和集水坑基础基坑,其特征在于以下步骤:1. A method for implementing elevator shaft and sump foundation retaining walls in easy-to-collapse soil, in which the elevator shaft foundation pit and sump pit foundation pit connected together are designed in the building body foundation pit (1), and the Characterized by the following steps: 第一步、在楼体基坑(1)的基坑底面上,放线出预设置的电梯井基础基坑和集水坑基础基坑的二坑外侧封闭护壁的构建轮廓(2);Step 1: On the bottom surface of the foundation pit of the building body (1), set out the construction outline (2) of the closed retaining wall outside the second pit of the foundation pit of the elevator shaft and the foundation pit of the sump pit; 第二步、在二坑外侧封闭护壁的构建轮廓(2)上,搭设二坑外侧下沉护壁井壁的现浇混凝土模板体系,并浇筑混凝土,形成二坑外侧混凝土护壁井壁(3);In the second step, on the construction outline (2) of the closed retaining wall outside the second pit, set up the cast-in-place concrete formwork system for the sinking retaining wall well wall outside the second pit, and pour concrete to form the concrete retaining wall well wall (3) outside the second pit; 第三步、将二坑外侧混凝土护壁井壁(3)下方的土体掏出,使二坑外侧混凝土护壁井壁(3),依靠自身的重力,下沉到电梯井基础基坑的设计标高位置处;将下沉到位的二坑外侧混凝土护壁井壁(3)内的土体挖出,形成电梯井基础基坑坑底面(4);The third step is to dig out the soil below the outer concrete wall (3) of the second pit, so that the outer concrete wall (3) of the second pit will sink to the design elevation of the foundation pit of the elevator shaft by its own gravity position; dig out the soil in the outer concrete retaining wall (3) of the second pit that has sunk in place to form the bottom surface (4) of the foundation pit of the elevator shaft; 第四步、在电梯井基础基坑坑底面(4)上,放线出预设置的集水坑基础基坑外侧封闭护壁的构建轮廓(5),该集水坑外侧护壁的构建轮廓(5)是靠接在二坑外侧混凝土护壁井壁(3)内一侧的,即,长方形的集水坑外侧护壁的构建轮廓(5)中的三条边,是与二坑外侧混凝土护壁井壁(3)中的三个内侧面靠接在一起的;Step 4: On the bottom surface of the foundation pit of the elevator shaft (4), set out the construction outline (5) of the closed retaining wall outside the foundation pit of the pre-set sump pit, and the construction outline of the outer retaining wall of the sump pit (5 ) is adjacent to the inner side of the outer concrete retaining wall (3) of the second pit, that is, the three sides of the construction outline (5) of the rectangular sump outer retaining wall are connected to the outer concrete retaining wall of the second pit ( 3) The three inner sides of the box are butted together; 第五步、在集水坑外侧护壁的构建轮廓(5)上,搭设集水坑外侧下沉护壁井壁的现浇混凝土模板体系(6),在该集水坑外侧下沉护壁井壁的现浇混凝土模板体系(6)中,与二坑外侧混凝土护壁井壁(3)中的三个内侧面靠接在一起的外侧模板,采用泡沫板;Step 5: Set up the cast-in-place concrete formwork system (6) on the construction outline (5) of the outer retaining wall of the sump pit, and set up the cast-in-place concrete formwork system (6) on the outer sinking retaining wall well wall of the sump pit. In the cast-in-place concrete formwork system (6), the outer formwork that abuts with the three inner sides of the outer concrete retaining wall (3) of the second pit uses a foam board; 第六步、在集水坑外侧下沉护壁井壁的现浇混凝土模板体系(6)中,浇筑混凝土,形成封闭的集水坑外侧混凝土护壁井壁(7);The sixth step is to pour concrete into the cast-in-situ concrete formwork system (6) for sinking the retaining wall well wall outside the sump pit to form a closed concrete retaining wall well wall (7) outside the sump pit; 第七步、将集水坑外侧下沉护壁井壁的现浇混凝土模板体系(6)中的模板拆除,并采用喷灯,将与二坑外侧混凝土护壁井壁(3)中的三个内侧面靠接在一起的泡沫板烧除,在集水坑外侧混凝土护壁井壁(7)与二坑外侧混凝土护壁井壁(3)之间,形成有两沉井间隔缝隙(8);The seventh step is to remove the formwork in the cast-in-place concrete formwork system (6) of the sinking retaining wall well wall on the outside of the sump pit, and use a blowtorch to match the three inner surfaces of the concrete retaining wall well wall (3) on the outside of the second pit The foam boards abutted together are burnt out, and a gap (8) between the two caissons is formed between the concrete wall (7) outside the sump pit and the concrete wall (3) outside the second pit; 第八步、将集水坑外侧混凝土护壁井壁(7)下方的土体掏出,使集水坑外侧混凝土护壁井壁(7),依靠自身的重力,下沉到集水坑基础基坑的设计标高位置处,将集水坑外侧混凝土护壁井壁(7)内的土体挖出,形成集水坑基坑坑底面(9);Step 8: Take out the soil below the concrete retaining wall (7) on the outside of the sump, so that the concrete retaining wall (7) on the outside of the sump sinks to the foundation pit of the sump by its own gravity At the design elevation position of the sump pit, dig out the soil in the concrete retaining wall (7) outside the sump pit to form the bottom surface of the sump pit foundation pit (9); 第九步、在下沉到位的集水坑外侧混凝土护壁井壁(7)的顶端面与二坑外侧混凝土护壁井壁(3)的底端面之间的两沉井间隔缝隙(8)中,设置水泥净浆浇筑层(10),将两沉井间隔缝隙(8)封闭;Step 9: In the gap between the two caissons (8) between the top surface of the concrete retaining wall (7) on the outside of the sinking sump and the bottom end of the concrete retaining wall (3) on the outside of the second pit, set The cement slurry pouring layer (10) seals the interval gap (8) between the two caissons; 第十步、在电梯井基础基坑坑底面(4)上,以及集水坑基坑坑底面(9)上,分别构筑200毫米厚的砂石褥垫层,并布设排水管。Step 10: On the bottom of the foundation pit of the elevator shaft (4) and the bottom of the foundation pit of the sump pit (9), respectively build a 200 mm thick sandstone cushion and arrange drainage pipes.
CN202210487570.2A 2022-05-06 2022-05-06 Construction method of elevator shaft and foundation retaining wall of sump pit in easy-to-collapse soil Active CN114809010B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210487570.2A CN114809010B (en) 2022-05-06 2022-05-06 Construction method of elevator shaft and foundation retaining wall of sump pit in easy-to-collapse soil

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210487570.2A CN114809010B (en) 2022-05-06 2022-05-06 Construction method of elevator shaft and foundation retaining wall of sump pit in easy-to-collapse soil

Publications (2)

Publication Number Publication Date
CN114809010A CN114809010A (en) 2022-07-29
CN114809010B true CN114809010B (en) 2023-08-18

Family

ID=82511893

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210487570.2A Active CN114809010B (en) 2022-05-06 2022-05-06 Construction method of elevator shaft and foundation retaining wall of sump pit in easy-to-collapse soil

Country Status (1)

Country Link
CN (1) CN114809010B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101245602A (en) * 2008-03-13 2008-08-20 王形 Construction technique for pits in foundation-pit support system
KR20090049731A (en) * 2007-11-14 2009-05-19 엄기형 Elevator feet support structure
CN105133619A (en) * 2015-08-07 2015-12-09 中国一冶集团有限公司 Construction method for deep foundation pit of elevator shaft
CN109736337A (en) * 2019-02-22 2019-05-10 宁蔚蔚 A kind of substrate elevator catch pit drift sand processing guarantees the dewatering device and method of bed course integrality
CN110158649A (en) * 2019-06-05 2019-08-23 浙江交工集团股份有限公司 The construction method of Adjacent Underground Pipeline when a kind of caisson sinking construction
CN113373963A (en) * 2021-06-08 2021-09-10 中国十七冶集团有限公司 Drainage structure for water collection pit and elevator foundation pit and construction method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090049731A (en) * 2007-11-14 2009-05-19 엄기형 Elevator feet support structure
CN101245602A (en) * 2008-03-13 2008-08-20 王形 Construction technique for pits in foundation-pit support system
CN105133619A (en) * 2015-08-07 2015-12-09 中国一冶集团有限公司 Construction method for deep foundation pit of elevator shaft
CN109736337A (en) * 2019-02-22 2019-05-10 宁蔚蔚 A kind of substrate elevator catch pit drift sand processing guarantees the dewatering device and method of bed course integrality
CN110158649A (en) * 2019-06-05 2019-08-23 浙江交工集团股份有限公司 The construction method of Adjacent Underground Pipeline when a kind of caisson sinking construction
CN113373963A (en) * 2021-06-08 2021-09-10 中国十七冶集团有限公司 Drainage structure for water collection pit and elevator foundation pit and construction method

Also Published As

Publication number Publication date
CN114809010A (en) 2022-07-29

Similar Documents

Publication Publication Date Title
CN101503882B (en) Underground continuous wall with connected reinforcement cage constructed by reverse construction method and construction method thereof
CN209854753U (en) A kind of caisson structure under the condition of pressurized water fine sand layer
CN110158630A (en) A kind of deep covering layer area large-span arch bridge annular ground continuous wall base
CN113431097A (en) Protection structure of shallow foundation building next to deep foundation pit engineering and construction method
CN105756091A (en) Metro station foundation pit construction method for controlling deformation of neighboring buildings
CN104099946A (en) Novel jacking pipe intersegment overhaul well
CN202194149U (en) Waterproof curtain
CN110700280B (en) A diversion device and construction method for foundation pit support construction in narrow areas
CN201972155U (en) Topdown-construction-method foundation pit supporting structure of steel plate pile
CN211113714U (en) Thin-wall full-surrounding embedded foundation suitable for rock foundation
CN102888847B (en) Construction method free from lowering water level for local deep foundation pit of elevator shaft
CN209854754U (en) A semi-closed caisson structure in quicksand formation
CN112281888A (en) Excavation supporting method for foundation pit caisson
CN104088296A (en) Soft soil area basement layer adding construction method
CN107326932B (en) A quasi-semi-reverse construction method for an underground garage
CN104846837B (en) The construction method of ultra-deep well in a kind of bright draining foundation ditch
CN105625299B (en) A kind of wall board type Novel underground diaphragm wall and its construction method
CN104213567A (en) Construction method for controlling sliding of slope section of underground pipeline
JP4011209B2 (en) Construction method of shaft
CN106436721A (en) Underground diaphragm wall embedded steel enclosing purlin plug system and construction method thereof
CN114809015B (en) Temporary support system and permanent structure combined construction method for open cut subway station
CN217204304U (en) A kind of cover and excavation inverse to do the waterproof structure of the upper construction joint of the side wall of the subway station
CN116084427A (en) Construction method of raft inner foundation pit for water-rich foundation in quicksand layer
CN113529903B (en) Construction method of middle inspection well by reverse construction method
CN114809010A (en) Construction method of foundation wall of elevator shaft and sump pit in easily collapsed soil

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: No.266 Taihang East Street, Changzhi City, Shanxi Province 046000

Patentee after: SHANXI THIRD CONSTRUCTION Co.,Ltd.

Country or region after: China

Patentee after: Shanxi Shoufeng Construction Engineering Co.,Ltd.

Address before: No.266 Taihang East Street, Changzhi City, Shanxi Province 046000

Patentee before: SHANXI THIRD CONSTRUCTION Co.,Ltd.

Country or region before: China

Patentee before: Shanxi Sanjian Group Construction Engineering Co.,Ltd.

CP03 Change of name, title or address