CN107918599A - A kind of billing method of work about electric power ticket - Google Patents
A kind of billing method of work about electric power ticket Download PDFInfo
- Publication number
- CN107918599A CN107918599A CN201711126560.1A CN201711126560A CN107918599A CN 107918599 A CN107918599 A CN 107918599A CN 201711126560 A CN201711126560 A CN 201711126560A CN 107918599 A CN107918599 A CN 107918599A
- Authority
- CN
- China
- Prior art keywords
- ticket
- work
- equipment
- work ticket
- wiring diagram
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 31
- 238000010586 diagram Methods 0.000 claims abstract description 88
- 238000012795 verification Methods 0.000 claims abstract description 41
- 230000008859 change Effects 0.000 claims abstract description 18
- 239000000126 substance Substances 0.000 claims abstract description 13
- 238000012550 audit Methods 0.000 claims description 11
- 230000008569 process Effects 0.000 description 5
- 238000012423 maintenance Methods 0.000 description 4
- 238000012546 transfer Methods 0.000 description 3
- 230000005540 biological transmission Effects 0.000 description 2
- 238000006243 chemical reaction Methods 0.000 description 2
- 238000007689 inspection Methods 0.000 description 2
- 238000007726 management method Methods 0.000 description 2
- 238000012552 review Methods 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 239000003990 capacitor Substances 0.000 description 1
- 239000003086 colorant Substances 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 239000004020 conductor Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000029058 respiratory gaseous exchange Effects 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F40/00—Handling natural language data
- G06F40/10—Text processing
- G06F40/166—Editing, e.g. inserting or deleting
- G06F40/174—Form filling; Merging
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/50—Information retrieval; Database structures therefor; File system structures therefor of still image data
- G06F16/51—Indexing; Data structures therefor; Storage structures
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/50—Information retrieval; Database structures therefor; File system structures therefor of still image data
- G06F16/58—Retrieval characterised by using metadata, e.g. metadata not derived from the content or metadata generated manually
- G06F16/5866—Retrieval characterised by using metadata, e.g. metadata not derived from the content or metadata generated manually using information manually generated, e.g. tags, keywords, comments, manually generated location and time information
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F40/00—Handling natural language data
- G06F40/10—Text processing
- G06F40/166—Editing, e.g. inserting or deleting
- G06F40/177—Editing, e.g. inserting or deleting of tables; using ruled lines
- G06F40/18—Editing, e.g. inserting or deleting of tables; using ruled lines of spreadsheets
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Human Resources & Organizations (AREA)
- Health & Medical Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Data Mining & Analysis (AREA)
- General Health & Medical Sciences (AREA)
- Economics (AREA)
- Tourism & Hospitality (AREA)
- Databases & Information Systems (AREA)
- Audiology, Speech & Language Pathology (AREA)
- Marketing (AREA)
- Entrepreneurship & Innovation (AREA)
- Computational Linguistics (AREA)
- Artificial Intelligence (AREA)
- General Business, Economics & Management (AREA)
- Software Systems (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Library & Information Science (AREA)
- Primary Health Care (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
A kind of billing method of work about electric power ticket, step are:Establish work ticket;Fill in the substance of work ticket;Change the state of corresponding device according to task in graphical interfaces, the operation carried out on graphical interfaces to equipment is converted into equipment operation term, insert on work ticket in corresponding equipment operation input item, the end-state data of each equipment in power equipment wiring diagram are generated into snapshot data;The ticket information of work ticket and associated snapshot data are preserved into work ticket database, circulation to examination & verification node is audited;Ticket information and associated snapshot data of the node from work ticket database loading work ticket are audited, the power equipment wiring diagram for being stored in examination & verification node is updated;Work ticket is audited with reference to the power equipment wiring diagram after the ticket information of work ticket and renewal, completes to make out an invoice if if auditing, if examination & verification by that need to not make out an invoice again.The present invention can simplify flow of making out an invoice, and improve reliability and efficiency during work ticket examination & verification.
Description
Technical field
The invention belongs to power system management technical field, more particularly to a kind of graphics aided method of work about electric power ticket.
Background technology
Two tickets in electric system " two tickets three are made " refer to work ticket and operation order, work ticket be permit in electrical equipment and
The writ to work in system software, and perform the written foundation for ensureing technical safety measures.Work ticket is responsible for by working
People fills in or work ticket signed by is filled in, by running person on duty's license.Operation order is the progress electric operation in electric system
Written foundation, including dispatch command ticket and switch operation ticket.Work ticket and operation order have highly important in safety management
Effect.
At present, the work ticket of electric system is generally made out an invoice by the way of being filled in manually, and needs to fill on work ticket
Content include:The essential informations such as place, time, staff, and equipment stop power transmission, hanging earthing conductor, suspension Sign Board, its
The safety measure information of the job requirements such as its safety notice.Plan ticket in work ticket, during signing and issuing, auditing, to filling out
Ticket people, the working status of auditor, workmanship and specialized capability requirement are very high, may occur if work ticket fills in mistake
Security incident, the person of making us and equipment produce huge loss.Work ticket can transfer to next section after being filled in manually at present
Point personnel are checked and are audited, in examination ticket, since power equipment is various, the mode of connection is complicated, more particularly, to
During large-scale service work, because containing a plurality of circuit, multiple equipment, even also there are the change of the circuit method of operation, nominal value
On the content filled in it is very more, and specific works information can not be intuitively shown in nominal value, therefore work ticket is checked oneself, audits inspection
When be very easy to appearance and omit or mistake.
The content of the invention
It is an object of the invention to provide a kind of graphics aided method of work about electric power ticket, flow of making out an invoice can be simplified, carried
Reliability and efficiency when high workload ticket is audited.
To achieve these goals, the present invention takes following technical solution:
A kind of billing method of work about electric power ticket, comprises the following steps:
Work ticket is established according to task;
The substance of work ticket is filled according to task;
The equipment to be operated in task is clicked in the graphical interfaces of power equipment wiring diagram, is changed according to task
The state of corresponding device, is converted to equipment operation term by the operation carried out on graphical interfaces to equipment, inserts on work ticket
In corresponding equipment operation input item, and the end-state data of each equipment in power equipment wiring diagram are generated into associated snapshot
Data;
The ticket information of work ticket and associated snapshot data are preserved into work ticket database, circulation to examination & verification section
Point is audited;
Ticket information and associated snapshot data of the node from work ticket database loading work ticket are audited, according to nominal value
Information and associated snapshot data are updated the power equipment wiring diagram for being stored in examination & verification node;
Examination ticket, examines work ticket with reference to the power equipment wiring diagram after the ticket information of work ticket and renewal
Core, completes to make out an invoice if auditing if, if examination & verification by that need to not make out an invoice again.
Further, the equipment after being operated is shown with not isolabeling in snapshot data.
Further, when to operate multiple equipment in a work ticket, when generating work ticket, according to device type and set
Standby state change information, merges display by the equipment that type is identical, state change information is identical, by type difference or state change
The different device class of information or branch show.
Further, when generating work ticket, carry out using routine operation term to associate device during multi-pass operation to operation
Set is described.
Further, the figure title setting in power equipment wiring diagram to each equipment is used for corresponding with work ticket foundation
The associate field of relation.
Further, when filling in the substance of work ticket, after inputting associate field, called automatically according to associate field
Associated power equipment wiring diagram.
Further, equipment operation input item is generated by the way of being filled in manually, and according to the equipment operation inputted
Term changes the state of relevant device in power equipment wiring diagram, generates snapshot data.
Under the same idea of the present invention, the present invention also provides a kind of billing method of work about electric power ticket, including following step
Suddenly:
Work ticket is established according to task;
The substance of work ticket is filled according to task;
The equipment to be operated in the task is clicked in the graphical interfaces of power equipment wiring diagram, according to the work
Task changes the state of corresponding device, and the operation carried out on graphical interfaces to equipment is converted to equipment operation term, is inserted
On the work ticket in corresponding equipment operation input item, and final power equipment wiring diagram generation is closed with the work ticket
The image of connection;
The ticket information of work ticket and associated image are preserved into work ticket database, circulation to examination & verification node into
Row examination & verification;
Audit ticket information and associated image of the node from work ticket database loading work ticket;
Examination ticket, audits work ticket with reference to work ticket and associated image, is completed if auditing if
Make out an invoice, if examination & verification by that need to not make out an invoice again.
From above technical scheme, the present invention is made out an invoice by graphical interfaces, changes equipment on power equipment wiring diagram
During state, corresponding equipment operation term is generated, while the snapshot data after equipment operation or image are preserved;Generate work
When making ticket, equipment operation term is loaded into nominal value automatically and is corresponded under column, simplify the mode of making out an invoice of work about electric power ticket, raising is opened
Ticket efficiency, avoids being manually entered issuable mistake;And by combining ticket information and associated with work ticket final
The power equipment wiring diagram or image audit work ticket of state, picture and text combine, and simple, intuitive, can not only improve work ticket inspection
Efficiency, can also improve the reliability and accuracy of examination & verification.
Brief description of the drawings
In order to illustrate the embodiments of the present invention more clearly, below will be to required use in embodiment or description of the prior art
Attached drawing do simple introduction, it should be apparent that, drawings in the following description are only some embodiments of the present invention, for ability
For the those of ordinary skill of domain, without creative efforts, it can also be obtained according to these attached drawings other attached
Figure.
Fig. 1 is the schematic diagram of regional area in power equipment wiring diagram;
Fig. 2 is the flow chart of the method for the present invention;
Fig. 3 is the circulation block diagram made out an invoice using the method for the present invention;
Fig. 4 is the nominal value schematic diagram of a blank work ticket;
Fig. 5 is interface schematic diagram when making out an invoice;
Fig. 6 is the snapshot data for showing state after equipment operation;
Fig. 7 is the schematic diagram for the operational term changed after being operated to equipment.
Embodiment
In order to which above and other objects of the present invention, feature and advantage can be become apparent from, the embodiment of the present invention cited below particularly,
And coordinate appended diagram, it is described below in detail.
Embodiment one
In electric system the connection relation between equipment and whole power grid are represented usually using power equipment wiring diagram
Between connection relation.The state of equipment is associated with the real-time status data of field device in power equipment wiring diagram, and electric power
Connection relation in equipment wiring diagram between various kinds of equipment is corresponding with the connection relation between field device consistent, can be according to field device
Status data change power equipment wiring diagram in equipment state (equipment state illustrated), for example, power equipment wiring
A certain on off state is opens and is green in figure, when when scene, the on off state changes into pass, then according to the real-time status at scene
The switch is also changed into off status in data power equipment wiring diagram, and is changed into red.Equipment in power equipment wiring diagram includes
But it is not limited to breaker, disconnecting switch, grounding switch, net door, temporary ground wire, busbar, transformer, trolley, capacitor etc..
Various kinds of equipment is marked with figure title respectively in power equipment wiring diagram, each equipment all has unique figure name
Claim, figure title is made of device name and/or device numbering.Fig. 1 show showing for a power equipment wiring diagram regional area
It is intended to.The present invention utilizes power equipment wiring diagram, by the state change of equipment in power equipment wiring diagram and equipment operation term
Conversion is associated, so as to simplify flow of making out an invoice, improves efficiency of making out an invoice.Power equipment wiring diagram is rendered complete before making out an invoice
Finish, and upload and be stored in the database in collection control service station, only being needed when making out an invoice will be with the relevant power equipment wiring of work ticket
Figure is downloaded to node of making out an invoice.Can in power equipment wiring diagram each equipment figure title setting associate field (such as
The title of substation), associate field is used to establish correspondence with work ticket.
Below in conjunction with the accompanying drawings and specific embodiment illustrates the method for the present invention, and Fig. 2 is the flow of the method for the present invention
Figure, Fig. 3 are the circulation block diagram made out an invoice using the method for the present invention, and as shown in Figures 2 and 3, the method for the present invention comprises the following steps:
The work ticket of respective type is established according to task;Fig. 4 show the nominal value schematic diagram of a work ticket, work
The ticket information of ticket includes substance and equipment operation input item, the substance of work ticket include work team, operation order number,
The works such as numbering, operating location, action, purchaser, the date of invoice, the work ticket term of validity, work group member and safe class
Make mission bit stream, be mainly used for retrieving, record related job information;Equipment operation input item and setting in power equipment wiring diagram
It is standby associated, for example, breaker and disconnecting switch including needing to disconnect or close, installation ground wire or grounding switch position,
Guard boom, the position for hanging nameplate etc. and the relevant task particular content of equipment operation are installed, is connect when in power equipment
When line chart midpoint selects relevant device and changes associate device state, relevant operation can be exchanged into literal language description insert it is corresponding
In equipment operation input item;
The substance of work ticket is filled according to task;
Generate equipment operation input item;Open have been downloaded into node of making out an invoice with the relevant power equipment wiring of work ticket
Figure, clicks the equipment to be operated in task in the graphical interfaces of power equipment wiring diagram, according to task change pair
The state of equipment is answered, the end-state data of all devices in power equipment wiring diagram are then generated into associated snapshot data
(Snapshot), while equipment operation term will be converted to the operation of equipment, and inserts corresponding equipment operation on work ticket
In input item;Such as in power equipment wiring diagram under busbar dead earth point carry out hanging ground-wire operation after, automatic conversion
The equipment operation term of generatrix power failure hanging ground-wire is simultaneously inserted in nominal value, at the same to dead earth point carry out hanging ground-wire operation after
End-state be recorded in in the associated snapshot data of the task;What snapshot data recorded is the final shape of each equipment
State, such as continuous several times operate some equipment and cause the state of equipment to be sent out repeatedly in power equipment wiring diagram as the personnel of making out an invoice
Changing, what snapshot data was recorded is the final status data of the equipment, rather than each operation in record operating process
Intermediateness data afterwards;Each equipment in power equipment wiring diagram when snapshot data is used for follow-up checks step to auditing node
State be updated, with ensure in the power equipment wiring diagram seen of examination & verification node the state of each equipment with node of making out an invoice
The state of each equipment is identical in power equipment wiring diagram when submitting work ticket;
Ticket information and associated snapshot data are preserved into work ticket database, cocurrent goes to examination & verification node and carries out
Examination & verification, examination & verification node can have one or more;Ticket information includes the substance and equipment operation input item of work ticket;
Auditor loads ticket information and associated snapshot data in examination & verification node from work ticket database, according to ticket
Face information and associated snapshot data are updated the power equipment wiring diagram for being stored in examination & verification node;Node is audited to preserve
Power equipment wiring diagram from collection control service station database, examination & verification node can from collection control service station or node of making out an invoice obtain
Original power equipment wiring diagram, power equipment wiring diagram is used to reproduce equipment state when node of making out an invoice is made out an invoice, preferably from collection
The database for controlling service station is downloaded, so that it is guaranteed that the uniformity of power equipment wiring diagram, ensures to make out an invoice node and audit node to see
To figure be the same, avoid intermediate links excessive and cause inconsistent with power equipment wiring diagram;
During auditor's examination ticket, with reference to the power equipment wiring diagram after the ticket information of work ticket and renewal to work
Audited as ticket, picture and text contrast by way of facilitate auditor check with examination ticket, if audit pass through if complete
Make out an invoice, if examination & verification by that need to not make out an invoice again.
Need first to set from collection control service station download electric power when client (node of making out an invoice) is made out an invoice using the method for the present invention
Standby wiring diagram downloads the real-time status data of power equipment when making out an invoice from collection control service station into local client, to local
The status information of each equipment carries out real-time update in power equipment wiring diagram in client.
Below by taking the work ticket to contact net (rail) power failure operation is made out an invoice as an example, the method for the present invention is carried out specifically
It is bright:
Personnel make out an invoice after Node registers system of making out an invoice, contact net (rail) power failure operation job is established in system interface
Ticket, as shown in Figure 5;
According to the substance of task input service ticket in work ticket;When in work ticket interface input associate field
Afterwards, system is the automatic power equipment wiring diagram for calling and being associated, such as inputs operating location information in operating location, you can is adjusted
With the wiring diagram in corresponding area, each input item of work ticket substance can also be by the form of drop-down menu to the personnel that make out an invoice
Make choice, each option is associated with corresponding power equipment wiring diagram, can quickly transfer/download corresponding website power equipment and connect
Line chart, improves efficiency of making out an invoice;
Open and have been downloaded into the power equipment wiring diagram of node of making out an invoice, into graphical interfaces, power equipment wiring diagram is by institute
The real-time status for having equipment is shown that the personnel that make out an invoice click in task in graphical interfaces and to operate in graphical interfaces
Equipment, change the state of equipment, such as this task equipment to be operated has:Pull open the knife of Zhong Cunzhan anode cabinet 2011
Lock, pulls open 201 switches, and 201 handcarts are pulled to isolated bit by working position, in the point electrical verification of 201-D dead earths and installs ground wire;
The personnel that then make out an invoice carry out the operation of above equipment successively in power equipment wiring diagram, and after the completion of all operations, electric power is set
The end-state generation snapshot data of each equipment in standby wiring diagram, as shown in fig. 6, equipment in snapshot data after change state with
Colored square frame encloses, and passes through visibly different mark (such as mark or marked with square frame etc. in different colors and irised out)
The equipment operated is shown, is audited easy to auditor;At the same time equipment operation will be converted to the operation of equipment successively
Term, and the correspondence position of work ticket is inserted, as shown in Figure 7;
Ticket information and associated snapshot data are preserved, sent to examination & verification node;
Ticket information and associated snapshot data of the auditor in examination & verification node loading work ticket, according to work ticket
Ticket information and associated snapshot data are updated the power equipment wiring diagram for being stored in examination & verification node;
Then in conjunction with the power equipment wiring diagram examination ticket updated, examination & verification is completed to make out an invoice after passing through, and examination & verification is obstructed
Cross, need to make out an invoice again.After work ticket has performed, the snapshot data generated during making out an invoice is deleted, and work ticket becomes history
Ticket.Above is being made out an invoice citing with rail-contacting net work ticket, the work ticket that the method for the present invention can be applied in substation is made out an invoice
Or the work ticket of other power domains is made out an invoice process, process of making out an invoice is the same.
When being made out an invoice using the method for the present invention, when to operate multiple equipment in a work ticket, if multiple same
The equipment of one type, and equipment is all same mode of operation, successively power equipment wiring diagram graphical interfaces to equipment into
, can be according to device type and equipment state change information, by type is identical, state change is believed when generating work ticket after row operation
The same equipment of manner of breathing merges display, by the different device class of type difference or state change information or branch's display.For example, will
Operation by assigning to conjunction is carried out to breaker A and breaker B, clicks on open circuit successively on the graphical interfaces of primary equipment wiring diagram
Device A, B carry out closing operation after, when generating work ticket, by breaker A, B by device numbering order " need to divide in work ticket nominal value
Merge display under the breaker and isolation switch of conjunction " column, such as:" breaker A, B " are closed, nominal value is shown that information is succinct, clear
Chu.In addition in the transfer process with term is operated, if there is multi-pass operation to associate device, conventional behaviour can be used
Make term an operational set is described, such as following operation has been carried out to the equipment of same circuit successively:Switch-dividing-point
Disconnecting link-conjunction earthing knife-switch, when then closing just separated switch again, system can prompt the personnel of making out an invoice whether the operation is conventional ground connection
Attended operation, if it is, the conjunction earthing knife-switch step record of the combination switch and previous step is operated for grounding maintenance, shows in nominal value
It is shown as to the circuit routine grounding maintenance;If following operation is carried out to the equipment of several circuits successively:Point of every circuit is opened
The earthing knife-switch of disconnecting link-circuit of conjunction every of pass-point every circuit, then again to the switch (the just switch of separating brake) of this several circuits
When carrying out closing operation, system can prompt the personnel of making out an invoice whether the operation is grounding maintenance operation, if it is, by the operation therewith
Preceding conjunction earthing knife-switch is recorded as grounding maintenance operation together, can show nominal value to describe operational set by routine operation term
It is concise, reading experience is lifted, improves review efficiency.
Foregoing flow of making out an invoice is that corresponding word description, anti-mistake are generated in nominal value by operating equipment in graphical interfaces
Come, word can also be inputted in nominal value and equipment state is also changed in graphical interfaces according to word description, for can be skilled
Ground is opened for the personnel that make out an invoice of work ticket, and the text information by identifying nominal value, which changes the relevant device in figure, to be improved out
The efficiency of ticket, such as a logical term set need to be only inputted, pass through a term similar to " shortcut " equally
An operational set is expressed, changes the equipment state in figure automatically, so compared to the multiple equipment by clicking figure again
It is easier for the brief term operation of generation one.
Embodiment two
It is by snapshot data and power equipment in embodiment one after node of making out an invoice make out an invoice relevant equipment operation
Wiring diagram with reference to and show make out an invoice operation after power equipment wiring diagram, and examination & verification node be also by snapshot data and electric power
Equipment wiring diagram with reference to the power equipment wiring diagram making out an invoice and make out an invoice at node after operation is reproduced, ensure that two nodes see with
The power equipment wiring diagram of the associated end-state of work ticket.
The present embodiment and the difference of embodiment one are that the present embodiment is by image come record electricity equipment wiring diagram
The end-state data of middle equipment.Specifically, in the present embodiment in node of making out an invoice is to power equipment wiring diagram each equipment into
After row operates and generates work ticket, the end-state of power equipment wiring diagram is saved as into image, and it is associated with work ticket;So
The ticket information of work ticket and associated image are preserved into work ticket database afterwards, circulation to examination & verification node is examined
Core;Node is audited after the ticket information of work ticket database loading work ticket and associated image, when examination ticket can
Work ticket is audited directly in conjunction with work ticket and associated image, without being updated again to power equipment wiring diagram,
Complete to make out an invoice if if auditing, if examination & verification by that need to not make out an invoice again.
By the way that the end-state of power equipment wiring diagram after operation of making out an invoice is generated image graph picture in the present embodiment, to realize
The state of each equipment after the power equipment wiring diagram of end-state that examination & verification node is seen and making out an invoice is operated when node is made out an invoice
Image is consistent.Since power equipment wiring diagram is different from general image graph picture, in examination & verification node need that specific software is installed
Reading and editor could be parsed, preserves the state of each equipment after operation in the form of the image, node of making out an invoice is made out an invoice the ticket of generation
Face information and associated image information are to after auditing node, as long as examination & verification node can read ticket information and image information i.e.
Can, without installing specific software, hardware requirement, convenient operation can be reduced.The carrier of ticket information can be in the present embodiment
Word document or pdf documents or the text document of excel documents or extended formatting;Image can be jpg forms or bmp forms or
The bitmap images of png forms or extended formatting, or CDR forms or AI forms or DXF form isovector images, or with it
The image of his form transmission, as long as can read and reproduce finally formed when node of making out an invoice carries out graphics aided in approval node
The image of electrical power wiring figure.Picture format not malleable during circulation, it can be ensured that the uniformity of data.
Described in the embodiment of the present invention make out an invoice node and audit node can be with collect control service station communication connection end
End, such as tablet computer, mobile phone etc..Make out an invoice in other embodiments node and examination & verification node can also be it is described collection control service
The user of the different rights set on standing, or by collecting the client in control service station, section of so making out an invoice described in Telnet
Point and examination & verification node can directly invoke the power equipment wiring diagram on collection control service station, without power equipment wiring diagram is downloaded
To another independent terminal, make out an invoice and audit and completed by logging in collection control service station.Make out an invoice in the present invention node and examination & verification
Node is by directly logging in or Telnet collection control service station is made out an invoice and the power equipment wiring diagram that is called in review process
It is accordingly to be regarded as being stored in the power equipment wiring diagram of make out an invoice node or examination & verification node.
The foregoing description of the disclosed embodiments, enables professional and technical personnel in the field to realize or use the present invention.
A variety of modifications to these embodiments will be apparent for those skilled in the art, as defined herein
General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, it is of the invention
Embodiment illustrated herein is not intended to be limited to, and is to fit to consistent with the principles and novel features disclosed herein
Widest range.
Claims (8)
1. a kind of billing method of work about electric power ticket, it is characterised in that comprise the following steps:
Work ticket is established according to task;
The substance of work ticket is filled according to task;
The equipment to be operated in task is clicked in the graphical interfaces of power equipment wiring diagram, is changed according to task and corresponded to
The state of equipment, equipment operation term is converted to by the operation carried out on graphical interfaces to equipment, is inserted corresponding on work ticket
Equipment operation input item in, and the end-state data of each equipment in power equipment wiring diagram are generated into associated snapshot number
According to;
The ticket information of work ticket and associated snapshot data are preserved into work ticket database, circulation to examination & verification node into
Row examination & verification;
Ticket information and associated snapshot data of the node from work ticket database loading work ticket are audited, according to ticket information
And associated snapshot data is updated the power equipment wiring diagram for being stored in examination & verification node;
Examination ticket, audits work ticket with reference to the power equipment wiring diagram after the ticket information of work ticket and renewal,
Complete to make out an invoice if if auditing, if examination & verification by that need to not make out an invoice again.
2. the billing method of work about electric power ticket according to claim 1, it is characterised in that:It will be operated in snapshot data
Equipment afterwards is shown with not isolabeling.
3. the billing method of work about electric power ticket as claimed in claim 1 or 2, it is characterised in that:When being grasped in a work ticket
Make multiple equipment, when generating work ticket, according to device type and equipment state change information, by type is identical, state change
The identical equipment of information merges display, and the different device class of type difference or state change information or branch are shown.
4. the billing method of work about electric power ticket as claimed in claim 1 or 2, it is characterised in that:When generating work ticket, to association
Equipment operational set is described using routine operation term during multi-pass operation.
5. the billing method of work about electric power ticket as claimed in claim 1, it is characterised in that:To each in power equipment wiring diagram
The figure title setting of equipment is used for the associate field that correspondence is established with work ticket.
6. the billing method of work about electric power ticket as claimed in claim 5, it is characterised in that:Filling in the substance of work ticket
When, after inputting associate field, call associated power equipment wiring diagram automatically according to associate field.
7. the billing method of work about electric power ticket as claimed in claim 1, it is characterised in that:Generated by the way of being filled in manually
Equipment operation input item, and change according to the equipment operation term that is inputted the state of relevant device in power equipment wiring diagram,
Generate snapshot data.
8. a kind of billing method of work about electric power ticket, it is characterised in that comprise the following steps:
Work ticket is established according to task;
The substance of work ticket is filled according to task;
The equipment to be operated in the task is clicked in the graphical interfaces of power equipment wiring diagram, according to the task
Change the state of corresponding device, the operation carried out on graphical interfaces to equipment is converted into equipment operation term, insert described
On work ticket in corresponding equipment operation input item, and final power equipment wiring diagram generation is associated with the work ticket
Image;
The ticket information of work ticket and associated image are preserved into work ticket database, circulation to examination & verification node is examined
Core;
Audit ticket information and associated image of the node from work ticket database loading work ticket;
Examination ticket, audits work ticket with reference to work ticket and associated image, completes to make out an invoice if if auditing,
If examination & verification by that need to not make out an invoice again.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711126560.1A CN107918599A (en) | 2017-11-15 | 2017-11-15 | A kind of billing method of work about electric power ticket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711126560.1A CN107918599A (en) | 2017-11-15 | 2017-11-15 | A kind of billing method of work about electric power ticket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107918599A true CN107918599A (en) | 2018-04-17 |
Family
ID=61896289
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711126560.1A Pending CN107918599A (en) | 2017-11-15 | 2017-11-15 | A kind of billing method of work about electric power ticket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107918599A (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109523240A (en) * | 2018-11-30 | 2019-03-26 | 国电南瑞科技股份有限公司 | Intelligent substation billing system and method |
CN110046720A (en) * | 2019-04-17 | 2019-07-23 | 济南纵向软件有限公司 | Work ticket management method based on the control of electric field maintenance safety |
CN110992622A (en) * | 2019-12-24 | 2020-04-10 | 金现代信息产业股份有限公司 | Safety management and control system and method based on mobile work ticket |
CN111680802A (en) * | 2020-06-01 | 2020-09-18 | 广东电网有限责任公司 | Work ticket detection method, device, equipment and storage medium |
CN112769628A (en) * | 2021-02-08 | 2021-05-07 | 浙江浙能台州第二发电有限责任公司 | Two-ticket online management implementation method comprising offline equipment |
CN113469556A (en) * | 2021-07-19 | 2021-10-01 | 广东电网有限责任公司 | Method and device for generating work ticket, electronic equipment and storage medium |
CN113762925A (en) * | 2021-09-07 | 2021-12-07 | 广东电网有限责任公司 | Auxiliary ticket filling method and device, electronic equipment and storage medium |
CN113869871A (en) * | 2021-10-11 | 2021-12-31 | 国网青海省电力公司信息通信公司 | Method, device and equipment for auditing electric power ticket |
CN117495304A (en) * | 2023-11-27 | 2024-02-02 | 国网江苏省电力有限公司扬州供电分公司 | Intelligent power transmission work ticket billing method based on graphic intellectualization |
CN117709699A (en) * | 2023-11-27 | 2024-03-15 | 国网江苏省电力有限公司扬州供电分公司 | Intelligent billing process automation system for power transmission line work ticket based on cloud computing |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101510076A (en) * | 2009-03-20 | 2009-08-19 | 西安交大辰方科技有限公司 | Method for auto-generating safety describing statement of electronic operation order |
CN102096856A (en) * | 2010-12-03 | 2011-06-15 | 湖州电力局 | Method for generating electricity production work sheet simplified diagram on the basis of power grid topology |
US20110153054A1 (en) * | 2009-12-22 | 2011-06-23 | Douglas Scott Hagen | Automated optical lens processing system, such as a system for providing supplemental information to laboratory technicians |
CN104881737A (en) * | 2015-05-19 | 2015-09-02 | 国网辽宁省电力有限公司盘锦供电公司 | Control figure billing system |
CN106557909A (en) * | 2016-11-21 | 2017-04-05 | 国网四川省电力公司眉山供电公司 | Work ticket automatic generation system |
-
2017
- 2017-11-15 CN CN201711126560.1A patent/CN107918599A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101510076A (en) * | 2009-03-20 | 2009-08-19 | 西安交大辰方科技有限公司 | Method for auto-generating safety describing statement of electronic operation order |
US20110153054A1 (en) * | 2009-12-22 | 2011-06-23 | Douglas Scott Hagen | Automated optical lens processing system, such as a system for providing supplemental information to laboratory technicians |
CN102096856A (en) * | 2010-12-03 | 2011-06-15 | 湖州电力局 | Method for generating electricity production work sheet simplified diagram on the basis of power grid topology |
CN104881737A (en) * | 2015-05-19 | 2015-09-02 | 国网辽宁省电力有限公司盘锦供电公司 | Control figure billing system |
CN106557909A (en) * | 2016-11-21 | 2017-04-05 | 国网四川省电力公司眉山供电公司 | Work ticket automatic generation system |
Non-Patent Citations (3)
Title |
---|
DMIKMB329_X8: "工作票管理规定(审核版)", 《HTTPS://WWW.DOC88.COM/P-1008586143053.HTML》 * |
关越: "智能式图形化电气工作票系统的开发和应用", 《2008电力行业信息化年会会议论文集》 * |
郑晓天: "基于SVG的图形拟票系统的研究与开发", 《中国学位论文全文数据库》 * |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109523240A (en) * | 2018-11-30 | 2019-03-26 | 国电南瑞科技股份有限公司 | Intelligent substation billing system and method |
CN110046720A (en) * | 2019-04-17 | 2019-07-23 | 济南纵向软件有限公司 | Work ticket management method based on the control of electric field maintenance safety |
CN110992622A (en) * | 2019-12-24 | 2020-04-10 | 金现代信息产业股份有限公司 | Safety management and control system and method based on mobile work ticket |
CN111680802A (en) * | 2020-06-01 | 2020-09-18 | 广东电网有限责任公司 | Work ticket detection method, device, equipment and storage medium |
CN111680802B (en) * | 2020-06-01 | 2023-09-08 | 广东电网有限责任公司 | Method, device, equipment and storage medium for detecting work ticket |
CN112769628B (en) * | 2021-02-08 | 2022-11-04 | 浙江浙能台州第二发电有限责任公司 | Two-ticket online management implementation method comprising offline device |
CN112769628A (en) * | 2021-02-08 | 2021-05-07 | 浙江浙能台州第二发电有限责任公司 | Two-ticket online management implementation method comprising offline equipment |
CN113469556A (en) * | 2021-07-19 | 2021-10-01 | 广东电网有限责任公司 | Method and device for generating work ticket, electronic equipment and storage medium |
CN113469556B (en) * | 2021-07-19 | 2024-03-29 | 广东电网有限责任公司 | Method and device for generating work ticket, electronic equipment and storage medium |
CN113762925A (en) * | 2021-09-07 | 2021-12-07 | 广东电网有限责任公司 | Auxiliary ticket filling method and device, electronic equipment and storage medium |
CN113762925B (en) * | 2021-09-07 | 2024-08-06 | 广东电网有限责任公司 | Auxiliary ticket filling method and device, electronic equipment and storage medium |
CN113869871A (en) * | 2021-10-11 | 2021-12-31 | 国网青海省电力公司信息通信公司 | Method, device and equipment for auditing electric power ticket |
CN113869871B (en) * | 2021-10-11 | 2024-04-19 | 国网青海省电力公司信息通信公司 | Method, device and equipment for checking power ticket |
CN117495304A (en) * | 2023-11-27 | 2024-02-02 | 国网江苏省电力有限公司扬州供电分公司 | Intelligent power transmission work ticket billing method based on graphic intellectualization |
CN117709699A (en) * | 2023-11-27 | 2024-03-15 | 国网江苏省电力有限公司扬州供电分公司 | Intelligent billing process automation system for power transmission line work ticket based on cloud computing |
CN117495304B (en) * | 2023-11-27 | 2024-06-11 | 国网江苏省电力有限公司扬州供电分公司 | Intelligent power transmission work ticket billing method based on graphic intellectualization |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107918599A (en) | A kind of billing method of work about electric power ticket | |
CN105914892B (en) | A kind of secondary maintenance peace arranges bill system and its implementation | |
CN104123271B (en) | Intelligent substation secondary design system based on Excel | |
CN102622463B (en) | Drawing-model uniformity based method for automatic check of design drawings | |
CN106446431B (en) | The electrical secondary system method for visualizing of extra-high voltage direct-current transmission control protection equipment | |
CN102760059B (en) | Automatic generating method for standardized test scripts of relay protection device of electrical system | |
US20150193558A1 (en) | Method and device for generating engineering topology of digital substation | |
CN201947061U (en) | Distribution network dispatching intelligent anti-mistake and real-time management system | |
CN105022874A (en) | Digital simulation automatic modeling method and system for power distribution network | |
CN104036348A (en) | Electronic mobile operation order system | |
CN102611199A (en) | Design and configuration integrated system for intelligent substation | |
CN103886398A (en) | Service monitoring method and system in cross-system heterogeneous environment | |
CN104463696A (en) | Power grid operating risk recognition and prevention method and system | |
CN104714529B (en) | Remote monitoring platform system of electric automobile | |
CN106570781B (en) | Intelligent substation monitoring information step-by-step acceptance method based on three-layer two-network structure | |
CN106296467B (en) | A method of generating operation order | |
CN102226912A (en) | System and method for managing potential hazards of electrical facility based on GIS (geographic information system) | |
CN108519929B (en) | CRC (cyclic redundancy check) method and device for bus protection configuration management and control of intelligent substation | |
CN205407414U (en) | Mistake system is prevented to intelligent power distribution net based on electric power GIS | |
CN109146253A (en) | A kind of intelligent automatic interactive operating system for making out an invoice and protecting locking | |
CN104125094A (en) | System and method for processing communication network faults of State Grid Corporation of China | |
CN108054719A (en) | Intelligent substation networking secondary circuit modeling method and method for diagnosing faults | |
CN108493893A (en) | A kind of system reducing distribution line tripping times | |
CN108492660A (en) | Substation's peace arranges analogy method, device and system | |
CN106844819B (en) | Intelligent station secondary graph model library design tool database acquisition system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180417 |
|
RJ01 | Rejection of invention patent application after publication |