CN107905547A - 一种对既有建筑联合加固结构以及施工方法 - Google Patents

一种对既有建筑联合加固结构以及施工方法 Download PDF

Info

Publication number
CN107905547A
CN107905547A CN201710968227.9A CN201710968227A CN107905547A CN 107905547 A CN107905547 A CN 107905547A CN 201710968227 A CN201710968227 A CN 201710968227A CN 107905547 A CN107905547 A CN 107905547A
Authority
CN
China
Prior art keywords
top plate
construction method
supporter
bottom plate
existing building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710968227.9A
Other languages
English (en)
Inventor
柳宪东
史海欧
刘鑫
王建
刘欣
肖峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Metro Design and Research Institute Co Ltd
Original Assignee
Guangzhou Metro Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Metro Design and Research Institute Co Ltd filed Critical Guangzhou Metro Design and Research Institute Co Ltd
Priority to CN201710968227.9A priority Critical patent/CN107905547A/zh
Publication of CN107905547A publication Critical patent/CN107905547A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

本发明提供了一种对既有建筑联合加固结构的施工方法,包括对既有结构中支撑体的外侧壁、侧墙的內侧壁进行凿毛处理形成凹凸面,铺设若干竖向钢筋;对底板的上表面以及顶板的下表面进行凿毛处理,铺设若干横向钢筋,竖向钢筋与横向钢筋连接,并固定在底板与顶板内的主钢筋上;对底梁与顶梁的外侧面进行凿毛处理;对中支撑体的外侧壁、侧墙的內侧壁、底板的上表面、顶板的下表面、底梁与顶梁的外侧面进行增厚浇筑,形成浇筑层;在所述顶板的上表面凿毛处理,铺设横向钢筋并进行增厚浇筑形成轨道交通结构基础。在轨道交通无法避让某些重要建构筑物的情况,通过对既有建构筑物的联合加固改造,使得轨道交通区间得以通过,同时不拆除既有建构筑物。

Description

一种对既有建筑联合加固结构以及施工方法
技术领域
本发明涉及市政工程领域,尤其涉及一种对既有建筑联合加固结构以及施工方法。
背景技术
轨道交通由于具有运量大、安全舒适、运输成本低等优点,成为目前缓解城市交通拥挤状况的有效途径。随着城市的发展,在轨道交通路由上不可避免地存在既有构筑物。但城市土地价格日益昂贵,而且某些建构筑物具有相对重要的作用,征拆十分困难。在轨道交通上跨既有构筑物的情况下,可酌情保留其一部分作为轨道交通轨道基础,此时需要对其进行一定的加固改造以满足轨道交通的要求。
当轨道交通路由无法避开既有构筑物时,处理方式一般为拆迁构筑物,或者拆除后和轨道交通结构同时复建。通常对既有建构筑物进行加固时,一般仅采用单种加固方式。征拆方案时间周期长,实施阻力大,且往往不具有可行性。选择原位结合复建方案,则时间周期也较长,在复建完成之前无法满足相关需求。既有建构筑物的单种加固方案可靠性和冗余度不足,无法满足轨道交通荷载大、振动大的特点。
发明内容
为解决上述技术问题,本发明的目的在于提供一种对既有建筑联合加固结构的施工方法,其中既有结构包括中支撑体、分别设置在中支撑体两端的顶梁和底梁、在四周组成包围结构的侧墙、底板和顶板,加固步骤如下:
S1:对既有结构中支撑体的外侧壁、侧墙的內侧壁进行凿毛处理形成凹凸面;
S2:在中支撑体的外侧壁、侧墙的內侧壁铺设若干竖向钢筋;
S3:对底板的上表面以及顶板的下表面进行凿毛处理;
S4:在底板的上表面以及顶板的下表面铺设若干横向钢筋,所述步骤S2中的竖向钢筋与横向钢筋连接,并固定在底板与顶板内的主钢筋上;
S5:对底梁与顶梁的外侧面进行凿毛处理;
S6:对中支撑体的外侧壁、侧墙的內侧壁、底板的上表面、顶板的下表面、底梁与顶梁的外侧面进行增厚浇筑,形成浇筑层;
S7:所述顶板的上表面凿毛处理,铺设横向钢筋并进行增厚浇筑形成轨道交通结构基础。
进一步的,所述中支撑体为中柱或中隔墙。
作为上述方案的改进,步骤S4中的竖向钢筋与主钢筋通过植筋或焊接固定。
进一步的,增厚浇筑层与被加固构件采用钢筋焊接或植筋植入搭接或植入抗剪栓钉的方式连接固定。
作为上述方案的改进,所述浇筑层外涂有粘结剂粘贴固定有钢板或碳纤维布。
进一步的,粘贴的钢板上打入锚栓固定。
作为上述方案的改进,浇筑层采用微膨胀混凝土,所述微膨胀混凝土掺有若干碳纤维和钢纤维。
实施本发明实施例,具有如下有益效果:
本发明对既有结构中支撑体、顶梁、底梁、侧墙、底板和顶板分别进行凿毛处理增加后续浇筑黏附力,在当中铺设相应规格的钢筋进行强化。可避免对轨道交通路由上既有建构筑物的拆迁,减小轨道交通建设实施难度,节约资金。既有结构承载力有显著提升,满足轨道交通荷载大、振动大的特点,保证轨道交通运营安全。
附图说明
图1是本发明实施例的结构示意图。
图2是本发明实施例的局部放大图。
附图标记说明:1、中支撑体;2、顶梁;3、底梁;4、侧墙;5、底板;6、顶板;7、浇筑层;8、凹凸面;9、轨道交通结构基础。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
如图1所示,本发明的一种对既有建筑联合加固结构的施工方法,其中既有结构包括中支撑体1、分别设置在中支撑体1两端的顶梁2和底梁3、在四周组成包围结构的侧墙4、底板5和顶板6,加固步骤如下:
S1:对既有结构中支撑体1的外侧壁、侧墙4的內侧壁进行凿毛处理形成凹凸面;
S2:在中支撑体1的外侧壁、侧墙4的內侧壁铺设若干竖向钢筋;
S3:对底板5的上表面以及顶板6的下表面进行凿毛处理;
S4:在底板5的上表面以及顶板的下表面6铺设若干横向钢筋,所述步骤S2中的竖向钢筋与横向钢筋连接,并固定在底板5与顶板6内的主钢筋上;
S5:对底梁4与顶梁3的外侧面进行凿毛处理;
S6:对中支撑体1的外侧壁、侧墙4的內侧壁、底板5的上表面、顶板6的下表面、底梁3与顶梁2的外侧面进行增厚浇筑,形成浇筑层7;
S7:所述顶板6的上表面凿毛处理,铺设横向钢筋并进行增厚浇筑形成轨道交通结构基础9。进一步的,增设的钢筋量通过计算得出。对既有结构中支撑体1、顶梁2、底梁3、侧墙4、底板5和顶板6分别进行凿毛处理增加后续浇筑黏附力,在当中铺设相应规格的钢筋进行强化。可避免对轨道交通路由上既有建构筑物的拆迁,减小轨道交通建设实施难度,节约资金。既有结构承载力有显著提升,满足轨道交通荷载大、振动大的特点,保证轨道交通运营安全。
优选的,所述中支撑体1为中柱或中隔墙。
优选的,步骤S4中的竖向钢筋与主钢筋通过植筋或焊接固定。
更优的,所述浇筑层7外涂有粘结剂粘贴固定有钢板或碳纤维布。
更优的,粘贴的钢板上打入锚栓固定。
优选的,浇筑层7采用微膨胀混凝土,所述微膨胀混凝土掺有若干碳纤维和钢纤维,进一步提高性能。
以上所述是本发明的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以做出若干改进和变形,这些改进和变形也视为本发明的保护范围。

Claims (6)

1.一种对既有建筑联合加固结构的施工方法,其中既有结构包括中支撑体、分别设置在中支撑体两端的顶梁和底梁、在四周组成包围结构的侧墙、底板和顶板,其特征在于,加固步骤如下:
S1:对既有结构的中支撑体的外侧壁、侧墙的內侧壁进行凿毛处理形成凹凸面;
S2:在中支撑体的外侧壁、侧墙的內侧壁铺设若干竖向钢筋;
S3:对底板的上表面以及顶板的下表面进行凿毛处理;
S4:在底板的上表面以及顶板的下表面铺设若干横向钢筋,所述步骤S2中的竖向钢筋与横向钢筋连接,并固定在底板与顶板内的主钢筋上;
S5:对底梁与顶梁的外侧面进行凿毛处理;
S6:对中支撑体的外侧壁、侧墙的內侧壁、底板的上表面、顶板的下表面、底梁与顶梁的外侧面进行增厚浇筑,形成浇筑层;
S7:所述顶板的上表面凿毛处理,铺设横向钢筋并进行增厚浇筑形成轨道交通结构基础。
2.根据权利要求1中所述的对既有建筑联合加固结构的施工方法,其特征在于,所述中支撑体为中柱或中隔墙。
3.根据权利要求1中所述的对既有建筑联合加固结构的施工方法,其特征在于,步骤S4中的竖向钢筋与主钢筋通过植筋或焊接固定。
4.根据权利要求1所述的对既有建筑联合加固结构的施工方法,其特征在于,所述浇筑层外涂有粘结剂粘贴固定有钢板或碳纤维布。
5.根据权利要求4所述的对既有建筑联合加固结构的施工方法,其特征在于,粘贴的钢板上打入锚栓固定。
6.根据权利要求1所述的对既有建筑联合加固结构的施工方法,其特征在于,浇筑层采用微膨胀混凝土,所述微膨胀混凝土掺有若干碳纤维和钢纤维。
CN201710968227.9A 2017-10-16 2017-10-16 一种对既有建筑联合加固结构以及施工方法 Pending CN107905547A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710968227.9A CN107905547A (zh) 2017-10-16 2017-10-16 一种对既有建筑联合加固结构以及施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710968227.9A CN107905547A (zh) 2017-10-16 2017-10-16 一种对既有建筑联合加固结构以及施工方法

Publications (1)

Publication Number Publication Date
CN107905547A true CN107905547A (zh) 2018-04-13

Family

ID=61841320

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710968227.9A Pending CN107905547A (zh) 2017-10-16 2017-10-16 一种对既有建筑联合加固结构以及施工方法

Country Status (1)

Country Link
CN (1) CN107905547A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110616719A (zh) * 2019-08-22 2019-12-27 中铁三局集团有限公司 一种上跨既有涵洞u型槽快速施工方法

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101581152A (zh) * 2009-06-05 2009-11-18 武汉大学 外套钢管混凝土扩大截面加固混凝土柱的方法
KR20100133637A (ko) * 2009-06-12 2010-12-22 (주) 에센엔지니어링 Pc 패널을 이용하는 건물 리모델링 시공 방법, 및 리모델링 건물
CN102108658A (zh) * 2009-12-29 2011-06-29 上海市城市建设设计研究院 将既有结构板改造为地铁道床基础的建造方法
CN102767142A (zh) * 2012-08-09 2012-11-07 四川川交路桥有限责任公司 用于加宽加固钢筋混凝土的一种植筋施工方法
CN102966245A (zh) * 2012-12-07 2013-03-13 清华大学 一种钢梁和既有钢筋混凝土柱的连接方法
CN105507170A (zh) * 2015-11-30 2016-04-20 中国神华能源股份有限公司 钢筋混凝土盖板涵的强化方法
CN205531421U (zh) * 2015-12-03 2016-08-31 山东科技大学 一种采用碳纤维加固钢筋混凝土梁的结构
CN106245928A (zh) * 2016-08-10 2016-12-21 山东东华水泥有限公司 一种混凝土料仓快速加固修复方法
CN107191006A (zh) * 2017-07-12 2017-09-22 中国人民解放军63926部队 一种导流槽耐火混凝土层拆除修复方法
CN107237510A (zh) * 2017-07-31 2017-10-10 大连市市政设计研究院有限责任公司 微小断面扩大法墩柱加固方法及加固结构
CN105804427B (zh) * 2016-03-25 2018-03-16 深圳瑞和建筑装饰股份有限公司 一种加固混凝土柱梁的加固施工方法

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101581152A (zh) * 2009-06-05 2009-11-18 武汉大学 外套钢管混凝土扩大截面加固混凝土柱的方法
KR20100133637A (ko) * 2009-06-12 2010-12-22 (주) 에센엔지니어링 Pc 패널을 이용하는 건물 리모델링 시공 방법, 및 리모델링 건물
CN102108658A (zh) * 2009-12-29 2011-06-29 上海市城市建设设计研究院 将既有结构板改造为地铁道床基础的建造方法
CN102767142A (zh) * 2012-08-09 2012-11-07 四川川交路桥有限责任公司 用于加宽加固钢筋混凝土的一种植筋施工方法
CN102966245A (zh) * 2012-12-07 2013-03-13 清华大学 一种钢梁和既有钢筋混凝土柱的连接方法
CN105507170A (zh) * 2015-11-30 2016-04-20 中国神华能源股份有限公司 钢筋混凝土盖板涵的强化方法
CN205531421U (zh) * 2015-12-03 2016-08-31 山东科技大学 一种采用碳纤维加固钢筋混凝土梁的结构
CN105804427B (zh) * 2016-03-25 2018-03-16 深圳瑞和建筑装饰股份有限公司 一种加固混凝土柱梁的加固施工方法
CN106245928A (zh) * 2016-08-10 2016-12-21 山东东华水泥有限公司 一种混凝土料仓快速加固修复方法
CN107191006A (zh) * 2017-07-12 2017-09-22 中国人民解放军63926部队 一种导流槽耐火混凝土层拆除修复方法
CN107237510A (zh) * 2017-07-31 2017-10-10 大连市市政设计研究院有限责任公司 微小断面扩大法墩柱加固方法及加固结构

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110616719A (zh) * 2019-08-22 2019-12-27 中铁三局集团有限公司 一种上跨既有涵洞u型槽快速施工方法
CN110616719B (zh) * 2019-08-22 2021-04-27 中铁三局集团有限公司 一种上跨既有涵洞u型槽快速施工方法

Similar Documents

Publication Publication Date Title
CN201400850Y (zh) 跨座式单轨交通系统大跨度钢轨道梁
CN106758856B (zh) 分块预制的先张法预应力波形钢腹板组合箱梁的施工方法
CN207331459U (zh) 一种正交异性钢板-混凝土组合桥面板
CN107938511A (zh) 一种正交异性钢板‑混凝土组合桥面板及其施工方法
CN102330408A (zh) 一种桥梁
CN207597256U (zh) 用于钢混组合连续梁负弯矩区的抗裂构造
CN110453584A (zh) 一种采用耐候波形钢腹板的钢-混凝土组合梁结构
CN103938549A (zh) 装配式波形钢斜腹板组合梁的施工方法
CN105064195B (zh) 预制拼装的鱼腹波形钢腹板体内预应力钢混组合简支梁桥及其施工方法
CN108468411A (zh) 竖向肋波纹腹板钢-混凝土组合连梁
CN108411773A (zh) 一种新旧桥梁柔性连接结构及其施工方法
CN207568231U (zh) 一种对既有建筑联合加固结构
CN107905547A (zh) 一种对既有建筑联合加固结构以及施工方法
CN202187278U (zh) 一种桥梁
CN106758857B (zh) 分块预制式二次预应力波形钢腹板组合梁的施工方法
CN110042770A (zh) 一种采用纵横体外预应力钢束拓宽原有桥梁的方法
CN202865729U (zh) 一种钢-混凝土组合整体式桥梁
CN205741871U (zh) 具有双肢波纹钢腹板的预应力钢筋混凝土箱梁
CN208219991U (zh) 竖向肋波纹腹板钢-混凝土组合连梁
CN207660193U (zh) 一种装配式钢结构建筑中应用的超长檐沟
CN108060797A (zh) 一种对既有建筑联合加固结构
CN109505237A (zh) 一种钢混组合桥梁伸缩缝处主梁纵向连接构造及施工方法
CN211446560U (zh) 一种预应力混凝土-钢组合梁
CN107916798A (zh) 适用于多层建筑套建高层建筑的建筑结构
CN210737255U (zh) 一种路基用箱型框架和钢筋混凝土箱型框路基

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 510000 No. 204 Huanshi West Road, Yuexiu District, Guangzhou City, Guangdong Province

Applicant after: GUANGZHOU METRO DESIGN & RESEARCH INSTITUTE Co.,Ltd.

Address before: 510000 No. 204 Huanshi West Road, Yuexiu District, Guangzhou City, Guangdong Province

Applicant before: GUANGZHOU METRO DESIGN & RESEARCH INSTITUTE Co.,Ltd.

SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180413