CN107932810A - The modeling method and mold ship bracket of a kind of hull bottom model - Google Patents

The modeling method and mold ship bracket of a kind of hull bottom model Download PDF

Info

Publication number
CN107932810A
CN107932810A CN201711171776.XA CN201711171776A CN107932810A CN 107932810 A CN107932810 A CN 107932810A CN 201711171776 A CN201711171776 A CN 201711171776A CN 107932810 A CN107932810 A CN 107932810A
Authority
CN
China
Prior art keywords
epoxy resin
hull bottom
mold
bracket
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711171776.XA
Other languages
Chinese (zh)
Inventor
李春洪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711171776.XA priority Critical patent/CN107932810A/en
Publication of CN107932810A publication Critical patent/CN107932810A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C39/00Shaping by casting, i.e. introducing the moulding material into a mould or between confining surfaces without significant moulding pressure; Apparatus therefor
    • B29C39/02Shaping by casting, i.e. introducing the moulding material into a mould or between confining surfaces without significant moulding pressure; Apparatus therefor for making articles of definite length, i.e. discrete articles
    • B29C39/10Shaping by casting, i.e. introducing the moulding material into a mould or between confining surfaces without significant moulding pressure; Apparatus therefor for making articles of definite length, i.e. discrete articles incorporating preformed parts or layers, e.g. casting around inserts or for coating articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C39/00Shaping by casting, i.e. introducing the moulding material into a mould or between confining surfaces without significant moulding pressure; Apparatus therefor
    • B29C39/22Component parts, details or accessories; Auxiliary operations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C39/00Shaping by casting, i.e. introducing the moulding material into a mould or between confining surfaces without significant moulding pressure; Apparatus therefor
    • B29C39/22Component parts, details or accessories; Auxiliary operations
    • B29C39/24Feeding the material into the mould
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C39/00Shaping by casting, i.e. introducing the moulding material into a mould or between confining surfaces without significant moulding pressure; Apparatus therefor
    • B29C39/22Component parts, details or accessories; Auxiliary operations
    • B29C39/36Removing moulded articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C39/00Shaping by casting, i.e. introducing the moulding material into a mould or between confining surfaces without significant moulding pressure; Apparatus therefor
    • B29C39/22Component parts, details or accessories; Auxiliary operations
    • B29C39/38Heating or cooling
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B73/00Building or assembling vessels or marine structures, e.g. hulls or offshore platforms
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29KINDEXING SCHEME ASSOCIATED WITH SUBCLASSES B29B, B29C OR B29D, RELATING TO MOULDING MATERIALS OR TO MATERIALS FOR MOULDS, REINFORCEMENTS, FILLERS OR PREFORMED PARTS, e.g. INSERTS
    • B29K2063/00Use of EP, i.e. epoxy resins or derivatives thereof, as moulding material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29LINDEXING SCHEME ASSOCIATED WITH SUBCLASS B29C, RELATING TO PARTICULAR ARTICLES
    • B29L2031/00Other particular articles
    • B29L2031/40Test specimens ; Models, e.g. model cars ; Probes

Abstract

The invention discloses a kind of modeling method of hull bottom model, it can carry out mold and the demoulding to bottom of ship, epoxy resin batch mixing is carried out including mold ship bracket and the miscellaneous bed of material moulding, pressing mold is carried out to epoxy resin batch mixing by hull bottom mould again and forms new ship bracket, can from ship bracket hull integrality, for build hull bottom have good test effect.The adjustment that the present invention is modeled for hull bottom of different shapes, and air-drying device can accelerate the molding time of mould, cleaning device can clean equipment automatically;The present invention is free of any organic solvent, is a kind of environmentally protective, pollution-free, and production and constructing operation are simple, and construction tool can wash with water, and the degree of safety during transport, storage and use is high.Raw material sources are extensive, and production cost is low, and production cleaning, meets the requirement of current environment protection;With moulding effect variation, it is easy to operate, novel the characteristics of.

Description

The modeling method and mold ship bracket of a kind of hull bottom model
Technical field
The invention belongs to modeling technique field, it is related to the modeling method and mold ship bracket of a kind of hull bottom model.
Background technology
The means of transport such as ship or automobile is built to generally require to manufacture one to one physical model first.That is master body, Or " master cast " is called, the mould of sheet metal part processed is thus turned over again.The development progress and precision of a kind of product, depending on standard The processing of entity, master cast.Because standards entities, the ground of master cast one to one reflects that the general assembly of covering and each component is closed System is manufacture and reprocesses the foundation of various moulds and assembling jig, and sheet metal part manufacture is exchanged with coordinating.People are to standard Entity, the processing of master cast, pours into research interest.In standards entities, the existing processing technology of master cast, made with epoxy resin Adhesive, all complex process, not easy to be processed, of high cost, production cycle are grown mostly.Particularly with epoxy resin as adhesive Plastic processing, due to using mineral matter in a large proportion as filler, it is small, crisp that this makes the processing of plastic mould intensity height, toughness occur The disadvantage that property is big, machining property is poor.
The content of the invention
For such case, the present invention provides the modeling method and mold ship bracket of a kind of hull bottom model, it can be right Bottom of ship carries out mold and the demoulding, including mold ship bracket and the miscellaneous bed of material carry out epoxy resin batch mixing moulding, then pass through ship Bed die tool to epoxy resin batch mixing carry out pressing mold forms new ship bracket, can from ship bracket hull integrality, for Building hull bottom has good test effect.The adjustment that the present invention is modeled for hull bottom of different shapes, and air-drying device can To accelerate the molding time of mould, cleaning device can clean equipment automatically;With the variation of moulding effect, easy to operate, The characteristics of novel.
The technical scheme is that:
A kind of modeling method of hull bottom model, comprises the following steps:
Step 1, places the good large-scale plastic cloth of leakproofness, the surrounding gear of the plastic cloth on mold ship bracket Block and fluid sealant are fixedly mounted on the frame of mold ship bracket;
Step 2, is paved with least two layers of plastic thin films on the plastic cloth, then at least two are spread on the plastic film The material that layer kapok, shredded paper and flexible chain break forms the miscellaneous bed of material, and spreads plastic film in the top of the miscellaneous bed of material;
Step 3, is put into the hull bottom mould for treating mold, and the hydraulic pressure on mold ship bracket is adjusted according to the bottom shape of hull bottom mould Device height, while coordinate limiting steering device to establish the blank of a hull bottom bottom shape, mold ship bracket is adjusted to ship The hull bottom mould for treating mold is taken out after bottom bottom profile and lines;Then inserts smearing release agent is pacified inserts with after preheating It is attached on the correspondence position for needing setting preformed hole of mold ship bracket;
Step 4, prepares epoxy resin batch mixing:
First, epoxy resin is put into material-compound tank and carries out heating melting stirring, when the epoxy resin reaches predetermined temperature, It is sent into degassing tank and is de-gassed after filler is produced with the epoxy resin uniform stirring after melting to not a large amount of foams, then Pour into a vacuum tank and be sufficiently mixed, and add defoamer and carry out deaeration processing;Secondly, curing agent is carried out heating to melt Melt processing, then the epoxy resin after curing agent and batch mixing is sufficiently mixed, obtain epoxy resin batch mixing, be ready for pourer Make;
Step 5, the good mold ship bracket casting epoxy resin batch mixing of place mat into step 3, then on epoxy resin batch mixing At least it is laid with layer of plastic film;
Step 6, the hull bottom mould for treating mold are preheated, and the hull bottom mould after preheating is smeared de- after being wrapped up with plastic film Mould agent;Then it is pressed into the epoxy resin batch mixing of step 5, mold curing and the demoulding is carried out to epoxy resin batch mixing;The demoulding Secondary curing, mechanical processing and inspection are carried out afterwards, obtain epoxy resin hull bottom model;The epoxy resin hull bottom mold curing It is made of afterwards in its surface smear self-cleaning waterborne epoxy coatings, its described self-cleaning waterborne epoxy coatings two component of A, B, its Respectively form by mass content number and be:
Component A:32~34 parts of aqueous epoxy curing agent;18~13 parts of rutile type titanium white;9~5 parts of barium sulfate;JTC-305 8~4 parts of type polytetrafluoroethylene powder;Fluorine-containing 6~4 parts of toughener;0.25~0.2 part of A10 types defoamer;2020 type levelling agents 0.25 ~0.2 part;0.8~0.5 part of 6- di-tert-butyl p-cresol antioxidant;0.8~0.5 part of BYK-3810 light stabilizers;Mill base 0.4 ~0.3 part;0.4~0.3 part of 12 coalescents of Texanol ester alcohols;24.75~35.05 parts of deionized water;
B component:32~34 parts of aqueous epoxy resin emulsion, 296DS types benzene/5~3 parts of acrylic emulsion.
According to the hydraulic device height on the Adjusting Shape mold ship bracket of required modeling, while coordinate limiting steering device The blank of a bottom die is established, the bottom profile and lines of established model are treated according to different demands adjustment;Carried out again after mold Cure and demould;Secondary curing, mechanical processing and inspection are carried out after the demoulding.Base-material and a certain amount of curing agent are uniformly mixed, Pour into module, under 50 DEG C to 60 DEG C of environment temperature, by 8 when small more than curing molding, then in the environment of room temperature It is lower to place more than 7 days, then demould and sample is made according to size requirement;The cast of gasket is according to axial center position, estimation The thickness of gasket is poured into a mould usually in the range of 15mm to 70mm, generally 25mm to 45mm, can laminated pouring more than 50mm.
As further technological improvement, then above-described epoxy resin uniform stirring adds filler mixing to 65 DEG C, Then add curing agent mixing;The epoxy resin is with filler according to 1:1.2 ratio is mixed evenly to after 70 DEG C Batch mixing is sent into degassing tank and is de-gassed;Pressure is 0.11 kPa in the degassing tank, and the degassing time is small for 3 When;When the time that the batch mixing is pumped into degassing tank is small no more than 4.Before cast, curing agent is poured into the bucket equipped with base-material, is stirred Mix uniformly, avoid bubble;Epoxy resin mixes the time that must be noted that degassing when being de-gassed with filler, can be made when small more than 4 Into degassing tank damage or scrap.
As further technological improvement, above-described mixture casting is to leave in mold ship bracket, in casting process The position of fixed orifice adds orifice mould and determines the position that orifice is reserved, and adds defoamer in casting process again, reduces gas The generation of bubble;The poring rate of the casting process is kept for 2 kgs/hr;Casting complete covers hull bottom shape simultaneously immediately And cured., should be since every piece of framed lowest point, until pouring full when pouring;If the framed volume of gasket is big and adjacent When, cast should be spaced;The defective material do not scraped during cast on barrel wall is poured into a mould;Condition of cure should meet to require:a)Environment Temperature is below 10 DEG C, using heating measures, when hardening time is 48 small;b)Environment temperature is at 10 DEG C to 20 DEG C, during curing Between for 48 it is small when;c)When environment temperature is more than 20 DEG C to 30 DEG C, when the cold curing time is 24 small;d)Environment temperature 30 DEG C with On, cast work should avoid high temperature in night or early morning progress, curing, when the cold curing time is 12 small.
As further technological improvement, above-described mould and insert surface first wrap up plastic film, rear to smear the demoulding Agent.Plastic film belongs to non-polar material, reacts torpescence with epoxy resin, is used for increasing the effect of the demoulding here, first wraps up Plastic film, after smearing release agent again, contribute to the effect of the demoulding.
Above-mentioned mold ship bracket includes bracket, air-drying device, limiting steering device, hydraulic device, cleaning device and liquid Body antirust agent;The bracket includes frame, stent, chassis, frame foot and groove bar;The frame is connected with groove bar and frame Phase mutual interval between frame;Wherein one of the frame is equipped with guide rail;The groove bar and stent interconnection and groove Phase mutual interval between bar;Phase mutual interval between the stent and chassis connection and stent;The frame foot and chassis phase Connect and phase mutual interval between frame foot;The limiting steering device include contact block, rotary sleeve, rotor, spring stack and Contiguous block;The contact block is fixedly connected with rotary sleeve;The rotor is fixedly connected with contiguous block;The rotary sleeve parcel turns Son rotatable connection;The contiguous block is connected by spring stack with contact block;The cleaning device include sliding shoe, connecting rod and Giant;The sliding shoe is connected with connecting rod and frame respectively;The connecting rod is connected with giant;The cunning Motion block is connected with the guide rail on frame;The hydraulic device includes hydraulic pump and telescopic rod;The hydraulic device connects with chassis Connect, the hydraulic device is equipped with multiple and does not contact between each other;The hydraulic device passes through contiguous block and limiting steering Device connects;The air-drying device is equipped with multiple and does not contact between each other;The air-drying device is connected with frame;It is described Air-drying device, limiting steering device, hydraulic device and cleaning device be connected with control system;The antirust liquid agent is smeared In bracket surface;The weight proportion of each component is in the antirust liquid agent:Tripolyphosphate 11~14%, oil rare earth sulfonic acid Salt 6~9%, organic amine 11~14%, soda ash 2~2.5%, surfactant 1~1.3%, surplus are water, wherein, main film forming agent is adopted Used with, alkaline corrosion inhibitor, antirust agent using have, accelerating agent uses, the pH value of aforesaid liquid antirust agent is controlled 11~14 Scope.When needing to carry out mold, flexible and limiting steering device rotation or fixation are carried out by control system control hydraulic device, Moulding shape is treated in formation;When carrying out mold to the central axis of hull bottom, on control system control limiting steering device Spring stack is tightened, and rotary sleeve can not be rotated on rotor, plays the limiting steering on locked support hull bottom central axis The effect of device.The different height of telescopic rod on hydraulic device is adjusted by control system, different bottom shapes can be formed; Air-drying device on frame has the function that to air-dry to mold;Cleaning device on the frame for having guide rail side, can Chassis is cleaned with being moved left and right on guide rail, the waste water after cleaning is discharged by the aperture on chassis.
Compared with prior art, advantages of the present invention:
1. the present invention can be modeled for hull bottom of different shapes, and the smoothness after modeling is good.
2. the present invention can accelerate the molding time of mould, and equipment can be cleaned automatically.
3. the moulding excellent of the present invention, install convenient.
It is a kind of environmentally protective, pollution-free, production and constructing operation are simple, apply 4. the present invention is free of any organic solvent Work instrument can wash with water, and the degree of safety during transport, storage and use is high.Raw material sources are extensive, are produced into This is low, and production cleaning, meets the requirement of current environment protection.
Brief description of the drawings
Fig. 1 is the structure diagram of mold ship bracket.
Fig. 2 is the position view of cleaning device.
Fig. 3 is the structure diagram of limiting steering device.
Fig. 4 is the explosive view of limiting steering device.
Attached drawing identifies:Air-drying device 1, frame 2, limiting steering device 3, stent 4, telescopic rod 5, hydraulic pump 6, aperture 7, bottom Frame 8, cleaning device 9, frame foot 10, sliding shoe 11, groove bar 12, connecting rod 13, giant 14, contact block 15, rotary sleeve 16, Rotor 17, contiguous block 18.
Embodiment
The present invention is further described below in conjunction with the accompanying drawings.
Embodiment one:
A kind of as shown in Figure 1, modeling method of hull bottom model, it is characterised in that:Step 1, places sealing on mold ship bracket Property good large-scale plastic cloth, the surrounding of the plastic cloth is fixedly mounted on the frame of mold ship bracket with block and fluid sealant On frame;Step 2, is paved with least two layers of plastic thin films on the plastic cloth, then at least two are spread on the plastic film The material that layer kapok, shredded paper and flexible chain break forms the miscellaneous bed of material, and spreads plastic film in the top of the miscellaneous bed of material;Step Three, the hull bottom mould for treating mold is put into, the hydraulic device height on mold ship bracket is adjusted according to the bottom shape of hull bottom mould, Coordinate limiting steering device to establish the blank of a hull bottom bottom shape at the same time, mold ship bracket is adjusted to hull bottom bottom profile The hull bottom mould of mold is treated with taking-up after lines;Then mold ship is installed to by inserts with after preheating to inserts smearing release agent Bracket needs to set on the correspondence position of preformed hole;
Step 4, prepares epoxy resin batch mixing:First, epoxy resin is put into material-compound tank and carries out heating melting stirring, it is described Epoxy resin when reaching predetermined temperature, after filler is produced with the epoxy resin uniform stirring after melting to not a large amount of foams It is sent into degassing tank and is de-gassed, be subsequently poured into a vacuum tank and be sufficiently mixed, and adds defoamer and carry out at deaeration Reason;Secondly, curing agent is subjected to heating melt process, then the epoxy resin after curing agent and batch mixing is sufficiently mixed, is obtained Epoxy resin batch mixing, is ready for cast work;
Step 5, the good mold ship bracket casting epoxy resin batch mixing of place mat into step 3, then on epoxy resin batch mixing At least it is laid with layer of plastic film;Step 6, the hull bottom mould for treating mold are preheated, the hull bottom mould plastics after preheating Smearing release agent after film parcel;Then it is pressed into the epoxy resin batch mixing of step 5, mould is carried out to epoxy resin batch mixing Type cures and the demoulding;Secondary curing, mechanical processing and inspection are carried out after the demoulding, obtains epoxy resin hull bottom model;The ring It is in its surface smear self-cleaning waterborne epoxy coatings, its described self-cleaning waterborne epoxy coatings after oxygen tree fat hull bottom mold curing It is made of two component of A, B, it, which is respectively formed by mass content number, is:
Component A:32~34 parts of aqueous epoxy curing agent;18~13 parts of rutile type titanium white;9~5 parts of barium sulfate;JTC-305 8~4 parts of type polytetrafluoroethylene powder;Fluorine-containing 6~4 parts of toughener;0.25~0.2 part of A10 types defoamer;2020 type levelling agents 0.25 ~0.2 part;0.8~0.5 part of 6- di-tert-butyl p-cresol antioxidant;0.8~0.5 part of BYK-3810 light stabilizers;Mill base 0.4 ~0.3 part;0.4~0.3 part of 12 coalescents of Texanol ester alcohols;24.75~35.05 parts of deionized water;
B component:32~34 parts of aqueous epoxy resin emulsion, 296DS types benzene/5~3 parts of acrylic emulsion.
According to the hydraulic device height on the Adjusting Shape mold ship bracket of required modeling, while coordinate limiting steering device 3 establish the blank of a bottom die, and the bottom profile and lines of established model are treated according to different demands adjustment;Carried out again after mold Cure and demould;Secondary curing, mechanical processing and inspection are carried out after the demoulding.The epoxy resin uniform stirring is to 65 DEG C, so Filler mixing is added afterwards, then adds curing agent mixing;The epoxy resin is with filler according to 1:1.2 ratio mixing is stirred Mix and be uniformly de-gassed to batch mixing being sent into degassing tank after 70 DEG C;Pressure is 0.11 kPa in the degassing tank, described When degassing time is 3 small;When the time that the batch mixing is pumped into degassing tank is small no more than 4.The mixture casting is in mold ship It is that the position addition orifice mould for leaving fixed orifice determines the position that orifice is reserved, casting process in bracket, in casting process In add defoamer again, reduce the generation of bubble;The poring rate of the casting process is kept for 2 kgs/hr;Casting complete Hull bottom shape is covered immediately and is cured.The mould and insert surface first wraps up plastic film, and rear smear takes off Mould agent.The modeling method of the hull bottom model, it is characterised in that:Including bracket, air-drying device 1, limiting steering device 3, liquid Pressure device, cleaning device 9 and antirust liquid agent;The bracket includes frame 2, stent 4, chassis 8, frame foot 10 and groove bar 12;The frame 2 and groove bar 12 connects and phase mutual interval between frame 2;Wherein one of the frame 2 is equipped with and leads Rail;The groove bar 12 and stent 4 is connected with each other and phase mutual interval between groove bar 12;The stent 4 and chassis 8 connects Connect and phase mutual interval between stent 4;The frame foot 10 and chassis 8 is connected with each other and phase mutual interval between frame foot 10;Institute The limiting steering device 3 stated includes contact block 15, rotary sleeve 16, rotor 17, spring stack and contiguous block 18;The contact block 15 It is fixedly connected with rotary sleeve 16;The rotor 17 is fixedly connected with contiguous block 18;The rotary sleeve 16 wraps up the rotation of rotor 17 and connects Connect;The contiguous block 18 is connected by spring stack with contact block 15;The cleaning device 9 includes sliding shoe 11, connecting rod 13 With giant 14;The sliding shoe 11 is connected with connecting rod 13 and frame 2 respectively;The connecting rod 13 and giant 14 Connection;The sliding shoe 11 is connected with the guide rail on frame 2;The hydraulic device includes hydraulic pump 6 and telescopic rod 5;Institute State hydraulic device to be connected with chassis 8, the hydraulic device is equipped with multiple and does not contact between each other;The hydraulic device leads to Contiguous block 18 is crossed to be connected with limiting steering device 3;The air-drying device 1 is equipped with multiple and does not contact between each other;Described Air-drying device 1 is connected with frame 2;Air-drying device 1, limiting steering device 3, hydraulic device and the cleaning device 9 and control System is connected;The antirust liquid agent is applied to bracket surface;The weight proportion of each component is in the antirust liquid agent:Three Quadrafos 11~14%, oil rare earth sulfonate 6~9%, organic amine 11~14%, soda ash 2~2.5%, surfactant 1~ 1.3%th, surplus is water, wherein, main film forming agent, which uses, alkaline corrosion inhibitor uses, antirust agent uses has, accelerating agent uses, above-mentioned liquid Scope of the pH value control of body antirust agent 11~14.
Base-material and a certain amount of curing agent are uniformly mixed, poured into module, under 50 DEG C to 60 DEG C of environment temperature, warp Cross 8 it is small when more than curing molding, then place more than 7 days in the environment of room temperature, then the demoulding and require to make according to size Into sample;According to axial center position, estimation pours into a mould the thickness of gasket usually in the range of 15mm to 70mm for the cast of gasket, and one As be 25mm to 45mm, can laminated pouring more than 50mm.Before cast, curing agent is poured into the bucket equipped with base-material, is stirred evenly, Avoid bubble;Epoxy resin mixes the time that must be noted that degassing when being de-gassed with filler, and degassing tank can be caused when small more than 4 Damage or scrap., should be since every piece of framed lowest point, until pouring full when pouring;If the framed volume of gasket is greatly again When being close to, cast should be spaced;The defective material do not scraped during cast on barrel wall is poured into a mould;Condition of cure should meet to require:A rings Border temperature is below 10 DEG C, using heating measures, when hardening time is 48 small;B environment temperatures are at 10 DEG C to 20 DEG C, during curing Between for 48 it is small when;When c environment temperatures are more than 20 DEG C to 30 DEG C, when the cold curing time is 24 small;D environment temperatures 30 DEG C with On, cast work should avoid high temperature in night or early morning progress, curing, when the cold curing time is 12 small.Plastic film category In non-polar material, react torpescence with epoxy resin, be used for increasing the effect of the demoulding here, first wrap up plastic film, after again Smearing release agent, contributes to the effect of the demoulding.When carrying out mold to the central axis of hull bottom, control system control turns to limit Spring stack on the device 3 of position is tightened, and rotary sleeve 16 can not be rotated on rotor 17, plays locked support hull bottom central shaft The effect of limiting steering device 3 on line.The different height of telescopic rod 5 on hydraulic device is adjusted by control system, can be with shape Into different bottom shapes;Air-drying device 1 on frame 2 has the function that to air-dry to mold;Arranged on there is guide rail side Cleaning device 9 on frame 2, can move left and right on guide rail and chassis 8 is cleaned, the waste water after cleaning passes through the bottom of arranged on Aperture 7 on frame 8 is discharged.Self-cleaning waterborne epoxy coatings is a kind of environmentally protective, pollution-free, and production and constructing operation are simple, Construction tool can wash with water, and the degree of safety during transport, storage and use is high.Raw material sources are extensive, production Cost is low, and production cleaning, meets the requirement of current environment protection
Embodiment two
The present embodiment two is essentially identical with one structure of embodiment and principle, the difference is that changing the order of operation, first by asphalt mixtures modified by epoxy resin Fat batch mixing is poured into after mold ship bracket, then adjusts the height of mold ship bracket hydraulic device, forms the shape that mold needs.
Specific embodiment described herein is only to spirit explanation for example of the invention.Technology belonging to the present invention is led The technical staff in domain can do various modifications or additions to described specific embodiment or replace in a similar way Generation, but without departing from spirit of the invention or beyond the scope of the appended claims.

Claims (5)

  1. A kind of 1. modeling method of hull bottom model, it is characterised in that:
    Step 1, places the good large-scale plastic cloth of leakproofness, the surrounding gear of the plastic cloth on mold ship bracket Block and fluid sealant are fixedly mounted on the frame of mold ship bracket;
    Step 2, is paved with least two layers of plastic thin films on the plastic cloth, then at least two are spread on the plastic film The material that layer kapok, shredded paper and flexible chain break forms the miscellaneous bed of material, and spreads plastic film in the top of the miscellaneous bed of material;
    Step 3, is put into the hull bottom mould for treating mold, and the hydraulic pressure on mold ship bracket is adjusted according to the bottom shape of hull bottom mould Device height, while coordinate limiting steering device to establish the blank of a hull bottom bottom shape, mold ship bracket is adjusted to ship The hull bottom mould for treating mold is taken out after bottom bottom profile and lines;Then inserts smearing release agent is pacified inserts with after preheating It is attached on the correspondence position for needing setting preformed hole of mold ship bracket;
    Step 4, prepares epoxy resin batch mixing:
    First, epoxy resin is put into material-compound tank and carries out heating melting stirring, when the epoxy resin reaches predetermined temperature, It is sent into degassing tank and is de-gassed after filler is produced with the epoxy resin uniform stirring after melting to not a large amount of foams, then Pour into a vacuum tank and be sufficiently mixed, and add defoamer and carry out deaeration processing;Secondly, curing agent is carried out heating to melt Melt processing, then the epoxy resin after curing agent and batch mixing is sufficiently mixed, obtain epoxy resin batch mixing, be ready for pourer Make;
    Step 5, the good mold ship bracket casting epoxy resin batch mixing of place mat into step 3, then on epoxy resin batch mixing At least it is laid with layer of plastic film;
    Step 6, the hull bottom mould for treating mold are preheated, and the hull bottom mould after preheating is smeared de- after being wrapped up with plastic film Mould agent;Then it is pressed into the epoxy resin batch mixing of step 5, mold curing and the demoulding is carried out to epoxy resin batch mixing;The demoulding Secondary curing, mechanical processing and inspection are carried out afterwards, obtain epoxy resin hull bottom model;The epoxy resin hull bottom mold curing It is made of afterwards in its surface smear self-cleaning waterborne epoxy coatings, its described self-cleaning waterborne epoxy coatings two component of A, B, its Respectively form by mass content number and be:
    Component A:32~34 parts of aqueous epoxy curing agent;18~13 parts of rutile type titanium white;9~5 parts of barium sulfate;JTC-305 8~4 parts of type polytetrafluoroethylene powder;Fluorine-containing 6~4 parts of toughener;0.25~0.2 part of A10 types defoamer;2020 type levelling agents 0.25 ~0.2 part;0.8~0.5 part of 6- di-tert-butyl p-cresol antioxidant;0.8~0.5 part of BYK-3810 light stabilizers;Mill base 0.4 ~0.3 part;0.4~0.3 part of 12 coalescents of Texanol ester alcohols;24.75~35.05 parts of deionized water;
    B component:32~34 parts of aqueous epoxy resin emulsion, 296DS types benzene/5~3 parts of acrylic emulsion.
  2. 2. the modeling method of hull bottom model according to claim 1, it is characterised in that:The epoxy resin uniform stirring And add filler when being heated to 65 DEG C and mixed in the container of low vacuum;The epoxy resin is with filler according to 1:1.2 Ratio be mixed evenly to batch mixing being sent into degassing tank after 70 DEG C and be de-gassed;Pressure is 0.11 in the degassing tank KPa, when the degassing time is 3 small;When the time that the batch mixing is pumped into degassing tank is small no more than 4.
  3. 3. the modeling method of hull bottom model according to claim 1, it is characterised in that:The epoxy resin mixture casting To defoamer is added again during mold ship bracket, the generation of bubble is reduced;The poring rate of the casting process keeps 2 Kg/hr;Casting complete covers hull bottom mould and is cured immediately.
  4. 4. the modeling method of hull bottom model according to claim 1, it is characterised in that:The hull bottom mould and inserts table Face is first to wrap up plastic film, rear smearing release agent.
  5. A kind of 5. mold ship bracket, it is characterised in that:Including bracket, air-drying device(1), limiting steering device(3), hydraulic pressure dress Put, cleaning device(9)With antirust liquid agent;The bracket includes frame(2), stent(4), chassis(8), frame foot(10)With it is recessed Channel bar(12);The frame(2)And groove bar(12)Connection and frame(2)Between phase mutual interval;The frame(2)Its In one be equipped with guide rail;The groove bar(12)And stent(4)Interconnection and groove bar(12)Between phase mutual interval;Institute The stent stated(4)And chassis(8)Connection and stent(4)Between phase mutual interval;The frame foot(10)And chassis(8)Mutually interconnect Connect and frame foot(10)Between phase mutual interval;The limiting steering device(3)Including contact block(15), rotary sleeve(16), turn Son(17), spring stack and contiguous block(18);The contact block(15)With rotary sleeve(16)It is fixedly connected;The rotor(17)With Contiguous block(18)It is fixedly connected;The rotary sleeve(16)Wrap up rotor(17)Rotatable connection;The contiguous block(18)Pass through spring Column and contact block(15)Connection;The cleaning device(9)Including sliding shoe(11), connecting rod(13)And giant(14); The sliding shoe(11)Respectively with connecting rod(13)And frame(2)Connection;The connecting rod(13)With giant(14)Even Connect;The sliding shoe(11)With frame(2)On guide rail connection;The hydraulic device includes hydraulic pump(6)And telescopic rod (5);The hydraulic device and chassis(8)Connection, the hydraulic device are equipped with multiple and do not contact between each other;The liquid Pressure device passes through contiguous block(18)With limiting steering device(3)Connection;The air-drying device(1)Equipped with multiple and mutual Do not contact;The air-drying device(1)With frame(2)Connection;The air-drying device(1), limiting steering device(3), hydraulic pressure Device and cleaning device(9)It is connected with control system;The antirust liquid agent is applied to bracket surface;The antirust liquid agent The weight proportion of middle each component is:Tripolyphosphate 11~14%, oil rare earth sulfonate 6~9%, organic amine 11~14%, soda ash 2~2.5%, surfactant 1~1.3%, surplus are water, and the pH value of the antirust liquid agent controls the scope 9~11.
CN201711171776.XA 2017-11-22 2017-11-22 The modeling method and mold ship bracket of a kind of hull bottom model Pending CN107932810A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711171776.XA CN107932810A (en) 2017-11-22 2017-11-22 The modeling method and mold ship bracket of a kind of hull bottom model

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711171776.XA CN107932810A (en) 2017-11-22 2017-11-22 The modeling method and mold ship bracket of a kind of hull bottom model

Publications (1)

Publication Number Publication Date
CN107932810A true CN107932810A (en) 2018-04-20

Family

ID=61929711

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711171776.XA Pending CN107932810A (en) 2017-11-22 2017-11-22 The modeling method and mold ship bracket of a kind of hull bottom model

Country Status (1)

Country Link
CN (1) CN107932810A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019100543A1 (en) * 2017-11-22 2019-05-31 李春洪 Method for constructing epoxy resin ship bottom model and cradle device of ship to be molded
WO2019100542A1 (en) * 2017-11-22 2019-05-31 李春洪 Method for modeling by using ship carrier frame device and ship carrier frame device
CN115418080A (en) * 2022-10-08 2022-12-02 启东海大聚龙新材料科技有限公司 Preparation method of resin cushion block material with anti-skid function for ship

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102011113A (en) * 2010-12-17 2011-04-13 南车长江车辆有限公司 Liquid antirusting agent used in railway vehicle water sandblasting antirusting process as well as preparation method and application thereof
CN104479501A (en) * 2014-12-24 2015-04-01 北京艾施姆科技有限公司 Self-cleaning waterborne epoxy coating for road guardrail and preparation method of self-cleaning waterborne epoxy coating
CN106626181A (en) * 2016-11-30 2017-05-10 国网重庆市电力公司电力科学研究院 Pouring technology for all-fiber optical current transformer
CN106985263A (en) * 2017-05-23 2017-07-28 南京倍立达新材料系统工程股份有限公司 A kind of die station supporting construction of precast concrete building element and application

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102011113A (en) * 2010-12-17 2011-04-13 南车长江车辆有限公司 Liquid antirusting agent used in railway vehicle water sandblasting antirusting process as well as preparation method and application thereof
CN104479501A (en) * 2014-12-24 2015-04-01 北京艾施姆科技有限公司 Self-cleaning waterborne epoxy coating for road guardrail and preparation method of self-cleaning waterborne epoxy coating
CN106626181A (en) * 2016-11-30 2017-05-10 国网重庆市电力公司电力科学研究院 Pouring technology for all-fiber optical current transformer
CN106985263A (en) * 2017-05-23 2017-07-28 南京倍立达新材料系统工程股份有限公司 A kind of die station supporting construction of precast concrete building element and application

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019100543A1 (en) * 2017-11-22 2019-05-31 李春洪 Method for constructing epoxy resin ship bottom model and cradle device of ship to be molded
WO2019100542A1 (en) * 2017-11-22 2019-05-31 李春洪 Method for modeling by using ship carrier frame device and ship carrier frame device
CN115418080A (en) * 2022-10-08 2022-12-02 启东海大聚龙新材料科技有限公司 Preparation method of resin cushion block material with anti-skid function for ship

Similar Documents

Publication Publication Date Title
CN105625720B (en) More materials build 3 D-printing forming method
CN107932810A (en) The modeling method and mold ship bracket of a kind of hull bottom model
CN106927729B (en) A kind of the quartzite slate preparation method and its product of imitation marble
CN101323157B (en) Method for producing sealing ring
CN101463181B (en) Self-lubricating composite material and manufacturing method of self-lubricating composite material mould
US3777000A (en) Method of producing a thick-walled cured plastics moulding
CN104893155B (en) PVC flooring base material and preparation method thereof
CN107902044A (en) A kind of method being modeled using Novel ankle bracket system and Novel ankle bracket system
CN105802433A (en) Quick-drying environment-friendly coating and manufacturing method thereof
CN104742383A (en) Integrated manufacturing method of composite material cavity member
CN107901311A (en) A kind of method being modeled using mold ship bracket system and mold ship bracket system
CN106238680A (en) A kind of lost foam casting process of automobile saddle-type traction base
CN110065285A (en) A kind of plastic skin and preparation method thereof of building template demoulding functions selfreparing
CN109161132A (en) Polyvinyl chloride automotive trim panel and preparation method thereof
CN107932809A (en) A kind of method being modeled using ship bracket system and ship bracket system
CN108821645A (en) A method of compound resin well cover is prepared using discarded circuit board non-metal powder collaboration polyester resin
CN104960119A (en) Preparation method of gypsum plastic suction mold
CN107932806A (en) The modeling method and mold ship bracket system of a kind of epoxy resin hull bottom model
CN109986725A (en) A kind of release agent and its manufacturing method and rotational molding technique using it
CN107512064A (en) The preparation method and water-proof plate of a kind of water-proof plate
CN112322044A (en) Preparation method of silicone rubber lost wax mould for artware with complex shape
CN204585877U (en) There is nonmetallic composite product mold that is semiclosed or closed inner chamber
CN105820297A (en) Preparation method of unsaturated wood substitute
CN104648027A (en) Batch cement pouring method of large-sized sculpture
CN105863252A (en) Production technical process of combined construction mold with decoration function

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180420