CN107905253A - A kind of piping lane segment mounting process - Google Patents

A kind of piping lane segment mounting process Download PDF

Info

Publication number
CN107905253A
CN107905253A CN201711103338.XA CN201711103338A CN107905253A CN 107905253 A CN107905253 A CN 107905253A CN 201711103338 A CN201711103338 A CN 201711103338A CN 107905253 A CN107905253 A CN 107905253A
Authority
CN
China
Prior art keywords
piping lane
lane segment
gantry crane
lifting
mounting process
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711103338.XA
Other languages
Chinese (zh)
Inventor
张广潭
邢立成
覃艳明
张晓刚
闫亮
方子辉
和锋
张勋榜
张胜伟
李彬
刘会平
张伟
苑喜斌
曹静蕾
刘沙沙
侯子旗
尹红旭
汪睿超
王向南
王婧雯
常立辉
刘兴华
马广杰
李海霞
赵岩
郑海洋
李�杰
赵臣
张志超
闫磊
才龙
李雨中
宋鹏飞
焦润安
刘晓轩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Excellent Heavy Industry Vehicle Technology Co Ltd
QINHUANGDAO UNITE HEAVY INDUSTRY TECHNOLOGY Co Ltd
Original Assignee
Beijing Excellent Heavy Industry Vehicle Technology Co Ltd
QINHUANGDAO UNITE HEAVY INDUSTRY TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Excellent Heavy Industry Vehicle Technology Co Ltd, QINHUANGDAO UNITE HEAVY INDUSTRY TECHNOLOGY Co Ltd filed Critical Beijing Excellent Heavy Industry Vehicle Technology Co Ltd
Priority to CN201711103338.XA priority Critical patent/CN107905253A/en
Publication of CN107905253A publication Critical patent/CN107905253A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells

Abstract

The invention discloses a kind of piping lane segment mounting process, utilize a set of piping lane segment lifting gantry crane, the piping lane segment that transport vehicle ships is hung down, it is then placed on the travelling bogie of lower section, piping lane segment is transported to below installation gantry crane by travelling bogie again, piping lane segment is sling with installation gantry crane, accurate adjustment contraposition is carried out and completes installation;The advantage of the invention is that:Construction method is simple, simplifies the process of piping lane segment, the flexibility of use environment is high, has a vast market prospect and good social benefit, economic benefit.

Description

A kind of piping lane segment mounting process
Technical field
The present invention relates to a kind of piping lane installation method, specifically a kind of piping lane segment mounting process, belongs to piping lane and applies Work method field.
Background technology
The open cut formula piping lane segment installation general data construction period is short, and piping lane segment weight is big, and lifting, mobile, contraposition is tired Difficulty, the bad guarantee of assembling precision, if the installation quality between piping lane segment, which goes wrong, can cause piping lane internal leak, and is managed Corridor is all to be embedded in below ground, and if there is quality problems, later maintenance difficulty is high, and is lost huge.
General open cut formula piping lane segment installation, with truck crane or crawler crane station on the outside of foundation pit on ground, by piping lane segment Sling, then docked with mounted piping lane segment, but ground place is all narrow on the outside of general piping lane foundation pit, does not stand The space of truck crane or crawler crane, and truck crane or crawler crane can not carry out the piping lane segment of lifting space multiple degrees of freedom essence Adjust, can not ensure aligning accuracy.
The content of the invention
To solve the above-mentioned problems, the present invention devises a kind of piping lane segment mounting process, and construction method is simple, simplifies The process of piping lane segment, the flexibility of use environment is high, has a vast market prospect and good social benefit, economic effect Benefit.
The technical scheme is that:
A kind of piping lane segment mounting process, Specific construction technique are as follows
Step 1:Piping lane segment is transported to lifting gantry crane cantilever;
Step 2:Piping lane segment is sling with lifting gantry crane, and is rotated by 90 °, it is then again that piping lane segment is traversing, it is placed on On the travelling bogie of the bottom of foundation ditch of excavation;
Step 3:Piping lane segment is transported below installation gantry crane with travelling bogie;
Step 4:Piping lane segment is sling with installation gantry crane, and carries out accurately adjustment and is carried out with mounted piping lane segment Docking, completes the whole installation process of a section piping lane segment.
Preferably, in the step 1, auxiliary stabilizing leg is equipped with the outside of lifting gantry crane cantilever, lifting gantry crane is outstanding Auxiliary stabilizing leg can support gantry crane cantilever when arm side is lifted by crane, and avoid tumbling.
Preferably, in the step 2, the hoisting overhead travelling crane for lifting gantry crane has rotating device, can sling piping lane segment After be rotated by 90 °.
Preferably, in the step 3, travelling bogie walks in excavation pit bottom surface, travels to and fro between lifting gantry crane and installation Between gantry crane.
Preferably, in the step 4, installation gantry crane can carry out the accurate adjustment of piping lane segment, its hoisting overhead travelling crane has Space three-freedom revolute function, with reference to the raising of gantry crane itself, large vehicle walking and overhead traveling crane three spatial translation freedom of walking Degree, can carry out space six degree of freedom to piping lane segment and accurately adjust.
Preferably, in the step, lifting gantry crane is in specific location, fixed, the lifting of responsible piping lane segment;Peace Gantry crane is filled in the assembled propulsion section by section of piping lane section assembling position.
The present invention utilizes a set of piping lane segment lifting gantry crane, and the piping lane segment that transport vehicle ships is hung down, is then placed Piping lane segment is transported to below installation gantry crane onto the travelling bogie of lower section, then by travelling bogie, will with installation gantry crane Piping lane segment is sling, and is carried out accurate adjustment contraposition and is completed installation, substantially increases the installation effectiveness of piping lane segment, saved and be constructed into This.
The advantage of the invention is that:Construction method is simple, simplifies the process of piping lane segment, the flexibility of use environment Height, has a vast market prospect and good social benefit, economic benefit.
The invention will be further described with reference to the accompanying drawings and examples.
Brief description of the drawings
Fig. 1 is overall schematic of the present invention;
Fig. 2 is present invention lifting gantry crane schematic diagram;
Fig. 3 is present invention installation gantry crane schematic diagram.
In figure:1st, gantry crane is lifted, 1-1, auxiliary stabilizing leg, 1-2, lifting gantry crane hoisting overhead travelling crane, 2, piping lane segment, 3rd, road surface haulage vehicle, 4, travelling bogie, 5, installation gantry crane, 5-1, installation gantry crane hoisting overhead travelling crane, 6, piping lane section has been installed Section, A, excavation pit.
Embodiment
The preferred embodiment of the present invention is illustrated below, it will be appreciated that preferred embodiment described herein is only used In the description and interpretation present invention, it is not intended to limit the present invention.
Embodiment 1
As shown in Figs. 1-3, a kind of piping lane segment mounting process, Specific construction technique are as follows:
Step 1:Piping lane segment 2 is transported to lifting 1 cantilever of gantry crane with road surface haulage vehicle 3;
Step 2:Piping lane segment 2 is sling with lifting gantry crane 1, and is rotated by 90 °, it is then again that piping lane segment 2 is traversing, place On the travelling bogie 4 for the foundation pit A bottoms excavated;
Step 3:5 lower section of installation gantry crane is transported into piping lane segment 2 with travelling bogie 4;
Step 4:With installation gantry crane 5 piping lane segment 2 is sling, and carry out accurately adjustment and with mounted piping lane segment 6 into Row docking, completes the whole installation process of a section piping lane segment.
Lifted in above-mentioned steps and auxiliary stabilizing leg 1-1 is equipped with the outside of 1 cantilever of gantry crane, lifting gantry crane 1 is in cantilever side Aid in stabilizing leg 1-1 to support gantry crane cantilever during lifting, avoid tumbling;The hoisting overhead travelling crane 1-2 of lifting gantry crane has Rotating device, is rotated by 90 ° after can piping lane segment 2 be sling;
Travelling bogie 4 walks in excavation pit A bottom surfaces in above-mentioned steps, travel to and fro between lifting gantry crane 1 and installation gantry crane 5 it Between;
Gantry crane 5 is installed in above-mentioned steps can carry out the accurate adjustment of piping lane segment 2, its hoisting overhead travelling crane 5-1 has space three certainly , can be to pipe with reference to the raising of gantry crane itself, large vehicle walking and overhead traveling crane three spatial translation frees degree of walking by degree revolute function Corridor segment 2 carries out space six degree of freedom and accurately adjusts.
In above-mentioned steps, lifting gantry crane 1 is in specific location, fixed, the lifting of responsible piping lane segment 2;Installation dragon Gantry crane 5 is in the assembled propulsion section by section of the assembled position in piping lane segment 2.
Finally it should be noted that:The foregoing is only a preferred embodiment of the present invention, is not intended to limit the invention, Although the present invention is described in detail with reference to the foregoing embodiments, for those skilled in the art, it still may be used To modify to the technical solution described in foregoing embodiments, or equivalent substitution is carried out to which part technical characteristic. Within the spirit and principles of the invention, any modification, equivalent replacement, improvement and so on, should be included in the present invention's Within protection domain.

Claims (7)

1. a kind of piping lane segment mounting process, it is characterised in that as follows with processing step:
Step 1:Piping lane segment is transported to lifting gantry crane cantilever;
Step 2:Piping lane segment is sling with lifting gantry crane, and is rotated by 90 °, it is then again that piping lane segment is traversing, it is placed on On the travelling bogie of the bottom of foundation ditch of excavation;
Step 3:Piping lane segment is transported below installation gantry crane with travelling bogie;
Step 4:Piping lane segment is sling with installation gantry crane, accurate adjust to mounted piping lane segment is carried out and carries out pair Connect, complete the whole installation process of a section piping lane segment.
A kind of 2. piping lane segment mounting process according to claim 1, it is characterised in that:The cantilever of the lifting gantry crane Outside is equipped with auxiliary stabilizing leg.
A kind of 3. piping lane segment mounting process according to claim 1, it is characterised in that:The lifting of the lifting gantry crane Overhead traveling crane has rotating device, rotates 90 after piping lane segment is sling.
A kind of 4. piping lane segment mounting process according to claim 1, it is characterised in that:In the step 3, transport is small Car walks in excavation pit bottom surface, travels to and fro between lifting gantry crane and installation gantry crane.
A kind of 5. piping lane segment mounting process according to claim 1, it is characterised in that:In the step 4, lifting day Car is turned round with space three-freedom, and three spatial translations are walked certainly with reference to the raising of gantry crane itself, large vehicle walking and overhead traveling crane By spending, space six degree of freedom is carried out to piping lane segment and is accurately adjusted.
A kind of 6. piping lane segment mounting process according to claim 1, it is characterised in that:In piping lane section assembling, institute It is fixed to state lifting gantry crane, is responsible for the lifting of piping lane segment.
A kind of 7. piping lane segment mounting process according to claim 1, it is characterised in that:The installation gantry crane is in piping lane Section assembling position is assembled section by section to be promoted.
CN201711103338.XA 2017-11-10 2017-11-10 A kind of piping lane segment mounting process Pending CN107905253A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711103338.XA CN107905253A (en) 2017-11-10 2017-11-10 A kind of piping lane segment mounting process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711103338.XA CN107905253A (en) 2017-11-10 2017-11-10 A kind of piping lane segment mounting process

Publications (1)

Publication Number Publication Date
CN107905253A true CN107905253A (en) 2018-04-13

Family

ID=61844597

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711103338.XA Pending CN107905253A (en) 2017-11-10 2017-11-10 A kind of piping lane segment mounting process

Country Status (1)

Country Link
CN (1) CN107905253A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108708397A (en) * 2018-08-08 2018-10-26 中铁四局集团第四工程有限公司 The paving frame method of underground pipe gallery standard knot
CN109183841A (en) * 2018-10-24 2019-01-11 中铁工程机械研究设计院有限公司 Prefabricated piping lane assembling and construction method based on U-shaped shield machine
CN109680713A (en) * 2018-12-26 2019-04-26 中国建筑土木建设有限公司 A kind of accurate adjustment frame corridor trolley
CN110282579A (en) * 2019-07-05 2019-09-27 中国建筑第八工程局有限公司 The Lift-on/Lift-off System and hanging method of prefabricated pipe trench in height-limited small space
CN113482049A (en) * 2021-07-21 2021-10-08 中交二公局第六工程有限公司 Construction method of pipeline branch port, pipeline branch port and pipe gallery system
CN113482047A (en) * 2021-07-21 2021-10-08 中交二公局第六工程有限公司 Pipe gallery installation method
CN114250777A (en) * 2021-12-10 2022-03-29 中交二公局第六工程有限公司 Double-span type feeding corridor system and double-span type feeding corridor method thereof
CN114892662A (en) * 2022-04-01 2022-08-12 中交第二航务工程局有限公司 Full-automatic hoisting method suitable for underground prefabricated structure

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205024717U (en) * 2015-09-20 2016-02-10 海南大学 Construction equipment of city utility tunnel immersed tube section
CN106284412A (en) * 2016-09-29 2017-01-04 陕西建筑产业投资集团有限公司 A kind of prefabricated pipe gallery and construction method
CN206052779U (en) * 2016-09-29 2017-03-29 陕西建筑产业投资集团有限公司 A kind of prefabricated pipe gallery splicing structure
CN106638687A (en) * 2016-11-16 2017-05-10 吉林省天祥建筑材料有限公司 Foundation-aid accurate and quick assembly technique for prefabricated assembly of comprehensive pipe rack

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205024717U (en) * 2015-09-20 2016-02-10 海南大学 Construction equipment of city utility tunnel immersed tube section
CN106284412A (en) * 2016-09-29 2017-01-04 陕西建筑产业投资集团有限公司 A kind of prefabricated pipe gallery and construction method
CN206052779U (en) * 2016-09-29 2017-03-29 陕西建筑产业投资集团有限公司 A kind of prefabricated pipe gallery splicing structure
CN106638687A (en) * 2016-11-16 2017-05-10 吉林省天祥建筑材料有限公司 Foundation-aid accurate and quick assembly technique for prefabricated assembly of comprehensive pipe rack

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108708397A (en) * 2018-08-08 2018-10-26 中铁四局集团第四工程有限公司 The paving frame method of underground pipe gallery standard knot
CN108708397B (en) * 2018-08-08 2020-09-25 中铁四局集团第四工程有限公司 Frame laying method for standard sections of underground pipe gallery
CN109183841A (en) * 2018-10-24 2019-01-11 中铁工程机械研究设计院有限公司 Prefabricated piping lane assembling and construction method based on U-shaped shield machine
CN109680713A (en) * 2018-12-26 2019-04-26 中国建筑土木建设有限公司 A kind of accurate adjustment frame corridor trolley
CN109680713B (en) * 2018-12-26 2023-12-26 中国建筑土木建设有限公司 Fine adjustment frame gallery trolley
CN110282579A (en) * 2019-07-05 2019-09-27 中国建筑第八工程局有限公司 The Lift-on/Lift-off System and hanging method of prefabricated pipe trench in height-limited small space
CN113482049A (en) * 2021-07-21 2021-10-08 中交二公局第六工程有限公司 Construction method of pipeline branch port, pipeline branch port and pipe gallery system
CN113482047A (en) * 2021-07-21 2021-10-08 中交二公局第六工程有限公司 Pipe gallery installation method
CN114250777A (en) * 2021-12-10 2022-03-29 中交二公局第六工程有限公司 Double-span type feeding corridor system and double-span type feeding corridor method thereof
CN114892662A (en) * 2022-04-01 2022-08-12 中交第二航务工程局有限公司 Full-automatic hoisting method suitable for underground prefabricated structure
CN114892662B (en) * 2022-04-01 2023-12-29 中交第二航务工程局有限公司 Full-automatic hoisting method suitable for underground prefabricated structure

Similar Documents

Publication Publication Date Title
CN107905253A (en) A kind of piping lane segment mounting process
CN205415601U (en) Tunnel lining multiposition detects with geological radar antenna machinery pushing arm bracket
US9746103B2 (en) Pipe laying machine and pipe laying method
CN205024717U (en) Construction equipment of city utility tunnel immersed tube section
CN102134043A (en) Crawler hydraulic support assembling machine
CN107867550A (en) A kind of automatic turning coil car
CN207684765U (en) A kind of piping lane segment lifting gantry crane
KR101659500B1 (en) bridge constructing machine and the method of constructing bridge
CN207434484U (en) A kind of automatic turning coil car
CN207793902U (en) Bridge rotating BEI-DOU position system based on PLC
CN203888767U (en) Retractable type hydraulic support leg of hydraulic pump
CN106192775A (en) One has self-centering function Bridge Rotation Construction Technique Rotary ball hinge
CN207684764U (en) A kind of piping lane segment contraposition installation gantry crane
CN206070391U (en) One kind has makes cardiac function Bridge Rotation Construction Technique Rotary ball hinge by oneself
CN108797642A (en) Prefabricated method piping lane installation vehicle and its install piping lane
CN110053936A (en) A kind of pipeline transporter and applied pipeline transportation method
CN204703908U (en) A kind of shield machine station-crossing device
CN103241691B (en) Long-span working-at-height rapid construction special cage
CN205171288U (en) Magnetism floats section of track and moves gantry crane
CN210359294U (en) Numerical control lathe that barrier propterty is good
CN108382540A (en) Barge disembarkation, launching method
CN204199157U (en) The assembled all-in-one of road construction
CN210238259U (en) Pipeline transportation device in pipe bridge
CN210119585U (en) Tunnel geological detector
CN107685751A (en) A kind of oil exploitation tracer transport carriage

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180413

RJ01 Rejection of invention patent application after publication