CN107918176B - A kind of steel tower unloads power device with ADSS optical cable - Google Patents
A kind of steel tower unloads power device with ADSS optical cable Download PDFInfo
- Publication number
- CN107918176B CN107918176B CN201710258878.9A CN201710258878A CN107918176B CN 107918176 B CN107918176 B CN 107918176B CN 201710258878 A CN201710258878 A CN 201710258878A CN 107918176 B CN107918176 B CN 107918176B
- Authority
- CN
- China
- Prior art keywords
- optical cable
- steel tower
- adss optical
- rod
- ring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000003287 optical effect Effects 0.000 title claims abstract description 109
- 102100020786 Adenylosuccinate synthetase isozyme 2 Human genes 0.000 title claims abstract description 104
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 68
- 239000010959 steel Substances 0.000 title claims abstract description 68
- 230000000694 effects Effects 0.000 claims abstract description 16
- 230000006835 compression Effects 0.000 claims description 16
- 238000007906 compression Methods 0.000 claims description 16
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 abstract description 14
- 229910052742 iron Inorganic materials 0.000 abstract description 7
- 230000007812 deficiency Effects 0.000 abstract description 2
- 101001138638 Homo sapiens Adenylosuccinate synthetase isozyme 2 Proteins 0.000 description 87
- 230000005484 gravity Effects 0.000 description 10
- 238000009434 installation Methods 0.000 description 7
- 238000010586 diagram Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- PCHJSUWPFVWCPO-UHFFFAOYSA-N gold Chemical compound [Au] PCHJSUWPFVWCPO-UHFFFAOYSA-N 0.000 description 2
- 239000010931 gold Substances 0.000 description 2
- 229910052737 gold Inorganic materials 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 230000003068 static effect Effects 0.000 description 2
- 239000012211 strain insulator Substances 0.000 description 2
- 239000000725 suspension Substances 0.000 description 2
- 238000005299 abrasion Methods 0.000 description 1
- 238000009825 accumulation Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000015556 catabolic process Effects 0.000 description 1
- 230000006698 induction Effects 0.000 description 1
- 239000012212 insulator Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000013307 optical fiber Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- G—PHYSICS
- G02—OPTICS
- G02B—OPTICAL ELEMENTS, SYSTEMS OR APPARATUS
- G02B6/00—Light guides; Structural details of arrangements comprising light guides and other optical elements, e.g. couplings
- G02B6/46—Processes or apparatus adapted for installing or repairing optical fibres or optical cables
- G02B6/48—Overhead installation
- G02B6/483—Installation of aerial type
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Optics & Photonics (AREA)
- Electric Cable Installation (AREA)
- Light Guides In General And Applications Therefor (AREA)
Abstract
The invention discloses a kind of steel towers to unload power device with ADSS optical cable, it is intended to and it is larger to the horizontal pull of steel tower when solving ADSS optical cable and being mounted on steel tower, influence the deficiency of the stability of steel tower.The invention includes connecting rod, is connected to length-adjustable two adjusting rod in connecting rod both ends, the pulling ring being connected on adjusting rod, two pulling rings are all connected with the support ring for being mounted on steel tower, ring activity is pulled to be hooked in support ring, connection tension on ring is pulled there are preformed armor rods, preformed armor rods connect ADSS optical cable, and two preformed armor rods tense connecting rod.ADSS optical cable is mounted on steel tower by unloading power device, substantially reduces the horizontal pull to steel tower, reduces the influence to iron tower stability, is conducive to extend the service life of steel tower.
Description
Technical field
The present invention relates to a kind of ADSS optical cable installation auxiliary devices, more specifically, it relates to a kind of steel tower ADSS light
Cable unloads power device.
Background technique
Currently, ADSS optical cable is set up with electric power tower, optical cable is fixed by fitting and every level-one steel tower, and both ends steel tower is in
Between angle tower ADSS optical cable held to bear the running tension of optical cable using strain hardware fitting, the tangent tower of middle section is using outstanding
It hangs down fitting hanging ADSS optical cable and is not subject to the running tension of optical cable.For steel tower, ADSS optical cable gets over its horizontal pull
It is small better, the excessive stability that will affect steel tower of pulling force, and we can only pass through increasing by the degree for adjusting optical cable stringing now
Big arc sag reduces the pulling force to steel tower.But ADSS optical cable operations specification has strict demand, the excessive easy band of arc sag to optical cable arc sag
Carry out problems, such as: lower safe distance is reduced, optical cable windage yaw increases, optical cable abrasion aggravation etc..Therefore, up to the present,
At home and abroad there is no a kind of effective methods, to reduce ADSS optical cable to the pulling force of steel tower.
Chinese patent notification number CN204832624U discloses a kind of high voltage overhead power transmission sequence ADSS optical fiber cable fitting string
And its connection structure, the preformed armor rods wire clamp including at least ADSS optical cable and for fixing ADSS optical cable, further include be connected to it is pre-
The connector of hank knotting wire clamp, be connected to the hanging plate of connector with and be serially connected with hanging plate for the link fixed with shaft tower, link
It is embedded in hanging plate.Withouyt insulator in hardware string, the alternation charge of ADSS optical cable appearance induction can constantly flow at any time
Enter ground, avoid due to the alternation charge of accumulation is breakdown and the problem of scorification optical cable, improve the safety of optical cable operation,
Optical cable operating cost has been saved simultaneously.But it is not suitable for intermediate angle tower, arc easily occurs using rear ADSS optical cable for a long time
It hangs down excessive phenomenon.
Summary of the invention
The present invention overcomes both sides deficiencies, first is that, when ADSS optical cable is mounted on steel tower, to the horizontal pull of steel tower
It is larger, influence the stability of steel tower;Second is that easily there is the excessive phenomenon of arc sag using rear ADSS optical cable for a long time, one is provided
Kind steel tower unloads power device with ADSS optical cable, and ADSS optical cable is mounted on steel tower by unloading power device, substantially reduces the water to steel tower
Horizontal drawing power, reduces the influence to iron tower stability, and ADSS optical cable arc sag it is excessive when can adjust automatically unload power device
Length reduces ADSS optical cable arc sag, ADSS optical cable is made to be less prone to the excessive phenomenon of arc sag to tense ADSS optical cable.
In order to solve the above-mentioned technical problem, the invention adopts the following technical scheme: a kind of steel tower unloads power dress with ADSS optical cable
It sets, including connecting rod, is connected to length-adjustable two adjusting rod in connecting rod both ends, the pulling ring being connected on adjusting rod,
Two pulling rings are all connected with the support ring for being mounted on steel tower, pull ring activity to be hooked in support ring, pull and connect on ring
Tension has preformed armor rods, and preformed armor rods connect ADSS optical cable, and two preformed armor rods tense connecting rod.
When ADSS optical cable is installed on steel tower, first support ring is installed on steel tower, preformed armor rods connection is fastened to ADSS
On optical cable, then preformed armor rods end is connected to and is pulled on ring, the length of adjusting rod is adjusted, makes connecting rod, adjusting rod, preformed armor rods
In tension, while ensuring that the arc sag of ADSS optical cable is met the requirements.It is subject to according to force analysis support ring preformed
Silk horizontal pull f=2sin(0.5a) * F, a be preformed armor rods and connecting rod extended line angle, F is preformed armor rods pulling force, that is, ADSS
The running tension of optical cable.As can be seen from the above equation, when preformed armor rods and connecting rod extended line angle are 0 degree, what support ring was subject to
Preformed armor rods horizontal pull f is 0, unloads power completely, steel tower is solely subjected to the gravity from ADSS optical cable vertical direction at this time;Work as preformed armor rods
When with connecting rod extended line angle less than 60 degree, f < F has the effect of unloading power, and steel tower bears vertical from ADSS optical cable at this time
The lesser pulling force of gravity and horizontal direction in direction;When preformed armor rods and connecting rod extended line angle are greater than 60 degree, f > F does not have
The effect of power is unloaded, steel tower bears gravity and the biggish pulling force of horizontal direction from ADSS optical cable vertical direction at this time.Therefore
ADSS optical cable ensures preformed armor rods and connecting rod extended line angle a less than 60 degree, when angle a is zero degree, i.e., in straight line iron when installing
When power device is unloaded in installation on tower, steel tower can use strain insulator gold not by the horizontal pull of ADSS optical cable on tangent suspension tower at this time
Tool production ADSS optical cable static side, advantageously reduces ADSS optic cable design, difficulty of construction, promotes ADSS optical cable project benefit.Steel tower
The gravity for the vertical direction being subject to will not influence the stability of steel tower.In conclusion ADSS optical cable is pacified by unloading power device
Mounted in steel tower, the horizontal pull to steel tower is substantially reduced, the influence to iron tower stability is reduced, is conducive to extend steel tower
Service life.
Preferably, adjusting rod includes the body of rod, two connecting screws for being threaded in body of rod both ends respectively, connecting screw end
Portion is equipped with connecting hook, and the connecting hook of a connecting screw is connect with ring is pulled, between the connecting hook and connecting rod of another connecting screw
It is connected with connection ring.It is realized by rotation connecting screw to the entire adjusting for adjusting pole length, consequently facilitating adjustment ADSS optical cable
Arc sag, prevent arc sag excessive.The length adjustment of adjusting rod is convenient, and the connection of connecting screw is reliable.
Preferably, the body of rod includes two spaced straight-bars, the link block for being connected to straight-bar end, link block is for connecting
Two straight-bars are connect, two connecting screws are connected on two link blocks.The body of rod tensile strength of this structure is good, long service life.
The structure preferably, pulling ring, support ring are in U-shape.The pulling ring and support ring of U-shaped are easily installed connection.
Preferably, connecting rod includes left lever, right pull rod, connecting support between left lever and right pull rod, support installation
On steel tower, support is equipped with slot, and left lever, the equal activity of right pull rod extend through slot, and left lever, right tie rod end are hinged
Connecting rod is adjusted, two adjust hinged pushing block between connecting rod;Supporting block is installed below preformed armor rods on steel tower, ADSS light in supporting block
The connection of cable corresponding position liftable pushes column, and ADSS optical cable, which is fitted in, pushes column upper end, and pushing column lower end to abut has abutting plate, supports
Compression bar is connected on fishplate bar, compression bar is hinged in supporting block, and the hinged push rod in compression bar end, push rod is hinged on pushing block.
After ADSS optical cable long-time use, by gravity, arc sag becomes larger, and ADSS optical cable and preformed armor rods link position are downward
Inclination pushes column that abutting plate is driven to move downward, is connected to and abuts on plate so that the promotion column in supporting block be pushed to move downward
Compression bar end be upturned, moved upwards to push up the pushing block being connected between two adjusting connecting rods by push rod,
Two adjusting connecting rods pull left lever, right pull rod to move to direction close to each other respectively, and left lever, right pull rod are drawn by adjusting rod
Dynamic ADSS optical cable is mobile to support direction, to reduce the arc sag of ADSS optical cable, prevents that ADSS optical cable arc sag is excessive and shadow
The phenomenon that ringing normal use.Adjust automatically unloads the length of power device when this structure setting keeps ADSS optical cable arc sag excessive,
To tense ADSS optical cable, reduces ADSS optical cable arc sag, ADSS optical cable is made to be less prone to the excessive phenomenon of arc sag.
Preferably, supporting block is equipped with wire casing, ADSS optical cable is arranged in wire casing.ADSS optical cable is arranged in supporting block
Wire casing in, it is ensured that ADSS optical cable can fit to push column upper end, prevent off-set phenomenon.
Preferably, supporting block lower end connects mounting rack, mounting rack includes that connection panel and bracket, bracket are arranged in downward
Face plate edge is connected, compression bar is hinged on bracket, and supporting block lower surface is equipped with two connecting columns, and connection panel is equipped with arc
Slot;One connecting column is connected through connection panel and with panel is connect, and connection panel can be rotated around the connecting column, and arc groove is corresponding
The center of circle is arranged on the axis where the connecting column;Another connecting column activity passes through arc groove, is all connected with locking on two connecting columns
Nut.It connects panel to rotate by shaft of a connecting column, arc groove slips over another connecting column, after mounting rack turns to proper angle
It tightens locking nut, realizes being fastenedly connected for mounting rack and supporting block.Mounting rack is rotatably connected on supporting block lower surface, when
When preformed armor rods and connecting rod extended line structure form an angle, rotational installation frame adapts it to the installation connection of compression bar, flexibly and easily.
Preferably, pushing column upper end to be equipped with pushes disk, pushes column lower end to be equipped with and abut ball, push and push disk and branch on column
It is socketed with spring between bracer, abuts ball and is connected on abutting plate.The setting of disk is pushed to increase the contact surface with ADSS optical cable
Product abuts the setting of ball and moves down convenient for promotion abutting plate, the return of spring being arranged convenient for pushing column.
Preferably, support both ends are equipped with the jack for extending through slot, left lever, right pull rod respectively with two on support
Jack activity is plugged in together, and several balls are equipped on jack inner wall.Left lever, right pull rod are plugged in jack, and ball has
Conducive to the resistance being subject in reduction left lever, right pull rod moving process.
Compared with prior art, the beneficial effects of the present invention are: ADSS optical cable is mounted on steel tower by unloading power device, significantly
Reduce the horizontal pull to steel tower, reduce the influence to iron tower stability, and when ADSS optical cable arc sag is excessive can from
It is dynamic to adjust the length for unloading power device, to tense ADSS optical cable, reduces ADSS optical cable arc sag, ADSS optical cable is made to be less prone to arc sag
Excessive phenomenon.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the use state of the embodiment of the present invention 1;
Fig. 2 is a schematic structural view of Embodiment 1 of the present invention;
Fig. 3 is the structural schematic diagram of the use state of the embodiment of the present invention 2;
Fig. 4 is the partial structural diagram of the embodiment of the present invention 2;
Fig. 5 is the supporting block of the embodiment of the present invention 2 and the attachment structure schematic diagram of mounting rack;
In figure: 1, connecting rod, 2, adjusting rod, 3, pulling ring, 4, steel tower, 5, support ring, 6, preformed armor rods, 7, ADSS optical cable,
8, the body of rod, 9, connecting screw, 10, connecting hook, 11, connection ring, 12, straight-bar, 13, link block, 14, left lever, 15, right pull rod,
16, support, 17, slot, 18, adjusting connecting rod, 19, pushing block, 20, supporting block, 21, promotion column, 22, abutting plate, 23, compression bar,
24, push rod, 25, wire casing, 26, connection panel, 27, bracket, 28, connecting column, 29, arc groove, 30, promotion disk, 31, abutting ball,
32, spring, 33, jack, 34, ball.
Specific embodiment
Below by specific embodiment, and in conjunction with attached drawing, technical scheme of the present invention is further described:
Embodiment 1: a kind of steel tower is unloaded power device (referring to attached drawing 1, attached drawing 2) with ADSS optical cable, including connecting rod 1, respectively
It is connected to length-adjustable two adjusting rod 2 in connecting rod both ends, the pulling ring 3 being connected on adjusting rod, connecting rod is single bar, two
It pulls ring to be all connected with the support ring 5 for being mounted on steel tower 4, ring, support ring is pulled to be in U-shape structure.Pull ring movable hook
It hangs in support ring, pulls connection tension on ring to have preformed armor rods 6, preformed armor rods connect ADSS optical cable 7, and two preformed armor rods tense connection
Bar.It pulls ring that can adjust along connecting rod extended line direction to move.Adjusting rod includes the body of rod 8, is threaded in body of rod both ends respectively
Two connecting screws 9, connecting screw end is equipped with connecting hook 10, and the connecting hook of a connecting screw is connect with pulling ring, Ling Yilian
It connects and is connected with connection ring 11 between the connecting hook of screw rod and connecting rod, connection ring is in U-shape structure.The body of rod includes two spaced
Straight-bar 12, the link block 13 for being connected to straight-bar end, link block are connected to two companies for connecting two straight-bars, two connecting screws
It connects on block.
When ADSS optical cable is installed on steel tower, first support ring is installed on steel tower, preformed armor rods connection is fastened to ADSS
On optical cable, then preformed armor rods end is connected to and is pulled on ring, the length of adjusting rod is adjusted, makes connecting rod, adjusting rod, preformed armor rods
In tension, while ensuring that the arc sag of ADSS optical cable is met the requirements.It is subject to according to force analysis support ring preformed
Silk horizontal pull f=2sin(0.5a) * F, a be preformed armor rods and connecting rod extended line angle, F is preformed armor rods pulling force, that is, ADSS
The running tension of optical cable.As can be seen from the above equation, when preformed armor rods and connecting rod extended line angle are 0 degree, what support ring was subject to
Preformed armor rods horizontal pull f is 0, unloads power completely, steel tower is solely subjected to the gravity from ADSS optical cable vertical direction at this time;Work as preformed armor rods
When with connecting rod extended line angle less than 60 degree, f < F has the effect of unloading power, and steel tower bears vertical from ADSS optical cable at this time
The lesser pulling force of gravity and horizontal direction in direction;When preformed armor rods and connecting rod extended line angle are greater than 60 degree, f > F does not have
The effect of power is unloaded, steel tower bears gravity and the biggish pulling force of horizontal direction from ADSS optical cable vertical direction at this time.Therefore
ADSS optical cable ensures preformed armor rods and connecting rod extended line angle a less than 60 degree, when angle a is zero degree, i.e., in straight line iron when installing
When power device is unloaded in installation on tower, steel tower can use strain insulator gold not by the horizontal pull of ADSS optical cable on tangent suspension tower at this time
Tool production ADSS optical cable static side, advantageously reduces ADSS optic cable design, difficulty of construction, promotes ADSS optical cable project benefit.Steel tower
The gravity for the vertical direction being subject to will not influence the stability of steel tower.In conclusion ADSS optical cable is pacified by unloading power device
Mounted in steel tower, the horizontal pull to steel tower is substantially reduced, the influence to iron tower stability is reduced, is conducive to extend steel tower
Service life.
Embodiment 2: a kind of steel tower is unloaded power device (referring to attached drawing 3 to attached drawing 5) with ADSS optical cable, structure and embodiment 1
Similar, main difference includes left lever 14, right pull rod 15 in connecting rod in this present embodiment, is connected between left lever and right pull rod
Support 16 is connect, support is mounted on steel tower, and support is equipped with slot 17, and left lever, the equal activity of right pull rod extend through slot, Zola
Bar, right tie rod end hingedly adjust connecting rod 18, and two adjust hinged pushing block 19 between connecting rod;Installation below preformed armor rods on steel tower
There is supporting block 20, the connection of ADSS optical cable corresponding position liftable pushes column 21 in supporting block, and ADSS optical cable, which is fitted in, to be pushed on column
End, pushing column lower end to abut has abutting plate 22, abuts and connects compression bar 23 on plate, and compression bar is hinged in supporting block, compression bar end hinge
Push rod 24 is connect, push rod is hinged on pushing block.Supporting block is equipped with wire casing 25, and ADSS optical cable is arranged in wire casing.Under supporting block
End connection mounting rack, mounting rack include connection panel 26 and bracket 27, and connection face plate edge is arranged in bracket downward, and compression bar is hinged
On bracket, supporting block lower surface is equipped with two connecting columns 28, and connection panel is equipped with arc groove 29;One connecting column is through connection
Panel is simultaneously connected with panel is connect, and connection panel can be rotated around the connecting column, and the corresponding center of circle of arc groove is arranged in the connecting column
On the axis at place;Another connecting column activity passes through arc groove, is all connected with locking nut on two connecting columns.Column upper end is pushed to be equipped with
Disk 30 is pushed, pushes column lower end to be equipped with and abuts ball 31, pushes to push being socketed with spring 32 between disk and supporting block on column, abuts ball
It is connected to and abuts on plate.Support both ends are equipped with the jack 33 for extending through slot, left lever, right pull rod respectively with two on support
Jack activity is plugged in together, and several balls 34 are equipped on jack inner wall.Other structures are same as Example 1.
After ADSS optical cable long-time use, by gravity, arc sag becomes larger, and ADSS optical cable and preformed armor rods link position are downward
Inclination pushes column that abutting plate is driven to move downward, is connected to and abuts on plate so that the promotion column in supporting block be pushed to move downward
Compression bar end be upturned, moved upwards to push up the pushing block being connected between two adjusting connecting rods by push rod,
Two adjusting connecting rods pull left lever, right pull rod to move to direction close to each other respectively, and left lever, right pull rod are drawn by adjusting rod
Dynamic ADSS optical cable is mobile to support direction, to reduce the arc sag of ADSS optical cable, prevents that ADSS optical cable arc sag is excessive and shadow
The phenomenon that ringing normal use.Adjust automatically unloads the length of power device when this structure setting keeps ADSS optical cable arc sag excessive,
To tense ADSS optical cable, reduces ADSS optical cable arc sag, ADSS optical cable is made to be less prone to the excessive phenomenon of arc sag.
Embodiment described above is two kinds of preferable schemes of the invention, is not made in any form to the present invention
Limitation, there are also other variations and modifications on the premise of not exceeding the technical scheme recorded in the claims.
Claims (8)
1. a kind of steel tower unloads power device with ADSS optical cable, characterized in that including connecting rod, be connected to connecting rod both ends length
Adjustable two adjusting rod, the pulling ring being connected on adjusting rod, two pulling rings are all connected with the support ring for being mounted on steel tower,
It pulls ring activity to be hooked in support ring, pulls connection tension on ring to have preformed armor rods, preformed armor rods connect ADSS optical cable, two preformed armor rods
Tense connecting rod;Connecting rod includes left lever, right pull rod, connecting support between left lever and right pull rod, and support is mounted on steel tower
On, support is equipped with slot, and left lever, the equal activity of right pull rod extend through slot, and hingedly adjusting connects for left lever, right tie rod end
Bar, two adjust hinged pushing block between connecting rod;Supporting block is installed below preformed armor rods on steel tower, ADSS optical cable is corresponding in supporting block
Liftable connection in position pushes column, and ADSS optical cable, which is fitted in, pushes column upper end, and pushing column lower end to abut has abutting plate, abuts on plate
Compression bar is connected, compression bar is hinged in supporting block, and the hinged push rod in compression bar end, push rod is hinged on pushing block.
2. a kind of steel tower according to claim 1 unloads power device with ADSS optical cable, characterized in that adjusting rod include the body of rod,
It is threaded in two connecting screws at body of rod both ends respectively, connecting screw end is equipped with connecting hook, the connecting hook of a connecting screw
It is connect with ring is pulled, is connected with connection ring between the connecting hook and connecting rod of another connecting screw.
3. a kind of steel tower according to claim 2 unloads power device with ADSS optical cable, characterized in that the body of rod includes that two intervals are set
The straight-bar set, the link block for being connected to straight-bar end, link block are connected to two companies for connecting two straight-bars, two connecting screws
It connects on block.
4. a kind of steel tower according to claim 1 unloads power device with ADSS optical cable, characterized in that pull ring, support ring equal
Be in U-shape structure.
5. a kind of steel tower according to claim 1 unloads power device with ADSS optical cable, characterized in that supporting block is equipped with line
Slot, ADSS optical cable are arranged in wire casing.
6. a kind of steel tower according to claim 1 unloads power device with ADSS optical cable, characterized in that supporting block lower end connection peace
It shelves, mounting rack includes connection panel and bracket, and connection face plate edge is arranged in bracket downward, and compression bar is hinged on bracket, is propped up
Bracer lower surface is equipped with two connecting columns, and connection panel is equipped with arc groove;One connecting column is through connection panel and and joint face
Plate connection, connection panel can be rotated around the connecting column, and the corresponding center of circle of arc groove is arranged on the axis where the connecting column;Separately
One connecting column activity passes through arc groove, is all connected with locking nut on two connecting columns.
7. a kind of steel tower according to claim 1 unloads power device with ADSS optical cable, characterized in that push column upper end to be equipped with and push away
Moving plate pushes column lower end to be equipped with and abuts ball, pushes to push that spring is socketed between disk and supporting block on column, abut ball be connected to
On fishplate bar.
8. a kind of steel tower according to claim 1 unloads power device with ADSS optical cable, characterized in that support both ends, which are equipped with, to be passed through
Through the jack of slot, left lever, right pull rod are plugged in together with two jack activities on support respectively, are installed on jack inner wall
There are several balls.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710258878.9A CN107918176B (en) | 2017-04-19 | 2017-04-19 | A kind of steel tower unloads power device with ADSS optical cable |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710258878.9A CN107918176B (en) | 2017-04-19 | 2017-04-19 | A kind of steel tower unloads power device with ADSS optical cable |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107918176A CN107918176A (en) | 2018-04-17 |
CN107918176B true CN107918176B (en) | 2019-08-06 |
Family
ID=61898627
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710258878.9A Active CN107918176B (en) | 2017-04-19 | 2017-04-19 | A kind of steel tower unloads power device with ADSS optical cable |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107918176B (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201238175Y (en) * | 2008-07-25 | 2009-05-13 | 南京线路器材厂 | Horizontal direction force regulating mechanism for hard busbar bridle wire with diagonal draw bar |
CN202057866U (en) * | 2011-05-13 | 2011-11-30 | 河南省电力公司驻马店供电公司 | Special double-hook lifting device for transmission line tangent suspension tower optical cables |
CN204216535U (en) * | 2014-10-18 | 2015-03-18 | 福州万山电力咨询有限公司 | 110KV line project duplex improves strain insulator-string |
CN104831945A (en) * | 2015-05-14 | 2015-08-12 | 中国电力科学研究院 | Device for replacing main material of transmission tower |
CN204832624U (en) * | 2015-08-13 | 2015-12-02 | 上海艾能电力工程有限公司 | ADSS optical cable gold utensil cluster for power transmission sequence is maked somebody a mere figurehead to high pressure and connection structure thereof |
CN206818948U (en) * | 2017-04-19 | 2017-12-29 | 国网浙江省电力公司湖州供电公司 | That ADSS optical cables are installed on a kind of steel tower unloads power apparatus |
-
2017
- 2017-04-19 CN CN201710258878.9A patent/CN107918176B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201238175Y (en) * | 2008-07-25 | 2009-05-13 | 南京线路器材厂 | Horizontal direction force regulating mechanism for hard busbar bridle wire with diagonal draw bar |
CN202057866U (en) * | 2011-05-13 | 2011-11-30 | 河南省电力公司驻马店供电公司 | Special double-hook lifting device for transmission line tangent suspension tower optical cables |
CN204216535U (en) * | 2014-10-18 | 2015-03-18 | 福州万山电力咨询有限公司 | 110KV line project duplex improves strain insulator-string |
CN104831945A (en) * | 2015-05-14 | 2015-08-12 | 中国电力科学研究院 | Device for replacing main material of transmission tower |
CN204832624U (en) * | 2015-08-13 | 2015-12-02 | 上海艾能电力工程有限公司 | ADSS optical cable gold utensil cluster for power transmission sequence is maked somebody a mere figurehead to high pressure and connection structure thereof |
CN206818948U (en) * | 2017-04-19 | 2017-12-29 | 国网浙江省电力公司湖州供电公司 | That ADSS optical cables are installed on a kind of steel tower unloads power apparatus |
Also Published As
Publication number | Publication date |
---|---|
CN107918176A (en) | 2018-04-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100913253B1 (en) | Power transmission rail track installation method that use catenary fixing device that fix electric wire so that miniaturization of straight tower may be available and catenary fixing device of polymer arm insulators | |
US9481264B2 (en) | Suspension apparatus and method for contact wire at the trough and crest of a track vertical curve | |
CN210326816U (en) | Wiring rack for fixing cable | |
CN109606206B (en) | Overhead rigid contact net cantilever supporting device of low headroom tunnel | |
CN216530362U (en) | Cable bridge for underground coal mine | |
CN107918176B (en) | A kind of steel tower unloads power device with ADSS optical cable | |
CN105366565B (en) | High voltage transmission line tower auxiliary lifting apparatus | |
CN218888065U (en) | Cable laying protection device for power maintenance | |
CN107907956B (en) | A kind of ADSS optical cable and steel tower attachment device | |
CN209805374U (en) | Insulating fixing device is used in installation of high-voltage cable | |
CN206818948U (en) | That ADSS optical cables are installed on a kind of steel tower unloads power apparatus | |
CN206818947U (en) | A kind of ADSS optical cables and steel tower attachment structure | |
CN205811471U (en) | The scalable cable clip device that a kind of mine down-hole is easy for installation | |
CN205159906U (en) | Insulation of special high tension transmission line strain insulator -string is qualified for next round of competitions flexible flat terracedly | |
CN209982002U (en) | Anti-shaking cable mounting structure for electric power steel pipe pole | |
CN212130153U (en) | Various steel sheet rail of steel construction | |
CN218648462U (en) | Extension support for live replacement of linear insulator | |
CN219591639U (en) | Adjustable antenna support | |
CN215419432U (en) | Cable protection pipe for composite structure electric power | |
CN204728800U (en) | A kind of power circuit cross-arm | |
CN218085174U (en) | Sectional insulator suspension device with elastic compensation | |
CN220512331U (en) | Wire-drawing hardware fitting of U-shaped hanging ring | |
CN212333711U (en) | Belt feeder off tracking adjusting device for coal mine | |
CN221168950U (en) | Insulating cross arm for distribution network | |
CN217482144U (en) | Road and bridge tunnel push pipe construction fixed knot constructs |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |