CN107916936A - A kind of major diameter one-tunnel two-tracks subway tunnel and its construction method - Google Patents
A kind of major diameter one-tunnel two-tracks subway tunnel and its construction method Download PDFInfo
- Publication number
- CN107916936A CN107916936A CN201711385428.2A CN201711385428A CN107916936A CN 107916936 A CN107916936 A CN 107916936A CN 201711385428 A CN201711385428 A CN 201711385428A CN 107916936 A CN107916936 A CN 107916936A
- Authority
- CN
- China
- Prior art keywords
- tunnel
- tracks
- road bed
- bed board
- subway
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 22
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 18
- 229910052742 iron Inorganic materials 0.000 claims description 9
- 238000009434 installation Methods 0.000 claims description 4
- 238000000034 method Methods 0.000 claims description 3
- 239000011150 reinforced concrete Substances 0.000 claims description 3
- 238000010586 diagram Methods 0.000 description 6
- 238000005516 engineering process Methods 0.000 description 2
- 230000007547 defect Effects 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000005192 partition Methods 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/14—Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
The present invention relates to a kind of major diameter one-tunnel two-tracks subway tunnel and its construction method, it includes tunnel body, bottom plate, mid-board, road bed board, track, evacuation platform, circuit pipeline and contact net;Wherein, the bottom slab concreting is in the intrinsic bottom in tunnel;The mid-board is poured on bottom plate vertically;The road bed board be horizontally set on mid-board and tunnel body in;The track is provided with two, it is laid on road bed board;The evacuation platform is connected on road bed board, and between two tracks;The circuit pipeline is laid on the intrinsic side wall in tunnel;The contact net is installed on the intrinsic top in tunnel, and positioned at the surface of track.Uplink and downlink train is arranged in same tunnel by the major diameter one-tunnel two-tracks subway tunnel of the present invention, can be reduced and be taken the underground space of about half, and easy for construction, cost-effective.
Description
【Technical field】
The present invention relates to a kind of tunnel and its construction method, and in particular to a kind of major diameter one-tunnel two-tracks subway tunnel and its
Construction method, belongs to subway work field of engineering technology.
【Background technology】
At present, normal dia shield tunnel can only arrange a row subway train, and subway uplink and downlink train is needed by two shields
Structure tunnel is realized, and the spacing between two shield tunnels is at least 1 Bei Dong rivers rising in Ningxia and flowing into central Shaanxi.Therefore, conventional shield tunnel Subway Tunnel accounts for
With the larger underground space, for the condition that the underground space is narrow and small, conventional shield tunnel Subway Tunnel line arrangement is extremely difficult.
Therefore, in order to solve the above technical problems, a kind of major diameter one-tunnel two-tracks subway tunnel it is necessory to provide innovation
And its construction method, to overcome the defect of the prior art.
【The content of the invention】
Uplink and downlink train can be arranged in solve the above problems, it is an object of the invention to provide one kind in same tunnel
Major diameter one-tunnel two-tracks subway tunnel.
Another object of the present invention is to provide a kind of construction method of major diameter one-tunnel two-tracks subway tunnel.
To realize above-mentioned first purpose, the technical solution that the present invention takes is:A kind of major diameter one-tunnel two-tracks subway tunnel,
It includes tunnel body, bottom plate, mid-board, road bed board, track, evacuation platform, circuit pipeline and contact net;Wherein, it is described
Bottom slab concreting is in the intrinsic bottom in tunnel;The mid-board is poured on bottom plate vertically;During the road bed board is horizontally set on
On partition wall and in tunnel body;The track is provided with two, it is laid on road bed board;The evacuation platform is connected to railway roadbed
On plate, and between two tracks;The circuit pipeline is laid on the intrinsic side wall in tunnel;The contact net is installed on
The intrinsic top in tunnel, and positioned at the surface of track.
The major diameter one-tunnel two-tracks subway tunnel of the present invention is further arranged to:The outside diameter 10m of the tunnel body, internal diameter
9m。
The major diameter one-tunnel two-tracks subway tunnel of the present invention is also configured to:The evacuation platform is Prefabricated block, with railway roadbed
Plate connection is fixed;The road bed board is monolithic reinforced concrete structure.
To realize above-mentioned second purpose, the technical solution that the present invention takes is:A kind of major diameter one-tunnel two-tracks subway tunnel
Construction method, it includes following construction procedure:
1) large-diameter shield construction, is completed, forms tunnel body construction;
2) bottom plate and mid-board, are poured, wherein, bottom plate is connected with the embedded iron on tunnel body;
3) road bed board, the reserved evacuation platform connection embedded iron in centre, are poured;
4) the track laying work of subway train in tunnel, is completed;And middle part evacuation platform construction is completed, and on road bed board
Embedded iron connects;
5) laying installation of the various circuit pipelines of tunnel internal, is completed, subway train contact net is installed, forms final tunnel
Road.
Compared with prior art, the present invention has the advantages that:The major diameter one-tunnel two-tracks subway tunnel of the present invention
Uplink and downlink train is arranged in same tunnel, can reduce and take the underground space of about half, and it is easy for construction, save into
This.
【Brief description of the drawings】
Fig. 1 is the schematic diagram of the major diameter one-tunnel two-tracks constructing metro tunnel step 1) of the present invention.
Fig. 2 is the schematic diagram of the major diameter one-tunnel two-tracks constructing metro tunnel step 2) of the present invention.
Fig. 3 is the schematic diagram of the major diameter one-tunnel two-tracks constructing metro tunnel step 3) of the present invention.
Fig. 4 is the schematic diagram of the major diameter one-tunnel two-tracks constructing metro tunnel step 4) of the present invention.
Fig. 5 is the schematic diagram of the major diameter one-tunnel two-tracks constructing metro tunnel step 5) of the present invention.
Fig. 6 is the structure diagram of the major diameter one-tunnel two-tracks subway tunnel (after completion) of the present invention.
【Embodiment】
Refer to shown in Figure of description 6, the present invention is a kind of major diameter one-tunnel two-tracks subway tunnel, it is by tunnel body
1st, a few part compositions such as bottom plate 2, mid-board 3, road bed board 4, track 5, evacuation platform 6, circuit pipeline 7 and contact net 8.
Wherein, the outside diameter 10m of the tunnel body 1, internal diameter 9m.
The bottom plate 2 is poured in the bottom in tunnel body 1.The mid-board 3 is poured on bottom plate 2 vertically.
The road bed board 4 is horizontally set on mid-board 3 with tunnel body 1, it is monolithic reinforced concrete structure.
The track 5 is provided with two, it is laid on road bed board 4.The evacuation platform 6 is connected on road bed board 6, and
Between two tracks 5.The evacuation platform 6 is Prefabricated block, is connected with road bed board solid.
The circuit pipeline 7 is laid on the side wall in tunnel body 1.The contact net 8 is installed in tunnel body 1
Top, and positioned at the surface of track 5.
Refer to shown in Figure of description 1 to attached drawing 6, the construction method of major diameter one-tunnel two-tracks subway tunnel of the invention
Including following construction procedure:
1) large-diameter shield construction, is completed, forms 1 structure of tunnel body;
2) bottom plate 2 and mid-board 3, are poured, wherein, bottom plate 2 is connected with the embedded iron on tunnel body 1;
3) road bed board 4, the reserved evacuation platform connection embedded iron in centre, are poured;
4) track 5 for, completing subway train in tunnel is laid with work;And complete middle part evacuation platform 6 and construct, with road bed board
Upper embedded iron connection;
5) laying installation of the various circuit pipelines 7 of tunnel internal, is completed, installation subway train contact net 8, forms final tunnel
Road.
Embodiment above is only the preferred embodiment of this creation, all in this wound not to limit this creation
Any modification, equivalent substitution, improvement and etc. done within the spirit and principle of work, should be included in this creation protection domain it
It is interior.
Claims (4)
- A kind of 1. major diameter one-tunnel two-tracks subway tunnel, it is characterised in that:Including tunnel body, bottom plate, mid-board, road bed board, Track, evacuation platform, circuit pipeline and contact net;Wherein, the bottom slab concreting is in the intrinsic bottom in tunnel;The interval Wall is poured on bottom plate vertically;The road bed board be horizontally set on mid-board and tunnel body in;The track is provided with two Bar, it is laid on road bed board;The evacuation platform is connected on road bed board, and between two tracks;The line pipe Line is laid on the intrinsic side wall in tunnel;The contact net is installed on the intrinsic top in tunnel, and positioned at track just on Side.
- 2. major diameter one-tunnel two-tracks subway tunnel as claimed in claim 1, it is characterised in that:The outside diameter of the tunnel body 10m, internal diameter 9m.
- 3. major diameter one-tunnel two-tracks subway tunnel as claimed in claim 1, it is characterised in that:The evacuation platform is prefabricated molds Block, fixation is connected with road bed board;The road bed board is monolithic reinforced concrete structure.
- 4. the construction method of the major diameter one-tunnel two-tracks subway tunnel as described in claims 1 to 3 item any one, its feature exist In:Including following construction procedure:1) large-diameter shield construction, is completed, forms tunnel body construction;2) bottom plate and mid-board, are poured, wherein, bottom plate is connected with the embedded iron on tunnel body;3) road bed board, the reserved evacuation platform connection embedded iron in centre, are poured;4) the track laying work of subway train in tunnel, is completed;And middle part evacuation platform construction is completed, it is and pre-buried on road bed board Iron connects;5) laying installation of the various circuit pipelines of tunnel internal, is completed, subway train contact net is installed, forms final tunnel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711385428.2A CN107916936A (en) | 2017-12-20 | 2017-12-20 | A kind of major diameter one-tunnel two-tracks subway tunnel and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711385428.2A CN107916936A (en) | 2017-12-20 | 2017-12-20 | A kind of major diameter one-tunnel two-tracks subway tunnel and its construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107916936A true CN107916936A (en) | 2018-04-17 |
Family
ID=61893860
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711385428.2A Pending CN107916936A (en) | 2017-12-20 | 2017-12-20 | A kind of major diameter one-tunnel two-tracks subway tunnel and its construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107916936A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018214737A1 (en) * | 2017-05-25 | 2018-11-29 | 中铁十四局集团有限公司 | Construction method for inner structure of single-bore double-track composite lining shield tunnel |
CN111086391A (en) * | 2019-11-18 | 2020-05-01 | 中铁二院工程集团有限责任公司 | Double-power-supply system type travel rail transit system |
CN112664225A (en) * | 2020-12-31 | 2021-04-16 | 中铁第四勘察设计院集团有限公司 | Single-hole double-line rectangular tunnel with partition walls in civil air defense partition doors arranged side by side |
CN114215598A (en) * | 2021-12-24 | 2022-03-22 | 中铁二院工程集团有限责任公司 | Single-hole double-track railway tunnel and method for reducing influence of train derailment on adjacent track operation |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201412160Y (en) * | 2009-06-02 | 2010-02-24 | 中铁第四勘察设计院集团有限公司 | Single-cave and double-line subway tunnel |
CN104794363A (en) * | 2015-05-06 | 2015-07-22 | 铁道第三勘察设计院集团有限公司 | Positioning method for tunneling construction of single-cavity double-line large-diameter railway shield tunnel |
CN107435544A (en) * | 2017-05-25 | 2017-12-05 | 中铁十四局集团有限公司 | A kind of construction method of one-tunnel two-tracks composite lining shield tunnel internal structure |
CN207131407U (en) * | 2017-09-13 | 2018-03-23 | 北京市政建设集团有限责任公司 | A kind of major diameter one-tunnel two-tracks subway tunnel |
-
2017
- 2017-12-20 CN CN201711385428.2A patent/CN107916936A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201412160Y (en) * | 2009-06-02 | 2010-02-24 | 中铁第四勘察设计院集团有限公司 | Single-cave and double-line subway tunnel |
CN104794363A (en) * | 2015-05-06 | 2015-07-22 | 铁道第三勘察设计院集团有限公司 | Positioning method for tunneling construction of single-cavity double-line large-diameter railway shield tunnel |
CN107435544A (en) * | 2017-05-25 | 2017-12-05 | 中铁十四局集团有限公司 | A kind of construction method of one-tunnel two-tracks composite lining shield tunnel internal structure |
CN207131407U (en) * | 2017-09-13 | 2018-03-23 | 北京市政建设集团有限责任公司 | A kind of major diameter one-tunnel two-tracks subway tunnel |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018214737A1 (en) * | 2017-05-25 | 2018-11-29 | 中铁十四局集团有限公司 | Construction method for inner structure of single-bore double-track composite lining shield tunnel |
CN111086391A (en) * | 2019-11-18 | 2020-05-01 | 中铁二院工程集团有限责任公司 | Double-power-supply system type travel rail transit system |
CN112664225A (en) * | 2020-12-31 | 2021-04-16 | 中铁第四勘察设计院集团有限公司 | Single-hole double-line rectangular tunnel with partition walls in civil air defense partition doors arranged side by side |
CN114215598A (en) * | 2021-12-24 | 2022-03-22 | 中铁二院工程集团有限责任公司 | Single-hole double-track railway tunnel and method for reducing influence of train derailment on adjacent track operation |
CN114215598B (en) * | 2021-12-24 | 2023-10-03 | 中铁二院工程集团有限责任公司 | Single-hole double-line railway tunnel and method for reducing influence of train derailment on adjacent line operation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107916936A (en) | A kind of major diameter one-tunnel two-tracks subway tunnel and its construction method | |
CN206785390U (en) | A kind of guide table structure for facilitating the excessively middle ventilating shaft of shield machine | |
CN207452594U (en) | A kind of urban track traffic prestressing force slab track | |
UA89528C2 (en) | Ballastless track for rail vehicles | |
CN107268348B (en) | Subway column check pit construction method | |
CN210975381U (en) | A prefabricated plate track structure is filled up in damping for little shield tunnel | |
CN206941325U (en) | The newly-built peg board formula roadbed of girder construction system in length and breadth | |
CN102912693B (en) | Floating track bed precast slab and construction method for precast slab assembled floating track bed | |
CN107354826B (en) | The rapid constructing method of tunnel built-in type rail system | |
CN103556575B (en) | Steel box girder falling construction method for crossing railway trunk line | |
CN207131407U (en) | A kind of major diameter one-tunnel two-tracks subway tunnel | |
CN203475472U (en) | Power cable trough hand hole well | |
CN205329433U (en) | Maintain convenient embedded track structure | |
CN102899996B (en) | Novel construction method of precast slab assembled floating road bed | |
CN214362569U (en) | Prefabricated ballast bed structure of built-in pump house department for urban rail transit | |
CN207793771U (en) | Middle low speed magnetic suspension traffic engineering is low to set circuit support rail beam | |
CN207062650U (en) | A kind of vibration damping floating plate ballast bed structure that limit location is invaded suitable for shield | |
CN203755164U (en) | Special hanging bracket for construction of post-pouring flange plates of acoustic barrier T-shaped beam | |
CN103061216B (en) | Monolithic rail bed and turnout lifting support arrangement structure of subway short sleeper | |
CN105041348A (en) | Underground space subsurface excavation construction method adopting combined roof | |
CN203700880U (en) | Floating type track bed turnout | |
CN103758040A (en) | Special hanging frame for construction of post-casting flange plate of sound barrier T beam and using method thereof | |
CN208734343U (en) | A kind of station tunnel excavation structure with interim middle spacer post support | |
CN108560330A (en) | The scalable general railway roadbed of secondary pouring type and its construction method | |
CN108774922A (en) | A kind of assembled ballastless track system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20180417 |
|
WD01 | Invention patent application deemed withdrawn after publication |