CN107909334A - A kind of project management method, device, server and computer-readable recording medium - Google Patents
A kind of project management method, device, server and computer-readable recording medium Download PDFInfo
- Publication number
- CN107909334A CN107909334A CN201711002592.0A CN201711002592A CN107909334A CN 107909334 A CN107909334 A CN 107909334A CN 201711002592 A CN201711002592 A CN 201711002592A CN 107909334 A CN107909334 A CN 107909334A
- Authority
- CN
- China
- Prior art keywords
- information
- subtask
- user
- user terminal
- sent
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/50—Network services
- H04L67/60—Scheduling or organising the servicing of application requests, e.g. requests for application data transmissions using the analysis and optimisation of the required network resources
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Operations Research (AREA)
- Economics (AREA)
- Marketing (AREA)
- Data Mining & Analysis (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The embodiment of the present application discloses a kind of project management method, device, server and computer-readable recording medium.The project management method is after the demand information of the first user terminal transmission is got, and the second user identification information in information sends the desired content in demand information to second user terminal according to demand;If the confirmation for receiving the transmission of second user terminal receives the feedback information of desired content, multiple subtasks that second user terminal is sent are obtained;The corresponding task amount configuration information in each subtask that second user terminal is sent is obtained, wherein task amount configuration information includes waiting information;Subtask and corresponding waiting information are sent to the first user terminal, if get the waiting confirmation message of the first user terminal feedback, each subtask and corresponding task amount configuration information are sent to corresponding 3rd user terminal according to the corresponding subsystem identification in each subtask, so as to complete to establish project the monitoring record of process, the efficiency of project management is improved.
Description
Technical field
This application involves technical field of information management, more particularly to a kind of project management method, device, server and calculating
Machine readable storage medium storing program for executing.
Background technology
Project management class software tool, which is laid particular emphasis on, at present is managed fixed project.The formation of project is often first undergone
It is proposed demand purpose, discussion and modification demand purpose, purpose are split, and finally just form project.However, existing project
Management class software can not reasonably monitor the forming process of project, so may result in much good demand purpose by
Way forgetting, omission etc., and these good demand purposes may not be described, and user is difficult the demand purpose to forgetting
Traced, substantially reduce the validity of project management, great inconvenience is brought to user.
The content of the invention
, can be to item this application provides a kind of project management method, device, server and computer-readable recording medium
Purpose forming process is kept track of, and improves the validity of project management.
In a first aspect, this application provides a kind of project management method, it includes:
The demand information of the first user terminal transmission is obtained, wherein the demand information includes desired content and second user
Identification information;
The desired content is sent to second user terminal according to the second user identification information;
If receiving the feedback information that the confirmation that the second user terminal is sent receives desired content, described second is obtained
Multiple subtasks that user terminal is sent, the plurality of subtask carry out fractionation shape for second user to the desired content
Into subtask, and each subtask includes corresponding subsystem identification;
The corresponding task amount configuration information in each subtask for obtaining that the second user terminal sends, wherein described
Task amount configuration information includes waiting information;
The corresponding waiting information in multiple subtasks and each subtask is sent to first user terminal;
If getting the waiting confirmation message of first user terminal feedback, according to the corresponding son in each subtask
System banner, each subtask and corresponding task amount configuration information are sent to corresponding 3rd user terminal, so that
Obtain the 3rd user and corresponding developer is distributed into multiple subtasks.
Second aspect, present invention also provides a kind of project management device, it includes:
Information acquisition unit, the demand information sent for obtaining the first user terminal, wherein the demand information includes
Desired content and second user identification information;
Content sending unit, for being sent the desired content to second user according to the second user identification information
Terminal;
Subtask acquiring unit, if receiving the anti-of desired content for receiving the confirmation that the second user terminal is sent
Feedforward information, obtains multiple subtasks that the second user terminal is sent, the plurality of subtask is second user to institute
The subtask that desired content split formation is stated, and each subtask includes corresponding subsystem identification;
Configuration information acquiring unit, each corresponding of the subtask sent for obtaining the second user terminal
Business amount configuration information, wherein the task amount configuration information includes waiting information;
Waiting information transmitting unit, for the corresponding waiting information in multiple subtasks and each subtask to be sent out
Send to first user terminal;
Transmitting element, if the waiting confirmation message for getting the first user terminal feedback, according to each described
The corresponding subsystem identification in subtask, each subtask and corresponding task amount configuration information are sent to the corresponding 3rd
User terminal, so that corresponding developer is distributed in multiple subtasks by the 3rd user.
The third aspect, the application provide a kind of server again, including memory, processor and are stored in the memory
Computer program that is upper and can running on the processor, it is characterised in that the processor is realized when performing described program
Any one of them project management method that the application provides.
Fourth aspect, the application provide a kind of computer-readable recording medium again, wherein the computer-readable storage
Media storage has computer program, and the computer program includes programmed instruction, and described program instructs when being executed by a processor
The processor is set to perform any one of them project management method of the application offer.
The application provides a kind of project management method, device, server and computer-readable recording medium.The project management
Method is after the demand information of the first user terminal transmission is got, and the second user identification information in information need to according to demand
The desired content in information is asked to send to second user terminal;If in the confirmation reception demand for receiving the transmission of second user terminal
The feedback information of appearance, then multiple subtasks of second user terminal transmission are obtained, plurality of subtask is second user to needing
Content is asked split the subtask of formation, and each subtask includes corresponding subsystem identification;Then second user is obtained
The corresponding task amount configuration information in each subtask that terminal is sent, wherein task amount configuration information include waiting information;To be more
The corresponding waiting information in a subtask and each subtask is sent to the first user terminal, and anti-getting the first user terminal
After the waiting confirmation message of feedback, according to the corresponding subsystem identification in each subtask, by each subtask and corresponding task amount
Configuration information is sent to corresponding 3rd user terminal, so that corresponding exploit person is distributed in multiple subtasks by the 3rd user
Member.This method can avoid the relevant information of project to proposing to be monitored record to the whole process that project is set up from demand
Lose, the business relationship of related personnel, improves the effective percentage of project management, while also improve item during enhancing project is established
The probability that mesh is set up, facility is provided for user's Maintenance Significant Items.
Brief description of the drawings
, below will be to needed in embodiment description in order to illustrate more clearly of the embodiment of the present application technical solution
Attached drawing is briefly described, it should be apparent that, drawings in the following description are some embodiments of the present application, general for this area
For logical technical staff, without creative efforts, other attached drawings can also be obtained according to these attached drawings.
Fig. 1 is a kind of schematic diagram of a scenario of project management method provided by the embodiments of the present application;
Fig. 2 is a kind of schematic flow diagram of project management method provided by the embodiments of the present application;
Fig. 3 is the application scenarios schematic diagram of project management method shown in Fig. 2;
Fig. 4 is the specific schematic flow diagram of step S106 in project management method shown in Fig. 2;
Fig. 5 is a kind of another schematic flow diagram of project management method provided by the embodiments of the present application;
Fig. 6 is a kind of another schematic flow diagram of project management method provided by the embodiments of the present application;
Fig. 7 is a kind of schematic block diagram of project management device provided by the embodiments of the present application;
Fig. 8 is a kind of another schematic block diagram of project management device provided by the embodiments of the present application;
Fig. 9 is a kind of another schematic block diagram of project management device provided by the embodiments of the present application;
Figure 10 is a kind of schematic block diagram of server provided by the embodiments of the present application.
Embodiment
Below in conjunction with the attached drawing in the embodiment of the present application, the technical solution in the embodiment of the present application is carried out clear, complete
Site preparation describes, it is clear that described embodiment is some embodiments of the present application, instead of all the embodiments.Based on this Shen
Please in embodiment, the every other implementation that those of ordinary skill in the art are obtained without making creative work
Example, shall fall in the protection scope of this application.
It should be appreciated that ought use in this specification and in the appended claims, term " comprising " and "comprising" instruction
Described feature, entirety, step, operation, the presence of element and/or component, but it is not precluded from one or more of the other feature, whole
Body, step, operation, element, component and/or its presence or addition for gathering.
It is also understood that the term used in this present specification is merely for the sake of the mesh for describing specific embodiment
And be not intended to limit the application.As present specification and it is used in the attached claims, unless on
Other situations are hereafter clearly indicated, otherwise " one " of singulative, "one" and "the" are intended to include plural form.
It will be further appreciated that the term "and/or" used in present specification and the appended claims is
Refer to any combinations and all possible combinations of one or more of the associated item listed, and including these combinations.
Referring to Fig. 1, Fig. 1 is a kind of schematic diagram of a scenario of project management method provided by the embodiments of the present application.It is real one
Apply in example, which is applied in the server of project management, and cost can be collected in the server of the project management
Any project managing device in application.Book for the purpose of simplifying the description, below by the server abbreviation server of project management.
First user terminal, second user terminal and the 3rd user terminal can be desktop computer, laptop computer, put down
Plate computer, personal digital assistant (PDA), smart mobile phone (such as Android phone, IOS mobile phones) etc., do not do specific limit herein
System.In addition, in Fig. 1, the number of first user terminal, second user terminal and the 3rd user terminal is one, can
With understanding, in actual application, the number of first user terminal, second user terminal and the 3rd user terminal
It all can be more, Fig. 1 functions only as schematically illustrate effect.
In Fig. 1, after the first user inputs the information such as desired content by the first user terminal and clicks on submitting button,
First user terminal will generate demand information according to information such as desired contents input by user, wherein, which includes needing
Ask content and second user identification information.First user terminal sends demand information to server.Server is getting
After the demand information that one user terminal is sent, the desired content will be sent to second user according to second user identification information
Terminal.After second user is clicking on confirmation reception desired content, second user terminal can be received to server transmission confirmation need to
Seek the feedback information of content.Server obtains the more of second user terminal transmission after the feedback information is received, by further
A subtask, the plurality of subtask to the desired content split the subtask of formation for second user, and often
A subtask includes corresponding subsystem identification.Then, server obtains each described of second user terminal transmission again
The corresponding task amount configuration information in subtask, wherein the task amount configuration information includes waiting information.Server again will be multiple
The corresponding waiting information in the subtask and each subtask is sent to the first user terminal, so that the first user confirms waiting.
, will be according to the corresponding subsystem in each subtask after server receives the waiting confirmation message of the first user terminal transmission
System mark, each subtask and corresponding task amount configuration information are sent to corresponding 3rd user terminal, so that
Corresponding developer is distributed in multiple subtasks by the 3rd user, so as to complete to propose to set up process to project from demand
Monitoring record, avoid omission demand and relevant information, improve the efficiency of project management.
Each step of the method for project management in the present embodiment is carried out in detail below in conjunction with Figure of description
It is bright.
Referring to Fig. 2, Fig. 2 is the schematic flow diagram of project management method in the present embodiment.The project management method includes
Step S101~S106.
S101, obtain the demand information that the first user terminal is sent, wherein the demand information includes desired content and the
Two user identity informations.
In one embodiment, the first user terminal can be by inputting account with installation project management system, the first user
Number, the checking information registry entry management system such as password, the phase of demand is then filled in the corresponding position of project management system
Close information.
For example, as shown in figure 3, Fig. 3 is the application scenarios schematic diagram of project management method shown in Fig. 2.First user is in " I
Task " in click on " newly-built demand " can show interface as shown in Figure 3.Filled in interface demand title, requirement description,
It is expected in the demands such as the demand numbering that on-line time, demand submitter and affiliated function, relevant documentation and system automatically generate
Hold.First user can also be inputted in " analyst " column or selection analysis teacher, and analyst refers to second user here." point
Analysis teacher " can show the information such as the name of analyst, job number, register account number in column, that is to say, that second user identification information can
Think that the unique identifications such as name, job number, register account number go out the information of second user.
It should be noted that in other embodiments, desired content can only include one kind or more that above-mentioned display comes out
Kind combination, other contents for not displaying out can also be included, as long as desired content can description demand, it is not right herein
The form of desired content is limited.
After first user has filled in desired content and second user identification information and clicked on submitting button, the first user is whole
End will content and second user identification information generation demand information, and send demand information to server according to demand.Service
Device can get the demand information of the first user terminal transmission, and perform step S102.
S102, according to the second user identification information send the desired content to second user terminal.
Server parses second user identification information and desired content from demand information, then sends desired content
To the second user terminal corresponding with second user identification information, so that second user passes through second user terminal registry entry
After management system, second user can view the desired content.
If S103, receive the feedback information that the confirmation that the second user terminal is sent receives desired content, institute is obtained
Multiple subtasks of second user terminal transmission are stated, the plurality of subtask carries out the desired content for second user
The subtask formed is split, and each subtask includes corresponding subsystem identification.
In one embodiment, if second user thinks that desired content is complete or desired content relatively closes after having checked desired content
Reason etc., second user can perform predetermined registration operation on the interface of project management system, for example click on and confirm to receive button, the
Two user terminals can detect that confirmation receives instruction, and receive instruction generation according to the confirmation and confirm to receive desired content
Feedback information, and the feedback information of confirmation reception desired content is sent to server.Certainly, second user terminal can also
It will confirm that reception instruction is sent to server as feedback information.
Server will obtain the after the confirmation for receiving the transmission of second user terminal receives the feedback information of desired content
Multiple subtasks that two user terminals are sent, plurality of subtask to desired content split the son of formation for second user
Task, and each subtask includes corresponding subsystem identification.
Specifically, in one embodiment, server upon reception of the feedback information, will be split needed for the dialog box of subtask
Page framework data sending can so show in second user terminal to second user terminal and split subtask dialogue
Frame, splits desired content easy to second user.
Certainly, in other embodiments, second user terminal, which can also be previously stored with, splits needed for the dialog box of subtask
Page framework data.After second user terminal detects that second user clicks on confirmation reception button, it is possible to directly invoke
The page framework data needed for the dialog box of subtask are split, and shows and splits subtask dialog box, such second user can
Desired content is split in subtask dialog box is split.
In one embodiment, second user can be using whole desired content as a subtask, can also be by demand
Appearance splits into two or more subtasks.For example, according to demand content it is known that the first user want create one insurance
Production marketing webpage, this insurance products sale webpage need marketing function, online customer service function, application after sale function, look into
Ask declaration form function etc., then desired content can be split into following subtask by second user:Marketing function subtask,
Line customer service function subtask, application function subtask, inquiry declaration form function subtask after sale.That is, by desired content institute
The each function of needing splits into different subtasks, behind different subtasks extended meeting be assigned to different departments and different open
Hair personnel are handled, and multiple departments or multiple developers cooperate and complete the foundation of whole insurance products sale webpage.Can be with
Understand, the mode that subtask is split into desired content is not limited to above-mentioned split by function, or other are torn open
The mode of dividing, is not particularly limited herein.
Second user by desired content during multiple subtasks are split into, it is necessary to be corresponded to for the configuration of each subtask
Subsystem identification.Here subsystem can be a subsystem under project management system, such as sales subordinate system, server
Subsystem etc..Subsystem identification can be subsystem title, numbering etc..
Second user can click on the operations such as submitting button after completing desired content splitting into multiple subtasks
So that second user terminal sends multiple subtasks to server, wherein, which includes corresponding subsystem identification.
After server receives multiple subtasks of second user terminal transmission, step S104 will be performed.
S104, the corresponding task amount configuration information in each subtask for obtaining that the second user terminal sends, its
Described in task amount configuration information include waiting information.
In one embodiment, after server gets multiple subtasks, by waiting page framework data sending to second
User terminal, such second user terminal can show the waiting page, and second user can arrange each subtask
Phase is handled.Certainly, in other embodiments, second user terminal can also store waiting page framework data, work as second user
Terminal detects that second user clicks on submitting button when operation, transfers the waiting page framework data prestored and the row of display
The phase page, so that second user carries out waiting processing to each subtask.
In one embodiment, after second user sets waiting information for each subtask, the behaviour such as submitting button is clicked on
Make, second user terminal generates the corresponding task amount configuration information in subtask according to the waiting information of each subtask, and will be every
The corresponding task amount configuration information in a subtask is sent to server.In this way, server can receive second user terminal
The corresponding task amount configuration information in each subtask sent.
In one embodiment, the user for desired content being split into different subtasks can be with appointing for the distribution of each subtask
The user of business amount configuration information is different, that is to say, that the action that second user terminal is done can be performed by multiple terminals.
For example, second user by desired content when splitting into different subtasks, it is also necessary to for each subtask distribution the
Four users, that is to say, that each subtask further includes corresponding fourth user identification information.It is it should be noted that each
Subtask can correspond to unique fourth user or multiple subtasks correspond to a fourth user.Server receives
Behind multiple subtasks that second user terminal is sent, the corresponding son will be appointed according to fourth user identification information in subtask
Business is sent to fourth user terminal.After fourth user terminal receives corresponding subtask, fourth user can to subtask into
Row confirms.For example fourth user thinks that the subtask that second user is split is reasonable, it, which can be clicked on, receives subtask button, this
When server will receive fourth user terminal transmission confirmation receive subtask feedback information, then server will can arrange
For phase page framework data sending to fourth user terminal, such fourth user terminal can show the waiting page, and the 4th uses
Family can carry out waiting processing to subtask.After fourth user sets waiting information for subtask, submitting button etc. is clicked on
Operation, fourth user terminal generates the corresponding task amount configuration information in subtask according to the waiting information of subtask, and son is appointed
Corresponding task amount configuration information of being engaged in is sent to server.In this way, server can receive the transmission of fourth user terminal
The corresponding task amount configuration information in subtask.
S105, send the corresponding waiting information in multiple subtasks and each subtask to first user
Terminal.
After server gets the corresponding waiting information in each subtask, multiple subtasks and each subtask are corresponded to
Waiting information send to the first user terminal, so that the first user confirms waiting information.In one embodiment, when
After one user agrees to waiting information of the second user for the distribution of each subtask, the first user, which can click on, confirms waiting button etc.
Operation, such server can receive the waiting confirmation message of the first user terminal feedback, and perform step S106.
If S106, the waiting confirmation message for getting the first user terminal feedback, according to each subtask pair
The subsystem identification answered, each subtask and corresponding task amount configuration information is sent whole to corresponding 3rd user
End, so that corresponding developer is distributed in multiple subtasks by the 3rd user.
In one embodiment, referring to Fig. 4, the idiographic flow that Fig. 4 is step S106 in project management method shown in Fig. 2 shows
It is intended to.After server receives waiting confirmation message, service implement body performs step S1061~S1062.
Each the corresponding subsystem identification in the subtask obtains corresponding 3rd user identity information for S1061, basis;
In one embodiment, the mapping table of subsystem identification and the 3rd user identity information is stored with server,
In the mapping table, each subsystem corresponds at least one 3rd user identity information, and server reads the correspondence
Table, and corresponding at least one 3rd user identity information is obtained according to the corresponding subsystem identification in subtask.
Each 3rd user identity information of S1062, basis, will each subtask and the configuration of corresponding task amount
Information is sent to corresponding 3rd user terminal.
Server configures subtask and corresponding task after corresponding 3rd user identity information in subtask is got
Information sends the 3rd user terminal corresponding to the 3rd user identity information.Such 3rd user can be by multiple subtasks point
The corresponding developer of dispensing, so as to complete the process that whole project proposes to set up to project from demand.
It is understood that the number of the 3rd user terminal can be multiple.For example the number of subtask is three, if
Three subtasks correspond to three the 3rd different user identity informations respectively, are also just corresponding with three the 3rd user terminals.
In one embodiment, referring to Fig. 5, Fig. 5 is another flow diagram of project management method in the present embodiment.Should
Project management method after step s 106, further includes step S107~S108.
S107, the corresponding personnel depaly information in each subtask for obtaining that the 3rd user terminal sends;
After 3rd user terminal receives subtask and corresponding task amount configuration information, the 3rd user will be obtained and appointed for son
The personnel depaly information of business distribution, and the corresponding personnel depaly information in subtask is sent to server.Here, personnel depaly is believed
Breath can include the information such as developer's said system, user name, developer affiliated function.
S108, according to the personnel depaly information send each subtask to corresponding developer's terminal.
, will be per height after server receives the corresponding personnel depaly information in each subtask of the 3rd user terminal transmission
Task is sent to the corresponding developer's terminal of personnel depaly information, and such developer can carry out exploitation work for project
Industry.
Project management method in the present embodiment, can be to proposing to the whole process that project is set up to be monitored from demand
Record, avoids the relevant information of project from losing, and the business relationship of related personnel, improves project pipe during enhancing project is established
The effective percentage of reason, while the probability that project is set up also is improved, provide facility for user's Maintenance Significant Items.
Referring to Fig. 6, Fig. 6 is another flow diagram of project management method in the present embodiment.The project management method
Including step S201~S212.
S201, obtain the demand information that the first user terminal is sent, wherein the demand information includes desired content and the
Two user identity informations.
In one embodiment, the first user terminal can be by inputting account with installation project management system, the first user
Number, the checking information registry entry management system such as password, the phase of demand is then filled in the corresponding position of project management system
Close information.
In one embodiment, the relevant information of demand, i.e. desired content are reached the standard grade including demand title, requirement description, expectation
The information such as the demand numbering that time, demand submitter and affiliated function, relevant documentation and system automatically generate.Need what is illustrated
It is that desired content can only include one or more combinations that above-mentioned display comes out, and can also not display out including other
Content, as long as desired content can description demand, the form of desired content is not limited herein.In addition, second uses
Family identification information can be the information that the unique identifications such as name, job number, register account number go out second user.
After first user has filled in desired content and second user identification information and clicked on submitting button, the first user is whole
End will content and second user identification information generation demand information, and send demand information to server according to demand.Service
Device can get the demand information of the first user terminal transmission, and perform step S202.
S202, according to the second user identification information send the desired content to second user terminal.
Server parses second user identification information and desired content from demand information, then sends desired content
To the second user terminal corresponding with second user identification information, so that second user passes through second user terminal registry entry
After management system, second user can view the desired content.
If S203, receive the feedback information for retracting desired content that the second user terminal is sent, by the feedback
Reason of retracting in information is sent to first user terminal, in order to which first user repaiies the desired content
Change.
In one embodiment, if second user is after desired content is checked, it is found that desired content is imperfect, for example lack need
Ask that title either lacks the information such as requirement description or second user thinks that the first user of needs provides demand relevant more letters
During breath, second user, which can input, retracts reason, and clicks on and retract demand button, and such second user terminal will be according to retracting
Reason, which generates, retracts the feedback information of desired content, and sends and retract the feedback information of desired content to server.
After server receives the feedback information for retracting desired content, this is retracted to moving back in the feedback information of desired content
Return reason to send to the first user terminal, such first user can be perfect according to retracting reason and carrying out desired content.
S204, receive the amended demand information that first user terminal is sent, wherein amended demand information
Including amended desired content and the second user identification information.
After the first user has improved desired content, the first user terminal can be according to amended desired content and second
User identity information generates amended demand information, and sends amended demand information to server.Server receives the
The amended demand information of one user terminal transmission simultaneously performs step S205.
S205, according to the second user identification information send the amended desired content to the second user
Terminal, and the step of perform S206 or return and perform S203.
Server parses second user identification information and amended desired content from amended demand information, so
Amended desired content is sent to the second user terminal corresponding with second user identification information afterwards.
If second user thinks that amended desired content is complete or amended after having checked amended desired content
Desired content is more reasonable etc., and second user can perform predetermined registration operation on the interface of project management system, for example clicks on true
Recognize reception button, second user terminal can detect that confirmation receives instruction, and receive instruction generation according to the confirmation and confirm
The feedback information of desired content is received, and the feedback information of confirmation reception desired content is sent to server.Service at this time
The confirmation for receiving the transmission of second user terminal is received the feedback information of desired content by device, and performs S206.
If second user thinks that amended desired content is still imperfect or amended desired content is still unreasonable
Etc., second user can again input and retract reason, and clicks on and retract demand button, and such second user terminal will basis
Retract reason regeneration and retract the feedback information of desired content, and send and retract the feedback information of desired content to server.This
When, server retracts the feedback information of desired content by receive the transmission of second user terminal, and returns and perform step S203.
If S206, receive the feedback information that the confirmation that the second user terminal is sent receives desired content, institute is obtained
Multiple subtasks of second user terminal transmission are stated, the plurality of subtask carries out the desired content for second user
The subtask formed is split, and each subtask includes corresponding subsystem identification.
When the confirmation that server receives the transmission of second user terminal receives the feedback information of desired content, the will be obtained
Multiple subtasks that two user terminals are sent, plurality of subtask to desired content split the son of formation for second user
Task, and each subtask includes corresponding subsystem identification.
Specifically, in one embodiment, server upon reception of the feedback information, will be split needed for the dialog box of subtask
Page framework data sending can so show in second user terminal to second user terminal and split subtask dialogue
Frame, splits desired content easy to second user.
In one embodiment, second user can be using whole desired content as a subtask, can also be by demand
Appearance splits into two or more subtasks, is not particularly limited herein.Desired content is being split into more height by second user
, it is necessary to configure corresponding subsystem identification for each subtask during task.Here subsystem can be project management system
A subsystem under system, such as sales subordinate system, service subsystem etc..Subsystem identification can be subsystem title, numbering
Deng.
Second user can click on the operations such as submitting button after completing desired content splitting into multiple subtasks
So that second user terminal sends multiple subtasks to server, wherein, which includes corresponding subsystem identification.
Behind multiple subtasks that server receives the transmission of second user terminal, step S207 will be performed.
Each the corresponding subsystem identification in the subtask obtains corresponding 3rd user identity information for S207, basis, and
The pre-set workload limit information of 3rd user is obtained according to the 3rd user identity information.
In one embodiment, the mapping table of subsystem identification and the 3rd user identity information is stored with server,
In the mapping table, each subsystem corresponds at least one 3rd user identity information, and server reads the correspondence
Table, and corresponding at least one 3rd user identity information is obtained according to the corresponding subsystem identification in subtask.Then server
The pre-set workload limit information of 3rd user is obtained according to the 3rd user identity information.Wherein, the 3rd user sets in advance
The workload limit information put can be the 3rd user according to its group or departmental staff's quantity, the current information such as workload
Come the maximum acceptable workload set.
Server is getting the 3rd user identity information and the pre-set workload limit letter of corresponding 3rd user
After breath, step S208 will be performed.
S208, the 3rd user identity information and corresponding workload limit information sent it is whole to the second user
End, in order to which the second user shares out the work according to the workload limit information of the 3rd user for each subtask
Measure to generate workload information.
Server sends the 3rd user identity information and corresponding workload limit information to the second user terminal.
The pre-set workload limit information that so second user may be referred to the 3rd user is each subtask Amount of work.
It should be noted that in other embodiments, second user terminal obtains the corresponding work of the 3rd user identity information
The mode of work amount limit information is not limited to the mode of above-mentioned steps S207 and S208, can also be other modes, such as, second
User terminal is previously stored with the corresponding workload limit information of the 3rd user identity information, or is stored in other application system
Have a corresponding workload limit information of the 3rd user identity information, second user by searching for second user terminal or other should
The corresponding workload limit information of the 3rd user identity information is obtained with system.
In addition, in one embodiment, server is also needed workload page framework data and waiting page framework data
The workload page and the waiting page, second user can be shown by sending to second user terminal, such second user terminal
Workload setting can be carried out to each subtask and waiting is handled.
S209, the corresponding task amount configuration information in each subtask for obtaining that the second user terminal sends, its
Described in task amount configuration information include waiting information and workload information;
After second user sets waiting information and workload information for each subtask, second user terminal is according to every
The corresponding task amount configuration information in waiting information and workload information generation subtask of a subtask, and by each subtask pair
The task amount configuration information answered is sent to server.In this way, server can receive each of second user terminal transmission
The corresponding task amount configuration information in subtask.
It can separate and obtain it should be noted that server obtains the waiting information of each subtask and workload information,
For example waiting information in the corresponding task amount configuration information in each subtask is first obtained, then to obtain each subtask corresponding
Workload information in task amount configuration information;Or first obtain work in the corresponding task amount configuration information in each subtask
Information is measured, then obtains the waiting information in the corresponding task amount configuration information in each subtask.Correspondingly, which can incite somebody to action
Workload page framework data, waiting page framework data are sent to second user terminal at twice.For example, first by workload page
Surface frame rack data is sent to second user terminal, then receives the corresponding task amount in each subtask that second user terminal is sent
Workload information in configuration information, then waiting page framework data sending to second user terminal, then reception second are used
Waiting information in the corresponding task amount configuration information in each subtask that family terminal is sent, etc., is not particularly limited herein.
S210, send the corresponding waiting information in multiple subtasks and each subtask to first user
Terminal.
After server gets the corresponding waiting information in each subtask, multiple subtasks and each subtask are corresponded to
Waiting information send to the first user terminal, so that the first user confirms waiting information.When the first user agrees to the
After waiting information of two users for the distribution of each subtask, the first user, which can click on, confirms the operation such as waiting button, so takes
Business device can receive the waiting confirmation message of the first user terminal feedback, and perform step S211.
If S211, the waiting confirmation message for getting the first user terminal feedback, according to the waiting confirmation message
The waiting state of corresponding subtask is updated, and generates the corresponding demand number in each subtask.
After the waiting confirmation message that server receives the first user terminal feedback, by the waiting state of subtask from treating
Waiting state is updated to waiting state, and generates a demand number for each subtask.The demand number can be development system
In the corresponding project number in the subtask, in other words, which is the corresponding project number in the subtask.So easy to exploitation
Personnel etc. search the relevant information of the subtask according to the demand number in development system and project management system.Server is every
After a subtask generation demand number, step S212 will be performed.
S212, according to the corresponding subsystem identification in each subtask, will each subtask and corresponding task
Measure configuration information and demand number is sent to corresponding 3rd user terminal, so that the 3rd user distributes multiple subtasks
To corresponding developer.
Server obtains corresponding 3rd user identity information according to each corresponding subsystem identification in the subtask, so
, will each subtask and corresponding task amount configuration information and demand number afterwards according to each 3rd user identity information
Send to corresponding 3rd user terminal.Multiple subtasks can be distributed to corresponding developer by such 3rd user,
So as to complete the process that whole project proposes to set up to project from demand.
Project management method in the present embodiment, can be to proposing to the whole process that project is set up to be monitored from demand
Record, avoids the relevant information of project from losing, and the business relationship of related personnel, improves project pipe during enhancing project is established
The effective percentage of reason, while the probability that project is set up also is improved, provide facility for user's Maintenance Significant Items.
The embodiment of the present application also provides a kind of project management device, which is used to perform any one of foregoing item
Mesh management method.Specifically, referring to Fig. 7, Fig. 7 is a kind of schematic frame of project management device provided by the embodiments of the present application
Figure.Project management device 300 can be installed in the server of project management.
As shown in fig. 7, project management device 300 is obtained including information acquisition unit 301, content sending unit 302, subtask
Take unit 303, configuration information acquiring unit 304, waiting information transmitting unit 305 and transmitting element 306.
(1) information acquisition unit 301;
Information acquisition unit 301, the demand information sent for obtaining the first user terminal, wherein the demand information bag
Include desired content and second user identification information.
In one embodiment, desired content include demand title, requirement description, it is expected on-line time, demand submitter and
The information such as the demand numbering that affiliated function, relevant documentation and system automatically generate.It should be noted that desired content can be only
The one or more combinations come out including above-mentioned display, can also include other contents for not displaying out, as long as in demand
Hold can description demand, the form of desired content is not limited herein.In addition, second user identification information can run after fame
The unique identifications such as word, job number, register account number go out the information of second user.
After the first user has filled in desired content and second user identification information and clicks on submitting button, the first user
Terminal will content and second user identification information generation demand information, and send demand information to project management and fill according to demand
Put 300.Information acquisition unit 301 can get the demand information of the first user terminal transmission.
(2) content sending unit 302;
Content sending unit 302, for being sent the desired content to second according to the second user identification information
User terminal.
Content sending unit 302 parses second user identification information and desired content from demand information, then need to
Content is asked to send to the second user terminal corresponding with second user identification information, so that second user is whole by second user
After holding registry entry management system, second user can view the desired content.
(3) subtask acquiring unit 303;
Subtask acquiring unit 303, if receiving desired content for receiving the confirmation that the second user terminal is sent
Feedback information, obtain multiple subtasks that the second user terminal is sent, the plurality of subtask is second user
To the desired content split the subtask of formation, and each subtask includes corresponding subsystem identification.
If second user thinks desired content is complete or desired content is more reasonable etc. after having checked desired content, second uses
Family can click on confirmation and receive button, and second user terminal can detect that confirmation receives instruction, and be received according to the confirmation
Instruction generation confirms to receive the feedback information of desired content, and the feedback information of confirmation reception desired content is sent to project
Managing device 300.Certainly, second user terminal can also will confirm that reception instruction is sent to project management as feedback information and fill
Put 300.
Subtask acquiring unit 303 receives the feedback information of desired content in the confirmation for receiving the transmission of second user terminal
Afterwards, multiple subtasks of second user terminal transmission will be obtained, plurality of subtask carries out desired content for second user
The subtask formed is split, and each subtask includes corresponding subsystem identification.
Specifically, in one embodiment, subtask acquiring unit 303 upon reception of the feedback information, will split subtask
Page framework data sending needed for dialog box so tears desired content open easy to second user to second user terminal
Point.
In one embodiment, second user can be using whole desired content as a subtask.Second user can also
Desired content is split into two or more subtasks, is not particularly limited herein.Second user is split by desired content
Into during multiple subtasks, it is necessary to configure corresponding subsystem identification for each subtask.Here subsystem can be item
A subsystem under mesh management system, such as sales subordinate system, service subsystem etc..Subsystem identification can be subsystem name
Claim, number etc..
Second user can click on the operations such as submitting button after completing desired content splitting into multiple subtasks
So that second user terminal sends multiple subtasks to subtask acquiring unit 303, wherein, which includes corresponding son
System banner.
(4) configuration information acquiring unit 304;
Configuration information acquiring unit 304, corresponds to for obtaining each subtask that the second user terminal is sent
Task amount configuration information, wherein the task amount configuration information includes waiting information.
In one embodiment, after subtask acquiring unit 303 gets multiple subtasks, configuration information acquiring unit
Waiting page framework data sending to second user terminal, such second user terminal can be shown the waiting page by 304,
Second user can carry out waiting processing to each subtask.
After second user sets waiting information for each subtask, the operation such as submitting button is clicked on, second user is whole
End generates the corresponding task amount configuration information in subtask according to the waiting information of each subtask, and each subtask is corresponding
Task amount configuration information is sent to project management device 300.In this way, configuration information acquiring unit 304 can receive it is each
The corresponding task amount configuration information in subtask.
In one embodiment, each subtask further includes corresponding fourth user identification information.Configuration information obtains
Unit 304 will send the corresponding subtask to fourth user terminal according to fourth user identification information in subtask.The
After four user terminals receive corresponding subtask, fourth user can confirm subtask.If configuration information obtains single
The confirmation that member 304 receives the transmission of fourth user terminal receives the feedback information of subtask, and configuration information acquiring unit 304 can be with
By waiting page framework data sending to fourth user terminal, such fourth user terminal can show the waiting page, the
Four users can carry out waiting processing to subtask.Fourth user terminal generates subtask according to the waiting information of subtask and corresponds to
Task amount configuration information, and the corresponding task amount configuration information in subtask is sent to project management device 300.In this way, match somebody with somebody
The corresponding task amount configuration information in subtask of fourth user terminal transmission can be received by putting information acquisition unit 304.
(5) waiting information transmitting unit 305;
Waiting information transmitting unit 305, for the corresponding waiting in multiple subtasks and each subtask to be believed
Breath is sent to first user terminal.
Configuration information acquiring unit 304, which sends the corresponding waiting information in multiple subtasks and each subtask to waiting, to be believed
Cease transmitting element 305, waiting information transmitting unit 305 by the corresponding waiting information in multiple subtasks and each subtask send to
First user terminal, so that the first user confirms waiting information.
(6) transmitting element 306;
Transmitting element 306, if the waiting confirmation message for getting the first user terminal feedback, according to each institute
The corresponding subsystem identification in subtask is stated, each subtask and corresponding task amount configuration information are sent to corresponding
Three user terminals, so that corresponding developer is distributed in multiple subtasks by the 3rd user.
After the first user agrees to the waiting information that second user is distributed for each subtask, the first user can click on really
Recognize the operation such as waiting button, such transmitting element 306 can receive the waiting confirmation message of the first user terminal feedback, and
Each subtask and corresponding task amount configuration information are sent to corresponding according to the corresponding subsystem identification in each subtask
3rd user terminal.
In one embodiment, referring to Fig. 8, Fig. 8 is another structural representation of project managing device in the embodiment of the present application
Figure.The transmitting element 306 specifically includes:
(61) subelement 3061 is obtained;
Subelement 3061 is obtained, is used for obtaining the corresponding 3rd according to each corresponding subsystem identification in the subtask
Family identification information;
In one embodiment, pair of subsystem identification and the 3rd user identity information is stored with project management device 300
Relation table is answered, in the mapping table, each subsystem corresponds at least one 3rd user identity information, obtains subelement
3061 read the mapping table, and obtain corresponding at least one 3rd user according to the corresponding subsystem identification in subtask and mark
Know information.Subelement 3061 is obtained to send corresponding 3rd user identity information in each subtask to transmission sub-unit 3062.
(62) transmission sub-unit 3062;
Transmission sub-unit 3062, will each subtask and right for according to each 3rd user identity information
The task amount configuration information answered is sent to corresponding 3rd user terminal.
Subtask and corresponding task configuration information are sent to the 3rd user identity information and corresponded to by transmission sub-unit 3062
The 3rd user terminal.Multiple subtasks can be distributed to corresponding developer by such 3rd user, so as to complete whole
The process that a project proposes to set up to project from demand.
In one embodiment, as shown in figure 8, the project management device 300 further includes:
(7) personal information acquiring unit 307;
Personal information acquiring unit 307, corresponds to for obtaining each subtask that the 3rd user terminal is sent
Personnel depaly information;
After 3rd user terminal receives subtask and corresponding task amount configuration information, the 3rd user will be obtained and appointed for son
The personnel depaly information of business distribution, and the corresponding personnel depaly information in subtask is sent to project management device 300.Personnel believe
Breath acquiring unit 307 will get personnel's configuration information.Here, personnel depaly information can include system belonging to developer
The information such as system, user name, developer affiliated function.
(8) subtask transmitting element 308.
Subtask transmitting element 308, for being sent each subtask to correspondence according to the personnel depaly information
Developer's terminal.
Personal information acquiring unit 307 will receive the corresponding personnel depaly information in each subtask and send to subtask hair
Send unit 308.Each subtask is sent to the corresponding developer's terminal of personnel depaly information by subtask transmitting element 308,
So developer can be directed to project and carry out development operation.
Project management device 300 in the present embodiment, can carry out the whole process for proposing to set up to project from demand
Monitoring record, avoids the relevant information of project from losing, and the business relationship of related personnel, improves item during enhancing project is established
The effective percentage of mesh management, while the probability that project is set up also is improved, provide facility for user's Maintenance Significant Items.
Referring to Fig. 9, Fig. 9 is another structure diagram of project managing device in the embodiment of the present application.The project management
Device 400 is used to perform any one of foregoing project management method.The project management device 400 can be installed on the clothes of project management
It is engaged in device.
Sent as shown in figure 9, project management device 400 includes information acquisition unit 401, content sending unit 402, reason
Unit 403, receiving unit 404, modification information transmitting element 405, subtask acquiring unit 406, mark acquiring unit 407, limit
Spend information acquisition unit 408, limit information transmitting element 409, configuration information acquiring unit 410, waiting information transmitting unit
411st, generation unit 412 and transmitting element 413 are updated.
(1) information acquisition unit 401;
Information acquisition unit 401, the demand information sent for obtaining the first user terminal, wherein the demand information bag
Include desired content and second user identification information.
In one embodiment, desired content include demand title, requirement description, it is expected on-line time, demand submitter and
The information such as the demand numbering that affiliated function, relevant documentation and system automatically generate.It should be noted that desired content can be only
The one or more combinations come out including above-mentioned display, can also include other contents for not displaying out, as long as in demand
Hold can description demand, the form of desired content is not limited herein.In addition, second user identification information can run after fame
The unique identifications such as word, job number, register account number go out the information of second user.
After the first user has filled in desired content and second user identification information and clicks on submitting button, the first user
Terminal will content and second user identification information generation demand information, and send demand information to project management and fill according to demand
Put 400.Information acquisition unit 401 can get the demand information of the first user terminal transmission.
(2) content sending unit 402;
Content sending unit 402, for being sent the desired content to second according to the second user identification information
User terminal.
Content sending unit 402 parses second user identification information and desired content from demand information, then need to
Content is asked to send to the second user terminal corresponding with second user identification information, so that second user is whole by second user
After holding registry entry management system, second user can view the desired content.
(3) reason transmitting element 403;
Reason transmitting element 403, if the feedback for retracting desired content sent for receiving the second user terminal
Information, the reason of retracting in the feedback information is sent to first user terminal, in order to which first user is to institute
Desired content is stated to modify.
If reason transmitting element 403 receives the feedback information for retracting desired content, illustrate that second user is thought in demand
Hold imperfection or unreasonable etc..This is retracted in the feedback information of desired content and retracts reason transmission by reason transmitting element 403
To the first user terminal, such first user can be perfect according to retracting reason desired content being carried out.
(4) receiving unit 404;
Receiving unit 404, the amended demand information sent for receiving first user terminal, wherein after modification
Demand information include amended desired content and the second user identification information.
After the first user has improved desired content, the first user terminal can be according to amended desired content and second
User identity information generates amended demand information, and sends amended demand information to project management device 400.Receive
Unit 404 will receive the amended demand information of the first user terminal transmission.Receiving unit 404 believes amended demand
Breath is sent to modification information transmitting element Unit 405.
(5) modification information transmitting element 405;
Modification information transmitting element 405, for according to the second user identification information by the amended demand
Hold and send to the second user terminal.
After modification information transmitting element 405 parses second user identification information and modification from amended demand information
Desired content, then amended desired content is sent to the second user terminal corresponding with second user identification information.
If second user thinks amended desired content is complete or amended desired content is more reasonable etc., second uses
Family can click on confirmation on the interface of project management system and receive button, and second user terminal can detect that confirmation receives
Instruction, and instruction generation is received according to the confirmation and confirms to receive the feedback information of desired content, and by the confirmation reception demand
The feedback information of appearance is sent to project management device 400.Subtask acquiring unit 406 will receive second user terminal hair at this time
The confirmation sent receives the feedback information of desired content, and subtask acquiring unit 406 will perform corresponding actions.
If second user thinks that amended desired content is still imperfect or amended desired content is still unreasonable
Etc., second user can again input and retract reason, and clicks on and retract demand button, and such second user terminal will basis
Retract reason regeneration and retract the feedback information of desired content, and send and retract feedback information to the project management of desired content and fill
Put 400.At this time, reason transmitting element 403 will receive the feedback information for retracting desired content of second user terminal transmission, former
Because transmitting element 403 will perform corresponding actions.
(6) subtask acquiring unit 406;
Subtask acquiring unit 406, if receiving desired content for receiving the confirmation that the second user terminal is sent
Feedback information, obtain multiple subtasks that the second user terminal is sent, the plurality of subtask is second user
To the desired content split the subtask of formation, and each subtask includes corresponding subsystem identification.
When subtask acquiring unit 406 receives the feedback information of the confirmation reception desired content of second user terminal transmission
When, multiple subtasks of second user terminal transmission will be obtained, plurality of subtask carries out desired content for second user
The subtask formed is split, and each subtask includes corresponding subsystem identification.
Specifically, in one embodiment, page framework of the subtask acquiring unit 406 needed for by fractionation subtask dialog box
Data sending can so show in second user terminal to second user terminal and split subtask dialog box, be easy to
Second user splits desired content.
In one embodiment, second user can be using whole desired content as a subtask, can also be by demand
Appearance splits into two or more subtasks, is not particularly limited herein.Desired content is being split into more height by second user
, it is necessary to configure corresponding subsystem identification for each subtask during task.Here subsystem can be project management system
A subsystem under system.Subsystem identification can be subsystem title, numbering etc..
Second user can click on the operations such as submitting button after completing desired content splitting into multiple subtasks
So that second user terminal sends multiple subtasks to project management device 400, wherein, which includes corresponding subsystem
System mark.Subtask acquiring unit 406 receive second user terminal transmission multiple subtasks after, by subtask send to
Mark acquiring unit 407.
(7) mark acquiring unit 407;
Mark acquiring unit 407, for obtaining the corresponding 3rd according to each corresponding subsystem identification in the subtask
User identity information.
In one embodiment, pair of subsystem identification and the 3rd user identity information is stored with project management device 400
Relation table is answered, in the mapping table, each subsystem corresponds at least one 3rd user identity information, mark acquiring unit
407 read the mapping table, and obtain corresponding at least one 3rd user according to the corresponding subsystem identification in subtask and mark
Know information.Corresponding 3rd user identity information in each subtask is sent to limit information and obtains list by mark acquiring unit 407
Member 408.
(8) limit information acquiring unit 408;
Limit information acquiring unit 408, it is advance for obtaining the 3rd user according to the 3rd user identity information
The workload limit information of setting.
Limit information acquiring unit 408 is pre- according to each subtask the 3rd user of corresponding 3rd user identity information acquisition
The workload limit information first set.Wherein, the pre-set workload limit information of the 3rd user can be the 3rd user's root
According to its group or departmental staff's quantity, current have the information such as workload the maximum acceptable workload that sets.
Limit information acquiring unit 408 will get corresponding 3rd user identity information in each subtask and corresponding
The pre-set workload limit information of three users is sent to limit information transmitting element 409.
(9) limit information transmitting element 409;
Limit information transmitting element 409, for by the 3rd user identity information and corresponding workload limit information
Send to the second user terminal, in order to which the second user according to the workload limit information of the 3rd user is every
A subtask Amount of work is to generate workload information.
Limit information transmitting element 409 sends the 3rd user identity information and corresponding workload limit information to described
Second user terminal.The pre-set workload limit information that so second user may be referred to the 3rd user is to appoint per height
Business Amount of work.
In one embodiment, limit information transmitting element 409 is also needed workload page framework data and the waiting page
Frame data, which is sent to second user terminal, such second user terminal, can show the workload page and the waiting page,
Second user workload setting can be carried out to each subtask and waiting is handled.
(10) configuration information acquiring unit 410;
Configuration information acquiring unit 410, corresponds to for obtaining each subtask that the second user terminal is sent
Task amount configuration information, wherein the task amount configuration information includes waiting information and workload information.
After second user sets waiting information and workload information for each subtask, second user terminal is according to every
The corresponding task amount configuration information in waiting information and workload information generation subtask of a subtask, and by each subtask pair
The task amount configuration information answered is sent to the configuration information acquiring unit 410 in project management device 400.
It should be noted that the limit information transmitting element 409 can be by workload page framework data, waiting page frame
Rack data is sent to second user terminal at twice, and correspondingly, configuration information acquiring unit 410 obtains the waiting of each subtask
Information and workload information, which can separate, to be obtained.For example, limit information transmitting element 409 first sends out workload page framework data
Send to second user terminal, each subtask that then the reception second user of configuration information acquiring unit 410 terminal is sent corresponds to
Task amount configuration information in workload information, limit information transmitting element 409 again by waiting page framework data sending extremely
Second user terminal, corresponding of each subtask that then the reception second user of configuration information acquiring unit 410 terminal is sent
Waiting information in business amount configuration information.
(11) waiting information transmitting unit 411;
Waiting information transmitting unit 411, for the corresponding waiting in multiple subtasks and each subtask to be believed
Breath is sent to first user terminal.
When waiting information transmitting unit 411 receives multiple subtasks of the transmission of configuration information acquiring unit 410 and each
During the corresponding waiting information in subtask, waiting information transmitting unit 411 is by the corresponding waiting in multiple subtasks and each subtask
Information is sent to the first user terminal, so that the first user confirms waiting information.
(12) generation unit 412 is updated;
Generation unit 412 is updated, if the waiting confirmation message for getting the first user terminal feedback, according to institute
The waiting state that waiting confirmation message updates corresponding subtask is stated, and generates the corresponding demand number in each subtask.
If renewal generation unit 412 receives the waiting confirmation message of the first user terminal feedback, illustrate that the first user is same
Anticipate the waiting information of each subtask, renewal generation unit 412 is by the waiting state of subtask from treating that waiting state is updated to
Waiting state, and a demand number is generated for each subtask, which can be that the subtask is corresponding in development system
Project number, in other words, the demand number are the corresponding project numbers in the subtask.
(13) transmitting element 413;
Transmitting element 413, for according to the corresponding subsystem identification in each subtask, will each subtask and
Corresponding task amount configuration information and demand number are sent to corresponding 3rd user terminal, so that the 3rd user will be multiple described
Distribute to corresponding developer in subtask.
Transmitting element 413 obtains corresponding 3rd user identifier according to the corresponding subsystem identification in each subtask to be believed
Breath, then according to each 3rd user identity information, will each subtask and corresponding task amount configuration information and
Demand number is sent to corresponding 3rd user terminal.Multiple subtasks can be distributed to corresponding exploitation by such 3rd user
Personnel, so as to complete the process that whole project proposes to set up to project from demand.
Project management device 400 in the present embodiment, can carry out the whole process for proposing to set up to project from demand
Monitoring record, avoids the relevant information of project from losing, and the business relationship of related personnel, improves item during enhancing project is established
The effective percentage of mesh management, while the probability that project is set up also is improved, provide facility for user's Maintenance Significant Items.
Above device can be implemented as a kind of form of computer program, and computer program can be in clothes as shown in Figure 10
Run on business device.
Referring to Fig. 10, Figure 10 is a kind of schematic block diagram of server provided by the embodiments of the present application.The server 500
Including the processor 520, memory and network interface 550 connected by system bus 510, wherein, memory can include non-
Volatile storage medium 530 and built-in storage 540.
The non-volatile memory medium 530 can storage program area 531 and computer program 532.The computer program 532
It is performed, may be such that processor 520 performs a kind of project management method.
The processor 520 is used to provide calculating and control ability, supports the operation of whole server 500.
Computer program can be stored in the built-in storage 540, when which is performed by processor 520, can be made
Obtain processor 520 and perform a kind of project management method.
The network interface 550 is used to carry out network service, such as sends the task dispatching of distribution.Those skilled in the art can manage
Solve, the structure shown in Figure 10, only with the block diagram of the relevant part-structure of application scheme, is not formed to the application side
The restriction for the server 500 that case is applied thereon, specific server 500 can include more more or fewer than shown in figure
Component, either combines some components or is arranged with different components.
Wherein, the processor 520 is used to run program code stored in memory, to implement function such as:Obtain
The demand information for taking the first user terminal to send, wherein the demand information includes desired content and second user identification information;
The desired content is sent to second user terminal according to the second user identification information;If receive the second user
The confirmation that terminal is sent receives the feedback information of desired content, obtains multiple subtasks that the second user terminal is sent, its
In multiple subtasks to the desired content split the subtask of formation, and each subtask for second user
Including corresponding subsystem identification;The corresponding task amount configuration in each subtask for obtaining that the second user terminal sends
Information, wherein the task amount configuration information includes waiting information;Multiple subtasks and each subtask are corresponded to
Waiting information send to first user terminal;If getting the waiting confirmation message of the first user terminal feedback,
According to the corresponding subsystem identification in each subtask, each subtask and corresponding task amount configuration information are sent
To corresponding 3rd user terminal, so that corresponding developer is distributed in multiple subtasks by the 3rd user.
In one embodiment, task amount configuration information further includes workload information, and processor 520 is performing the acquisition institute
Before the corresponding task amount configuration information in each subtask for stating the transmission of second user terminal, following program is also performed:Root
Corresponding 3rd user identity information is obtained according to the corresponding subsystem identification in each subtask, and according to the 3rd user
Identification information obtains the pre-set workload limit information of the 3rd user;By the 3rd user identity information and correspondence
Workload limit information send to the second user terminal, in order to which the second user is according to the work of the 3rd user
Work amount limit information is each subtask Amount of work to generate workload information.
In one embodiment, processor 520 is being performed according to each corresponding subsystem identification in the subtask, will be each
When the subtask and corresponding task amount configuration information are sent to corresponding three user terminal, following program is specifically performed:
Corresponding 3rd user identity information is obtained according to the corresponding subsystem identification in each subtask;According to each described 3rd
User identity information, each subtask and corresponding task amount configuration information are sent to corresponding 3rd user terminal.
In one embodiment, processor 520 is being performed according to each corresponding subsystem identification in the subtask, will be each
The subtask and corresponding task amount configuration information are sent to before corresponding 3rd user terminal, also perform following program:
The waiting state of corresponding subtask is updated according to the waiting confirmation message, and generates the corresponding demand in each subtask
Number;Processor 520 is being performed according to the corresponding subsystem identification in each subtask, will each subtask and corresponding
When task amount configuration information is sent to corresponding three user terminal, following program is specifically performed:Corresponded to according to each subtask
Subsystem identification, each subtask and corresponding task amount configuration information and demand number are sent to the corresponding 3rd and used
Family terminal.
In one embodiment, processor 520 sends out the desired content according to the second user identification information in execution
Send to second user terminal, also perform following program:If receive retracting in demand for the second user terminal transmission
The feedback information of appearance, the reason of retracting in the feedback information is sent to first user terminal, in order to described first
User modifies the desired content;The amended demand information that first user terminal is sent is received, wherein repairing
Demand information after changing includes amended desired content and the second user identification information;Identified according to the second user
Information sends the amended desired content to the second user terminal, and if return execution receive it is described second use
It is whole that if the step of confirmation that family terminal is sent receives the feedback information of desired content or return execution receive the second user
The step of retracting the feedback information of desired content of end transmission.
It should be appreciated that in the embodiment of the present application, processor 520 can be central processing unit (Central
ProcessingUnit, CPU), which can also be other general processors, digital signal processor
(DigitalSignalProcessor, DSP), application-specific integrated circuit (ApplicationSpecificIntegrated
Circuit, ASIC), ready-made programmable gate array (Field-ProgrammableGateArray, FPGA) or other can compile
Journey logical device, discrete gate or transistor logic, discrete hardware components etc..Wherein, general processor can be micro- place
It can also be any conventional processor etc. to manage device or the processor.
A kind of computer-readable recording medium is provided in another embodiment of the application, the computer-readable recording medium
Computer program is stored with, wherein computer program includes programmed instruction.The programmed instruction is realized when being executed by processor:Obtain
The demand information that first user terminal is sent, wherein the demand information includes desired content and second user identification information;Root
The desired content is sent to second user terminal according to the second user identification information;If it is whole to receive the second user
The confirmation that end is sent receives the feedback information of desired content, obtains multiple subtasks that the second user terminal is sent, wherein
Multiple subtasks to the desired content split the subtask of formation, and each subtask bag for second user
Include corresponding subsystem identification;The corresponding task amount in each subtask for obtaining that the second user terminal sends matches somebody with somebody confidence
Breath, wherein the task amount configuration information includes waiting information;Multiple subtasks and each subtask are corresponding
Waiting information is sent to first user terminal;If get the waiting confirmation message of the first user terminal feedback, root
According to the corresponding subsystem identification in each subtask, by each subtask and corresponding task amount configuration information send to
Corresponding 3rd user terminal, so that corresponding developer is distributed in multiple subtasks by the 3rd user.
In one embodiment, task amount configuration information further includes workload information;The programmed instruction is executed by processor institute
Before stating the corresponding task amount configuration information in obtain that the second user terminal sends each subtask, also perform as follows
Program:Corresponding 3rd user identity information is obtained according to the corresponding subsystem identification in each subtask, and according to described
3rd user identity information obtains the pre-set workload limit information of the 3rd user;3rd user identifier is believed
Breath and corresponding workload limit information are sent to the second user terminal, in order to which the second user is according to the described 3rd
The workload limit information of user is each subtask Amount of work to generate workload information.
In one embodiment, which is executed by processor according to each corresponding subsystem mark in the subtask
Know, it is specific to perform when each subtask and corresponding task amount configuration information are sent to corresponding three user terminal
Following program:Corresponding 3rd user identity information is obtained according to the corresponding subsystem identification in each subtask;According to every
A 3rd user identity information, each subtask and corresponding task amount configuration information are sent to the corresponding 3rd
User terminal.
In one embodiment, which is executed by processor according to each corresponding subsystem mark in the subtask
Know, each subtask and corresponding task amount configuration information are sent to before corresponding 3rd user terminal, also performed
Following program:The waiting state of corresponding subtask is updated according to the waiting confirmation message, and generates each subtask
Corresponding demand number;Processor 520 is being performed according to each corresponding subsystem identification in the subtask, and each son is appointed
When business and corresponding task amount configuration information are sent to corresponding three user terminal, following program is specifically performed:According to each
The corresponding subsystem identification in subtask, will each the subtask and corresponding task amount configuration information and demand number send to right
The 3rd user terminal answered.
In one embodiment, which is executed by processor the demand according to the second user identification information
Content is sent to second user terminal, also performs following program:If receive retracting for the second user terminal transmission
The feedback information of desired content, the reason of retracting in the feedback information is sent to first user terminal, in order to institute
The first user is stated to modify to the desired content;The amended demand information that first user terminal is sent is received,
Wherein amended demand information includes amended desired content and the second user identification information;Used according to described second
Family identification information sends the amended desired content to the second user terminal, and if return execution receive it is described
If the step of confirmation that second user terminal is sent receives the feedback information of desired content or return, which perform, receives described second
The step of retracting the feedback information of desired content of user terminal transmission.
The computer-readable recording medium can be USB flash disk, mobile hard disk, read-only storage (ROM, Read-Only
Memory), magnetic disc or CD etc. are various can be with the medium of store program codes.
It is apparent to those skilled in the art that for convenience of description and succinctly, the item of foregoing description
The specific work process of mesh managing device and unit, may be referred to the corresponding process in preceding method embodiment, no longer superfluous herein
State.Step in the embodiment of the present application method can be sequentially adjusted, merged and deleted according to actual needs.The application is implemented
Unit in example device can be combined, divided and deleted according to actual needs.
In addition, each functional unit in each embodiment of the application can be integrated in a processing unit, can also
It is that unit is individually physically present or two or more units integrate in a unit.It is above-mentioned integrated
Unit can both be realized in the form of hardware, can also be realized in the form of SFU software functional unit.The integrated unit is such as
Fruit realized in the form of SFU software functional unit and as independent production marketing or in use, a computer can be stored in can
Read in storage medium.Based on such understanding, the technical solution of the application substantially in other words contributes the prior art
Part, or all or part of the technical solution can embody in the form of software product, computer software production
Product are stored in a storage medium, including some instructions are used so that a computer equipment (can be personal computer, eventually
End, or network equipment etc.) perform each embodiment the method for the application all or part of step.
The above, is only the embodiment of the application, but the protection domain of the application is not limited thereto, any
Those familiar with the art can readily occur in various equivalent modifications or replace in the technical scope that the application discloses
Change, these modifications or substitutions should all cover within the protection domain of the application.Therefore, the protection domain of the application should be with right
It is required that protection domain subject to.
Claims (10)
- A kind of 1. project management method, it is characterised in that including:The demand information of the first user terminal transmission is obtained, wherein the demand information includes desired content and second user identifies Information;The desired content is sent to second user terminal according to the second user identification information;If receiving the feedback information that the confirmation that the second user terminal is sent receives desired content, the second user is obtained Multiple subtasks that terminal is sent, the plurality of subtask carry out the desired content for second user to split formation Subtask, and each subtask includes corresponding subsystem identification;The corresponding task amount configuration information in each subtask for obtaining that the second user terminal sends, wherein the task Amount configuration information includes waiting information;The corresponding waiting information in multiple subtasks and each subtask is sent to first user terminal;If getting the waiting confirmation message of first user terminal feedback, according to the corresponding subsystem in each subtask Mark, each subtask and corresponding task amount configuration information are sent to corresponding 3rd user terminal, so that the Corresponding developer is distributed in multiple subtasks by three users.
- 2. project management method according to claim 1, it is characterised in that the task amount configuration information further includes work Measure information;The corresponding task amount configuration information in each subtask for obtaining that the second user terminal sends it Before, further include:Corresponding 3rd user identity information is obtained according to the corresponding subsystem identification in each subtask, and according to described the Three user identity informations obtain the pre-set workload limit information of the 3rd user;3rd user identity information and corresponding workload limit information are sent to the second user terminal, in order to The second user is according to the workload limit information of the 3rd user is each subtask Amount of work to generate Workload information.
- 3. project management method according to claim 1, it is characterised in that each the subtask is corresponding for the basis Subsystem identification, each subtask and corresponding task amount configuration information are sent to corresponding 3rd user terminal, bag Include:Corresponding 3rd user identity information is obtained according to the corresponding subsystem identification in each subtask;According to each described 3rd user identity information, each subtask and corresponding task amount configuration information is sent whole to corresponding 3rd user End.
- 4. project management method according to claim 1, it is characterised in that each the subtask corresponds in the basis Subsystem identification, by each subtask and corresponding task amount configuration information send to corresponding 3rd user terminal it Before, further include:The waiting state of corresponding subtask is updated according to the waiting confirmation message, and generates each subtask Corresponding demand number;Each the corresponding subsystem identification in the subtask, each subtask of general and corresponding task amount configure the basis Information is sent to corresponding 3rd user terminal, including:According to the corresponding subsystem identification in each subtask, by each institute State subtask and corresponding task amount configuration information and demand number is sent to corresponding 3rd user terminal.
- 5. project management method according to claim 1, it is characterised in that believe in described identified according to the second user Breath sends the desired content to second user terminal, further includes:If receive what the second user terminal was sent The feedback information of desired content is retracted, the reason of retracting in the feedback information is sent to first user terminal, so as to Modify in first user to the desired content;Receive the amended demand letter that first user terminal is sent Breath, wherein amended demand information includes amended desired content and the second user identification information;According to described Two user identity informations send the amended desired content to the second user terminal, and if return execution receive If the step of confirmation that the second user terminal is sent receives the feedback information of desired content or return execution receive described The step of retracting the feedback information of desired content of second user terminal transmission.
- A kind of 6. project management device, it is characterised in that including:Information acquisition unit, the demand information sent for obtaining the first user terminal, wherein the demand information includes demand Content and second user identification information;Content sending unit, it is whole to second user for being sent the desired content according to the second user identification information End;Subtask acquiring unit, if receiving the feedback letter of desired content for receiving the confirmation that the second user terminal is sent Breath, obtains multiple subtasks that the second user terminal is sent, and the plurality of subtask is second user to the need Content is asked split the subtask of formation, and each subtask includes corresponding subsystem identification;Configuration information acquiring unit, for the corresponding task amount in each subtask for obtaining that the second user terminal sends Configuration information, wherein the task amount configuration information includes waiting information;Waiting information transmitting unit, for by the corresponding waiting information in multiple subtasks and each subtask send to First user terminal;Transmitting element, if the waiting confirmation message for getting the first user terminal feedback, appoints according to each son It is engaged in corresponding subsystem identification, each subtask and corresponding task amount configuration information is sent to corresponding 3rd user Terminal, so that corresponding developer is distributed in multiple subtasks by the 3rd user.
- 7. project management device according to claim 6, it is characterised in that the task amount configuration information further includes work Measure information;The project management device further includes:Mark acquiring unit, for obtaining corresponding 3rd user identifier according to each corresponding subsystem identification in the subtask Information;Limit information acquiring unit, for obtaining the pre-set work of the 3rd user according to the 3rd user identity information Work amount limit information;Limit information transmitting element, for sending the 3rd user identity information and corresponding workload limit information to institute Second user terminal is stated, in order to which the second user according to the workload limit information of the 3rd user is each son Task Amount of work is to generate workload information.
- 8. project management device according to claim 6, it is characterised in that the transmitting element includes:Subelement is obtained, for obtaining corresponding 3rd user identifier letter according to each corresponding subsystem identification in the subtask Breath;Transmission sub-unit, will each subtask and corresponding task for each 3rd user identity information of basis Amount configuration information is sent to corresponding 3rd user terminal.
- 9. a kind of server, including memory, processor and it is stored on the memory and can runs on the processor Computer program, it is characterised in that the processor is realized such as any one of claim 1 to 5 when performing described program Project management method.
- 10. a kind of computer-readable recording medium, it is characterised in that the computer-readable recording medium storage has computer journey Sequence, the computer program include programmed instruction, and described program instruction makes the processor perform such as when being executed by a processor Claim 1-5 any one of them project management methods.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711002592.0A CN107909334A (en) | 2017-10-24 | 2017-10-24 | A kind of project management method, device, server and computer-readable recording medium |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711002592.0A CN107909334A (en) | 2017-10-24 | 2017-10-24 | A kind of project management method, device, server and computer-readable recording medium |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107909334A true CN107909334A (en) | 2018-04-13 |
Family
ID=61840823
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711002592.0A Pending CN107909334A (en) | 2017-10-24 | 2017-10-24 | A kind of project management method, device, server and computer-readable recording medium |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107909334A (en) |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109146393A (en) * | 2018-06-09 | 2019-01-04 | 安行惠保(北京)科技发展有限公司 | People's wound surveys information processing method and system |
CN109711802A (en) * | 2018-12-14 | 2019-05-03 | 深圳壹账通智能科技有限公司 | Item information processing method, device, computer equipment and storage medium |
CN109726975A (en) * | 2018-06-01 | 2019-05-07 | 平安普惠企业管理有限公司 | Project development method, apparatus, equipment and readable storage medium storing program for executing based on workflow |
CN109801044A (en) * | 2019-03-07 | 2019-05-24 | 泰康保险集团股份有限公司 | It insures creation method, device and the storage medium of product |
CN109803003A (en) * | 2018-12-29 | 2019-05-24 | 华为技术有限公司 | A kind of control method, system and relevant device |
CN110298542A (en) * | 2019-05-23 | 2019-10-01 | 深圳壹账通智能科技有限公司 | Intelligent waiting method, apparatus, computer equipment and storage medium |
CN110310023A (en) * | 2019-06-18 | 2019-10-08 | 平安普惠企业管理有限公司 | A kind of project scheduling method, equipment, server and computer readable storage medium |
CN111078194A (en) * | 2019-12-20 | 2020-04-28 | 广州唯品会研究院有限公司 | Demand management method, demand management terminal, and storage medium |
WO2020124292A1 (en) * | 2018-12-16 | 2020-06-25 | 吉安市井冈山开发区金庐陵经济发展有限公司 | Method for preparing business plan |
CN112069134A (en) * | 2020-09-04 | 2020-12-11 | 中国平安人寿保险股份有限公司 | Requirement document processing method, device and medium |
CN114399230A (en) * | 2022-02-25 | 2022-04-26 | 深圳壹账通智能科技有限公司 | Task information processing method, device, equipment and storage medium |
CN114648283A (en) * | 2020-12-18 | 2022-06-21 | 深圳市采集科技有限公司 | Method and system for facilitating personalized management by cooperation of multiple parties |
US11436541B2 (en) * | 2017-02-02 | 2022-09-06 | Microsoft Technology Licensing, Llc | Macrotask execution for digital assistant devices |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7386797B1 (en) * | 2002-05-22 | 2008-06-10 | Oracle Corporation | Framework to model and execute business processes within a collaborative environment |
CN102054232A (en) * | 2010-12-30 | 2011-05-11 | 用友软件股份有限公司 | Method and device for project management |
CN104392310A (en) * | 2014-11-13 | 2015-03-04 | 深圳市玖昔物联科技发展有限公司 | Networked work coordinated management system |
-
2017
- 2017-10-24 CN CN201711002592.0A patent/CN107909334A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7386797B1 (en) * | 2002-05-22 | 2008-06-10 | Oracle Corporation | Framework to model and execute business processes within a collaborative environment |
CN102054232A (en) * | 2010-12-30 | 2011-05-11 | 用友软件股份有限公司 | Method and device for project management |
CN104392310A (en) * | 2014-11-13 | 2015-03-04 | 深圳市玖昔物联科技发展有限公司 | Networked work coordinated management system |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11436541B2 (en) * | 2017-02-02 | 2022-09-06 | Microsoft Technology Licensing, Llc | Macrotask execution for digital assistant devices |
CN109726975A (en) * | 2018-06-01 | 2019-05-07 | 平安普惠企业管理有限公司 | Project development method, apparatus, equipment and readable storage medium storing program for executing based on workflow |
CN109146393A (en) * | 2018-06-09 | 2019-01-04 | 安行惠保(北京)科技发展有限公司 | People's wound surveys information processing method and system |
CN109146393B (en) * | 2018-06-09 | 2024-02-02 | 安行惠保(北京)科技发展有限公司 | Human injury investigation information processing method and system |
CN109711802A (en) * | 2018-12-14 | 2019-05-03 | 深圳壹账通智能科技有限公司 | Item information processing method, device, computer equipment and storage medium |
WO2020124292A1 (en) * | 2018-12-16 | 2020-06-25 | 吉安市井冈山开发区金庐陵经济发展有限公司 | Method for preparing business plan |
CN109803003A (en) * | 2018-12-29 | 2019-05-24 | 华为技术有限公司 | A kind of control method, system and relevant device |
CN109801044A (en) * | 2019-03-07 | 2019-05-24 | 泰康保险集团股份有限公司 | It insures creation method, device and the storage medium of product |
CN110298542A (en) * | 2019-05-23 | 2019-10-01 | 深圳壹账通智能科技有限公司 | Intelligent waiting method, apparatus, computer equipment and storage medium |
CN110310023A (en) * | 2019-06-18 | 2019-10-08 | 平安普惠企业管理有限公司 | A kind of project scheduling method, equipment, server and computer readable storage medium |
CN111078194A (en) * | 2019-12-20 | 2020-04-28 | 广州唯品会研究院有限公司 | Demand management method, demand management terminal, and storage medium |
CN111078194B (en) * | 2019-12-20 | 2023-08-18 | 广州品唯软件有限公司 | Demand management method, demand management terminal, and storage medium |
CN112069134A (en) * | 2020-09-04 | 2020-12-11 | 中国平安人寿保险股份有限公司 | Requirement document processing method, device and medium |
CN112069134B (en) * | 2020-09-04 | 2024-09-24 | 中国平安人寿保险股份有限公司 | Method, device and medium for processing demand document |
CN114648283A (en) * | 2020-12-18 | 2022-06-21 | 深圳市采集科技有限公司 | Method and system for facilitating personalized management by cooperation of multiple parties |
CN114399230A (en) * | 2022-02-25 | 2022-04-26 | 深圳壹账通智能科技有限公司 | Task information processing method, device, equipment and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107909334A (en) | A kind of project management method, device, server and computer-readable recording medium | |
CN102193781B (en) | Integrated design application | |
CN112561386A (en) | Method, device and equipment for acquiring business process | |
CN109857667A (en) | Automatic interface testing method, test device, test equipment and storage medium | |
Puschmann et al. | Enterprise application integration systems and architecture–the case of the Robert Bosch Group | |
Barnett et al. | Application of QFD to the software development process | |
US20120116834A1 (en) | Hybrid task board and critical path method based project application | |
US7814030B2 (en) | Systems and methods for managing enterprise IT support planning | |
CN105989450A (en) | Automated, accelerated prototype generation system | |
KR100970851B1 (en) | System construction guide system | |
CN104572068A (en) | Catalog driven order management for rule definition | |
Abrantes et al. | Preparing project based organizations for change | |
Wanderley et al. | Generating goal-oriented models from creative requirements using model driven engineering | |
CN109491705B (en) | Delivery method and device | |
KR20160054281A (en) | Apparatus for designing processing modeling and method for designing processing modeling based on the binary bills of material structure | |
CN107679198A (en) | The querying method and device of information | |
US11030232B1 (en) | System and method for managing regulatory information | |
CN113988323A (en) | Cable intelligent management system | |
US20030135353A1 (en) | User-executable method for complex model data analysis and associated system, computer device, and computer software program product | |
CN112132597A (en) | Data processing method, device, equipment and storage medium | |
CN106355047B (en) | License management system and license management method | |
Ribeiro et al. | Improving productive processes using a process mining approach | |
CN114004553B (en) | System, server and client for generating plans in visual mode | |
Abdissa et al. | Design and Development of Product Data Management (PDM) For Textile Company | |
CN113378521B (en) | Automatic filling method, device and storage medium for visit record based on working daily report |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180413 |