CN107905119A - A kind of bridge construction is with falling rack device and method - Google Patents
A kind of bridge construction is with falling rack device and method Download PDFInfo
- Publication number
- CN107905119A CN107905119A CN201711438509.4A CN201711438509A CN107905119A CN 107905119 A CN107905119 A CN 107905119A CN 201711438509 A CN201711438509 A CN 201711438509A CN 107905119 A CN107905119 A CN 107905119A
- Authority
- CN
- China
- Prior art keywords
- outer barrel
- filler
- barrel
- inner cylinder
- outlet pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 41
- 238000000034 method Methods 0.000 title claims abstract description 14
- 239000000945 filler Substances 0.000 claims abstract description 51
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 33
- 239000010865 sewage Substances 0.000 claims abstract description 19
- 238000011065 in-situ storage Methods 0.000 claims abstract description 7
- FAPWRFPIFSIZLT-UHFFFAOYSA-M Sodium chloride Chemical compound [Na+].[Cl-] FAPWRFPIFSIZLT-UHFFFAOYSA-M 0.000 claims description 42
- 239000013078 crystal Substances 0.000 claims description 21
- 239000011780 sodium chloride Substances 0.000 claims description 21
- 239000004576 sand Substances 0.000 claims description 19
- 238000002955 isolation Methods 0.000 claims description 17
- 238000001914 filtration Methods 0.000 claims description 11
- 229910001208 Crucible steel Inorganic materials 0.000 claims description 9
- 239000003351 stiffener Substances 0.000 claims description 9
- 230000000694 effects Effects 0.000 claims description 5
- 238000012856 packing Methods 0.000 claims description 5
- 239000000463 material Substances 0.000 claims description 3
- 239000007787 solid Substances 0.000 claims description 3
- 239000000203 mixture Substances 0.000 claims description 2
- 239000002351 wastewater Substances 0.000 claims 1
- 238000013461 design Methods 0.000 description 4
- 239000002245 particle Substances 0.000 description 4
- 238000012795 verification Methods 0.000 description 3
- 230000006835 compression Effects 0.000 description 2
- 238000007906 compression Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000001360 synchronised effect Effects 0.000 description 2
- 244000035744 Hura crepitans Species 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- -1 and thickness 24cm Substances 0.000 description 1
- 230000015271 coagulation Effects 0.000 description 1
- 238000005345 coagulation Methods 0.000 description 1
- 230000010485 coping Effects 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 238000004090 dissolution Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 239000011521 glass Substances 0.000 description 1
- 239000003292 glue Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000011148 porous material Substances 0.000 description 1
- 150000003839 salts Chemical class 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Filtration Of Liquid (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The present invention relates to a kind of bridge construction with falling rack device, including outer barrel, inner cylinder, filler, water inlet pipe, outlet pipe, PVC hose, high-pressure hydraulic pump, Sewage treatment case.It is a kind of with this fall rack device it is matched fall frame method, include the following steps:Step 1:Before bridge pouring construction, outer barrel is placed on supporter, stent is placed on inner cylinder top plate, then connects PVC hose on water inlet pipe, outlet pipe respectively;Step 2:After hardening is completed in cast-in-situ bridge construction, PVC hose is connected into high-pressure hydraulic pump and Sewage treatment case;Step 3:High-pressure hydraulic pump is opened, hydraulic pressure is entered into outer barrel;Step 4:With the dissolving and discharge of upper strata filler, filler can gradually reduce, and inner cylinder gradually reduces, and realize frame.The device and method solves the problems, such as that inconvenient in the prior art and balance is not easy, and has positive technical meaning.
Description
Technical field
The present invention relates to a kind of bridge construction with rack device and method is fallen, belong to construction equipment field.
Background technology
With flourishing for China's economy, bridge construction enters all-round developing stage, the construction method of science of bridge building
Also step must be closely followed.
At present in bridge construction, the rack device that falls of cast-in-situ box girder falsework uses flask device more, i.e., justifies in steel
Built-in back-up sand of cylindricality sand cylinder, provides bearing capacity, construction finishes, and opens the valve on sand cylinder by sand cylinder for wrapping for sand
Door, sand outflow pore, bearing capacity disappear, that is, complete frame.The device and method is primarily present following several shortcomings:(1)Sand
Cylinder position is normally near pier coping portion, and height is higher, and each dropping for sand cylinder is both needed to special messenger by specially setting up
Scaffold turn on the valve of sand cylinder one by one to realize, it is especially time-consuming and laborious for high pier.(2)Multiple stents of same bridge or
Dropping for multiple sand cylinders of same stent is difficult synchronous progress, and bridge and stent easily produce uneven stress, and it is hidden to there is safety
Suffer from.
Therefore, design it is a kind of easy to operate and easy to the bridge construction that synchronously drops with falling rack device and fall frame side accordingly
Method, is those skilled in the art's urgent problem to be solved.
The content of the invention
To solve the problems, such as inconvenient existing for prior art decline rack device and being difficult to synchronously drop, the present invention provides
A kind of new bridge construction is with falling rack device and fall frame method, using following technical proposals:
A kind of bridge construction is with falling rack device, it is characterised in that including:Outer barrel, inner cylinder, filler, water inlet pipe, outlet pipe, PVC are soft
Pipe, high-pressure hydraulic pump, Sewage treatment case;
Wherein, outer barrel includes outer barrel barrel and outer tube end plate, and filtration apparatus, the filtration apparatus bag are equipped with the outer barrel barrel
Include the isolation board with distribution hole in cylinder, be filled in the cast steel ball and water inlet pipe in space between isolation board and outer barrel barrel
Outer barrel barrel distribution hole corresponding with outlet pipe;
The filler is arranged in outer barrel, is divided into 2 layers, and lower floor's filler is sand, and upper strata filler is at least partially NaCl crystal
Solid packing;
Inner cylinder is arranged in outer barrel opening, above filler;
PVC hose connects high-pressure hydraulic pump and water inlet pipe, Sewage treatment case and outlet pipe respectively.
Preferably, the inner cylinder includes top plate, interior tube end plate, inner cylinder barrel, stiffener, fill concrete, wherein supporting
The ceiling edge of stent exceeds outer barrel barrel.
Or it is preferable, lower floor's packed height exceedes filtration apparatus, and particle diameter is 1.25mm ~ 2.5mm;The isolation board point
The diameter of cloth hole is less than lower floor's packing material size.
Or it is preferable, the upper strata filler is sand and NaCl crystal admixtures, the weight accounting of NaCl crystal for 40% ~
70%。
Or preferable, all NaCl crystal of upper strata filler.
It is a kind of to fall frame method with fall rack device using any of the above-described bridge construction, it is characterised in that to include the following steps:
Step 1:Before bridge pouring construction, the outer barrel is placed on supporter, fills filler as needed, inner cylinder is put into outer
Cylinder, stent is placed on inner cylinder top plate, then connects PVC hose on water inlet pipe, outlet pipe respectively;
Step 2:After hardening is completed in cast-in-situ bridge construction, water inlet pipe is connected into PVC hose connection high-pressure hydraulic pump, outlet pipe is connected
PVC hose connects Sewage treatment case;
Step 3:High-pressure hydraulic pump is opened, hydraulic pressure is entered into outer barrel, enters Sewage treatment case through outlet pipe;
Step 4:With the dissolving and discharge of upper strata filler, under the effect of the pressure, filler can gradually reduce, and inner cylinder gradually drops
It is low, realize frame.
The present invention has the following advantages that:
(1)Packing volume is set steadily to reduce by way of dissolving, discharging, so that stent steadily declines;
(2)Supplied water with high-pressure hydraulic pump by PVC hose into outer barrel, can not only avoid manually specially setting up foot hand in the prior art
Frame operate sandbox inconvenience, can also Multi-path synchronous carry out, it is ensured that stent integrally falls the steady of frame, makes bridge and support force equal
It is even.
Brief description of the drawings
Fig. 1 is the embodiment overall applicability schematic diagram that the present invention falls rack device;
Fig. 2 is the embodiment part-structure sectional elevation schematic diagram that the present invention falls rack device;
Fig. 3 is the embodiment part-structure schematic cross section that the present invention falls rack device;
Fig. 4 is close-up schematic view in Fig. 2;
Fig. 5 is close-up schematic view in Fig. 3.
Wherein:1-inner cylinder;2-outer barrel;3-filler;4-water inlet pipe;5-outlet pipe;6-PVC hose;7-high pressure
Water pump;8-Sewage treatment case;9-top plate;10-interior tube end plate;11-inner cylinder barrel;12-stiffener;13-filling coagulation
Soil;14-closed glass glue;15-outer barrel barrel;16-outer tube end plate;17-isolation board;18-cast steel ball;19-outer barrel cylinder
Wall distribution hole;20-isolation board distribution hole.
Embodiment
The present invention is further described with reference to the accompanying drawings and examples.
Embodiment 1:
As shown in Figures 1 to 5, a kind of bridge construction is with falling rack device, including:Outer barrel 2, inner cylinder 1, filler 3, water inlet pipe 4, water outlet
Pipe 5, PVC hose 6, high-pressure hydraulic pump 7, Sewage treatment case 8;
Wherein, outer barrel 2 includes outer barrel barrel 15 and outer tube end plate 16, and 15 lower part of outer barrel barrel is equipped with water inlet pipe 4, outlet pipe 5, mistake
Filter device;The filtration apparatus includes the isolation board 17 with distribution hole in the cylinder, is filled in isolation board 17 and outer barrel barrel
The cast steel ball 18 in space, outer barrel barrel distribution hole 19 corresponding with water inlet pipe 4 and outlet pipe 5 between 15;Wherein described cast steel ball
18 a diameter of 3mm, 19 a diameter of 2mm of outer barrel barrel distribution hole.
The filler 3 for playing carrying is arranged in outer barrel, is divided into 2 layers;Lower floor's filler is the sand that particle diameter is 1.25 ~ 2.5mm
Son, thickness 10cm;Upper strata filler is sand and NaCl crystal admixtures, weight ratio 6:4, thickness 24cm, NaCl crystal
For particulate;Lower floor's packed height exceedes filtration apparatus, a diameter of 1mm of 17 distribution hole of isolation board.Through actual verification, use
After filler in this embodiment, settling amount meets construction requirement after carrying, illustrates that filling intensity meets design requirement.
Inner cylinder 1 includes top plate 9, interior tube end plate 10, inner cylinder barrel 11, stiffener 12, fill concrete 13, wherein support branch
9 edge of top plate of frame exceeds outer barrel barrel 15.
It is described fall rack device be applied in the construction of 5 × 35m prefabricated case beam pier cap beam Bailey beams support cast-in-place, each construction
Stent falls frame cylinder using 4 groups;Every group falls frame cylinder and includes 1 outer barrel, 1 inner cylinder and 1 group of filler, stress 605.1kN;
2 height of outer barrel is 480mm;Outer barrel barrel 15 internal diameter 497mm, thick 25mm;The outer thickness of tube end plate 16 20mm.1 height of inner cylinder is
240mm, inner cylinder barrel 11, interior tube end plate 10, stiffener 12, top plate 9 thickness 20mm, interior tube end plate 10 and the inner side of outer barrel barrel 15
Formed and coordinated, 9 outside diameter of top plate is 604mm.
The high-pressure hydraulic pump 7 uses JPS-Q130 type gasoline jetting machines, flow 15L/min, operating pressure
25MPa。
With used bridge construction with fall rack device it is corresponding fall frame method include the following steps:
Step 1:Before bridge pouring construction, the outer barrel 2 is placed on supporter, filler 3 is filled as needed, inner cylinder 1 is put
Enter outer barrel 2, stent is placed on the top plate 9 of inner cylinder, then connect PVC hose 6 on water inlet pipe 4, outlet pipe 5 respectively;
Step 2:After hardening is completed in cast-in-situ bridge construction, water inlet pipe 4 is connected into PVC hose connection high-pressure hydraulic pump 7, by outlet pipe 5
Connected PVC hose 6 connects Sewage treatment case 8;
Step 3:High-pressure hydraulic pump 7 is opened, hydraulic pressure is entered into outer barrel 2, enters Sewage treatment case 8 through outlet pipe 5;
Step 4:With the dissolving and discharge of NaCl crystal, the hole of filler 3 becomes larger, and under the effect of the pressure, filler can be gradual
Compression, inner cylinder 1 gradually reduce, and realize frame.
Bent cap both sides cylinder when measure falls frame(1# and 3#)T curve appearing S, 1# cylinders and 3# cylinders sedimentation-when
Half interval contour is essentially identical, total settlement average out to 67.4mm, and satisfaction synchronously falls frame requirement.
Embodiment 2:
As shown in Figures 1 to 5, a kind of bridge construction is with falling rack device, including:Outer barrel 2, inner cylinder 1, filler 3, water inlet pipe 4, water outlet
Pipe 5, PVC hose 6, high-pressure hydraulic pump 7, Sewage treatment case 8;
Wherein, outer barrel 2 includes outer barrel barrel 15 and outer tube end plate 16, and 15 lower part of outer barrel barrel is equipped with water inlet pipe 4, outlet pipe 5, mistake
Filter device;The filtration apparatus includes the isolation board 17 with distribution hole in the cylinder, is filled in isolation board 17 and outer barrel barrel
The cast steel ball 18 in space, outer barrel barrel distribution hole 19 corresponding with water inlet pipe 4 and outlet pipe 5 between 15;Wherein described cast steel ball
18 a diameter of 3mm, 19 a diameter of 2mm of outer barrel barrel distribution hole.
The filler 3 for playing carrying is arranged in outer barrel, is divided into 2 layers;Lower floor's filler is the sand that particle diameter is 1.25 ~ 2.5mm
Son, thickness 10cm;Upper strata filler is sand and NaCl crystal admixtures, weight ratio 3:7, thickness 24cm, NaCl crystal
For particulate;Lower floor's packed height exceedes filtration apparatus, a diameter of 1mm of 17 distribution hole of isolation board.Through actual verification, use
After filler in this embodiment, settling amount meets construction requirement after carrying, illustrates that filling intensity meets design requirement.
Inner cylinder 1 includes top plate 9, interior tube end plate 10, inner cylinder barrel 11, stiffener 12, fill concrete 13, wherein support branch
9 edge of top plate of frame exceeds outer barrel barrel 15.
It is described fall rack device be applied in the construction of 5 × 35m prefabricated case beam pier cap beam Bailey beams support cast-in-place, each construction
Stent falls frame cylinder using 4 groups;Every group falls frame cylinder and includes 1 outer barrel, 1 inner cylinder and 1 group of filler, stress 605.1kN;
2 height of outer barrel is 480mm;Outer barrel barrel 15 internal diameter 497mm, thick 25mm;The outer thickness of tube end plate 16 20mm.1 height of inner cylinder is
240mm, inner cylinder barrel 11, interior tube end plate 10, stiffener 12, top plate 9 thickness 20mm, interior tube end plate 10 and the inner side of outer barrel barrel 15
Formed and coordinated, 9 outside diameter of top plate is 604mm.
The high-pressure hydraulic pump 7 uses JPS-Q130 type gasoline jetting machines, flow 15L/min, operating pressure
25MPa。
With used bridge construction with fall rack device it is corresponding fall frame method include the following steps:
Step 1:Before bridge pouring construction, the outer barrel 2 is placed on supporter, filler 3 is filled as needed, inner cylinder 1 is put
Enter outer barrel 2, stent is placed on the top plate 9 of inner cylinder, then connect PVC hose 6 on water inlet pipe 4, outlet pipe 5 respectively;
Step 2:After hardening is completed in cast-in-situ bridge construction, water inlet pipe 4 is connected into PVC hose connection high-pressure hydraulic pump 7, by outlet pipe 5
Connected PVC hose 6 connects Sewage treatment case 8;
Step 3:High-pressure hydraulic pump 7 is opened, hydraulic pressure is entered into outer barrel 2, enters Sewage treatment case 8 through outlet pipe 5;
Step 4:With the dissolving and discharge of NaCl crystal, the hole of filler 3 becomes larger, and under the effect of the pressure, filler can be gradual
Compression, inner cylinder 1 gradually reduce, and realize frame.
Bent cap both sides cylinder when measure falls frame(1# and 2#)T curve appearing S, 1# cylinders and 2# cylinders sedimentation-when
Half interval contour is essentially identical, total settlement average out to 121.1mm, and satisfaction synchronously falls frame requirement.
Embodiment 3:
As shown in Figures 1 to 5, a kind of bridge construction is with falling rack device, including:Outer barrel 2, inner cylinder 1, filler 3, water inlet pipe 4, water outlet
Pipe 5, PVC hose 6, high-pressure hydraulic pump 7, Sewage treatment case 8;
Wherein, outer barrel 2 includes outer barrel barrel 15 and outer tube end plate 16, and 15 lower part of outer barrel barrel is equipped with water inlet pipe 4, outlet pipe 5, mistake
Filter device;The filtration apparatus includes the isolation board 17 with distribution hole in the cylinder, is filled in isolation board 17 and outer barrel barrel
The cast steel ball 18 in space, outer barrel barrel distribution hole 19 corresponding with water inlet pipe 4 and outlet pipe 5 between 15;Wherein described cast steel ball
18 a diameter of 3mm, 19 a diameter of 2mm of outer barrel barrel distribution hole.
The filler 3 for playing carrying is arranged in outer barrel, is divided into 2 layers;Lower floor's filler is the sand that particle diameter is 1.25 ~ 2.5mm
Son, thickness 10cm;Upper strata filler is NaCl crystal, and thickness 24cm, NaCl crystal are particulate;Lower floor's packed height exceeded
Filter device, a diameter of 1mm of 17 distribution hole of isolation board.Through actual verification, after the filler in this embodiment, after carrying
Settling amount meets construction requirement, illustrates that filling intensity meets design requirement.
Inner cylinder 1 includes top plate 9, interior tube end plate 10, inner cylinder barrel 11, stiffener 12, fill concrete 13, wherein support branch
9 edge of top plate of frame exceeds outer barrel barrel 15.
It is described fall rack device be applied in the construction of 5 × 35m prefabricated case beam pier cap beam Bailey beams support cast-in-place, each construction
Stent falls frame cylinder using 4 groups;Every group falls frame cylinder and includes 1 outer barrel, 1 inner cylinder and 1 group of filler, stress 605.1kN;
2 height of outer barrel is 480mm;Outer barrel barrel 15 internal diameter 497mm, thick 25mm;The outer thickness of tube end plate 16 20mm.1 height of inner cylinder is
240mm, inner cylinder barrel 11, interior tube end plate 10, stiffener 12, top plate 9 thickness 20mm, interior tube end plate 10 and the inner side of outer barrel barrel 15
Formed and coordinated, 9 outside diameter of top plate is 604mm.
The high-pressure hydraulic pump 7 uses JPS-Q130 type gasoline jetting machines, flow 15L/min, operating pressure
25MPa。
With used bridge construction with fall rack device it is corresponding fall frame method include the following steps:
Step 1:Before bridge pouring construction, the outer barrel 2 is placed on supporter, filler 3 is filled as needed, inner cylinder 1 is put
Enter outer barrel 2, stent is placed on the top plate 9 of inner cylinder, then connect PVC hose 6 on water inlet pipe 4, outlet pipe 5 respectively;
Step 2:After hardening is completed in cast-in-situ bridge construction, water inlet pipe 4 is connected into PVC hose connection high-pressure hydraulic pump 7, by outlet pipe 5
Connected PVC hose 6 connects Sewage treatment case 8;
Step 3:High-pressure hydraulic pump 7 is opened, hydraulic pressure is entered into outer barrel 2, enters Sewage treatment case 8 through outlet pipe 5;
Step 4:With the dissolving and discharge of NaCl crystal, under the effect of the pressure, filler can gradually reduce, and inner cylinder 1 gradually drops
It is low, realize frame.
4 groups of t curve appearing Ss for falling frame cylinder are essentially identical after measured, total settlement average out to 239.0mm, meet same
Step falls frame requirement.
As NaCl crystal, in the case where there is container to carry out space restriction, the Incoercibility based on solid, resistance to pressure
Degree is very high;Qinghai lakeside has the highway being paved into salt, can be evidence.The first two embodiment of the present invention employs mixture
Form, be intended merely to from the aspect of the actual cost in engineering.Because it is the process based on NaCl dissolution of crystals steadily to fall frame,
Therefore, upper strata filler all employs the scheme of NaCl crystal, the scheme of NaCl crystal is used with part, on Developing Trend simultaneously
Without difference.
The foregoing description of the disclosed embodiments, enables professional and technical personnel in the field to realize or use the present invention.
A variety of modifications to embodiment will be apparent for those skilled in the art, as defined herein general
Principle can be realized in other embodiments without departing from the spirit or scope of the present invention, is not described in detail
The part presented with partial enlargement, is the prior art, herein without repeating.Therefore, the present invention is not intended to be limited to herein
These shown embodiments, and it is to fit to the most wide scope consistent with principles disclosed herein and feature.
Claims (6)
1. a kind of bridge construction is with falling rack device, it is characterised in that including:
Outer barrel(2), inner cylinder(1), filler(3), water inlet pipe(4), outlet pipe(5), PVC hose(6), high-pressure hydraulic pump(7), waste water return
Receive case(8);
Wherein, outer barrel(2)Including outer barrel barrel(15)With outer tube end plate(16), in the outer barrel barrel(15)Filled equipped with filtering
Put, the filtration apparatus includes the isolation board with distribution hole in cylinder(17), be filled in isolation board(17)With outer barrel barrel
(15)Between space cast steel ball(18)With water inlet pipe(4)And outlet pipe(5)Corresponding outer barrel barrel distribution hole(19);
The filler(3)It is arranged at outer barrel(2)It is interior, it is divided into 2 layers, lower floor's filler is sand, and upper strata filler is at least partially
The solid packing of NaCl crystal;
The inner cylinder(1)It is arranged at outer barrel(2)Opening is interior, filler(3)Top;
The PVC hose(6)High-pressure hydraulic pump is connected respectively(7)With water inlet pipe(4), Sewage treatment case(8)With outlet pipe(5).
2. it is according to claim 1 fall rack device, it is characterised in that the inner cylinder(1)Including top plate(9), interior tube end plate
(10), inner cylinder barrel(11), stiffener(12), fill concrete(13), the wherein top plate of supporting support(9)Edge exceeds outer barrel
Barrel(15).
3. it is according to claim 1 fall rack device, it is characterised in that lower floor's packed height exceedes filtration apparatus, grain
Footpath is 1.25mm ~ 2.5mm;The diameter of the isolation board distribution hole is less than lower floor's packing material size.
4. it is according to claim 1 fall rack device, it is characterised in that the upper strata filler blends for sand and NaCl crystal
Material, the weight accounting of NaCl crystal is 40% ~ 70%.
5. it is according to claim 1 fall rack device, it is characterised in that all NaCl crystal of upper strata filler.
6. it is a kind of using claim 1 to 5 described it is any fall rack device fall frame method it is characterised in that it includes following steps:
Step 1:Before bridge pouring construction, by the outer barrel(2)It is placed on supporter, fills filler as needed(3), by inner cylinder
(1)It is put into outer barrel(2), in the top plate of inner cylinder(9)Upper placement stent, then respectively in water inlet pipe(4), outlet pipe(5)Upper connection
PVC hose(6);
Step 2:After hardening is completed in cast-in-situ bridge construction, by water inlet pipe(4)Connected PVC hose(6)Connect high-pressure hydraulic pump(7), will
Outlet pipe(5)Connected PVC hose(6)Connect Sewage treatment case(8);
Step 3:Open high-pressure hydraulic pump(7), hydraulic pressure is entered into outer barrel(2), through outlet pipe(5)Into Sewage treatment case(8);
Step 4:With the dissolving and discharge of upper strata filler, under the effect of the pressure, filler(3)It can gradually reduce, inner cylinder(1)By
Gradually reduce, realize frame.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711438509.4A CN107905119B (en) | 2017-12-27 | 2017-12-27 | Bridge construction is with falling frame device and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711438509.4A CN107905119B (en) | 2017-12-27 | 2017-12-27 | Bridge construction is with falling frame device and method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107905119A true CN107905119A (en) | 2018-04-13 |
CN107905119B CN107905119B (en) | 2024-04-16 |
Family
ID=61871328
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711438509.4A Active CN107905119B (en) | 2017-12-27 | 2017-12-27 | Bridge construction is with falling frame device and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107905119B (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2510015A1 (en) * | 1974-03-12 | 1975-09-18 | Koss Kurt | PROCESS AND DEVICE FOR SECTIONAL PRODUCTION OF THE INDIVIDUAL FIELDS OF THE SUPERSTRUCTURE OF PILLAR BRIDGES OR SIMILAR STRUCTURAL STRUCTURES |
CN202718042U (en) * | 2012-08-14 | 2013-02-06 | 中交二公局第二工程有限公司 | Steel tube support cross slope adjusting and support-removing device in bridge construction |
CN106758846A (en) * | 2017-01-12 | 2017-05-31 | 江苏省交通技师学院 | Cast-in-place box beam bracket and construction method |
CN206784184U (en) * | 2017-05-12 | 2017-12-22 | 吉力此且 | Heavy template support system off-load stand apparatus |
CN208105051U (en) * | 2017-12-27 | 2018-11-16 | 烟台大学 | A kind of bridge construction is with falling rack device |
-
2017
- 2017-12-27 CN CN201711438509.4A patent/CN107905119B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2510015A1 (en) * | 1974-03-12 | 1975-09-18 | Koss Kurt | PROCESS AND DEVICE FOR SECTIONAL PRODUCTION OF THE INDIVIDUAL FIELDS OF THE SUPERSTRUCTURE OF PILLAR BRIDGES OR SIMILAR STRUCTURAL STRUCTURES |
GB1505145A (en) * | 1974-03-12 | 1978-03-30 | Koss K | Apparatus and method for building a concrete bridge superstructure |
CN202718042U (en) * | 2012-08-14 | 2013-02-06 | 中交二公局第二工程有限公司 | Steel tube support cross slope adjusting and support-removing device in bridge construction |
CN106758846A (en) * | 2017-01-12 | 2017-05-31 | 江苏省交通技师学院 | Cast-in-place box beam bracket and construction method |
CN206784184U (en) * | 2017-05-12 | 2017-12-22 | 吉力此且 | Heavy template support system off-load stand apparatus |
CN208105051U (en) * | 2017-12-27 | 2018-11-16 | 烟台大学 | A kind of bridge construction is with falling rack device |
Also Published As
Publication number | Publication date |
---|---|
CN107905119B (en) | 2024-04-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106284427B (en) | A kind of basement post-pouring zone temporary leaking water earth-retaining construction method | |
CN208105051U (en) | A kind of bridge construction is with falling rack device | |
CN103470046A (en) | Concrete pouring device and method for ultrahigh steel pipe concrete column by using conduit method | |
CN107035147A (en) | A kind of cone bucket concrete pouring construction method | |
CN102561372A (en) | Plugging method for downcomer for well-point dewatering of deep foundation pit | |
CN101775783B (en) | Construction method by using sandbox as temporary support for continuous beam | |
CN209468806U (en) | Reservoir and collection reutilization system | |
CN110185099A (en) | A kind of rural potable water water tank and its installation method being easily installed disassembly | |
CN109440865A (en) | Reservoir collects reutilization system and reservoir construction technology | |
CN209115120U (en) | A kind of lining of hidden digging structure two concrete vault anticreep sky device | |
CN107905119A (en) | A kind of bridge construction is with falling rack device and method | |
CN111172878B (en) | Intelligent preloading system for simulating construction load of arch bridge and construction method | |
CN214274671U (en) | Face and combine natural gas line protection buttress forever | |
CN206667070U (en) | A kind of suspension holdfast for being used for constructing tie beam in water | |
CN104846935B (en) | Head-tank treating seepage remodeling method | |
CN101446072A (en) | Construction method for pouring concrete within steel pipe of arch bridge | |
CN105568927B (en) | The construction method of water-bag type concrete works movement joint sealing swaging die | |
CN216749071U (en) | Geotechnical engineering landslide model test equipment | |
CN212025922U (en) | Intelligent pre-pressing system for arch bridge simulation construction load | |
CN201605533U (en) | Continuous beam temporary support | |
CN109024649A (en) | Bottom plate multilayer Large-size rebar installs system and construction method | |
CN206746108U (en) | A kind of build concrete mud separation equipment | |
CN108316757A (en) | Municipal and environment-friendly protection network | |
CN106029983A (en) | Pneumatic tire compactor with water ballast | |
CN208023696U (en) | A kind of novel double open type drain cover panel assembly |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |