CN107934352A - A kind of mobile lifting formula feeding tube - Google Patents
A kind of mobile lifting formula feeding tube Download PDFInfo
- Publication number
- CN107934352A CN107934352A CN201711375529.1A CN201711375529A CN107934352A CN 107934352 A CN107934352 A CN 107934352A CN 201711375529 A CN201711375529 A CN 201711375529A CN 107934352 A CN107934352 A CN 107934352A
- Authority
- CN
- China
- Prior art keywords
- feeding tube
- stent
- linking arm
- parallel
- support roller
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G11/00—Chutes
- B65G11/02—Chutes of straight form
- B65G11/026—Chutes of straight form for bulk
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G11/00—Chutes
- B65G11/18—Supports or mountings
- B65G11/186—Supports or mountings for bulk
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G11/00—Chutes
- B65G11/20—Auxiliary devices, e.g. for deflecting, controlling speed of, or agitating articles or solids
- B65G11/206—Auxiliary devices, e.g. for deflecting, controlling speed of, or agitating articles or solids for bulk
Abstract
The invention discloses a kind of mobile lifting formula feeding tube.A kind of mobile lifting formula feeding tube, including axletree, wheel, further include feeding tube, lift winch, steel wire rope, linking arm, lifting arm, feeding tube support roller, pulley blocks, and linking arm is parallel terraced stent;Under normality, the bottom surface of the feeding tube upper end is abutted on parallel terraced two, the stent feeding tube support roller that stripe board other end end cross is installed with relatively;Pulley blocks use pulley blocks mounting bracket to be installed on the close feeding tube support roller position of parallel terraced stent, and lift winch is installed on the feeding tube bottom surface on the upside of linking arm and feeding tube link position using lift winch mounting bracket.Big material bin clout is emptied and is delivered to lifting machine inlet by feeding tube by convenient realize of the invention, is reduced big material bin clout and is had bad luck cost, improves big material bin clout and empty work efficiency;Prevent big material bin clout dust pollution surrounding environment.
Description
Technical field
The invention belongs to a kind of feeding tube, especially belongs to a kind of mobile lifting formula feeding tube.
Background technology
At present, in anode carbon block production process, because technological requirement is needed the big material bin on anode carbon block production line sometimes
Clout is emptied.Big material bin by place limited space because that can not be set fixed discharge duct, and general 6 meters from the ground of discharge port
More than, it is mostly to be had bad luck using automobile to lifting machine inlet, of high cost, work effect that former big material bin clout, which empties discharge way,
Rate is low;Big material bin clout dust pollution surrounding environment is also easily formed at the same time.How easily big material bin clout to be emptied simultaneously
Lifting machine inlet is transported to, and reduces clout and has bad luck cost, clout is improved and empties work efficiency;Also prevent clout dust pollution
Surrounding environment is problem to be solved.
The content of the invention
The technical problems to be solved by the invention are:A kind of mobile lifting formula feeding tube is provided.Material is slipped using the lift
Pipe can easily not only empty big material bin clout and be delivered to lifting machine inlet by material conveying pipe, and can drop
Low clout has bad luck cost, improves clout and empties work efficiency;It can also prevent clout dust pollution surrounding environment.
The present invention solve above-mentioned technical problem technical solution be:A kind of mobile lifting formula feeding tube, including axletree and
The wheel at axletree both ends is installed on using bearing respectively, it is characterized in that:Further include feeding tube, lift winch, steel wire rope, company
Arm, lifting arm, feeding tube support roller, pulley blocks are connect, which is parallel terraced stent, and the parallel terraced stent is by two opposite bars
6 transverse plates that shape plate and at least parallel transverse are installed between this two opposite stripe boards are formed;The parallel terraced stent two
Bearing is also installed respectively in the cross through hole that bar is set respectively with respect to stripe board one end end, parallel terraced two, the stent is opposite
Stripe board is installed with both sides of the end cap installed in axletree centre position of bearing respectively, and parallel terraced two, the stent is opposite
Stripe board other end end cross is installed with feeding tube support roller;
Bearing is installed in the cross through hole that described linking arm one end is set, which is installed with the end cap peace of bearing
Mounted in the centre position of the axletree, the other end of the linking arm and two side position of feeding tube middle and lower part bottom center line
On two pieces of risers and the shaft being installed between two pieces of risers are installed are flexibly connected;Under normality, the bottom surface of the feeding tube upper end
Abut on parallel terraced two, the stent feeding tube support roller that stripe board other end end cross is installed with relatively;The pulley
Group is installed on using pulley blocks mounting bracket on the close feeding tube support roller position of parallel terraced stent, and the lift winch, which uses, to be risen
Drop on the feeding tube bottom surface that hoist engine mounting bracket is installed on the upside of linking arm and feeding tube link position;The one of the steel wire rope
End is fixedly mounted on lift winch, and the other end is fixedly mounted on close to linking arm and feeding tube through pulley blocks using draw ring
On the upper top surface of the linking arm of link position;
Diagonally-installed jacking disk on the tube wall of the feeding tube top, is installed with sealing ring on the jacking disk;The feeding tube
Top tube wall angle of inclination is 40-45 °, and the feeding tube bottom tube wall angle of inclination is 40-45 °;When startup lift winch
When parallel terraced stent is slowly risen with workshop place plane in 90 °, what parallel ladder stent one end end cross was installed with slips material
The feeding tube that against on conduit saddle wheel slowly rises, and the sealing ring energy being installed with the jacking disk of feeding tube top tube wall setting
Docked with the elastic hose sealing of big material bin feed opening installation, the ripple that the feeding tube bottom can be set with lifting machine inlet
Pipe docks.
The course of work of the present invention is:The present invention is pushed to big material bin feed opening and lifts the workshop between machine inlet
On the ground, start lift winch slowly to rise parallel terraced stent up to being in 90 ° with workshop place plane, parallel ladder stent one end
The feeding tube that against on the feeding tube support roller that end cross is installed with slowly rises, the jacking set on the tube wall of feeding tube top
The sealing ring being installed with disk is docked with the elastic hose sealing that big material bin feed opening is installed, and feeding tube bottom is fed with elevator
The bellows docking that mouth is set, opens big material bin discharge valve until completion discharge operation;Big material bin discharging discharge operation is completed, and is opened
Dynamic lift winch antiport, parallel ladder stent are slowly fallen until packing up normality, and parallel ladder stent one end end cross is pacified
The feeding tube that against on the feeding tube support roller being filled with slowly is fallen up to packing up normality, and the present invention is pushed to the vacant field in workshop
On the ground in case using again.
The beneficial effects of the invention are as follows:Since the present invention is provided with feeding tube, lift winch, steel wire rope, linking arm, liter
Arm, feeding tube support roller, pulley blocks drop, and under normality, the bottom surface of the feeding tube upper end abuts in the opposite bar shapeds of parallel two, terraced stent
On the feeding tube support roller that plate other end end cross is installed with;Pulley blocks are installed on parallel terraced stent using pulley blocks mounting bracket
On feeding tube support roller position, lift winch is installed on linking arm and feeding tube connection position using lift winch mounting bracket
On the feeding tube bottom surface for putting upside.When starting lift winch, by parallel terraced stent, slowly rise is in workshop place plane
At 90 °, the feeding tube that against on the feeding tube support roller that parallel ladder stent one end end cross is installed with slowly rises, and slips material
The sealing ring being installed with the jacking disk that tube top end pipe wall is set is docked with the elastic hose sealing that big material bin feed opening is installed, and is slipped
Docked with the bellows that lifting machine inlet is set expects pipe bottom.Convenient realize of the invention is emptied big material bin clout
And lifting machine inlet is delivered to by feeding tube, reduce big material bin clout and have bad luck cost, improve big material bin clout and empty
Work efficiency;Prevent big material bin clout dust pollution surrounding environment.
Brief description of the drawings
The present invention is further described with reference to the accompanying drawings and examples;
Fig. 1 is the structure diagram that the present invention packs up normality;
Fig. 2 is the structure diagram of working status of the present invention;
Fig. 3 is the left view of working status of the present invention;
In attached drawing:It is 1. axletree, 2. wheels, 3. feeding tubes, 4. lift winch, 5. steel wire ropes, 6. linking arms, 7. parallel
Terraced stent, 8. feeding tube support rollers, 9. pulley blocks, 10. shafts, 11. jacking disks, 12. sealing rings.
Embodiment
Below by specific embodiment, the present invention is described in further detail.
Embodiment 1
As shown in Figure 1, Figure 2, Figure 3 shows, a kind of mobile lifting formula feeding tube, including axletree 1 and installed respectively using bearing
Wheel 2 at 1 both ends of axletree, it is characterized in that:Further include feeding tube 3, lift winch 4, steel wire rope 5, linking arm 6, lifting
Arm, feeding tube support roller 8, pulley blocks 9, the linking arm are parallel terraced stent 7, and the parallel terraced stent 7 is by two opposite stripe boards
6 transverse plates that at least parallel transverse is installed between this two opposite stripe boards are formed;7 two phases of the parallel terraced stent
Zhou Cheng ﹙ explanations are also installed with respectively into Tong Kong ﹙ Figure of description in non-Hua Chu ﹚ to the Heng that stripe board one end end is set respectively
﹚ is not drawn out in book attached drawing, the end cap which is installed with bearing respectively is installed on axletree 1
The both sides in centre position, parallel terraced 7 two, the stent stripe board other end end cross relatively are installed with feeding tube support roller 8;
The Heng that described 6 one end of linking arm is set is installed with Zhou Cheng ﹙ specifications into Tong Kong ﹙ Figure of description in non-Hua Chu ﹚
﹚ is not drawn out in attached drawing, which is installed with centre position of the end cap installed in the axletree 1 of bearing, the linking arm
6 other end on 3 middle and lower part bottom center line of feeding tube, two side position with being installed with two pieces of vertical plate ﹙ Figure of description not
Hua Chu ﹚ and the shaft 10 being installed between two pieces of risers are flexibly connected;Under normality, the bottom surface of 3 upper end of feeding tube abuts in institute
State on parallel terraced 7 two, the stent feeding tube support roller 8 that stripe board other end end cross is installed with relatively;The pulley blocks 9 make
It is installed on pulley blocks mounting bracket on close 8 position of feeding tube support roller of parallel terraced stent 7, the lift winch 4 uses liter
Drop on 3 bottom surface of feeding tube that hoist engine mounting bracket is installed on the upside of linking arm 6 and 3 link position of feeding tube;The steel wire rope 5
One end be fixedly mounted on lift winch 4, the other end is fixedly mounted on close to linking arm 6 through pulley blocks 9 using draw ring
With on the upper top surface of the linking arm 6 of 3 link position of feeding tube;
Diagonally-installed jacking disk 11 on the 3 top tube wall of feeding tube, is installed with sealing ring 12 on the jacking disk 11;Should
3 top tube wall angle of inclination of feeding tube is 40 °, and the 3 bottom tube wall angle of inclination of feeding tube is 40 °;When the startup lifting
When hoist engine 4 slowly rises parallel terraced stent 7 with workshop place plane in 90 °, parallel 7 one end end cross installation of ladder stent
The feeding tube 3 that against on the feeding tube support roller 8 slowly rises, and pacifies on the jacking disk 11 of 3 top tube wall setting of feeding tube
The sealing ring 12 being filled with can with big material bin Xia Liao Kou ﹙ Figure of description in non-Hua Chu ﹚ installation Dan Ruan Guan ﹙ Figure of description in
﹚ sealing docking, ripple that feeding tube 3 bottom can with lifting machine inlet ﹙ Figure of description do not draw out ﹚ be set are not drawn out
Non- Hua Chu ﹚ docking in Guan ﹙ Figure of description.
Embodiment 2
As shown in Figure 1, Figure 2, Figure 3 shows, a kind of mobile lifting formula feeding tube, including axletree 1 and installed respectively using bearing
Wheel 2 at 1 both ends of axletree, it is characterized in that:Further include feeding tube 3, lift winch 4, steel wire rope 5, linking arm 6, lifting
Arm, feeding tube support roller 8, pulley blocks 9, the linking arm are parallel terraced stent 7, and the parallel terraced stent 7 is by two opposite stripe boards
6 transverse plates that at least parallel transverse is installed between this two opposite stripe boards are formed;7 two phases of the parallel terraced stent
Zhou Cheng ﹙ explanations are also installed with respectively into Tong Kong ﹙ Figure of description in non-Hua Chu ﹚ to the Heng that stripe board one end end is set respectively
﹚ is not drawn out in book attached drawing, the end cap which is installed with bearing respectively is installed on axletree 1
The both sides in centre position, parallel terraced 7 two, the stent stripe board other end end cross relatively are installed with feeding tube support roller 8;
The Heng that described 6 one end of linking arm is set is installed with Zhou Cheng ﹙ specifications into Tong Kong ﹙ Figure of description in non-Hua Chu ﹚
﹚ is not drawn out in attached drawing, which is installed with centre position of the end cap installed in the axletree 1 of bearing, the linking arm
6 other end on 3 middle and lower part bottom center line of feeding tube, two side position with being installed with two pieces of vertical plate ﹙ Figure of description not
Hua Chu ﹚ and the shaft 10 being installed between two pieces of risers are flexibly connected;Under normality, the bottom surface of 3 upper end of feeding tube abuts in institute
State on parallel terraced 7 two, the stent feeding tube support roller 8 that stripe board other end end cross is installed with relatively;The pulley blocks 9 make
It is installed on pulley blocks mounting bracket on close 8 position of feeding tube support roller of parallel terraced stent 7, the lift winch 4 uses liter
Drop on 3 bottom surface of feeding tube that hoist engine mounting bracket is installed on the upside of linking arm 6 and 3 link position of feeding tube;The steel wire rope 5
One end be fixedly mounted on lift winch 4, the other end is fixedly mounted on close to linking arm 6 through pulley blocks 9 using draw ring
With on the upper top surface of the linking arm 6 of 3 link position of feeding tube;
Diagonally-installed jacking disk 11 on the 3 top tube wall of feeding tube, is installed with sealing ring 12 on the jacking disk 11;Should
3 top tube wall angle of inclination of feeding tube is 42 °, and the 3 bottom tube wall angle of inclination of feeding tube is 42 °;When the startup lifting
When hoist engine 4 slowly rises parallel terraced stent 7 with workshop place plane in 90 °, parallel 7 one end end cross installation of ladder stent
The feeding tube 3 that against on the feeding tube support roller 8 slowly rises, and pacifies on the jacking disk 11 of 3 top tube wall setting of feeding tube
The sealing ring 12 being filled with can with big material bin Xia Liao Kou ﹙ Figure of description in non-Hua Chu ﹚ installation Dan Ruan Guan ﹙ Figure of description in
﹚ sealing docking, ripple that feeding tube 3 bottom can with lifting machine inlet ﹙ Figure of description do not draw out ﹚ be set are not drawn out
Non- Hua Chu ﹚ docking in Guan ﹙ Figure of description.
Embodiment 3
As shown in Figure 1, Figure 2, Figure 3 shows, a kind of mobile lifting formula feeding tube, including axletree 1 and installed respectively using bearing
Wheel 2 at 1 both ends of axletree, it is characterized in that:Further include feeding tube 3, lift winch 4, steel wire rope 5, linking arm 6, lifting
Arm, feeding tube support roller 8, pulley blocks 9, the linking arm are parallel terraced stent 7, and the parallel terraced stent 7 is by two opposite stripe boards
6 transverse plates that at least parallel transverse is installed between this two opposite stripe boards are formed;7 two phases of the parallel terraced stent
Zhou Cheng ﹙ explanations are also installed with respectively into Tong Kong ﹙ Figure of description in non-Hua Chu ﹚ to the Heng that stripe board one end end is set respectively
﹚ is not drawn out in book attached drawing, the end cap which is installed with bearing respectively is installed on axletree 1
The both sides in centre position, parallel terraced 7 two, the stent stripe board other end end cross relatively are installed with feeding tube support roller 8;
The Heng that described 6 one end of linking arm is set is installed with Zhou Cheng ﹙ specifications into Tong Kong ﹙ Figure of description in non-Hua Chu ﹚
﹚ is not drawn out in attached drawing, which is installed with centre position of the end cap installed in the axletree 1 of bearing, the linking arm
6 other end on 3 middle and lower part bottom center line of feeding tube, two side position with being installed with two pieces of vertical plate ﹙ Figure of description not
Hua Chu ﹚ and the shaft 10 being installed between two pieces of risers are flexibly connected;Under normality, the bottom surface of 3 upper end of feeding tube abuts in institute
State on parallel terraced 7 two, the stent feeding tube support roller 8 that stripe board other end end cross is installed with relatively;The pulley blocks 9 make
It is installed on pulley blocks mounting bracket on close 8 position of feeding tube support roller of parallel terraced stent 7, the lift winch 4 uses liter
Drop on 3 bottom surface of feeding tube that hoist engine mounting bracket is installed on the upside of linking arm 6 and 3 link position of feeding tube;The steel wire rope 5
One end be fixedly mounted on lift winch 4, the other end is fixedly mounted on close to linking arm 6 through pulley blocks 9 using draw ring
With on the upper top surface of the linking arm 6 of 3 link position of feeding tube;
Diagonally-installed jacking disk 11 on the 3 top tube wall of feeding tube, is installed with sealing ring 12 on the jacking disk 11;Should
3 top tube wall angle of inclination of feeding tube is 45 °, and the 3 bottom tube wall angle of inclination of feeding tube is 45 °;When the startup lifting
When hoist engine 4 slowly rises parallel terraced stent 7 with workshop place plane in 90 °, parallel 7 one end end cross installation of ladder stent
The feeding tube 3 that against on the feeding tube support roller 8 slowly rises, and pacifies on the jacking disk 11 of 3 top tube wall setting of feeding tube
The sealing ring 12 being filled with can with big material bin Xia Liao Kou ﹙ Figure of description in non-Hua Chu ﹚ installation Dan Ruan Guan ﹙ Figure of description in
﹚ sealing docking, ripple that feeding tube 3 bottom can with lifting machine inlet ﹙ Figure of description do not draw out ﹚ be set are not drawn out
Non- Hua Chu ﹚ docking in Guan ﹙ Figure of description.
By above-mentioned description, those skilled in the art completely can be in the model without departing from this invention technological thought
In enclosing, various changes and amendments are carried out all within protection scope of the present invention.The unaccomplished matter of the present invention, belongs to ability
The common knowledge of field technique personnel.
Claims (2)
1. a kind of mobile lifting formula feeding tube, including axletree and the wheel for being installed on axletree both ends using bearing respectively, its
It is characterized in:Further include feeding tube, lift winch, steel wire rope, linking arm, lifting arm, feeding tube support roller, pulley blocks, the connection
Arm is parallel terraced stent, which is installed on this two opposite bars by two opposite stripe boards and at least parallel transverse
6 transverse plates between shape plate are formed;Parallel terraced two, the stent transverse direction that stripe board one end end is set respectively relatively is led to
Bearing is also installed respectively, the end cap which is installed with bearing respectively is installed on car in hole
The both sides in wheel shaft centre position, parallel terraced two, the stent stripe board other end end cross relatively are installed with feeding tube support
Wheel;
Bearing is installed in the cross through hole that described linking arm one end is set, the end cap which is installed with bearing is installed on
The centre position of the axletree, the other end of the linking arm on two side position of feeding tube middle and lower part bottom center line with pacifying
It is filled with two pieces of risers and the shaft being installed between two pieces of risers is flexibly connected;Under normality, the bottom surface of the feeding tube upper end reclines
On parallel terraced two, the stent feeding tube support roller that stripe board other end end cross is installed with relatively;The pulley blocks make
It is installed on pulley blocks mounting bracket on the close feeding tube support roller position of parallel terraced stent, the lift winch is rolled up using lifting
Machine mounting bracket is raised on the feeding tube bottom surface on the upside of linking arm and feeding tube link position;One end of the steel wire rope is consolidated
On lift winch, the other end is fixedly mounted on using draw ring through pulley blocks and is connected close to linking arm with feeding tube for Dingan County
On the upper top surface of the linking arm of position;
Diagonally-installed jacking disk on the tube wall of the feeding tube top, is installed with sealing ring on the jacking disk;The feeding tube top
Tube wall angle of inclination is 40-45 °, and the feeding tube bottom tube wall angle of inclination is 40-45 °;Will be flat when starting lift winch
Row ladder stent is slowly risen with workshop place plane when being in 90 °, the feeding tube support that parallel ladder stent one end end cross is installed with
The feeding tube that against on wheel slowly rises, and on the jacking disk that sets of feeding tube top tube wall the sealing ring that is installed with can with it is big
The elastic hose sealing docking of bin blanking mouth installation, the bellows pair that the feeding tube bottom can be set with lifting machine inlet
Connect.
2. a kind of mobile lifting formula feeding tube according to claim 1, it is characterized in that:The described feeding tube top tube wall tilts
Angle is 42 °, and the feeding tube bottom tube wall angle of inclination is 42 °.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711375529.1A CN107934352A (en) | 2017-12-19 | 2017-12-19 | A kind of mobile lifting formula feeding tube |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711375529.1A CN107934352A (en) | 2017-12-19 | 2017-12-19 | A kind of mobile lifting formula feeding tube |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107934352A true CN107934352A (en) | 2018-04-20 |
Family
ID=61940866
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711375529.1A Withdrawn CN107934352A (en) | 2017-12-19 | 2017-12-19 | A kind of mobile lifting formula feeding tube |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107934352A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110303589A (en) * | 2019-07-19 | 2019-10-08 | 甘肃酒钢集团西部重工股份有限公司 | A kind of dry type refractory powder material distributing machine and its distributing method and application |
-
2017
- 2017-12-19 CN CN201711375529.1A patent/CN107934352A/en not_active Withdrawn
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110303589A (en) * | 2019-07-19 | 2019-10-08 | 甘肃酒钢集团西部重工股份有限公司 | A kind of dry type refractory powder material distributing machine and its distributing method and application |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203877365U (en) | Sand conveying semitrailer | |
CN203095044U (en) | Cargo loading and unloading equipment | |
CN104801481B (en) | High energy efficiency pocket segregation apparatus | |
CN112373864A (en) | Modular fracturing sand storage and conveying system | |
CN107934352A (en) | A kind of mobile lifting formula feeding tube | |
CN1911766B (en) | Conveyor belt type loading machine | |
CN104444482A (en) | Logistics system for collecting paper of large-format offset press | |
CN202717372U (en) | Automatically moving type stacker reclaimer | |
CN207791799U (en) | A kind of mobile lifting formula feeding tube | |
CN106743317B (en) | Self-cleaning telescopic cement unloading and conveying device | |
CN207944691U (en) | A kind of construction Lifting scaffold | |
CN108709690A (en) | General water testing machine suitable for water base powder base fire extinguisher production | |
CN203974817U (en) | From charging liftable mining trolley | |
CN201198410Y (en) | Hanging steel bar bearing for spiral conveyer | |
CN203975748U (en) | A kind of chain bucket elevator | |
CN209241993U (en) | A kind of mining support trolley | |
CN202499543U (en) | Recovery transition device | |
CN202518146U (en) | Self-loading and self-unloading trailer | |
CN204896729U (en) | Easily restore multi -angle ore delivery machine of unloading | |
CN208948801U (en) | A kind of shift unit of large size bulk-handling funnel | |
CN215853293U (en) | Mining drill rod flat end face device | |
CN205076494U (en) | Portable grain conveyer | |
CN213595196U (en) | Bucket type grain elevator | |
CN108044187A (en) | A kind of workshop pipe fitting automatic charging device | |
CN215709274U (en) | Conveying device with high safety performance |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20180420 |
|
WW01 | Invention patent application withdrawn after publication |