FDPSO based on separable inner cupola formula anchoring system Download PDFInfo
- Publication number
- CN107933843A CN107933843A CN201711206593.7A CN201711206593A CN107933843A CN 107933843 A CN107933843 A CN 107933843A CN 201711206593 A CN201711206593 A CN 201711206593A CN 107933843 A CN107933843 A CN 107933843A
- Authority
- CN
- China
- Prior art keywords
- floating drum
- capstan head
- drilling
- wall
- hull
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B35/00—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
- B63B35/44—Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
- B63B35/4413—Floating drilling platforms, e.g. carrying water-oil separating devices
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
- B63B21/50—Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
- B63B21/50—Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
- B63B2021/501—Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers by means of articulated towers, i.e. slender substantially vertically arranged structures articulated near the sea bed
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Earth Drilling (AREA)
Abstract
The present invention relates to a kind of FDPSO based on separable inner cupola formula anchoring system, including hull and inner cupola formula anchoring system, hull includes a moon pool, and moon pool is vertical to run through hull;Inner cupola formula anchoring system includes capstan head, liquid transfer system and anchor structure;Capstan head is rotatablely connected with hull, and capstan head includes capstan head outer wall construction, floating drum, floating drum cave mechanism, and capstan head outer wall construction is installed in moon pool, and floating drum cave mechanism is located at the lower part of capstan head outer wall construction, and floating drum is installed in the mechanism of floating drum cave;Liquid transfer system includes drilling riser pipe and production tube;Production tube is connected with the pipeline on ship;Anchor structure includes anchor chain and anchor chain separation adjusting connector, and anchor chain separation adjusting connector is installed on floating drum.The present invention is using single moon pool, capstan head region is reduced, adds oil gas cabin storage space, increases the weathercock effect scope of application of inner cupola formula anchoring system, floating drum can realize that drilling well piping is separated with producing the underwater Layer Near The Sea Surface of piping, improve the ability for tackling extreme weather environment.
Description
Technical field
The present invention relates to offshore oil and construction of natural gas fields engineering device technique field, and in particular to a kind of drilling well takes into account with oil storage
Floating type well drilling production storage unload carrying platform (Floating Drilling Production Storage Offloading,
FDPSO)。
Background technology
Inner cupola formula anchoring system is as a kind of single point mooring that environmental load can be greatly reduced and influenced on floating platform
System, in drill ship and Floating Production Storage discharge mechanism (Floating Production Storage and
Offloading, FPSO) it is inner have application, it is arranged in a vertical cylindrical opening (i.e. moon pool) through hull.Single-point system
Pool system is normally at bow, and hull can be rotated around mooring gear, and turret mooring device is a kind of steel structure device, its upper part with
Floating body is connected, and lower part is connected with mooring line, and top is equipped with swivel joint, and floating body can be around capstan head inner shaft under wind, wave, stream effect
Forward dynamic, enable bow all the time towards minimum stress, i.e., using weathercock effect.For FPSO ship types, the standpipe of oil gas is conveyed
To be flexible, capstan head has the ability of the Automatic-falling under dangerous situation, and lower part capstan head takes off automatically when meeting with extreme meteorological condition
Fall, main ship sails out of, and extreme environment sails back reconnection again after in the past.And for drill ship, its standpipe is rigidity, and Automatic-falling is difficult to reality
It is existing, preventer ejection escape is used when meeting with extreme meteorological condition, main ship tows the method that standpipe sails out of.Preventer is positioned at sea
At bed well head, the control well device of blowout is prevented, directly itself and drilling riser pipe are disconnected in well head, drilling fluid can be caused to leak, pole
Big pollution environment, and reconnection operation is complicated.
It is the work(such as a kind of collection drilling well, production, well workover, completion, storage emptying that carrying platform (FDPSO) is unloaded in floating type well drilling production storage
Ship can be developed in the highly integrated performance source of one, cost of investment can be reduced, shorten the production cycle, carried from the nineties in last century
After going out, cause the extensive concern of ocean engineering circle, there are many research institutions to conduct a research this, and gradually there is real ship to build.
Conventional ship type FDPSO uses two moon pools, and two inner cupolas load production and drilling well piping respectively, and single point mooring is changed into two point
Mooring.The presence of two fixing points limits the angle that rotates freely of floating body, and the weathercock effect scope of application is affected, right
FDPSO is unfavorable in face of the adaptability of extreme environment.Inner cupola system is located at hull interior, reduces the volume of compartment of floating body, Er Qiegai
Hull design structure itself is become, the presence of two inner cupola systems, then can become apparent these shortcomings in FDPSO.In addition,
Conventional ship type FDPSO takes the mode for promptly disconnecting marine riser and preventer and sailing out of well location, consumption when handling extreme weather environment
Duration, causes drilling fluid to reveal, and pollutes environment, and cost is big.
The content of the invention
The technical problem to be solved in the present invention is in view of the deficiency of the prior art, there is provided one kind is based on dividing
From the FDPSO of inner cupola formula anchoring system, it has the separable inner cupola formula mooring that can complete piping Layer Near The Sea Surface detached job
System, can resist extreme meteorological condition, and economic risk is small, adaptable.
The present invention is that technical solution is used by solving technical problem set forth above:
A kind of FDPSO based on separable inner cupola formula anchoring system, including hull and inner cupola formula anchoring system, it is described
Hull includes a moon pool, and the moon pool is vertical to run through the hull;The inner cupola formula anchoring system includes capstan head, liquid passes
Defeated system and anchor structure;
The capstan head includes capstan head outer wall construction, floating drum, floating drum cave mechanism, drilling cramp, and the capstan head outer wall construction is installed on
In the moon pool, the capstan head outer wall construction is rotatablely connected with the hull, and the floating drum cave mechanism is arranged at outside the capstan head
The lower part of wall construction, the floating drum are installed in the floating drum cave mechanism, and the floating drum can be with floating drum cave organizational separation;
The drilling cramp includes frame body, swivel joint and top driving device, and the frame body is fixedly installed on the deck of the hull, the rotation
Adapter is installed on the frame body center, and the top driving device is installed at the top of the frame body;
The liquid transfer system includes drilling riser pipe and production tube, and dress is driven in the top of the drilling riser pipe with the top
Put connection, the bottom of the drilling riser pipe sequentially pass through get into after the swivel joint, capstan head outer wall construction, floating drum seabed with
Under;The bottom of the production tube is connected with drilling well, the top of production tube sequentially pass through the floating drum, capstan head outer wall construction,
It is connected after swivel joint with the fixation pipeline on ship;
The anchor structure includes anchor chain and anchor chain separation adjusting connector, and the anchor chain separation adjusting connector is installed on described floating
On cylinder, the upper end of the anchor chain is installed on the anchor chain separation adjusting connector, lower end is located at seabed.
In such scheme, the inner cupola formula anchoring system further includes sleeve and rotor-bearing system, and the sleeve is used for
Realize docking for hull and capstan head, the sleeve is fixedly connected with the hull, and the capstan head outer wall construction is installed on the set
In cylinder, the rotor-bearing system includes rotor bearing and rotating wheel, and the rotor bearing is mounted on the set with rotating wheel
Between cylinder and capstan head outer wall construction, the capstan head outer wall construction is rotated by the rotor bearing and rotating wheel with the sleeve to be connected
Connect, the hull can be freely rotated around the capstan head outer wall construction.
In such scheme, the capstan head outer wall construction includes capstan head wall, support frame and strengthens connector, the capstan head wall
For cylindrical shape, the support frame is installed on the inside of the capstan head wall, and the reinforcement connector is installed on the outside of the capstan head wall
Bottom, between the capstan head wall and sleeve, around the capstan head wall.
In such scheme, the floating drum cave mechanism includes floating drum cave outer wall and buoy connector, the buoy connector peace
Upper end loaded on floating drum cave outer wall, floating drum cave outer wall are up-thin-low-thick round table-like, the shape of the floating drum and institute
The shape adaptation of floating drum cave outer wall is stated, the upper end of the floating drum is installed on floating drum cave outer wall by the buoy connector
It is interior.
In such scheme, the inner wall of the floating drum is disposed with floating drum transversum and floating drum indulges bone.
In such scheme, the floating drum includes the inclined waterproof cabin, level-one ballast tank, two level set gradually from top to bottom
Ballast tank and three-level ballast tank;The lower part bulkhead of the inclined waterproof cabin is ramp-like in dipping down, and the inclined waterproof cabin
The depth of periphery is higher than middle depth;The drilling riser pipe and production tube sequentially pass through the inclined waterproof cabin, level-one pressure
Carry water tank, two level ballast tank and three-level ballast tank.
In such scheme, the drilling riser pipe includes marine riser and drilling rod, and the marine riser is set in the outer of the drilling rod
Week, the liquid transfer system further include watertight conduit, the upper end of the watertight conduit and the upper-deck cabin of the two level ballast tank
Wall is tightly connected, lower end and the lower bulkhead of the three-level ballast tank are tightly connected;The drilling riser pipe is led through the watertight
Pipe.
In such scheme, the marine riser is included at top marine riser, lower part marine riser and marine riser merogenesis, the water proof
Threaded connection place at pipe merogenesis between marine riser single-unit, can disconnect and reconnection, the top marine riser are positioned at marine riser
All marine risers more than at merogenesis, the lower part marine riser be positioned at marine riser merogenesis sentence under all marine risers;It is described
Drilling rod is included at top rod, lower part drilling rod and drilling rod merogenesis, the threaded connection place at the drilling rod merogenesis between drilling rod single-unit,
Can disconnect and reconnection, the top rod is all drilling rods more than at drilling rod merogenesis, the lower part drilling rod be positioned at
Drilling rod merogenesis sentence under all drilling rods.
In such scheme, the floating drum further include be installed on the level-one ballast tank lower part bulkhead, with the drilling well
The coaxial hydraulic clamping manipulator of standpipe, the hydraulic clamping manipulator can clamp or unclamp the drilling riser pipe;Bored
When the separation of well standpipe or reconnection operation, it is respectively positioned at the marine riser merogenesis and at drilling rod merogenesis under the inclined waterproof cabin
Between portion's bulkhead and hydraulic clamping manipulator.
In such scheme, the liquid transfer system further includes oil pipe fixing device, and the oil pipe fixing device is installed on
The bottom of the floating drum, the production tube run through the oil pipe fixing device.
The beneficial effects of the present invention are:
1st, using single moon pool, single point mooring, the two point Mooring Arrangements of relatively bimonthly pool FDPSO, reduce capstan head region,
So as to add oil gas cabin storage space, while the scope of application of inner cupola weathercock effect is increased, it is extreme meteorological to enhance reply
Adaptibility to response, disclosure satisfy that the synchronous of drilling well and production function carries out, it is badly extra large suitable for the severe ice regime in polar region and South China Sea
Platform well drilling and production of hydrocarbons operation under condition.
2nd, capstan head lower part is equipped with the floating drum that can depart from capstan head main body, and floating drum can realize drilling well piping with producing the water of piping
Lower Layer Near The Sea Surface separation, improves and tackles extreme weather environment ability;
3rd, by intelligent control system separable floating drum can be relied on to realize the separation of piping, floating drum is still logical after separation
Anchoring system constant bearing is crossed, rigid drilling well piping can be fixed with this, its separation is realized, can meet South China Sea, arctic regions
Deng the platform well drilling under rough seas and production of hydrocarbons operation, parameter regulation and control are carried out to floating drum floading condition, all kinds of valves, are realized
Separation and the long-distance intelligent control of reconnection work.
4th, drilling well piping and production piping are arranged in same capstan head, bores the floating of this inner cupola formula anchoring system of loading
Well production platform realizes production, accumulating, drilling well function at the same time, shortens oil-gas mining investment cycle, reduces oil field development warp
Ji risk.
Brief description of the drawings
Below in conjunction with accompanying drawings and embodiments, the invention will be further described, in attached drawing:
Fig. 1 is the structure diagram of FDPSO of the present invention based on separable inner cupola formula anchoring system;
Fig. 2 is the structure of the inner cupola formula anchoring system of the FDPSO based on separable inner cupola formula anchoring system shown in Fig. 1
Schematic diagram;
Fig. 3 is the structure diagram of the drilling cramp of the anchoring system of inner cupola formula shown in Fig. 2;
Fig. 4 is the sectional view of the floating drum of the anchoring system of inner cupola formula shown in Fig. 2;
Fig. 5 is that the anchoring system of inner cupola formula shown in Fig. 2 is located at deck with the sectional view of lower member;
Fig. 6 is the structure diagram of the liquid transfer system of the anchoring system of inner cupola formula shown in Fig. 2.
In figure:100th, hull;101st, deck;200th, inner cupola formula anchoring system;10th, capstan head;11st, capstan head outer wall construction;
111st, capstan head wall;112nd, support frame;113rd, connector is strengthened;12nd, floating drum;121st, inclined waterproof cabin;122nd, level-one ballast water
Cabin;123rd, two level ballast tank;124th, three-level ballast tank;125th, floating drum transversum;126th, floating drum indulges bone;127th, hydraulic clamping machine
Tool hand;13rd, floating drum cave mechanism;131st, floating drum cave outer wall;132nd, buoy connector;14th, drilling cramp;141st, frame body;142nd, rotation connects
Head;143rd, top driving device;20th, sleeve;30th, liquid transfer system;31st, watertight conduit;32nd, drilling riser pipe;321st, marine riser;
3211st, top marine riser;3212nd, lower part marine riser;3213rd, at marine riser merogenesis;322nd, drilling rod;3221st, top rod;
3222nd, lower part drilling rod;3223rd, at drilling rod merogenesis;323rd, sealed valve;33rd, production tube;34th, oil pipe fixing device;40th, it is imperial
Door;50th, anchor structure;51st, anchor chain;52nd, anchor chain separation adjusting connector;60th, rotor-bearing system;61st, rotor bearing;62、
Rotating wheel.
Embodiment
In order to which the technical features, objects and effects of the present invention are more clearly understood, now compare attached drawing and describe in detail
The embodiment of the present invention.
As shown in figures 1 to 6, it is the FDPSO based on separable inner cupola formula anchoring system of a preferred embodiment of the present invention,
Including hull 100 and inner cupola formula anchoring system 200, hull 100 includes a moon pool, and moon pool is vertical to run through hull 100, moon pool
Inside carry inner cupola formula anchoring system 200.Inner cupola formula anchoring system 200 includes capstan head 10, liquid transfer system 30 and anchor
Structure 50.
Capstan head 10 includes capstan head outer wall construction 11, floating drum 12, floating drum cave mechanism 13 and drilling cramp 14.Capstan head outer wall construction 11 is pacified
Loaded in moon pool, capstan head outer wall construction 11 is rotatablely connected with hull 100, and floating drum cave mechanism 13 is arranged at capstan head outer wall construction 11
Lower part.Floating drum 12 is installed in floating drum cave mechanism 13, and floating drum 12 can be separated with floating drum cave mechanism 13.Drilling cramp 14 includes frame body
141st, swivel joint 142 and top driving device 143, frame body 141 are fixedly installed on the deck 101 of hull 100, with capstan head outer wall knot
Structure 11 is coaxial, can be rotated with hull 100, and swivel joint 142 is installed on the center of frame body 141, and swivel joint 142 is a kind of
The closed rotary connectors of 360 ° of rotation pumped (conveying) mediums, can with the wind, wave, flow rotation, be for being connected the transmission of hull 100 and liquid
The hydraulic seal rotated in piping, when capstan head 10 works, can be transferred in 100 fixed piping system of hull by system 30.Top driving device 143
It is installed on the top of frame body 141.
Liquid transfer system 30 includes drilling riser pipe 32 and production tube 33, the top of drilling riser pipe 32 and top driving device
143 connections, the bottom of drilling riser pipe 32 sequentially pass through get into after swivel joint 142, capstan head outer wall construction 11, floating drum 12 seabed with
Under, drilling riser pipe 32 is rigidity, is connected through a screw thread and formed by several single-unit standpipes, top driving device 143 is used for drilling riser pipe 32
Installation;The bottom of production tube 33 is connected with drilling well, and the top of production tube 33 sequentially passes through floating drum 12, capstan head outer wall construction
11st, it is connected after swivel joint 142 with the fixation pipeline on ship, for transporting the petroleum resources from offshore mining.
Anchor structure 50 is used to mooring line being fixed on bottom, including anchor chain 51 and anchor chain separation adjusting connector 52, anchor chain point
It is installed on from connector 52 is adjusted on floating drum 12, the upper end of anchor chain 51 is installed on anchor chain separation adjusting connector 52, lower end is located at seabed.
Anchor chain 51 runs through anchor chain separation adjusting connector 52, and the effect of anchor chain separation adjusting connector 52 is to adjust the length of anchor chain 51, and is adjusted
The separation of floating drum 12 and the mooring force of significantly change during reconnection are saved, ensures structure safety.In the present embodiment, anchor chain 51 has three groups, often
Three anchor chains 51 of group, using 12 center of floating drum as the center of circle, are evenly distributed on the lower section of floating drum 12, are separated for hull 100 with floating drum 12
The mooring of floating drum 12.
FDPSO of the present invention based on separable inner cupola formula anchoring system has the function of production of hydrocarbons, accumulating and drilling well, will
Drilling well piping and production piping are arranged in same capstan head 10, and the detachable floating drum 12 that relying on to anchor realizes rigid piping
(drilling riser pipe 32) is separated with the underwater Layer Near The Sea Surface of flexible piping (production tube 33), bad weather condition is tackled, suitable for oil field
Early stage trial production and drilling well exploitation, effectively reduce oil and gas development economic risk.
The effect of floating drum 12:On the one hand, whole liquid transfer system 30 is to rely on it to be separated, on the other hand, in ship
After body 100 is separated with floating drum 12, floating drum 12 is capable of providing buoyancy to offset the power of anchoring.
Further optimize, in the present embodiment, inner cupola formula anchoring system 200 further includes sleeve 20 and rotor-bearing system
60, sleeve 20 is used for realization docking for hull 100 and capstan head 10, and sleeve 20 is fixedly connected with hull 100, capstan head outer wall construction 11
It is installed in sleeve 20, rotor-bearing system 60 is installed between sleeve 20 and capstan head outer wall construction 11, capstan head outer wall construction 11
It is rotatablely connected by rotor-bearing system 60 and sleeve 20, hull 100 can be freely rotated around capstan head outer wall construction 11, form wind
Effect is marked, so that active force suffered by FDPSO hulls 100 is minimum.Rotor-bearing system 60 includes rotor bearing 61 and rotating wheel
62, in the present embodiment, rotor bearing 61 and rotating wheel 62 respectively have 12, are uniformly looped around around capstan head 10, can be used for connecting
Capstan head 10 and sleeve 20, and limit that capstan head 10 is vertical and lateral displacement.
Further optimize, in the present embodiment, capstan head outer wall construction 11 includes capstan head wall 111, support frame 112 and strengthens connecting
Fitting 113.Capstan head wall 111 is cylindrical shape, other components is placed wherein, the unitary rotation together with capstan head outer wall construction 11.
Support frame 112 is installed on the inner side of capstan head wall 111, for strengthening the structural strength of capstan head outer wall construction 11.Strengthen connector 113
The bottom in the outside of capstan head wall 111 is installed on, between capstan head wall 111 and sleeve 20, around capstan head wall 111, limitation capstan head bottom
Portion it is circumferentially displaced.Further optimize, in the present embodiment, floating drum cave mechanism 13 includes floating drum cave outer wall 131 and buoy connector
132, buoy connector 132 is installed on the upper end of floating drum cave outer wall 131.Floating drum cave outer wall 131 is up-thin-low-thick round table-like, is floated
The shape of cylinder 12 and the shape adaptation of floating drum cave outer wall 131, the upper end of floating drum 12 is installed on floating drum cave by buoy connector 132
In outer wall 131.Further optimize, in the present embodiment, floating drum wall disposed inboard has floating drum transversum 125 and floating drum to indulge bone 126, is used for
Strengthen the structural strength of floating drum 12.
Further optimize, in the present embodiment, floating drum 12 includes inclined waterproof cabin 121, the level-one set gradually from top to bottom
Ballast tank 122, two level ballast tank 123 and three-level ballast tank 124.Inclined waterproof cabin 121 is located at 12 top of floating drum, its cabin
Wall is located at 12 top a quarter of floating drum, and inclined waterproof cabin 121 plays the role of water proof in 32 separation process of drilling riser pipe.
Level-one ballast tank 122, two level ballast tank 123 and three-level ballast tank 124 are located at the lower section of inclined waterproof cabin 121, will be floating
The space of the lower section of cylinder 12 is according to height trisection.The lower part bulkhead of inclined waterproof cabin 121 is ramp-like in dipping down, and inclined waterproof cabin
The depth of 121 peripheries is more than middle depth, and so when drilling riser pipe 32 detaches floating drum 12 in water, floating drum 12 carries out again close
Water therein is leak into during envelope can be deposited in around inclined waterproof cabin 121, avoid it from entering inside floating drum 12.Multistage ballast is set
Water tank is used to control snorkeling for floating drum 12, and wherein during level-one ballast tank damage, other ballast tanks remain to work on.Bore
Well standpipe 32 and production tube 33 sequentially pass through inclined waterproof cabin 121, level-one ballast tank 122, two level ballast tank 123 and three
Level ballast tank 124.
Further optimize, in the present embodiment, floating drum 12, which further includes, to be installed on 122 lower part bulkhead of level-one ballast tank and brill
The coaxial hydraulic clamping manipulator 127 of well standpipe 32, hydraulic clamping manipulator 127 can clamp or unclamp drilling riser pipe 32.
Further optimizing, in the present embodiment, drilling riser pipe 32 includes marine riser 321, drilling rod 322 and sealed valve 323, every
Water pipe 321 is set in the periphery of drilling rod 322, and marine riser 321 and drilling rod 322 are through to operating location from the top of capstan head 10.
Marine riser 321 is included 3213 at top marine riser 3211, lower part marine riser 3212 and marine riser merogenesis.Carry out separation and reconnection work
When making, 3213 between lower bulkhead and the hydraulic clamping manipulator 127 of inclined waterproof cabin 121 at marine riser merogenesis, marine riser
3213 threaded connection place between marine riser single-unit at merogenesis, can disconnect and reconnection, top marine riser 3211 are positioned at water proof
More than 3213 all marine risers at pipe merogenesis, lower part marine riser 3212 at marine riser merogenesis less than 3213 it is all every
Water pipe.Drilling rod 322 is included 3223 at top rod 3221, lower part drilling rod 3222 and drilling rod merogenesis.Separated and reconnection operation
When, 3223 between lower bulkhead and the hydraulic clamping manipulator 127 of inclined waterproof cabin 121 at drilling rod merogenesis, at drilling rod merogenesis
3223 threaded connection place between drilling rod single-unit, can disconnect and reconnection, top rod 3221 are 3223 at drilling rod merogenesis
All drilling rods above, lower part drilling rod 3222 are at drilling rod merogenesis less than 3223 all drilling rods.Sealed valve 323 is located at
At marine riser merogenesis 3213 and drilling rod merogenesis between 3223, play closed under discrete state lower part drilling rod 3222 and lower part every
The effect of water pipe 3212, and a bayonet unit is carried, the opposite position between lower part drilling rod 3222 and lower part marine riser 3212 can be limited
Move.
When needing to carry out the lock out operation of drilling riser pipe 32, hydraulic clamping manipulator 127 clamps lower part marine riser first
3212, it is fixed, coordinates top driving device 143,3213 disconnect threaded connection at marine riser merogenesis, and top marine riser 3211 is
Drawable, sealed valve 323 is stuck, the relative displacement of limitation lower part marine riser 3212 and lower part drilling rod 3222 so that bores lower part
Bar 3222 is fixed, and coordinates top driving device 143, and 3223 disconnect threaded connection at drilling rod merogenesis, and top rod 3221 is i.e. drawable.
Then hydraulic clamping manipulator 127 unclamps, and the separation of rigid drilling riser pipe 32 can be completed, it is achieved thereby that floating drum 12 and hull
100 separation.
When needing to carry out the reconnection operation of drilling riser pipe 32, floating drum 12 floats up to reconnection position, and hull 100 stretches out top
3223 at drilling rod 3221 to 12 inner drill rods merogenesis of floating drum, hydraulic clamping manipulator 127, which clamps lower part marine riser 3212, makes it solid
Fixed, sealed valve 323 is stuck, the relative displacement of limitation lower part marine riser 3212 and lower part drilling rod 3222 so that lower part drilling rod
3222 fix, and coordinate top driving device 143, and 3223 re-start threaded connection at drilling rod merogenesis, complete the reconnection of drilling rod up and down.
Hull 100 stretches out 3213 at top marine riser 3211 to 12 inside marine riser merogenesis of floating drum again, coordinate top driving device 143, every
3213 re-start threaded connection at water pipe merogenesis, complete the reconnection of marine riser up and down.Then the pine of hydraulic clamping manipulator 127
Open, the reconnection of rigid drilling riser pipe 32 can be completed, it is achieved thereby that the reconnection of floating drum 12 and hull 100.
Liquid transfer system 30 further includes the watertight conduit 31 positioned at 12 center of floating drum, the upper end of watertight conduit 31 and two level
The upper bulkhead of ballast tank 123 is tightly connected, the lower bulkhead of lower end and three-level ballast tank 124 is tightly connected;Marine riser 321
Diameter is slightly less than watertight conduit 31, and drilling riser pipe 32 runs through watertight conduit 31, sets the effect of watertight conduit 31 to be that guiding is floating
Cylinder 12 is moved along snorkeling for drilling riser pipe 32, avoids drilling riser pipe 32 from colliding with 12 internals of floating drum, and prevents from working as
When with watertight conduit 31 relative displacement occurs for drilling riser pipe 32, seawater is penetrated into inside floating drum 12 from 12 bottom of floating drum.
Further optimize, in the present embodiment, liquid transfer system 30 further includes oil pipe fixing device 34, oil pipe fixing device
34 are installed on the bottom of floating drum 12, and production tube 33 runs through oil pipe fixing device 34, and the effect of oil pipe fixing device 34 is to adjust
Control relative direction of the production tube 33 when 12 bottom of floating drum is stretched out so that production tube 33 is to external diffusion, while oil pipe is fixed
One valve is housed, its folding is used for the separation and reconnection for controlling production tube 33 in device 34.Production tube 33 is divided for three groups, often
Group three, is evenly distributed on around floating drum 12, and be respectively positioned on the angular bisector of two adjacent groups anchor chain 51.
Further optimize, in the present embodiment, gantry structure 40 is located at the top of capstan head, is made of a crossbeam and two supporting legs
Frame like structure, be for adapting to the distinct device needed for different designs requirement and the constructional device that sets, for it is plug-in other
Equipment, other equipment can be capstan winch or electric-control system in the present invention, specifically be determined by design requirement, other equipment is hung on gantry and ties
On the crossbeam of structure 40.
Hull 100 and floating drum 12 can be by GPS positionings, and under emergency work condition, intelligent control system can be according to 12 He of floating drum
The real-time position information of hull 100, regulation and control ship orientation, makes it precisely return to well location.Intelligent control system can be according to need at the same time
Regulate and control the open and-shut mode of the elastic state of hydraulic clamping manipulator 127, sealed valve 323 and oil valves, can control floating drum
12 inside ballast water volumes and by control anchor chain separation adjusting connector 52 adjust 51 length of anchor chain, to regulate and control snorkeling for floating drum 12
State.
The operation principle of FDPSO of the present invention based on separable inner cupola formula anchoring system is as follows:
During common operating mode, under the influence of wind, wave, stream, hull 100 is by the effect of weathercock effect, freely around inner cupola formula
Anchoring system 200 rotates, and makes the fore body of hull 100 forever towards minimum stress surface.
When floating ice is met with the operating mode of polar region, hull 100 can actively be rotated around inner cupola formula anchoring system 200, make hull 100
Fore body meet ice so that ice load suffered by hull 100 is minimized.
When meeting with bad weather condition, such as tropical storm or thick ice when is emergency work condition, carries out detached job, drilling well at this time
Standpipe 32 stops circulation of drilling fluid, closes oil transportation tube valve, disconnects production tube 33, floating drum 12 is declined along drilling riser pipe 32,
Intelligence control system controls the ballast water of floating drum 12, and by controlling anchor chain separation adjusting connector 52 to adjust 51 length of anchor chain, makes
3213 are placed exactly in the lower bulkhead of inclined waterproof cabin 121 and hydraulic clamping manipulator 127 at 12 dive of floating drum to marine riser merogenesis
Between locate, carry out detached job.Hydraulic clamping manipulator 127 coordinates top driving device 143 to separate drilling rod 322 and marine riser 321, together
When sealed valve 323 is closed.When detaching top rod 3221 and top marine riser 3211, the inclined of floating drum 12 is first pumped it to
In waterproof cabin 121, the lower hatch door of inclined waterproof cabin 121 is closed, then is fully drawn out, closes the upper-deck cabin of inclined waterproof cabin 121
Door.So far, mask work terminates.After ship determines safety, coordinate intelligent control system, sail back and bore position,.Coordinate ship's fix
Function hull 100 stretches out top rod 3221, is accurately docked with floating drum 12, is inserted into by the upper hatch door of inclined waterproof cabin 121 floating
Cylinder 12, hydraulic clamping manipulator 127 coordinates top driving device 143 to complete the reconnection of drilling rod 322, then stretches out top marine riser 3211,
Floating drum 12 is inserted into by the upper hatch door of inclined waterproof cabin 121, hydraulic clamping manipulator 127 coordinates top driving device 143 to complete water proof
The reconnection of pipe 321.Intelligence control system controls the ballast water of floating drum 12, and by controlling anchor chain separation adjusting connector 52 to adjust anchor
51 length of chain, makes floating drum 12 float along top marine riser 3211, reinserts in floating drum cave mechanism 13, passes through buoy connector
132 are fixedly connected.Reconnection production tube 33, opens oil valves, opens sealed valve 323, and liquid transfer system 30 recovers work
Make, capstan head 10 resets, and reconnection work is completed.
Each embodiment is described by the way of progressive in this specification, what each embodiment stressed be and other
The difference of embodiment, between each embodiment identical similar portion mutually referring to.
The embodiment of the present invention is described above in conjunction with attached drawing, but the invention is not limited in above-mentioned specific
Embodiment, above-mentioned embodiment is only schematical, rather than restricted, those of ordinary skill in the art
Under the enlightenment of the present invention, in the case of present inventive concept and scope of the claimed protection is not departed from, it can also make very much
Form, these are belonged within the protection of the present invention.
Claims (10)
1. a kind of FDPSO based on separable inner cupola formula anchoring system, including hull and inner cupola formula anchoring system, its feature
It is,
The hull includes a moon pool, and the moon pool is vertical to run through the hull;
The inner cupola formula anchoring system includes capstan head, liquid transfer system and anchor structure;
The capstan head includes capstan head outer wall construction, floating drum, floating drum cave mechanism, drilling cramp, and the capstan head outer wall construction is installed on described
In moon pool, the capstan head outer wall construction is rotatablely connected with the hull, and the floating drum cave mechanism is arranged at the capstan head outer wall knot
The lower part of structure, the floating drum are installed in the floating drum cave mechanism, and the floating drum can be with floating drum cave organizational separation;It is described
Drilling cramp includes frame body, swivel joint and top driving device, and the frame body is fixedly installed on the deck of the hull, and the rotation connects
Head is installed on the frame body center, and the top driving device is installed at the top of the frame body;
The liquid transfer system includes drilling riser pipe and production tube, and the top of the drilling riser pipe connects with the top driving device
Connect, the bottom of the drilling riser pipe is got into below seabed after sequentially passing through the swivel joint, capstan head outer wall construction, floating drum;Institute
The bottom for stating production tube is connected with drilling well, and the top of production tube sequentially passes through the floating drum, capstan head outer wall construction, rotation connect
It is connected after head with the fixation pipeline on ship;
The anchor structure includes anchor chain and anchor chain separation adjusting connector, and the anchor chain separation adjusting connector is installed on the floating drum
On, the upper end of the anchor chain is installed on the anchor chain separation adjusting connector, lower end is located at seabed.
2. the FDPSO according to claim 1 based on separable inner cupola formula anchoring system, it is characterised in that in described
Turret mooring system further includes sleeve and rotor-bearing system, and the sleeve is used for realization docking for hull and capstan head, described
Sleeve is fixedly connected with the hull, and the capstan head outer wall construction is installed in the sleeve, and the rotor-bearing system includes
Rotor bearing and rotating wheel, the rotor bearing and rotating wheel are mounted between sleeve and the capstan head outer wall construction, described
Capstan head outer wall construction is rotatablely connected by the rotor bearing and rotating wheel with the sleeve, and the hull can be around the capstan head
Outer wall construction is freely rotated.
3. the FDPSO according to claim 1 based on separable inner cupola formula anchoring system, it is characterised in that described turn
Tower outer wall construction includes capstan head wall, support frame and strengthens connector, and the capstan head wall is cylindrical shape, the support frame installation
On the inside of the capstan head wall, the bottom strengthened connector and be installed on the outside of the capstan head wall, positioned at the capstan head wall and set
Between cylinder, around the capstan head wall.
4. the FDPSO according to claim 1 based on separable inner cupola formula anchoring system, it is characterised in that described floating
Tong Xue mechanisms include floating drum cave outer wall and buoy connector, and the buoy connector is installed on the upper end of floating drum cave outer wall,
Floating drum cave outer wall is up-thin-low-thick round table-like, the shape of the floating drum and the shape adaptation of floating drum cave outer wall, institute
The upper end for stating floating drum is installed in the outer wall of the floating drum cave by the buoy connector.
5. the FDPSO according to claim 1 based on separable inner cupola formula anchoring system, it is characterised in that described floating
The inner wall of cylinder is disposed with floating drum transversum and floating drum indulges bone.
6. the FDPSO according to claim 1 based on separable inner cupola formula anchoring system, it is characterised in that described floating
Cylinder includes inclined waterproof cabin, level-one ballast tank, two level ballast tank and the three-level ballast tank set gradually from top to bottom;Institute
It is ramp-like in dipping down to state the lower part bulkhead of inclined waterproof cabin, and the depth of the inclined waterproof cabin periphery is higher than middle depth;
The drilling riser pipe and production tube sequentially pass through the inclined waterproof cabin, level-one ballast tank, two level ballast tank and three-level
Ballast tank.
7. the FDPSO according to claim 6 based on separable inner cupola formula anchoring system, it is characterised in that the brill
Well standpipe includes marine riser and drilling rod, and the marine riser is set in the periphery of the drilling rod, and the liquid transfer system further includes
Watertight conduit, the upper end of the watertight conduit and the sealed connection of upper bulkhead, lower end and the three-level of the two level ballast tank
The lower bulkhead of ballast tank is tightly connected;The drilling riser pipe runs through the watertight conduit.
8. the FDPSO according to claim 7 based on separable inner cupola formula anchoring system, it is characterised in that it is described every
Water pipe is included at top marine riser, lower part marine riser and marine riser merogenesis, at the marine riser merogenesis between marine riser single-unit
Threaded connection place, can disconnect and reconnection, and the top marine riser is all marine risers more than at marine riser merogenesis, institute
State lower part marine riser be positioned at marine riser merogenesis sentence under all marine risers;The drilling rod includes top rod, lower part drilling rod
At drilling rod merogenesis, the threaded connection place at the drilling rod merogenesis between drilling rod single-unit, can disconnect and reconnection, the top are bored
Bar is all drilling rods more than at drilling rod merogenesis, the lower part drilling rod be positioned at drilling rod merogenesis sentence under all drilling rods.
9. the FDPSO according to claim 8 based on separable inner cupola formula anchoring system, it is characterised in that described floating
Cylinder further include be installed on the level-one ballast tank lower part bulkhead, the hydraulic clamping manipulator coaxial with the drilling riser pipe,
The hydraulic clamping manipulator can clamp or unclamp the drilling riser pipe;When carrying out separation or the reconnection operation of drilling riser pipe,
Be respectively positioned at the marine riser merogenesis and at drilling rod merogenesis the lower part bulkhead of the inclined waterproof cabin and hydraulic clamping manipulator it
Between.
10. the FDPSO according to claim 1 based on separable inner cupola formula anchoring system, it is characterised in that the liquid
Body Transmission system further includes oil pipe fixing device, and the oil pipe fixing device is installed on the bottom of the floating drum, the production oil
Pipe runs through the oil pipe fixing device.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711206593.7A CN107933843B (en) | 2017-11-27 | 2017-11-27 | FDPSO based on separable inner cupola formula anchoring system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711206593.7A CN107933843B (en) | 2017-11-27 | 2017-11-27 | FDPSO based on separable inner cupola formula anchoring system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107933843A true CN107933843A (en) | 2018-04-20 |
CN107933843B CN107933843B (en) | 2019-06-28 |
Family
ID=61950086
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711206593.7A Active CN107933843B (en) | 2017-11-27 | 2017-11-27 | FDPSO based on separable inner cupola formula anchoring system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107933843B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109018205A (en) * | 2018-08-21 | 2018-12-18 | 安徽亚太锚链制造有限公司 | It is a kind of can Fast Installation stable connection anchor chain |
CN109850070A (en) * | 2019-02-27 | 2019-06-07 | 武汉理工大学 | Floating drum release and recovery system based on separable inner cupola formula anchoring system |
CN116767427A (en) * | 2023-07-31 | 2023-09-19 | 招商局重工(江苏)有限公司 | Mooring floating installation method for inner rotating tower |
CN116803837A (en) * | 2023-07-31 | 2023-09-26 | 招商局重工(江苏)有限公司 | Single-point mooring system and installation method thereof |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1226863A (en) * | 1996-08-02 | 1999-08-25 | Fmc有限公司 | Disconnectable turret mooring system utilizing spider buoy |
WO2002088509A1 (en) * | 2001-04-25 | 2002-11-07 | Exxonmobil Upstream Research Company | Offshore floating production method |
CN101287645A (en) * | 2005-10-17 | 2008-10-15 | 单点系泊公司 | Disconnectable buoyant turret mooring system |
WO2008140654A1 (en) * | 2007-05-11 | 2008-11-20 | Exxonmobil Upstream Research Company | Automatic ice-vaning ship |
CN102092465A (en) * | 2011-01-28 | 2011-06-15 | 中国海洋石油总公司 | Double moon pool floating production drilling oil storage ship |
CN103189272A (en) * | 2010-09-16 | 2013-07-03 | 瑞士单浮筒系泊公司 | Disconnectable turret mooring system |
CN103738475A (en) * | 2009-03-18 | 2014-04-23 | 瑞士单浮筒系泊公司 | Mooring system with decoupled mooring lines and/or riser system |
-
2017
- 2017-11-27 CN CN201711206593.7A patent/CN107933843B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1226863A (en) * | 1996-08-02 | 1999-08-25 | Fmc有限公司 | Disconnectable turret mooring system utilizing spider buoy |
WO2002088509A1 (en) * | 2001-04-25 | 2002-11-07 | Exxonmobil Upstream Research Company | Offshore floating production method |
CN101287645A (en) * | 2005-10-17 | 2008-10-15 | 单点系泊公司 | Disconnectable buoyant turret mooring system |
WO2008140654A1 (en) * | 2007-05-11 | 2008-11-20 | Exxonmobil Upstream Research Company | Automatic ice-vaning ship |
CN103738475A (en) * | 2009-03-18 | 2014-04-23 | 瑞士单浮筒系泊公司 | Mooring system with decoupled mooring lines and/or riser system |
CN103189272A (en) * | 2010-09-16 | 2013-07-03 | 瑞士单浮筒系泊公司 | Disconnectable turret mooring system |
CN102092465A (en) * | 2011-01-28 | 2011-06-15 | 中国海洋石油总公司 | Double moon pool floating production drilling oil storage ship |
Non-Patent Citations (1)
Title |
---|
刘健等: "FDPSO在深水油田开发中应用浅析", 《第十五届中国海洋(岸)工程学术讨论会论文集》 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109018205A (en) * | 2018-08-21 | 2018-12-18 | 安徽亚太锚链制造有限公司 | It is a kind of can Fast Installation stable connection anchor chain |
CN109850070A (en) * | 2019-02-27 | 2019-06-07 | 武汉理工大学 | Floating drum release and recovery system based on separable inner cupola formula anchoring system |
CN109850070B (en) * | 2019-02-27 | 2020-01-31 | 武汉理工大学 | Buoy releasing and recovering system based on separable internal turret mooring system |
CN116767427A (en) * | 2023-07-31 | 2023-09-19 | 招商局重工(江苏)有限公司 | Mooring floating installation method for inner rotating tower |
CN116803837A (en) * | 2023-07-31 | 2023-09-26 | 招商局重工(江苏)有限公司 | Single-point mooring system and installation method thereof |
CN116767427B (en) * | 2023-07-31 | 2024-05-14 | 招商局重工(江苏)有限公司 | Mooring floating installation method for inner rotating tower |
Also Published As
Publication number | Publication date |
---|---|
CN107933843B (en) | 2019-06-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7628224B2 (en) | Shallow/intermediate water multipurpose floating platform for arctic environments | |
CN204527563U (en) | Middle deep water semi-submersible drilling platform | |
KR100255620B1 (en) | A ship for offshore loading or unloading of a flowable medium | |
CN107933843B (en) | FDPSO based on separable inner cupola formula anchoring system | |
JP5362819B2 (en) | Separable turret mooring system with rotatable turntable | |
CN107914834B (en) | Polygonal floating type oil storage device for production | |
CN104354843B (en) | Coordinate the miniature salvaging drilling equipment of over seat anker and the method for ROV | |
CN101954959B (en) | Deepwater semi-submerged drilling platform | |
CN101109269B (en) | Deepwater drilling device based on near surface deviation | |
MXPA05004043A (en) | Riser installation vessel and method of using the same. | |
CN103895828A (en) | Double-curved-surface floating type production oil storage platform | |
CN105000137A (en) | Sector rotation single point mooring liquid transportation system | |
CN201737142U (en) | Deepwater semi-submersible type drilling platform | |
CN102837804A (en) | Installation equipment and installation method for suction anchor in deep water | |
CN103883273A (en) | Method for utilizing two cranes on saturation diving support vessel to mount vertical pipe | |
CN203902799U (en) | Double-curved-surface-shaped floating oil production and storage platform | |
Rutkowski | A comparison between conventional buoy mooring CBM, single point mooring SPM and single anchor loading sal systems considering the hydro-meteorological condition limits for safe ship’s operation offshore | |
US6457536B1 (en) | Method and system for exploiting natural resources under the seabed | |
CN205801474U (en) | A kind of lowering or hoisting gear of the sonar for boats and ships | |
CN103482025A (en) | Novel inwards rotation tower single-point mooring device | |
NO314350B1 (en) | Connector assembly and connector body for offshore fluid transfer | |
CN204713384U (en) | Floating type well drilling produces storage Unloading Device | |
CN202175175U (en) | Multipurpose anchor-handling tug supply vessel | |
CN101139912A (en) | Deepwater drilling apparatus with automatic-upending subaqueous blow-out preventer | |
CN207737469U (en) | A kind of small-sized FPSO of dynamic positioning for marginal oil field |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |