CN107918340A - A kind of power distribution automation adjustment method on the spot based on simulation main website - Google Patents

A kind of power distribution automation adjustment method on the spot based on simulation main website Download PDF

Info

Publication number
CN107918340A
CN107918340A CN201711240938.0A CN201711240938A CN107918340A CN 107918340 A CN107918340 A CN 107918340A CN 201711240938 A CN201711240938 A CN 201711240938A CN 107918340 A CN107918340 A CN 107918340A
Authority
CN
China
Prior art keywords
main website
debugging
simulation
power distribution
spot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711240938.0A
Other languages
Chinese (zh)
Inventor
陈艳
滕俊
陆圣芝
杨金喜
张晓青
谭志军
韩韬
黄�俊
钱宇昊
赵迎亚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Nari Technology Co Ltd
Yangzhou Power Supply Co of Jiangsu Electric Power Co
Original Assignee
State Grid Corp of China SGCC
Nari Technology Co Ltd
Yangzhou Power Supply Co of Jiangsu Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Nari Technology Co Ltd, Yangzhou Power Supply Co of Jiangsu Electric Power Co filed Critical State Grid Corp of China SGCC
Priority to CN201711240938.0A priority Critical patent/CN107918340A/en
Publication of CN107918340A publication Critical patent/CN107918340A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/048Monitoring; Safety

Abstract

The invention discloses a kind of power distribution automation adjustment method on the spot based on simulation main website.Support original distribution main station system IEC61968 model criterias, establish an interim simulation main website, the required various information in display scheduling end in distribution terminal Commissioning field, and can be synchronized with actual motion main website.Live power distribution automation simulation main website joint debugging method, by way of full automatic access is debugged and what debugging was reported automatically generates, can find potential trouble point at once, carry out defect elimination at the scene in time.The power distribution automation of main website adjustment method on the spot is simulated at the same time, is solved to be now able to the contradiction that field test need to must be set up communicate with main website, is reduced the time that terminal is debugged on the spot, the efficiency that raising power distribution automation is debugged on the spot.

Description

A kind of power distribution automation adjustment method on the spot based on simulation main website
Technical field
The present invention relates to telecontrol information in distribution automation system to gather field, be international standard IEC61850 distribution from A kind of application in dynamicization field.
Background technology
With the digitizing of power distribution network, information-based, automation, interactive and intelligentized development, to the distant of distribution terminal The requirement for the efficiency that control, remote measurement, the standardization of remote signalling " three is distant " information, distribution terminal are debugged is higher and higher.Terminal and reality at present The laying of communication equipment takes a long time between the operation main website of border, and the debugging to distribution terminal brings very big unfavorable.At present When carrying out power distribution automation and debugging on the spot, it is necessary to keep communicating with main website, need, by terminal commissioning staff, also to need one at the scene People is coordinated in actual motion main website, in communications facility when breaking down, be able to not will be got in touch with main website, is caused existing Field debugging can not be normally carried out, and cause the significant wastage of personnel and time.
(1) data sent on distribution terminal will have clear and definite implication, and different terminal equipment manufacturer formulates a unified mark Table masterplate and automatic generation method on schedule;
(2) distribution terminal equipment needs to have self-described function and unified interface specification;
(3) effectively power distribution automation quickly access with joint debugging, acceptance method, ensure the practical of distribution system;
(4) the terminal device field adjustable flow of standard, automatically generates terminal debugging report, can promptly and accurately exclude existing Field failure;
(5) security, reliability, the requirement of stability are reached.
In traditional power distribution automation is debugged on the spot, distribution terminal (ring main unit DTU, on-pole switch FTU etc.) information Specification access distribution main website needs end side personnel manually to carry out the examination and submission of three distant table signals, then is safeguarded by main website Personnel with the information that terminal commissioning staff provides point by point check examination.Transmission test between distribution terminal and distribution main website By be accomplished manually, terminal and the remote debugging efforts efficiency of main website it is low, field basic debugging to communication dependence it is big, be unfavorable for The Large scale construction of electrical power distribution automatization system and popularization and application.Remote signalling, remote measurement, remote controlled point table are transmitted by manual type, then By the mode of information point table input database, there are relevance between the indefinite and various data of data implication is not strong manually for main website The problem of.The joint debugging of distribution end access at present external environment restriction, joint debugging heavy workload, the scene such as communicated needs power off time to grow Etc. problem.
The present invention is carried with easy to commissioning staff by designing a kind of simulation main website for depositing in laptop, When carrying out power distribution automation and debugging on the spot, it is complete to be not required to the communication equipment laying of terminal and actual motion main website, can carry out Full process automatization is debugged, and multiple terminals that current actual motion main website faces while the coordination difficulty of access is reduced, according to existing Field debugging situation, debugging report can be read by automatically generating, and improve debugging efficiency.
The content of the invention
Goal of the invention:The meaning that simulation main website can be carried is to solve live distribution power automation terminal and does not possess and main website The contradiction that can not be debugged during communication, is not required to keep communicating freely with terminal commissioning staff's moment when main website maintenance personnel debugs at the scene It is logical, improve commissioning staff's efficiency.Meanwhile simulation main website can solve distribution power automation terminal operation and maintenance information point table before putting into operation and advise Generalized and the difficulty issued automatically, in debugging at the scene, establish the debugging of standard and check and accept system, can be in time by simulating main website The debugging report of generation finds field failure, such as order of connection problem, crosses flow problem etc..Simulation main station system possesses specified The inputting interface of overcurrent value so that the adaptability of field adjustable is stronger.Debugging, which is carried out, using simulation main website avoids multiple terminals The problem of accessing at the same time.
Technical solution:In order to solve the above technical problems, the technical solution adopted by the present invention is:Invention is a kind of based on simulation master Stand and debug the distribution terminal information method that quick joint debugging is automatically accessed with overall process on the spot of subsystem, carry out power distribution automation Debug on the spot.
(1) mold sync and the figure for simulating main website are synchronous.The model of actual motion main website and graphic file are synchronized to Simulate in main website, synchronizing content includes distribution terminal information, passage and stipulations etc.;In debugging at the scene, simulation main website receives After data message, compare the information such as channel number, IP address, the network port, the state that puts into operation, if the letter synchronous with actual motion main website Manner of breathing is consistent, then returns to confirmation message, if inconsistent with synchronizing information, in the instant debugging report of simulation main website generation into Row feedback.
(2) terminal commissioning staff can learn the accuracy of " three is distant " data by way of secure accessing platform;
(3) debugging on the spot for distribution terminal is realized by way of debugging process standardization, including different interval data On send order, telemetry and overcurrent overload alarm signal;
Hardware layer explanation:The domestic mainstream server of D5200 (power distribution network train operation control and management system) is installed, for scene The wireless module or cable that commissioning staff uses.Operating system layer:(SuSE) Linux OS, up to dream database.D5200 systems can Directly apply to the quick of power distribution automation to debug on the spot, realize automatic decision wiring line sequence, protection remote measurement matching, it is final automatic Generation debugging report.
Brief description of the drawings
Fig. 1 carries out power distribution automation using simulation main website and debugs schematic diagram on the spot;
Fig. 2 simulations main website mold sync flow chart.
Embodiment
The present invention is further described with reference to specific embodiment.
(1) on the premise of distribution terminal is installed in place at the scene, carrying out scene using simulation main website, debugging can be put on the spot The de- dependence to communication, realize terminal on the spot quickly with main website joint debugging.Simulation main website debugging system is debugged using subsystem is debugged States model, automatic point table generation technique, with actual motion main website simultaneous techniques, realize that power distribution automation simulation main station system is preposition Collection and real time data processing.The debugging enironment completely the same with operation main website, verification " three are realized at the scene by simulating main website It is distant ", terminal configuration parameters, the correctness of stipulations configuration etc., ensure it is consistent with main website end acceptance criteria, flow, realize distribution oneself Dynamicization is quickly debugged on the spot;
(2) deployment simulation main station system debugging system, distribution terminal information full mistake of the deployment based on power distribution automation main station Process automation access function module, actual motion main website is according to each self-generating model of result of the information exchange sent in terminal producer Configuration file, then actual motion main website is according to the database of distribution terminal self-described fileinfo renewal main station system, formulation Based on " it is three distant " standard point table, and then mold sync carried out by distribution main website management tool exp_man, passes through Graph texts Part figure is synchronized to simulation main website.When debugging on the spot at the scene, distribution terminal commissioning staff can lead according to field condition with simulation Information in standing is checked;
(3) required standard power distribution automation debugs flow on the spot, and the order of data is sent in unified field adjustable wiring, from And ensure the correctness of field connection line sequence.According to field condition, the rated value of input overcurrent overload in simulation main website, from It is dynamic to judge whether overcurrent Overload, CT (current transformer) equipment work normally and overcurrent overload announcement Whether alert signal can normally send;
(4) method by automating generation terminal debugging report, debugs reporting requirements with reference to on-site terminal, automatically generates Terminal debugging result is reported, all failures that distribution terminal is likely to occur in debugging process on the spot, such as wiring are shown in report Sequence error, alarm signal can not generate, current transformer accuracy is sub-standard, switch changed position and remote signals be not immediately right The problems such as answering.Reiterate to standardize herein and debug the importance of flow, sent in debugging process in remote signals and telemetry The deviation for sequentially and on defined sending order to produce, can displaying scene wiring error in the debugging report of generation;
Each one of use site main flow terminal any producer's distribution terminal such as FTU, DTU, foundation meet project distribution end Hold joint debugging, acceptance criteria system, for the overall process with regard to the quick joint debugging test of system of simulation main website and power distribution automation main station Quickly access.During inspection, semaphore, change debugging dosage order, conversion terminal protection definite value etc. are sent by changing on FTU, DTU Disturbing factor verification simulation main website carries out the reliability of power distribution automation adjustment method on the spot.

Claims (5)

1. a kind of power distribution automation adjustment method on the spot based on simulation main website, it is characterised in that simulation main website can actively be sent out The distribution terminal that existing engineering site is newly installed, and according to the self-described configuration information sent on distribution terminal, create distribution terminal amount Model library is surveyed, the remote measurement sent on automatic identification distribution terminal, remote signalling real time data, according to field failure, automatically generate debugging report Accuse, comprise the following steps that:
(1) what simulation main website and actual motion main website formulated unification is the standardization point table of " three is distant " based on remote control, remote measurement, remote signalling Template, the equipment that template is suitable for each main flow terminal producer, by main website maintenance personnel by being exported in actual motion main website, and according to The information that distribution terminal producer provides is verified;
(2) it is synchronous with actual motion main website progress mold sync and figure to simulate main website;
(3) installation is complete in engineering site for distribution terminal, accesses power distribution automation communication network, and simulation main website front server is beaten Open network monitoring service;
(4) distribution terminal on the spot by way of standardizing joint debugging realized by debugging process, and field adjustable order is formulated before debugging, existing Debugging should be performed in strict accordance with the debugging order of formulation on the spot for field.
2. according to the method described in claim 1, it is characterized in that:The distribution terminal must be with reality before removing debugging Main website establishes the rigid condition of communication.
3. according to the method described in claim 1, it is characterized in that:Establish the distribution terminal debugging stream of the standard based on " three is distant " Journey and acceptance criteria system, the relation of signal sequence and field connection is sent in analysis, automatically generates debugging report immediately, is found existing Field wiring faults.
4. according to the method described in claim 1, it is characterized in that:Main website is simulated before telemetry is received, passes through simulation Value is defined in main website Debugging interface input current protection customization, so as to judge that live electric current whether there is overcurrent condition, strengthens hair Send the levels of precision of alarm signal.
5. according to the method described in claim 1, it is characterized in that:Simulation main website and actual motion main website use simultaneous techniques, Realize power distribution automation simulation main station system front-collection and real time data processing, simulation main website at the scene with actual motion main website Possesses completely the same debugging enironment.
CN201711240938.0A 2017-11-30 2017-11-30 A kind of power distribution automation adjustment method on the spot based on simulation main website Pending CN107918340A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711240938.0A CN107918340A (en) 2017-11-30 2017-11-30 A kind of power distribution automation adjustment method on the spot based on simulation main website

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711240938.0A CN107918340A (en) 2017-11-30 2017-11-30 A kind of power distribution automation adjustment method on the spot based on simulation main website

Publications (1)

Publication Number Publication Date
CN107918340A true CN107918340A (en) 2018-04-17

Family

ID=61897180

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711240938.0A Pending CN107918340A (en) 2017-11-30 2017-11-30 A kind of power distribution automation adjustment method on the spot based on simulation main website

Country Status (1)

Country Link
CN (1) CN107918340A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109116144A (en) * 2018-07-27 2019-01-01 国网湖北省电力有限公司咸宁供电公司 A kind of prefix type terminal detection platform of distribution
CN109444582A (en) * 2018-11-08 2019-03-08 积成电子股份有限公司 The automatic adjustment method in distribution terminal side based on live mobile terminal and simulation main website
CN110095684A (en) * 2019-05-17 2019-08-06 南方电网科学研究院有限责任公司 A kind of terminal connection relationship method of calibration, equipment and distribution terminal test equipment
CN110531724A (en) * 2019-09-17 2019-12-03 国网辽宁省电力有限公司辽阳供电公司 A kind of automatic sample definition method of telemetering based on smart grid Dispatching Control System
CN110618328A (en) * 2019-09-26 2019-12-27 国网湖南省电力有限公司 On-site joint debugging test method for power distribution terminal
CN111799889A (en) * 2020-07-24 2020-10-20 国网湖北省电力有限公司黄石供电公司 Debugging method for general efficient processing of urban network distribution network automatic terminal
CN112702384A (en) * 2020-11-25 2021-04-23 易源士创信息科技(南京)有限公司 Device plug and play implementation method based on IEC 61850/IEC CIM standard model
CN113972747A (en) * 2021-12-23 2022-01-25 广州思泰信息技术有限公司 Automatic closed-loop debugging device and method for distribution network automation terminal
CN114184887A (en) * 2021-11-29 2022-03-15 国网江苏省电力有限公司南京供电分公司 System and method for diagnosing FTU fault on site
CN115395651A (en) * 2022-08-30 2022-11-25 国网山东省电力公司蒙阴县供电公司 Master station simulation system for protection debugging

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150006141A1 (en) * 2013-06-26 2015-01-01 International Business Machines Corporation Method, computer program and system providing real-time power grid hypothesis testing and contigency planning
CN104269934A (en) * 2014-10-23 2015-01-07 国家电网公司 Transformer substation monitoring information debugging method based on mobile type simulating and dispatching main station
CN104635084A (en) * 2015-02-03 2015-05-20 国家电网公司 Distribution automation equipment transmission test method based on simulator station
CN105262230A (en) * 2015-11-26 2016-01-20 国网辽宁省电力有限公司大连供电公司 Method for establishing portable scheduling master station system to debug newly-built substation
CN106771760A (en) * 2016-12-30 2017-05-31 国网天津市电力公司 A kind of distributed FA functional diagnosis method based on main website simulation

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150006141A1 (en) * 2013-06-26 2015-01-01 International Business Machines Corporation Method, computer program and system providing real-time power grid hypothesis testing and contigency planning
CN104269934A (en) * 2014-10-23 2015-01-07 国家电网公司 Transformer substation monitoring information debugging method based on mobile type simulating and dispatching main station
CN104635084A (en) * 2015-02-03 2015-05-20 国家电网公司 Distribution automation equipment transmission test method based on simulator station
CN105262230A (en) * 2015-11-26 2016-01-20 国网辽宁省电力有限公司大连供电公司 Method for establishing portable scheduling master station system to debug newly-built substation
CN106771760A (en) * 2016-12-30 2017-05-31 国网天津市电力公司 A kind of distributed FA functional diagnosis method based on main website simulation

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109116144A (en) * 2018-07-27 2019-01-01 国网湖北省电力有限公司咸宁供电公司 A kind of prefix type terminal detection platform of distribution
CN109444582B (en) * 2018-11-08 2020-10-09 积成电子股份有限公司 Automatic debugging method for power distribution terminal side based on field mobile terminal and analog master station
CN109444582A (en) * 2018-11-08 2019-03-08 积成电子股份有限公司 The automatic adjustment method in distribution terminal side based on live mobile terminal and simulation main website
CN110095684A (en) * 2019-05-17 2019-08-06 南方电网科学研究院有限责任公司 A kind of terminal connection relationship method of calibration, equipment and distribution terminal test equipment
CN110095684B (en) * 2019-05-17 2022-02-15 南方电网科学研究院有限责任公司 Terminal connection relation checking method and device and power distribution terminal testing device
CN110531724A (en) * 2019-09-17 2019-12-03 国网辽宁省电力有限公司辽阳供电公司 A kind of automatic sample definition method of telemetering based on smart grid Dispatching Control System
CN110618328A (en) * 2019-09-26 2019-12-27 国网湖南省电力有限公司 On-site joint debugging test method for power distribution terminal
CN111799889A (en) * 2020-07-24 2020-10-20 国网湖北省电力有限公司黄石供电公司 Debugging method for general efficient processing of urban network distribution network automatic terminal
CN112702384A (en) * 2020-11-25 2021-04-23 易源士创信息科技(南京)有限公司 Device plug and play implementation method based on IEC 61850/IEC CIM standard model
CN112702384B (en) * 2020-11-25 2022-07-22 易源士创信息科技(南京)有限公司 Device plug and play implementation method based on IEC 61850/IEC CIM standard model
CN114184887A (en) * 2021-11-29 2022-03-15 国网江苏省电力有限公司南京供电分公司 System and method for diagnosing FTU fault on site
CN113972747A (en) * 2021-12-23 2022-01-25 广州思泰信息技术有限公司 Automatic closed-loop debugging device and method for distribution network automation terminal
CN113972747B (en) * 2021-12-23 2022-04-08 广州思泰信息技术有限公司 Automatic closed-loop debugging method for distribution network automation terminal
CN115395651A (en) * 2022-08-30 2022-11-25 国网山东省电力公司蒙阴县供电公司 Master station simulation system for protection debugging
CN115395651B (en) * 2022-08-30 2023-07-14 国网山东省电力公司蒙阴县供电公司 Master station simulation system for protection debugging

Similar Documents

Publication Publication Date Title
CN107918340A (en) A kind of power distribution automation adjustment method on the spot based on simulation main website
CN107346917B (en) Secondary device based on virtual machine integrates joint debugging method
CN103176084B (en) Intelligent substation simulation system in panoramic replace mode and integration testing method for intelligent substation simulation system
CN104460346B (en) Feeder automation action logic test method based on power distribution terminal service verification
CN105373655B (en) A kind of method of one electrical secondary system connection figure of organic association Intelligent transformer station
CN101546472B (en) Implement method of integrated universal simulation test system for electric network scheduling and electric quantity collection
CN104820635B (en) A kind of self-closing ring gauge about robustness testing method based on the semantic parsing of dynamic script
CN112765258B (en) Power distribution network graph model checking management system and method thereof
CN106971663B (en) A kind of wind power plant analogue system and method
CN108400908A (en) Supervisory control of substation information checks and accepts device and method automatically
CN108257439A (en) A kind of distribution automation Training Methodology and analogue system for adapting to various modes
CN108923953A (en) A kind of virtual main station system of power remote machine debugging
CN107819647B (en) Intelligent substation station control layer network tester
CN104483842A (en) Regulation and control integrated automatic master station comparison method
CN110784020A (en) Automatic checking and accepting equipment, system and method for monitoring information
CN113422820A (en) Automatic joint debugging device and method for main station telecontrol information
CN204291050U (en) A kind of dispatching and monitoring information check system
CN107666179B (en) Method and system for updating information of power distribution automation graph-model interaction point table
CN104868599A (en) Intelligent substation message simulation test and association analysis system, and simulation method
CN105262211A (en) Distribution master station and terminal synchronous on-line self-diagnosis method
CN110991037A (en) Intelligent substation test simulation system based on SCD
CN113437798B (en) Master-substation data consistency verification method for master-substation telecontrol information
CN110989547A (en) Detection method and system for intelligent substation one-key sequence control system
CN105680441A (en) Simulated replacement technique-based simulated point-alignment device
CN111046543A (en) Intelligent substation test simulation method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 225009 Weiyang Road, Jiangsu, China, No. 179, No.

Applicant after: YANGZHOU POWER SUPPLY BRANCH OF STATE GRID JIANGSU ELECTRIC POWER Co.,Ltd.

Applicant after: NARI TECHNOLOGY Co.,Ltd.

Applicant after: STATE GRID CORPORATION OF CHINA

Address before: No. 179, Weiyang Road, Yangzhou City, Yangzhou City, Jiangsu Province

Applicant before: YANGZHOU POWER SUPPLY COMPANY, STATE GRID JIANGSU ELECTRIC POWER Co.

Applicant before: NARI TECHNOLOGY Co.,Ltd.

Applicant before: State Grid Corporation of China

WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180417