CN107918176A - A kind of steel tower unloads power apparatus with ADSS optical cables - Google Patents

A kind of steel tower unloads power apparatus with ADSS optical cables Download PDF

Info

Publication number
CN107918176A
CN107918176A CN201710258878.9A CN201710258878A CN107918176A CN 107918176 A CN107918176 A CN 107918176A CN 201710258878 A CN201710258878 A CN 201710258878A CN 107918176 A CN107918176 A CN 107918176A
Authority
CN
China
Prior art keywords
steel tower
optical cables
adss optical
rod
power apparatus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710258878.9A
Other languages
Chinese (zh)
Other versions
CN107918176B (en
Inventor
臧伟
吴云鹏
江建军
王嶔
王华伟
韦晓初
盛建雄
张力
诸骏豪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Huzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Huzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Huzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201710258878.9A priority Critical patent/CN107918176B/en
Publication of CN107918176A publication Critical patent/CN107918176A/en
Application granted granted Critical
Publication of CN107918176B publication Critical patent/CN107918176B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G02OPTICS
    • G02BOPTICAL ELEMENTS, SYSTEMS OR APPARATUS
    • G02B6/00Light guides; Structural details of arrangements comprising light guides and other optical elements, e.g. couplings
    • G02B6/46Processes or apparatus adapted for installing or repairing optical fibres or optical cables
    • G02B6/48Overhead installation
    • G02B6/483Installation of aerial type

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Electric Cable Installation (AREA)
  • Light Guides In General And Applications Therefor (AREA)

Abstract

The invention discloses a kind of steel tower power apparatus is unloaded with ADSS optical cables, it is intended to it is larger to the horizontal pull of steel tower when solving ADSS optical cables on steel tower, influence the deficiency of the stability of steel tower.The invention includes connecting rod, is connected to length-adjustable two adjusting rod in connecting rod both ends, the pulling ring being connected on adjusting rod, two pulling rings are all connected with for the support ring on steel tower, ring activity is pulled to be hooked in support ring, connection tension on ring is pulled to have preformed armor rods, preformed armor rods connects ADSS optical cables, and two preformed armor rodses tense connecting rod.ADSS optical cables are installed on steel tower by unloading power apparatus, substantially reduce the horizontal pull to steel tower, reduce the influence to iron tower stability, are conducive to extend the service life of steel tower.

Description

A kind of steel tower unloads power apparatus with ADSS optical cables
Technical field
The present invention relates to a kind of ADSS optical cables installation auxiliary device, more specifically, it relates to a kind of steel tower ADSS light Cable unloads power apparatus.
Background technology
At present, ADSS optical cables are set up with electric power tower, and optical cable per level-one steel tower by gold utensil with fixing, and both ends steel tower is with Between angle tower ADSS optical cables are gripped so as to bear the running tension of optical cable using strain hardware fitting, the tangent tower of center section is using outstanding The gold utensil that hangs down hangs ADSS optical cables and is not subject to the running tension of optical cable.For steel tower, ADSS optical cables get over its horizontal pull Small better, pulling force, which crosses senior general, influences the stability of steel tower, and we can only rely on the degree for adjusting optical cable stringing now, pass through increasing Big arc sag, reduces the pulling force to steel tower.But ADSS optical cables operations specification has optical cable arc sag on strict demand, the excessive easy band of arc sag Carry out problems, such as:Lower safe distance is reduced, optical cable windage yaw increases, optical cable abrasion aggravation etc..Therefore, up to the present, A kind of effective method is at home and abroad there is no, to reduce pulling force of the ADSS optical cables to steel tower.
Chinese patent notification number CN204832624U, discloses a kind of high voltage overhead power transmission sequence ADSS optical fiber cable fitting strings And its connection structure, including at least ADSS optical cables and for fixing the preformed armor rods wire clamps of ADSS optical cables, further include be connected to it is pre- The connector of hank knotting wire clamp, be connected to the hanging plate of connector with and be serially connected with the link for being used to fix with shaft tower of hanging plate, link It is embedded in hanging plate.Can constantly it be flowed at any time withouyt insulator, the alternation electric charge of ADSS optical cables appearance sensing in hardware string Enter ground, avoid due to the alternation electric charge of accumulation is breakdown and the problem of scorification optical cable, improve the security of optical cable operation, Optical cable operating cost is saved at the same time.But it is not suitable for middle angle tower, easily there is arc using rear ADSS optical cables for a long time Vertical excessive phenomenon.
The content of the invention
The present invention overcomes both sides deficiency, when, when ADSS optical cables are installed on steel tower, to the horizontal pull of steel tower It is larger, influence the stability of steel tower;Second, easily there is the excessive phenomenon of arc sag using rear ADSS optical cables for a long time, there is provided one Kind steel tower unloads power apparatus with ADSS optical cables, and ADSS optical cables are installed on steel tower by unloading power apparatus, substantially reduce the water to steel tower Horizontal drawing power, reduces the influence to iron tower stability, and ADSS optical cable arc sags it is excessive when can adjust automatically unload power apparatus Length, so as to tense ADSS optical cables, reduces ADSS optical cable arc sags, ADSS optical cables is less prone to the excessive phenomenon of arc sag.
In order to solve the above-mentioned technical problem, the present invention uses following technical scheme:A kind of steel tower unloads power with ADSS optical cables and fills Put, including connecting rod, be connected to length-adjustable two adjusting rod in connecting rod both ends, the pulling ring being connected on adjusting rod, Two pulling rings are all connected with, for the support ring on steel tower, pulling ring activity to be hooked in support ring, pull and are connected on ring Tension has preformed armor rods, preformed armor rods connection ADSS optical cables, and two preformed armor rodses tense connecting rod.
When ADSS optical cables are installed on steel tower, first support ring is installed on steel tower, preformed armor rods connection is fastened to ADSS On optical cable, then preformed armor rods end is connected to and is pulled on ring, the length of adjusting rod is adjusted, makes connecting rod, adjusting rod, preformed armor rods In tension, while ensure that the arc sag of ADSS optical cables is met the requirements.What support ring was subject to according to force analysis is preformed Silk horizontal pull f=2sin(0.5a)* F, a are preformed armor rods and connecting rod extended line angle, and F is preformed armor rods pulling force, that is, ADSS The running tension of optical cable.As can be seen from the above equation, when preformed armor rods and connecting rod extended line angle are 0 degree, what support ring was subject to Preformed armor rods horizontal pull f is 0, unloads power completely, steel tower is solely subjected to the gravity from ADSS optical cable vertical directions at this time;Work as preformed armor rods When being less than 60 degree with connecting rod extended line angle, f<F, has the effect for unloading power, and steel tower bears vertical from ADSS optical cables at this time The less pulling force of gravity and horizontal direction in direction;When preformed armor rods and connecting rod extended line angle are more than 60 degree, f>F does not possess The effect of power is unloaded, steel tower bears gravity from ADSS optical cable vertical directions and the larger pulling force of horizontal direction at this time.Therefore ADSS optical cables ensure that preformed armor rods is less than 60 degree with connecting rod extended line angle a when installing, when angle a is zero degree, i.e., in straight line iron When power apparatus is unloaded in installation on tower, steel tower can use strain insulator gold on tangent suspension tower at this time from the horizontal pull of ADSS optical cables Tool makes ADSS optical cable static sides, advantageously reduces ADSS optic cable designs, difficulty of construction, lifts ADSS optical cable project benefits.Steel tower The gravity for the vertical direction being subject to does not interfere with the stability of steel tower.In conclusion ADSS optical cables are pacified by unloading power apparatus Mounted in steel tower, the horizontal pull to steel tower is substantially reduced, reduces the influence to iron tower stability, is conducive to extend steel tower Service life.
Preferably, adjusting rod includes the body of rod, is threaded in two connecting screws at body of rod both ends, connecting screw end respectively Portion is equipped with connecting hook, and the connecting hook of a connecting screw is with pulling ring to be connected, between the connecting hook and connecting rod of another connecting screw It is connected with connection ring.Realized by the screw rod that is rotatably connected to the whole adjusting for adjusting pole length, consequently facilitating adjustment ADSS optical cables Arc sag, prevent that arc sag is excessive.The length adjustment of adjusting rod is convenient, and the connection of connecting screw is reliable.
Preferably, the body of rod includes two spaced straight-bars, is connected to the contiguous block of straight-bar end, contiguous block is used to connect Two straight-bars are connect, two connecting screws are connected on two contiguous blocks.The body of rod tensile strength of this structure is good, service life length.
The structure preferably, pulling ring, support ring take the shape of the letter U.The pulling ring and support ring of U-shaped are easily installed connection.
Preferably, connecting rod includes left lever, right pull rod, connects bearing between left lever and right pull rod, bearing installation On steel tower, bearing is equipped with slot, and left lever, the equal activity of right pull rod extend through slot, and left lever, right tie rod end are hinged Connecting rod is adjusted, two adjust hinged pushing block between connecting rod;Supporting block is installed, ADSS light in supporting block on steel tower below preformed armor rods The connection of cable correspondence position liftable promotes column, and ADSS optical cables, which are fitted in, promotes column upper end, and promoting column lower end to abut has abutting plate, supports Compression bar is connected on fishplate bar, compression bar is hinged in supporting block, and compression bar end is hinged push rod, and push rod is hinged on pushing block.
After ADSS optical cable long-time uses, by gravity, arc sag becomes larger, and ADSS optical cables and preformed armor rods link position are downward Tilt, so as to promote the promotion column in supporting block to move downward, promote column to drive abutting plate to move downward, be connected to and abut on plate Compression bar end be upturned, moved upwards so as to push up the pushing block being connected between two adjusting connecting rods by push rod, Two adjusting connecting rods pull left lever, right pull rod to be moved to direction close to each other respectively, and left lever, right pull rod are drawn by adjusting rod Dynamic ADSS optical cables are moved to bearing direction, so as to reduce the arc sag of ADSS optical cables, prevent that ADSS optical cable arc sags are excessive and shadow Ring the phenomenon of normal use.Adjust automatically unloads the length of power apparatus when this structure setting enables ADSS optical cable arc sags excessive, So as to tense ADSS optical cables, reduce ADSS optical cable arc sags, ADSS optical cables is less prone to the excessive phenomenon of arc sag.
Preferably, supporting block is equipped with wire casing, ADSS optical cables are arranged in wire casing.ADSS optical cables are arranged in supporting block Wire casing in, it is ensured that ADSS optical cables, which can fit to, promotes column upper end, prevents off-set phenomenon.
Preferably, supporting block lower end connects mounting bracket, mounting bracket includes connection panel and stent, stent are arranged on downward Face plate edge is connected, compression bar is hinged on stent, and supporting block lower surface is equipped with two connecting poles, and connection panel is equipped with arc Groove;One connecting pole is through connection panel and with being connected panel connection, and connection panel can be rotated around the connecting pole, and arc groove is corresponding The center of circle is arranged on the axis where the connecting pole;Another connecting pole activity passes through arc groove, is all connected with locking on two connecting poles Nut.Connect panel to rotate by shaft of a connecting pole, arc groove slips over another connecting pole, after mounting bracket turns to proper angle Locking nut is tightened, realizes being fastenedly connected for mounting bracket and supporting block.Mounting bracket is rotatably connected on supporting block lower surface, when When preformed armor rods forms an angle with connecting rod extended line structure, rotational installation frame adapts it to the installation connection of compression bar, flexibly and easily.
Preferably, promoting column upper end to be equipped with pushing disk, promote column lower end to be equipped with and abut ball, promote pushing disk and branch on column Spring is socketed between bracer, ball is abutted and is connected on abutting plate.The setting of pushing disk adds the contact surface with ADSS optical cables Product, abuts the setting of ball easy to promote abutting plate to move down, spring is set easy to promote the return of column.
Preferably, bearing both ends are equipped with the jack for extending through slot, left lever, right pull rod respectively with two on bearing Jack activity is plugged in together, and some balls are provided with jack inner wall.Left lever, right pull rod are plugged in jack, and ball has Beneficial to the resistance being subject in reduction left lever, right pull rod moving process.
Compared with prior art, the beneficial effects of the invention are as follows:ADSS optical cables are installed on steel tower by unloading power apparatus, significantly Reduce the horizontal pull to steel tower, reduce the influence to iron tower stability, and when ADSS optical cable arc sags are excessive can from It is dynamic to adjust the length for unloading power apparatus, so as to tense ADSS optical cables, reduce ADSS optical cable arc sags, ADSS optical cables is less prone to arc sag Excessive phenomenon.
Brief description of the drawings
Fig. 1 is the structure diagram of the use state of the embodiment of the present invention 1;
Fig. 2 is the structure diagram of the embodiment of the present invention 1;
Fig. 3 is the structure diagram of the use state of the embodiment of the present invention 2;
Fig. 4 is the partial structural diagram of the embodiment of the present invention 2;
Fig. 5 is the supporting block of the embodiment of the present invention 2 and the attachment structure schematic diagram of mounting bracket;
In figure:1st, connecting rod, 2, adjusting rod, 3, pull ring, 4, steel tower, 5, support ring, 6, preformed armor rods, 7, ADSS optical cables, 8, bar Body, 9, connecting screw, 10, connecting hook, 11, connection ring, 12, straight-bar, 13, contiguous block, 14, left lever, 15, right pull rod, 16, branch Seat, 17, slot, 18, adjust connecting rod, 19, pushing block, 20, supporting block, 21, promote column, 22, abut plate, 23, compression bar, 24, push away Bar, 25, wire casing, 26, connection panel, 27, stent, 28, connecting pole, 29, arc groove, 30, pushing disk, 31, abut ball, 32, bullet Spring, 33, jack, 34, ball.
Embodiment
Below by specific embodiment, and with reference to attached drawing, technical scheme is further described specifically:
Embodiment 1:A kind of steel tower unloads power apparatus with ADSS optical cables(Referring to attached drawing 1, attached drawing 2), including connecting rod 1, connect respectively Length-adjustable two adjusting rod 2, the pulling ring 3 being connected on adjusting rod at connecting rod both ends, connecting rod are single bar, and two pull Ring is all connected with for the support ring 5 on steel tower 4, pulls ring, support ring to take the shape of the letter U structure.Ring activity is pulled to be hooked on In support ring, connection tension on ring is pulled to have preformed armor rods 6, preformed armor rods connection ADSS optical cables 7, two preformed armor rodses tense connecting rod.Draw Rotating ring can be adjusted along connecting rod extended line direction and moved.Adjusting rod includes the body of rod 8, is threaded in two companies at body of rod both ends respectively Screw rod 9 is connect, connecting screw end is equipped with connecting hook 10, and the connecting hook of a connecting screw is with pulling ring to be connected, another connecting screw Connecting hook and connecting rod between be connected with connection ring 11, connection ring takes the shape of the letter U structure.The body of rod includes two spaced straight-bars 12nd, the contiguous block 13 of straight-bar end is connected to, contiguous block is used to connect two straight-bars, and two connecting screws are connected to two contiguous blocks On.
When ADSS optical cables are installed on steel tower, first support ring is installed on steel tower, preformed armor rods connection is fastened to ADSS On optical cable, then preformed armor rods end is connected to and is pulled on ring, the length of adjusting rod is adjusted, makes connecting rod, adjusting rod, preformed armor rods In tension, while ensure that the arc sag of ADSS optical cables is met the requirements.What support ring was subject to according to force analysis is preformed Silk horizontal pull f=2sin(0.5a)* F, a are preformed armor rods and connecting rod extended line angle, and F is preformed armor rods pulling force, that is, ADSS The running tension of optical cable.As can be seen from the above equation, when preformed armor rods and connecting rod extended line angle are 0 degree, what support ring was subject to Preformed armor rods horizontal pull f is 0, unloads power completely, steel tower is solely subjected to the gravity from ADSS optical cable vertical directions at this time;Work as preformed armor rods When being less than 60 degree with connecting rod extended line angle, f<F, has the effect for unloading power, and steel tower bears vertical from ADSS optical cables at this time The less pulling force of gravity and horizontal direction in direction;When preformed armor rods and connecting rod extended line angle are more than 60 degree, f>F does not possess The effect of power is unloaded, steel tower bears gravity from ADSS optical cable vertical directions and the larger pulling force of horizontal direction at this time.Therefore ADSS optical cables ensure that preformed armor rods is less than 60 degree with connecting rod extended line angle a when installing, when angle a is zero degree, i.e., in straight line iron When power apparatus is unloaded in installation on tower, steel tower can use strain insulator gold on tangent suspension tower at this time from the horizontal pull of ADSS optical cables Tool makes ADSS optical cable static sides, advantageously reduces ADSS optic cable designs, difficulty of construction, lifts ADSS optical cable project benefits.Steel tower The gravity for the vertical direction being subject to does not interfere with the stability of steel tower.In conclusion ADSS optical cables are pacified by unloading power apparatus Mounted in steel tower, the horizontal pull to steel tower is substantially reduced, reduces the influence to iron tower stability, is conducive to extend steel tower Service life.
Embodiment 2:A kind of steel tower unloads power apparatus with ADSS optical cables(Referring to attached drawing 3 to attached drawing 5), its structure and embodiment 1 Similar, main difference includes left lever 14, right pull rod 15 in connecting rod in this present embodiment, connects between left lever and right pull rod Bearing 16 is connect, bearing is installed on steel tower, and bearing is equipped with slot 17, and left lever, the equal activity of right pull rod extend through slot, Zola Bar, right tie rod end hingedly adjust connecting rod 18, and two adjust hinged pushing block 19 between connecting rod;Installation below preformed armor rods on steel tower Have a supporting block 20, in supporting block the connection of ADSS optical cable correspondence positions liftable promote column 21, ADSS optical cables, which are fitted in, to be promoted on column End, promoting column lower end to abut has abutting plate 22, abuts and compression bar 23 is connected on plate, and compression bar is hinged in supporting block, compression bar end hinge Push rod 24 is connect, push rod is hinged on pushing block.Supporting block is equipped with wire casing 25, and ADSS optical cables are arranged in wire casing.Under supporting block End connection mounting bracket, mounting bracket includes connection panel 26 and stent 27, stent are arranged on connection face plate edge downward, and compression bar is hinged On stent, supporting block lower surface is equipped with two connecting poles 28, and connection panel is equipped with arc groove 29;One connecting pole is through connection Panel is simultaneously connected with being connected panel, and connection panel can be rotated around the connecting pole, and the corresponding center of circle of arc groove is arranged on the connecting pole On the axis at place;Another connecting pole activity passes through arc groove, and locking nut is all connected with two connecting poles.Column upper end is promoted to be equipped with Pushing disk 30, promotes column lower end to be equipped with and abuts ball 31, promote and be socketed with spring 32 on column between pushing disk and supporting block, abut ball It is connected to and abuts on plate.Bearing both ends are equipped with the jack 33 for extending through slot, left lever, right pull rod respectively with two on bearing Jack activity is plugged in together, and some balls 34 are provided with jack inner wall.Other structures are same as Example 1.
After ADSS optical cable long-time uses, by gravity, arc sag becomes larger, and ADSS optical cables and preformed armor rods link position are downward Tilt, so as to promote the promotion column in supporting block to move downward, promote column to drive abutting plate to move downward, be connected to and abut on plate Compression bar end be upturned, moved upwards so as to push up the pushing block being connected between two adjusting connecting rods by push rod, Two adjusting connecting rods pull left lever, right pull rod to be moved to direction close to each other respectively, and left lever, right pull rod are drawn by adjusting rod Dynamic ADSS optical cables are moved to bearing direction, so as to reduce the arc sag of ADSS optical cables, prevent that ADSS optical cable arc sags are excessive and shadow Ring the phenomenon of normal use.Adjust automatically unloads the length of power apparatus when this structure setting enables ADSS optical cable arc sags excessive, So as to tense ADSS optical cables, reduce ADSS optical cable arc sags, ADSS optical cables is less prone to the excessive phenomenon of arc sag.
Embodiment described above is two kinds of preferable schemes of the present invention, and not the present invention is made in any form Limitation, also has other variations and remodeling on the premise of without departing from the technical solution described in claim.

Claims (9)

1. a kind of steel tower unloads power apparatus with ADSS optical cables, it is characterized in that, including connecting rod, it is connected to connecting rod both ends length Adjustable two adjusting rod, the pulling ring being connected on adjusting rod, two pulling rings are all connected with for the support ring on steel tower, Pull ring activity to be hooked in support ring, pull connection tension on ring to have preformed armor rods, preformed armor rods connection ADSS optical cables, two preformed armor rodses Tense connecting rod.
2. a kind of steel tower according to claim 1 unloads power apparatus with ADSS optical cables, it is characterized in that, adjusting rod include the body of rod, Two connecting screws at body of rod both ends are threaded in respectively, and connecting screw end is equipped with connecting hook, the connecting hook of a connecting screw With pulling ring to be connected, connection ring is connected between the connecting hook and connecting rod of another connecting screw.
3. a kind of steel tower according to claim 2 unloads power apparatus with ADSS optical cables, it is characterized in that, the body of rod includes two intervals and sets The straight-bar put, the contiguous block for being connected to straight-bar end, contiguous block are used to connect two straight-bars, and two connecting screws are connected to two companies Connect on block.
4. a kind of steel tower according to claim 1 unloads power apparatus with ADSS optical cables, it is characterized in that, pull ring, support ring equal Take the shape of the letter U structure.
5. a kind of steel tower according to any one of claims 1 to 4, unloads power apparatus with ADSS optical cables, it is characterized in that, connection Bar includes left lever, right pull rod, connects bearing between left lever and right pull rod, and bearing is installed on steel tower, and bearing is equipped with groove Hole, left lever, the equal activity of right pull rod extend through slot, and left lever, right tie rod end hingedly adjust connecting rod, two adjust connecting rods it Between hinged pushing block;Supporting block is installed, ADSS optical cable correspondence positions liftable connects in supporting block on steel tower below preformed armor rods Column is promoted, ADSS optical cables, which are fitted in, promotes column upper end, and promoting column lower end to abut has abutting plate, abuts and connects compression bar, compression bar on plate It is hinged in supporting block, compression bar end is hinged push rod, and push rod is hinged on pushing block.
6. a kind of steel tower according to claim 5 unloads power apparatus with ADSS optical cables, it is characterized in that, supporting block is equipped with line Groove, ADSS optical cables are arranged in wire casing.
7. a kind of steel tower according to claim 5 unloads power apparatus with ADSS optical cables, it is characterized in that, supporting block lower end connection peace Shelve, mounting bracket includes connection panel and stent, stent are arranged on connection face plate edge downward, and compression bar is hinged on stent, branch Bracer lower surface is equipped with two connecting poles, and connection panel is equipped with arc groove;One connecting pole is through connection panel and and joint face Plate connects, and connection panel can be rotated around the connecting pole, and the corresponding center of circle of arc groove is arranged on the axis where the connecting pole;Separately The activity of one connecting pole passes through arc groove, and locking nut is all connected with two connecting poles.
8. a kind of steel tower according to claim 5 unloads power apparatus with ADSS optical cables, it is characterized in that, promote column upper end to be equipped with and push away Moving plate, promotes column lower end to be equipped with and abuts ball, promote and be socketed with spring on column between pushing disk and supporting block, abut ball be connected to On fishplate bar.
9. a kind of steel tower according to claim 5 unloads power apparatus with ADSS optical cables, it is characterized in that, bearing both ends, which are equipped with, to be passed through Through the jack of slot, left lever, right pull rod are plugged in together with two jack activities on bearing respectively, are installed on jack inner wall There are some balls.
CN201710258878.9A 2017-04-19 2017-04-19 A kind of steel tower unloads power device with ADSS optical cable Active CN107918176B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710258878.9A CN107918176B (en) 2017-04-19 2017-04-19 A kind of steel tower unloads power device with ADSS optical cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710258878.9A CN107918176B (en) 2017-04-19 2017-04-19 A kind of steel tower unloads power device with ADSS optical cable

Publications (2)

Publication Number Publication Date
CN107918176A true CN107918176A (en) 2018-04-17
CN107918176B CN107918176B (en) 2019-08-06

Family

ID=61898627

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710258878.9A Active CN107918176B (en) 2017-04-19 2017-04-19 A kind of steel tower unloads power device with ADSS optical cable

Country Status (1)

Country Link
CN (1) CN107918176B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201238175Y (en) * 2008-07-25 2009-05-13 南京线路器材厂 Horizontal direction force regulating mechanism for hard busbar bridle wire with diagonal draw bar
CN202057866U (en) * 2011-05-13 2011-11-30 河南省电力公司驻马店供电公司 Special double-hook lifting device for transmission line tangent suspension tower optical cables
CN204216535U (en) * 2014-10-18 2015-03-18 福州万山电力咨询有限公司 110KV line project duplex improves strain insulator-string
CN104831945A (en) * 2015-05-14 2015-08-12 中国电力科学研究院 Device for replacing main material of transmission tower
CN204832624U (en) * 2015-08-13 2015-12-02 上海艾能电力工程有限公司 ADSS optical cable gold utensil cluster for power transmission sequence is maked somebody a mere figurehead to high pressure and connection structure thereof
CN206818948U (en) * 2017-04-19 2017-12-29 国网浙江省电力公司湖州供电公司 That ADSS optical cables are installed on a kind of steel tower unloads power apparatus

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201238175Y (en) * 2008-07-25 2009-05-13 南京线路器材厂 Horizontal direction force regulating mechanism for hard busbar bridle wire with diagonal draw bar
CN202057866U (en) * 2011-05-13 2011-11-30 河南省电力公司驻马店供电公司 Special double-hook lifting device for transmission line tangent suspension tower optical cables
CN204216535U (en) * 2014-10-18 2015-03-18 福州万山电力咨询有限公司 110KV line project duplex improves strain insulator-string
CN104831945A (en) * 2015-05-14 2015-08-12 中国电力科学研究院 Device for replacing main material of transmission tower
CN204832624U (en) * 2015-08-13 2015-12-02 上海艾能电力工程有限公司 ADSS optical cable gold utensil cluster for power transmission sequence is maked somebody a mere figurehead to high pressure and connection structure thereof
CN206818948U (en) * 2017-04-19 2017-12-29 国网浙江省电力公司湖州供电公司 That ADSS optical cables are installed on a kind of steel tower unloads power apparatus

Also Published As

Publication number Publication date
CN107918176B (en) 2019-08-06

Similar Documents

Publication Publication Date Title
US20130306422A1 (en) Vertical curve rail and method
CN218415578U (en) High-rise building cable laying device
CN111371051A (en) Support hanger
CN105366565B (en) High voltage transmission line tower auxiliary lifting apparatus
WO2024192938A1 (en) Crossarm assembly and power transmission tower
CN213585109U (en) Pipeline supporting mechanism for weak current engineering
CN218888065U (en) Cable laying protection device for power maintenance
CN107918176A (en) A kind of steel tower unloads power apparatus with ADSS optical cables
CN206818948U (en) That ADSS optical cables are installed on a kind of steel tower unloads power apparatus
CN209805374U (en) Insulating fixing device is used in installation of high-voltage cable
CN208950429U (en) Steel tube tower used for transmission line
CN205944970U (en) Take pull ring angle adjusting mechanism&#39;s wedge strain clamp
CN205811471U (en) The scalable cable clip device that a kind of mine down-hole is easy for installation
CN107907956A (en) A kind of ADSS optical cables and steel tower attachment device
CN205159906U (en) Insulation of special high tension transmission line strain insulator -string is qualified for next round of competitions flexible flat terracedly
CN206818947U (en) A kind of ADSS optical cables and steel tower attachment structure
CN208797504U (en) A kind of polymer plastic steel type ladder-type bridge frame
CN108675180A (en) A kind of handling appliance for building
CN209982002U (en) Anti-shaking cable mounting structure for electric power steel pipe pole
CN212130153U (en) Various steel sheet rail of steel construction
CN220642070U (en) Guide wheel capable of preventing deviation
CN205484675U (en) Power transmission line insulator detects power unit of instrument
CN218648462U (en) Extension support for live replacement of linear insulator
CN221305463U (en) Sag adjusting device for power transmission wire
CN221168950U (en) Insulating cross arm for distribution network

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant