CN107906253A - Pipe installation method and system - Google Patents
Pipe installation method and system Download PDFInfo
- Publication number
- CN107906253A CN107906253A CN201711017598.5A CN201711017598A CN107906253A CN 107906253 A CN107906253 A CN 107906253A CN 201711017598 A CN201711017598 A CN 201711017598A CN 107906253 A CN107906253 A CN 107906253A
- Authority
- CN
- China
- Prior art keywords
- pipeline
- mathematical models
- adjustment
- pipe
- component
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/024—Laying or reclaiming pipes on land, e.g. above the ground
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/17—Mechanical parametric or variational design
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T17/00—Three dimensional [3D] modelling, e.g. data description of 3D objects
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2113/00—Details relating to the application field
- G06F2113/14—Pipes
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- Geometry (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Mechanical Engineering (AREA)
- Computational Mathematics (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- Computer Graphics (AREA)
- Software Systems (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention provides a kind of pipe installation method and system, pass through the sign of the mount message in the 3D mathematical models of pipeline, and the setting-out instrument for passing through erecting bed, 3D mathematical models after the corresponding mount message of the sign pipeline are adjusted, splice for later stage pipeline, and unknown in work progress carries out place mat, staff is eliminated when the individual character in face of 2D drawings judges by the expression directly perceived of 3D mathematical models, it is more easy to reach common understanding to optimal solution, make installation more accurate, also there are 3D mathematical models as reference during examination, it can realize during pipeline construction, material is made full use of, lifting construction precision and efficiency.
Description
Technical field
The present invention relates to a kind of pipe installation method and system.
Background technology
(referring to PVC pipeline) in present electromechanics work progress more, pipeline is mostly the on-site cutting after field lofting,
It is laborious that this is time consuming, inefficiency, and the use to material is not planned well, and material exposes in atmosphere, quality
It is easy to give a discount.In addition, the leftover pieces arbitrarily stacked, some is in order to be continuing with, it is necessary to stack for a long time, so not only accounting for
With space, quality of materials declines, and adds many security risks.
The content of the invention
It is an object of the invention to provide a kind of pipe installation method and system, can solve Pipe installing inefficiency
Problem.
To solve the above problems, the present invention provides a kind of pipe installation method, including:
Based on pipeline mounting construction drawing, the 3D mathematical models of pipeline are established by software;
The corresponding mount message of the pipeline is indicated on the 3D mathematical models;
By the setting-out instrument of erecting bed, the 3D mathematical models after the corresponding mount message of the sign pipeline are made
Adjustment;
The Pipe installing of erecting bed is completed based on the 3D mathematical models after the adjustment.
Further, in the above-mentioned methods, the corresponding mount message of the pipeline includes:The parameter of conduit assembly, connection
Technique and numbering.
Further, in the above-mentioned methods, indicated on the 3D mathematical models the corresponding mount message of the pipeline it
Afterwards, further include:
Export the work sheet of the parameter for indicating the corresponding conduit assembly of the pipeline, Joining Technology and numbering;
The cutting of PVC pipeline component in the conduit assembly is completed in processing factory according to the work sheet.
Further, in the above-mentioned methods, the pipeline peace of erecting bed is completed based on the 3D mathematical models after the adjustment
Dress, including:
The cutting of iron pipe component in the conduit assembly is completed according to the 3D mathematical models after the adjustment;
The PVC pipeline component and iron pipe component are combined by installation according to the 3D mathematical models after the adjustment.
Further, in the above-mentioned methods, the pipeline peace of erecting bed is completed based on the 3D mathematical models after the adjustment
After dress, further include:
Two dimensional pipeline construction drawing according to the 3D mathematical models generation after the adjustment.
Another side according to the present invention, there is provided a kind of pipeline installation system, including:
Model building module, for based on pipeline mounting construction drawing, establishing the 3D mathematical models of pipeline by software;
Module is indicated, for indicating the corresponding mount message of the pipeline on the 3D mathematical models;
Module is adjusted, for the setting-out instrument by erecting bed, after indicating the corresponding mount message of the pipeline
3D mathematical models adjust;
Module is installed, for completing the Pipe installing of erecting bed based on the 3D mathematical models after the adjustment.
Further, in said system, the corresponding mount message of the pipeline includes:The parameter of conduit assembly, connection
Technique and numbering.
Further, in said system, cutting module is further included, the corresponding pipeline group of the pipeline is indicated for exporting
The work sheet of the parameter of part, Joining Technology and numbering;According to the work sheet in processing factory completes the conduit assembly PVC
The cutting of conduit assembly.
Further, in said system, the installation module, for being completed according to the 3D mathematical models after the adjustment
The cutting of iron pipe component in the conduit assembly;According to the 3D mathematical models after the adjustment by the PVC pipeline component and iron
Tube assembly is combined installation.
Further, in said system, two-dimentional construction drawing generation module is further included, for according to the 3D after the adjustment
The two dimensional pipeline construction drawing of mathematical model generation.
Compared with prior art, the sign of the invention by the mount message in the 3D mathematical models of pipeline, and pass through peace
The setting-out instrument at scene is filled, the 3D mathematical models after the corresponding mount message of the sign pipeline are adjusted, are managed for the later stage
Road splices, and unknown in work progress carries out place mat, and eliminating staff by the expression directly perceived of 3D mathematical models works as
Individual character in face of 2D drawings judges, is more easy to reach common understanding to optimal solution, makes installation more accurate, and also there is 3D mathematical models work in when examination
For reference, it can realize during pipeline construction, material is made full use of, lifting construction precision and efficiency.
Brief description of the drawings
Fig. 1 is the flow chart of the pipe installation method of one embodiment of the invention.
Embodiment
In order to make the foregoing objectives, features and advantages of the present invention clearer and more comprehensible, it is below in conjunction with the accompanying drawings and specific real
Applying mode, the present invention is described in further detail.
As shown in Figure 1, the present invention provides a kind of pipe installation method, including:
Step S1, based on pipeline mounting construction drawing, the 3D mathematical models of pipeline are established by software;
Step S2, indicates the corresponding mount message of the pipeline on the 3D mathematical models;
Step S3, by the setting-out instrument of erecting bed, to the 3D numerals after the corresponding mount message of the sign pipeline
Model adjusts;
Step S4, the Pipe installing of erecting bed is completed based on the 3D mathematical models after the adjustment.
Here, sign of the present invention by the mount message in the 3D mathematical models of pipeline, and putting by erecting bed
Sampling instrument, adjusts the 3D mathematical models after the corresponding mount message of the sign pipeline, splices for later stage pipeline, and
Unknown in work progress carries out place mat, and staff is eliminated when in face of 2D drawings by the expression directly perceived of 3D mathematical models
Individual character judges, is more easy to reach common understanding to optimal solution, makes installation more accurate, and also there are 3D mathematical models in when examination as reference, can
Realize during pipeline construction, material is made full use of, lifting construction precision and efficiency.
In one embodiment of pipe installation method of the present invention, the corresponding mount message of the pipeline includes:Conduit assembly
Parameter, Joining Technology and numbering.
Here, by the mount message of the parameter of conduit assembly, Joining Technology and numbering, make pipeline, connector and company
Connect technique and have and accurately express, various components are numbered according to sequence of construction, it is possible to achieve the accurate installation of pipeline.
Realize that material cost reduces with time cost.High machining accuracy, pre-designed Joining Technology, to pipe fitting and connector
Numbering the utilization rate of material is reached maximum, greatly promote the efficiency of construction stage.
In one embodiment of pipe installation method of the present invention, step S2, the pipeline is indicated on the 3D mathematical models
After corresponding mount message, further include:
Export the work sheet of the parameter for indicating the corresponding conduit assembly of the pipeline, Joining Technology and numbering;
The cutting of PVC pipeline component in the conduit assembly is completed in processing factory according to the work sheet.
, can be with here, by indicating the parameter of the corresponding conduit assembly of the pipeline, Joining Technology and the work sheet of numbering
Ensure the accurate cutting of PVC pipeline component in the conduit assembly.With assembled architecture close to pipeline also using at assembled
Reason, after processing factory's preprocessing, is shipped in batches, ensures stock utilization highest.
In one embodiment of pipe installation method of the present invention, step S4, is completed based on the 3D mathematical models after the adjustment
The Pipe installing of erecting bed, including:
The cutting of iron pipe component in the conduit assembly is completed according to the 3D mathematical models after the adjustment;
The PVC pipeline component and iron pipe component are combined by installation according to the 3D mathematical models after the adjustment.
Here, pass through the 3D mathematical models after the adjustment, it is ensured that iron pipe component is accurate in the conduit assembly
Cutting, and the installation of the efficient combination of the PVC pipeline component and iron pipe component.
As shown in Figure 1, in one embodiment of pipe installation method of the present invention, step S4, based on the 3D numbers after the adjustment
After word model completes the Pipe installing of erecting bed, further include:
Step S5, according to the two dimensional pipeline construction drawing of the 3D mathematical models generation after the adjustment, during for onsite acceptance
Use.
The present invention also provides a kind of another pipeline installation system, including:
Model building module, for based on pipeline mounting construction drawing, establishing the 3D mathematical models of pipeline by software;
Module is indicated, for indicating the corresponding mount message of the pipeline on the 3D mathematical models;
Module is adjusted, for the setting-out instrument by erecting bed, after indicating the corresponding mount message of the pipeline
3D mathematical models adjust;
Module is installed, for completing the Pipe installing of erecting bed based on the 3D mathematical models after the adjustment.
Here, sign of the present invention by the mount message in the 3D mathematical models of pipeline, and putting by erecting bed
Sampling instrument, adjusts the 3D mathematical models after the corresponding mount message of the sign pipeline, splices for later stage pipeline, and
Unknown in work progress carries out place mat, and staff is eliminated when in face of 2D drawings by the expression directly perceived of 3D mathematical models
Individual character judges, is more easy to reach common understanding to optimal solution, makes installation more accurate, and also there are 3D mathematical models in when examination as reference, can
Realize during pipeline construction, material is made full use of, lifting construction precision and efficiency.
In one embodiment of pipeline installation system of the present invention, the corresponding mount message of the pipeline includes:Conduit assembly
Parameter, Joining Technology and numbering.
Here, by the mount message of the parameter of conduit assembly, Joining Technology and numbering, make pipeline, connector and company
Connect technique and have and accurately express, various components are numbered according to sequence of construction, it is possible to achieve the accurate installation of pipeline.
Realize that material cost reduces with time cost.High machining accuracy, pre-designed Joining Technology, to pipe fitting and connector
Numbering the utilization rate of material is reached maximum, greatly promote the efficiency of construction stage.
In one embodiment of pipeline installation system of the present invention, cutting module is further included, the pipeline pair is indicated for exporting
The work sheet of the parameter of the conduit assembly answered, Joining Technology and numbering;The pipe is completed in processing factory according to the work sheet
The cutting of PVC pipeline component in road component.
, can be with here, by indicating the parameter of the corresponding conduit assembly of the pipeline, Joining Technology and the work sheet of numbering
Ensure the accurate cutting of PVC pipeline component in the conduit assembly.With assembled architecture close to pipeline also using at assembled
Reason, after processing factory's preprocessing, is shipped in batches, ensures stock utilization highest.
In one embodiment of pipeline installation system of the present invention, the installation module, for according to the 3D numbers after the adjustment
Word model completes the cutting of iron pipe component in the conduit assembly;According to the 3D mathematical models after the adjustment by the pvc pipe
Road component and iron pipe component are combined installation.
Here, pass through the 3D mathematical models after the adjustment, it is ensured that iron pipe component is accurate in the conduit assembly
Cutting, and the installation of the efficient combination of the PVC pipeline component and iron pipe component.
In one embodiment of pipeline installation system of the present invention, further include:
Two-dimentional construction drawing generation module, for the two dimensional pipeline construction according to the 3D mathematical models generation after the adjustment
Figure, for being used during onsite acceptance.
Each embodiment is described by the way of progressive in this specification, what each embodiment stressed be and other
The difference of embodiment, between each embodiment identical similar portion mutually referring to.
Obviously, those skilled in the art can carry out invention spirit of the various modification and variations without departing from the present invention
And scope.If in this way, these modifications and changes of the present invention belong to the claims in the present invention and its equivalent technologies scope it
Interior, then the present invention is also intended to including these modification and variations.
Claims (10)
- A kind of 1. pipe installation method, it is characterised in that including:Based on pipeline mounting construction drawing, the 3D mathematical models of pipeline are established by software;The corresponding mount message of the pipeline is indicated on the 3D mathematical models;By the setting-out instrument of erecting bed, tune is made to the 3D mathematical models after the corresponding mount message of the sign pipeline It is whole;The Pipe installing of erecting bed is completed based on the 3D mathematical models after the adjustment.
- 2. pipe installation method as claimed in claim 1, it is characterised in that the corresponding mount message of the pipeline includes:Pipe Parameter, Joining Technology and the numbering of road component.
- 3. pipe installation method as claimed in claim 2, it is characterised in that indicate the pipeline on the 3D mathematical models After corresponding mount message, further include:Export the work sheet of the parameter for indicating the corresponding conduit assembly of the pipeline, Joining Technology and numbering;The cutting of PVC pipeline component in the conduit assembly is completed in processing factory according to the work sheet.
- 4. pipe installation method as claimed in claim 3, it is characterised in that completed based on the 3D mathematical models after the adjustment The Pipe installing of erecting bed, including:The cutting of iron pipe component in the conduit assembly is completed according to the 3D mathematical models after the adjustment;The PVC pipeline component and iron pipe component are combined by installation according to the 3D mathematical models after the adjustment.
- 5. such as Claims 1-4 any one of them pipe installation method, it is characterised in that based on the 3D numbers after the adjustment After word model completes the Pipe installing of erecting bed, further include:Two dimensional pipeline construction drawing according to the 3D mathematical models generation after the adjustment.
- A kind of 6. pipeline installation system, it is characterised in that including:Model building module, for based on pipeline mounting construction drawing, establishing the 3D mathematical models of pipeline by software;Module is indicated, for indicating the corresponding mount message of the pipeline on the 3D mathematical models;Module is adjusted, for the setting-out instrument by erecting bed, to the 3D numbers after the corresponding mount message of the sign pipeline Word model adjusts;Module is installed, for completing the Pipe installing of erecting bed based on the 3D mathematical models after the adjustment.
- 7. pipeline installation system as claimed in claim 6, it is characterised in that the corresponding mount message of the pipeline includes:Pipe Parameter, Joining Technology and the numbering of road component.
- 8. pipeline installation system as claimed in claim 7, it is characterised in that further include cutting module, institute is indicated for exporting State the work sheet of the parameter of the corresponding conduit assembly of pipeline, Joining Technology and numbering;It is complete in processing factory according to the work sheet The cutting of PVC pipeline component into the conduit assembly.
- 9. pipeline installation system as claimed in claim 8, it is characterised in that the installation module, for according to the adjustment 3D mathematical models afterwards complete the cutting of iron pipe component in the conduit assembly;According to the 3D mathematical models after the adjustment by institute State PVC pipeline component and iron pipe component is combined installation.
- 10. such as claim 6 to 9 any one of them pipeline installation system, it is characterised in that further include two-dimentional construction drawing generation Module, for the two dimensional pipeline construction drawing according to the 3D mathematical models generation after the adjustment.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711017598.5A CN107906253A (en) | 2017-10-26 | 2017-10-26 | Pipe installation method and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711017598.5A CN107906253A (en) | 2017-10-26 | 2017-10-26 | Pipe installation method and system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107906253A true CN107906253A (en) | 2018-04-13 |
Family
ID=61841793
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711017598.5A Pending CN107906253A (en) | 2017-10-26 | 2017-10-26 | Pipe installation method and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107906253A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108674927A (en) * | 2018-05-22 | 2018-10-19 | 江苏赛麟汽车科技有限公司 | A kind of pipeline parts divide packing method |
CN108941990A (en) * | 2018-07-28 | 2018-12-07 | 上海二十冶建设有限公司 | A kind of cooling-bed hydraulic pipeline modular installation method |
CN109296048A (en) * | 2018-09-07 | 2019-02-01 | 中天建设集团有限公司 | A kind of water supply and sewerage pipeline virtual assembling, batch production processing construction method |
CN111457157A (en) * | 2020-04-20 | 2020-07-28 | 中国十七冶集团有限公司 | Production and installation method of outdoor multi-professional prefabricated pressure pipeline set |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103793553A (en) * | 2013-12-17 | 2014-05-14 | 西安航天动力试验技术研究所 | Pipeline arrangement method |
CN105046359A (en) * | 2015-07-19 | 2015-11-11 | 南宁市政工程集团有限公司 | BIM (Building Information Modelling) technology based municipal pipeline factory prefabrication and installation method |
CN106481880A (en) * | 2016-11-16 | 2017-03-08 | 中铁上海工程局集团有限公司 | One kind is based on BIM and aluminum alloy mould plate correct embedment water supply and drainage sleeve pipe and construction method |
-
2017
- 2017-10-26 CN CN201711017598.5A patent/CN107906253A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103793553A (en) * | 2013-12-17 | 2014-05-14 | 西安航天动力试验技术研究所 | Pipeline arrangement method |
CN105046359A (en) * | 2015-07-19 | 2015-11-11 | 南宁市政工程集团有限公司 | BIM (Building Information Modelling) technology based municipal pipeline factory prefabrication and installation method |
CN106481880A (en) * | 2016-11-16 | 2017-03-08 | 中铁上海工程局集团有限公司 | One kind is based on BIM and aluminum alloy mould plate correct embedment water supply and drainage sleeve pipe and construction method |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108674927A (en) * | 2018-05-22 | 2018-10-19 | 江苏赛麟汽车科技有限公司 | A kind of pipeline parts divide packing method |
CN108941990A (en) * | 2018-07-28 | 2018-12-07 | 上海二十冶建设有限公司 | A kind of cooling-bed hydraulic pipeline modular installation method |
CN109296048A (en) * | 2018-09-07 | 2019-02-01 | 中天建设集团有限公司 | A kind of water supply and sewerage pipeline virtual assembling, batch production processing construction method |
CN111457157A (en) * | 2020-04-20 | 2020-07-28 | 中国十七冶集团有限公司 | Production and installation method of outdoor multi-professional prefabricated pressure pipeline set |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107906253A (en) | Pipe installation method and system | |
CN111627099B (en) | Steel structure non-contact actual measurement real quantity method and system based on three-dimensional scanning technology | |
CN104499714A (en) | Mechanical and electrical installation engineering construction method based on BIM platform and measuring robot | |
CN105888248A (en) | Construction method of guiding informationization prefabricated member based on BIM (Building Information Modeling)) technology | |
CN102768026B (en) | The equipment of the full-scale quick detection of a kind of blade | |
CN110717212B (en) | BIM (building information modeling) model checking method | |
CN103336856A (en) | Virtual steel structure pre-assembly method based on visual model | |
US10614179B2 (en) | Method for automating full-scale templates for positioning audio/video components | |
CN102518204B (en) | Buddha ceremonial canopy and manufacturing method thereof | |
CN111797451B (en) | BIM-based overhead line model construction method | |
CN108563860A (en) | A kind of virtual pre-assembly method of steel construction | |
CN104778488A (en) | Steel-structure building positioning paster based on BIM | |
CN106840014A (en) | A kind of method for monitoring face along tunnel axial deformation | |
CN110414136B (en) | BIM-based bridge rapid modeling method and system | |
CN111432197A (en) | Construction monitoring method and system | |
CN105043347A (en) | Wall inclination measuring system and method | |
CN107103170A (en) | Support of pipelines design method based on BIM technology | |
CN111309945A (en) | Method and system for accurately classifying inspection pictures of unmanned aerial vehicle | |
CN111691691A (en) | Method for installing, measuring and positioning box body bending and twisting component and drum node | |
CN105382491A (en) | Machining, manufacturing and inspection method of arc-shaped steel pipe column | |
CN104217065B (en) | BIM technology-based drawing reviewing system and method | |
CN204189034U (en) | A kind of engine pedestal centralising device | |
CN110864625A (en) | Method and system for installing, positioning and detecting construction site equipment | |
CN109376989B (en) | BiM-based bid management method | |
CN112884896B (en) | BIM technology-based special-shaped ramp three-dimensional model rapid generation method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180413 |