CN107885802A - Inquiry into balance method, apparatus and equipment - Google Patents

Inquiry into balance method, apparatus and equipment Download PDF

Info

Publication number
CN107885802A
CN107885802A CN201711047857.9A CN201711047857A CN107885802A CN 107885802 A CN107885802 A CN 107885802A CN 201711047857 A CN201711047857 A CN 201711047857A CN 107885802 A CN107885802 A CN 107885802A
Authority
CN
China
Prior art keywords
data
remaining sum
accounts
assets
expenditure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711047857.9A
Other languages
Chinese (zh)
Inventor
许哲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Advanced New Technologies Co Ltd
Original Assignee
Alibaba Group Holding Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Alibaba Group Holding Ltd filed Critical Alibaba Group Holding Ltd
Priority to CN201711047857.9A priority Critical patent/CN107885802A/en
Publication of CN107885802A publication Critical patent/CN107885802A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/245Query processing
    • G06F16/2458Special types of queries, e.g. statistical queries, fuzzy queries or distributed queries
    • G06F16/2477Temporal data queries
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/245Query processing
    • G06F16/2453Query optimisation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes

Abstract

This specification embodiment, which provides a kind of inquiry into balance method, apparatus and equipment, this method, to be included:Receive for inquire about at least two desired assets are in the remaining sum of same scheduled date when, one query statement is built according to the asset identification of scheduled date and desired asset, realize that one query obtains at least two desired assets less than or equal to keep accounts data and the data of entering an item of expenditure in the accounts occurred in the scheduled date when remaining sum changes, according to keep accounts data and the data progress remaining sum calculating of entering an item of expenditure in the accounts of every desired asset, remaining sum of the every desired asset in the scheduled date is obtained.

Description

Inquiry into balance method, apparatus and equipment
Technical field
This specification is related to data processing field, more particularly to inquiry into balance method, apparatus and equipment.
Background technology
As the payment epoch march toward the financial epoch, the abundant financial product of category occurs.For example, user can pass through client End purchase fund, wealth bringing in treasured etc. are invested, and carrying out fund short-term loan at daily interest by client realizes financing etc., the investment of user and financing The final assets that can all form user.Remaining sum can be used to indicate that the amount of money or fund share of assets etc..Remaining sum possible application exists In plurality of application scenes, for example, receiving the inquiry request that user triggers generation, queried the balance according to inquiry request.And for example, it is remaining Volume carries out inquiry into balance etc. as the important factor for calculating income when needing to carry out income calculation.
Remaining sum, which can be recorded, when being related to remaining sum and changing changes record.Wherein, remaining sum, which changes record, can include assets The attributes such as mark, balance type, currency type, the data that keep accounts, data of entering an item of expenditure in the accounts and current balance.Every asset search can be directed at present A nearest remaining sum less than or equal to the scheduled date changes record, is obtained so as to be changed from remaining sum in record more than this assets Volume.It can just be updated because the remaining sum of every assets changes to be recorded in when surplus changes, the remaining sum transfer date of a different assets May be different, therefore need to generate query statement respectively for every assets and inquired about, search efficiency is low.
It is particularly important in consideration of it, providing a kind of scheme quickly to query the balance.
The content of the invention
To overcome problem present in correlation technique, present description provides inquiry into balance method, apparatus and equipment.
A kind of inquiry into balance method, methods described include:
Inquiry request is received, the inquiry request is used to inquire about remaining sum of at least two desired assets in the scheduled date, institute The scheduled date for stating at least two desired assets is identical;
One inquiry is built according to the asset identification of at least two desired assets in the scheduled date and inquiry request Sentence, for inquire about at least two desired assets less than or equal in the scheduled date occur remaining sum change when keep accounts data and Enter an item of expenditure in the accounts data;
According to keep accounts data and the data progress remaining sum calculating of entering an item of expenditure in the accounts of every desired asset, obtain every desired asset and referring to The remaining sum fixed the date.
In an optional implementation, the scheduled date is using day as minimum time unit, if an assets are same When remaining sum variation occurs in one day first, newly-built data and/or the data of entering an item of expenditure in the accounts of keeping accounts;If an assets within same day it is non-first When generation remaining sum changes, keep accounts data and/or the data of entering an item of expenditure in the accounts established are updated, so that an assets are at most wrapped within same day Containing keep accounts a data and/or a data of entering an item of expenditure in the accounts.
In an optional implementation, changing record based on remaining sum, structure concordance list, the concordance list include in advance Keep accounts data and four attributes of data of entering an item of expenditure in the accounts when asset identification, remaining sum transfer date, remaining sum variation, the remaining sum change record It is updated when remaining sum changes;
The asset identification according at least two desired assets in the scheduled date and inquiry request builds one Query statement, for inquiring about at least two desired assets less than or equal to the number that keeps accounts occurred in the scheduled date when remaining sum changes According to data of entering an item of expenditure in the accounts, including:
Asset identification based at least two desired assets in the inquiry request and less than or equal to scheduled date structure Build a query statement;
According to constructed query statement, one query goes out the remaining sum variation less than or equal to the scheduled date from concordance list Date and asset identification are data and the data of entering an item of expenditure in the accounts of being kept accounts corresponding to the asset identification of desired asset.
In an optional implementation, more than keep accounts data and the data progress of entering an item of expenditure in the accounts according to every desired asset Volume calculates, and obtains remaining sum of the every desired asset in the scheduled date, including:
According to the asset identification of every desired asset, keep accounts data and the data of entering an item of expenditure in the accounts that inquire about acquisition are grouped;
The summation of the summation for the data that kept accounts in every group of data and data of entering an item of expenditure in the accounts is sought into difference, obtains mesh corresponding to this group of data Mark remaining sum of the assets in the scheduled date.
In an optional implementation, methods described also includes:
If keep accounts data or data of entering an item of expenditure in the accounts are not present in desired asset within less than or equal to the scheduled date, by desired asset Zero is arranged in the remaining sum of scheduled date.
A kind of inquiry into balance device, described device include:
Request receiving module, for receiving inquiry request, the inquiry request is used for inquiry at least two desired assets and existed The remaining sum of scheduled date, the scheduled date of at least two desired assets are identical;
Data inquiry module, for the assets according at least two desired assets in the scheduled date and inquiry request Mark one query statement of structure, become for inquiring about at least two desired assets less than or equal to generation remaining sum in the scheduled date Keep accounts data and data of entering an item of expenditure in the accounts when dynamic;
Remaining sum obtains module, for keep accounts data and the data progress remaining sum calculating of entering an item of expenditure in the accounts according to every desired asset, obtains Obtain remaining sum of the every desired asset in the scheduled date.
In an optional implementation, the scheduled date also includes by minimum time unit, described device of day Data recordin module, it is used for:If remaining sum occurs first within same day for an assets when changing, newly-built keep accounts and/or goes out data Account data;If an assets are non-when remaining sum occurs first changing within same day, update keeping accounts of having established and data and/or enter an item of expenditure in the accounts Data a, so that assets contain up to keep accounts data and/or a data of entering an item of expenditure in the accounts within same day.
In an optional implementation, changing record based on remaining sum, structure concordance list, the concordance list include in advance Keep accounts data and four attributes of data of entering an item of expenditure in the accounts when asset identification, remaining sum transfer date, remaining sum variation, the remaining sum change record It is updated when remaining sum changes;
The data inquiry module is specifically used for:
Asset identification based at least two desired assets in the inquiry request and less than or equal to scheduled date structure Build a query statement;
According to constructed query statement, one query goes out the remaining sum variation less than or equal to the scheduled date from concordance list Date and asset identification are data and the data of entering an item of expenditure in the accounts of being kept accounts corresponding to the asset identification of desired asset.
In an optional implementation, the remaining sum obtains module and is specifically used for:
According to the asset identification of every desired asset, keep accounts data and the data of entering an item of expenditure in the accounts that inquire about acquisition are grouped;
The summation of the summation for the data that kept accounts in every group of data and data of entering an item of expenditure in the accounts is sought into difference, obtains mesh corresponding to this group of data Mark remaining sum of the assets in the scheduled date.
In an optional implementation, the remaining sum obtains module and is additionally operable to:
If keep accounts data or data of entering an item of expenditure in the accounts are not present in desired asset within less than or equal to the scheduled date, by desired asset Zero is arranged in the remaining sum of scheduled date.
A kind of computer equipment, including:
Processor;
For storing the memory of processor-executable instruction;
Wherein, the processor is configured as:
Inquiry request is received, the inquiry request is used to inquire about remaining sum of at least two desired assets in the scheduled date, institute The scheduled date for stating at least two desired assets is identical;
One inquiry is built according to the asset identification of at least two desired assets in the scheduled date and inquiry request Sentence, for inquire about at least two desired assets less than or equal in the scheduled date occur remaining sum change when keep accounts data and Enter an item of expenditure in the accounts data;
According to keep accounts data and the data progress remaining sum calculating of entering an item of expenditure in the accounts of every desired asset, obtain every desired asset and referring to The remaining sum fixed the date.
Periodicity remaining sum characterize assets specify the cycle at the last moment hold quantity.
The technical scheme that the embodiment of this specification provides can include the following benefits:
This specification embodiment receive for inquire about at least two desired assets are in the remaining sum of same scheduled date when, One query statement is built according to the asset identification of scheduled date and desired asset, realizes that one query obtains at least two mesh Mark assets provide less than or equal to keep accounts data and the data of entering an item of expenditure in the accounts occurred in the scheduled date when remaining sum changes according to every target Keep accounts data and the data progress remaining sum calculating of entering an item of expenditure in the accounts of production, obtain remaining sum of the every desired asset in the scheduled date.It can be seen that for At least two assets, only need to build a query statement realizes one query, is looked into without being built respectively for every desired asset Sentence is ask, avoids repeatedly inquiry from causing inquiry time-consuming accumulative, therefore improve search efficiency.
It should be appreciated that the general description and following detailed description of the above are only exemplary and explanatory, not This specification can be limited.
Brief description of the drawings
Accompanying drawing herein is merged in specification and forms the part of this specification, shows the reality for meeting this specification Apply example, and be used for together with specification the principle for explaining this specification.
Fig. 1 is a kind of flow chart of inquiry into balance method of this specification according to an exemplary embodiment.
Fig. 2 is the schematic diagram of another inquiry into balance method of this specification according to an exemplary embodiment.
Fig. 3 is a kind of hardware structure diagram of computer equipment where this specification inquiry into balance device.
Fig. 4 is a kind of block diagram of inquiry into balance device of this specification according to an exemplary embodiment.
Embodiment
Here exemplary embodiment will be illustrated in detail, its example is illustrated in the accompanying drawings.Following description is related to During accompanying drawing, unless otherwise indicated, the same numbers in different accompanying drawings represent same or analogous key element.Following exemplary embodiment Described in embodiment do not represent all embodiments consistent with this specification.On the contrary, they are only and such as institute The example of the consistent apparatus and method of some aspects be described in detail in attached claims, this specification.
It is only merely for the purpose of description specific embodiment in the term that this specification uses, and is not intended to be limiting this explanation Book." one kind " of used singulative, " described " and "the" are also intended to bag in this specification and in the appended claims Most forms are included, unless context clearly shows that other implications.It is also understood that term "and/or" used herein is Refer to and any or all may be combined comprising the associated list items purpose of one or more.
It will be appreciated that though various information may be described using term first, second, third, etc. in this specification, but These information should not necessarily be limited by these terms.These terms are only used for same type of information being distinguished from each other out.For example, do not taking off In the case of this specification scope, the first information can also be referred to as the second information, and similarly, the second information can also be claimed For the first information.Depending on linguistic context, word as used in this " if " can be construed to " ... when " or " when ... " or " in response to determining ".
As the payment epoch march toward the financial epoch, the abundant financial product of category occurs.For example, user can pass through client End purchase fund, wealth bringing in treasured etc. are invested, and carrying out fund short-term loan at daily interest by client realizes financing etc., the investment of user and financing The final assets that can all form user.Remaining sum can be used to indicate that the amount of money or fund share of assets etc..Remaining sum possible application exists In plurality of application scenes, for example, the inquiry request that user triggers generation is received, according to inquiry request queries asset in specified day The remaining sum of phase.And for example, remaining sum carries out inquiry into balance etc. as the important factor for calculating income when needing to carry out income calculation.
Wherein, return on assets is the value-added part of user's holding assets.Assets mainly have two kinds of increment forms:One kind is money The time cost form of production, such as user are stored in the current deposit of bank, according to deposit rate and hold number of days and are rised in value; Another kind is assets to marking fair value version, such as user's purchase stock fund, the market value of the stock of capital investment Go up, then corresponding fund asset, which can also rise in value, obtains income.
Income calculation is that the calculating of the value-added part of user's holding assets confirms process, with two kinds of return on assets shapes of rising in value Formula illustrates the definition of income calculation:For the current deposit interest of time cost appreciation type, income calculation can be combined Day whole remaining sum, interest rate (cost rate) and the process for depositing the phase the final interest value of the calculating such as (time span) factor;To marking fair value Change the mutual fund earnings of appreciation type, income calculation can combine fund share (end day remaining sum) and the ACCNAV that user holds Etc. the factor, the process of ultimate yield is calculated.The income of assets is the important measurement index of asset quality, is that user buys assets One of referring especially to.And end day remaining sum represents assets in amount of money in hand at the last moment of corresponding date or quantity, herein it is signified most A moment is related to assets category afterwards, and non-fully with consecutive days at the last moment (24 points) equity.In the work of time cost appreciation type 24 points of remaining sum of current deposit is corresponded in phase interest on deposit, then can be 24 points at the last moment;Become to mark fair value Change 15 points of the share that fund is corresponded in the mutual fund earnings of appreciation type, then can be 15 points at the last moment.
It can be seen that inquiry into balance can be carried out when needing to carry out income calculation.Query the balance can be applied in other should With in scene, do not repeat one by one herein.The financial product enriched with category occurs, it is not only possible to because different user is held not Cause the demand that remaining sum batch query be present with assets, it is also possible to cause remaining sum batch be present because same user holds multiple assets Measure the demand of inquiry.Therefore need to provide a kind of scheme of remaining sum batch query.
The a large amount of wastes that can exist to storage resource are recorded because the fixed cycle records remaining sum variation, therefore, only remaining Volume can just record remaining sum and change record when changing.Wherein, remaining sum change record can include asset identification, balance type, currency type, Keep accounts the attributes such as data, data of entering an item of expenditure in the accounts and current balance.
At present, an assets are inquired about in the remaining sum of scheduled date, the scheduled date can be inquired about with the presence or absence of remaining sum variation Record, if it does, obtaining remaining sum from remaining sum daily variation record, and the remaining sum of acquisition is defined as assets in the scheduled date Remaining sum;Change and record if there is no remaining sum, using the scheduled date as time reference line, backtracking remaining sum changes record, and remaining sum is become Dynamic record is arranged in chronological order, is obtained a newest remaining sum and is changed record, and then obtains assets more than the scheduled date Volume.
But when carrying out inquiry into balance at least two assets, only had a surplus because the remaining sum of every assets changes record Volume can just record (i.e. remaining sum change record not exists daily) when changing, the remaining sum transfer date of a different assets may not Together, therefore need to generate query statement respectively for every assets and inquired about, the time-consuming of service can be with the increasing of amount of assets Add and linearly increasing, search efficiency is low.
In consideration of it, this specification embodiment provides a kind of scheme of quick search remaining sum.This specification embodiment is receiving To for inquire about at least two desired assets in the remaining sum of same scheduled date, according to scheduled date and the money of desired asset Production mark one query statement of structure, realizes that one query obtains at least two desired assets within less than or equal to the scheduled date Keep accounts data and the data of entering an item of expenditure in the accounts when remaining sum changes occur, more than keep accounts data and the data progress of entering an item of expenditure in the accounts of every desired asset Volume calculates, and obtains remaining sum of the every desired asset in the scheduled date.It can be seen that at least two assets, it only need to build one and look into Ask sentence and realize one query, without building query statement respectively for every desired asset, avoid repeatedly inquiry from causing to inquire about It is time-consuming accumulative, therefore improve search efficiency.
As shown in figure 1, Fig. 1 is a kind of flow of inquiry into balance method of this specification according to an exemplary embodiment Figure, this method can be used in database, and this method can include step 102,104 and 106.
In a step 102, inquiry request is received, the inquiry request is used to inquire about at least two desired assets in specified day The remaining sum of phase, the scheduled date of at least two desired assets are identical.
At step 104, according to the asset identification of at least two desired assets in the scheduled date and inquiry request A query statement is built, for inquiring about at least two desired assets when less than or equal to remaining sum variation occurs in the scheduled date Keep accounts and data and enter an item of expenditure in the accounts data.
In step 106, according to keep accounts data and the data progress remaining sum calculating of entering an item of expenditure in the accounts of every desired asset, every is obtained Remaining sum of the desired asset in the scheduled date.
Wherein, in different application scenarios, the executive agent for sending inquiry request can be different, step 102 to step 106 executive agent can also be different.For example, need to inquire about desired asset in the scene of the remaining sum of scheduled date in user, User can send inquiry request by client to service end, and step 102 is performed to 106 by service end, and by Query Result It is back to client.And for example, in the scene for needing to calculate income, return on assets computing module can send to database and inquire about Request, step 102 is performed by database and is back to return on assets computing module to step 106, and by Query Result.
Inquiry request can be used for inquiring about remaining sum of at least two desired assets in the scheduled date.The application scenarios of this programme Can be the situation for the remaining sum for being related to more desired assets of inquiry, it is to be understood that during the remaining sum of one desired asset of inquiry This specification embodiment scheme can also be used.More desired assets can be the assets of same user or different use The assets at family.Asset identification and the scheduled date of desired asset can be carried in inquiry request.Asset identification is to be used for The mark of desired asset is identified, the asset identification of different assets is different, and different assets are distinguished using asset identification to realize.It is same Multiple assets are there may be under user account, can be in user's account in order to distinguish the different assets under same user account On the basis of number, with reference to different assets, the asset identification of different assets is generated, the asset identification can be assets account, assets Account etc..
On the scheduled date, the scheduled date is historical date.Scheduled date can using specify the cycle as minimum time unit, For example, the scheduled date can using the second, point, when, day, week, the specified cycle such as the moon or year is minimum time unit.For example, specify day When phase is using day as minimum time unit, the form of scheduled date can be the forms such as 00 day 00 month 00 year or 0000-00-00, If the scheduled date can be 20170501, then can with queries asset on May 1st, 2017 remaining sum.And for example, the scheduled date is with year For minimum time unit when, the scheduled date can be 2016, then can be with remaining sum of the queries asset in 2016.
Accordingly, the remaining sum of scheduled date can be all ending balances, for example, end second remaining sum, point whole remaining sum, Shi Zhongyu Volume, end day remaining sum, week whole remaining sum, end of the month remaining sum or annual balance etc..So-called all ending balances, represent that assets were specified in the cycle The amount of money or share at last moment.By taking end day remaining sum as an example, end day remaining sum represents the amount of money of assets last moment in one day Or share.
And in practical application, incremental data can be just recorded in remaining sum when remaining sum changes and changed in record.Incremental data The information such as data, data of entering an item of expenditure in the accounts, current balance that keep accounts can be included.Wherein, the data that keep accounts are to flow into the data of account, again can be with Referred to as flow into data.For example, it may be flowing into the amount of money, fund share etc. is flowed into.Data of entering an item of expenditure in the accounts are to flow out the data of account, again may be used To be referred to as flowing out data.For example, it may be the outflow amount of money, outflow fund share etc..
As a kind of recording mode, occur to generate a remaining sum variation record when remaining sum changes every time, work as the scheduled date Remaining sum when being all ending balances, can obtain and change record less than or equal to institute's surplus in the scheduled date, and then obtain At least two desired assets are less than or equal to keep accounts data and the data of entering an item of expenditure in the accounts occurred in the scheduled date when remaining sum changes.
In order to improve subsequent query efficiency, the incremental data in same period is recorded in same remaining sum and changed in record, Incremental data in different cycles is recorded in different bar remaining sums and changed in record.If more than an assets occur first within a cycle Volume changes, and the remaining sum in the newly-built cycle changes record;If an assets in same period it is non-first occur remaining sum change when, more The remaining sum in the new cycle changes record, so that an assets contain up to a remaining sum in same period and change record.Wherein, Often kept accounts because remaining sum changes caused by data or data of entering an item of expenditure in the accounts, thus will can keep accounts data or enter an item of expenditure in the accounts data and Remaining sum after renewal is recorded in remaining sum corresponding to the cycle and changed in record.Incremental data comprises at least keep accounts data and number of entering an item of expenditure in the accounts According to.
Scheduled date is illustrated by minimum time unit of day, remaining sum variation occurs within same day for assets When, incremental data is recorded in same remaining sum and changed in record;Assets are when different in a few days generation remaining sums change, by changing number Changed according to different bar remaining sums are recorded in record.If specifically, an assets occur first within same day remaining sum change when, newly It is built into account data and/or data of entering an item of expenditure in the accounts;If an assets during the non-remaining sum variation of generation first, update what is established within same day The data that keep accounts and/or data of entering an item of expenditure in the accounts, so that an assets contain up to one within same day keeps accounts data and/or one is entered an item of expenditure in the accounts Data.
Wherein, the same day can carry out division acquisition at the last moment according to assets category defined.If for example, most A moment is 24 points afterwards, then dividing mode on the one is:0 point to 24 points of the same day.If it is at the last moment at 15 points, division side on the one Formula is:15 points of the previous day are to 15 points of the same day.
Multiple remaining sum variation is carried out in same period, the incremental data that the variation of each remaining sum obtains is updated and replaced Change, so that remaining sum changes each attribute at most only assignment in record.Renewal can tire out when replacing to incremental data Meter.For example, in same period, if first time remaining sum is changed for 10,000 RMB that keep accounts, the remaining sum for establishing the cycle changes note Record, remaining sum, which changes record, to be included:
Asset identification (xxxx), the data that keep accounts (10,000 yuan), data of entering an item of expenditure in the accounts (0), remaining sum (remaining sum of upper cycle+1 ten thousand), currency type (RMB) ...;
If second remaining sum is changed for 20,000 RMB that keep accounts, by remaining sum change in record keep accounts data and remaining sum is entered Row renewal, remaining sum change record and are updated to:
Asset identification (xxxx), the data that keep accounts (30,000 yuan), data of entering an item of expenditure in the accounts (0), remaining sum (remaining sum of upper cycle+3 ten thousand), currency type (RMB) ....
Because the scheduled date of more desired assets in inquiry request is identical, therefore, can will the scheduled date as the time Line carries out one query, for example, can the asset identification based at least two desired assets in scheduled date and inquiry request A query statement is built, for inquiring about at least two desired assets when less than or equal to remaining sum variation occurs in the scheduled date Keep accounts and data and enter an item of expenditure in the accounts data.
In one example, record is changed due to remaining sum can be carried out when remaining sum changes, and remaining sum is changed in record at least , therefore, can be according to desired asset including asset identification, remaining sum transfer date, the data that keep accounts, data of entering an item of expenditure in the accounts and current balance Asset identification and the scheduled date inquired about, inquiry obtain less than or equal to the scheduled date remaining sum transfer date and provide The remaining sum that production is identified as the asset identification of desired asset changes record, and changes to obtain to keep accounts in record from remaining sum and data and enter an item of expenditure in the accounts Data.
However, it is desired asset to obtain the remaining sum transfer date for being less than or equal to the scheduled date and asset identification in inquiry The remaining sum of asset identification change record, it is necessary to by way of returning table, change to obtain to keep accounts in record from remaining sum and data and go out Account data, therefore, in order to further improve search efficiency, record structure concordance list in advance is changed based on remaining sum.Wherein, the rope Draw keep accounts data and four attributes of data of entering an item of expenditure in the accounts when table includes asset identification, remaining sum transfer date, remaining sum variation, the remaining sum Variation is recorded in when remaining sum changes and is updated.In consideration of it, based at least two desired assets in the inquiry request Asset identification and less than or equal to the scheduled date build a query statement;According to constructed query statement from concordance list One query goes out corresponding for the asset identification of desired asset less than or equal to the remaining sum transfer date and asset identification of scheduled date Keep accounts and data and enter an item of expenditure in the accounts data.
Keep accounts data and to go out when asset identification, remaining sum transfer date, remaining sum change due to having contained in concordance list Four attributes of account data, then can using the asset identification of desired asset and less than or equal to the scheduled date as index condition, Inquiry obtains keep accounts data and data of entering an item of expenditure in the accounts from concordance list, and reduction indexes back table, improves search efficiency.
After acquisition keeps accounts data and data of entering an item of expenditure in the accounts, due at least two desired assets be present, target is every in order to obtain Remaining sum of the desired asset in the scheduled date, therefore, entering of obtaining can will be inquired about according to the asset identification of every desired asset Account data and data of entering an item of expenditure in the accounts are grouped;Based on keep accounts data and the data progress remaining sum calculating of entering an item of expenditure in the accounts in every group of data, obtain Remaining sum of the every desired asset in the scheduled date., can be by the number that kept accounts in every group of data as one of which remaining sum computational methods According to summation and the summation of data of entering an item of expenditure in the accounts seek difference, obtain desired asset corresponding to this group of data in the remaining sum of scheduled date.
It can be seen that once obtaining the process data of desired asset by a timeline (scheduled date), added up in real time Calculate and obtain per remaining sum of the reward for writing or painting sheet in the scheduled date, calculated by align data with real-time, solve the main consumption repeatedly inquired about When bottleneck, ensure inquiry service stable performance.
Further, if keep accounts data or data of entering an item of expenditure in the accounts are not present in desired asset within less than or equal to the scheduled date, i.e., Remaining sum is not present within less than or equal to the scheduled date and changes for desired asset, then sets remaining sum of the desired asset in the scheduled date It is zero.
Wherein, one is built according to the asset identification of at least two desired assets in the scheduled date and inquiry request Query statement, keep accounts data or data of entering an item of expenditure in the accounts are not found based on query statement, then remaining sum of the desired asset in the scheduled date It is zero.
Various technical characteristics in embodiment of above can be arbitrarily combined, as long as the combination between feature is not present Conflict or contradiction, but as space is limited, do not described one by one, therefore the various technical characteristics in above-mentioned embodiment is any It is combined the scope for falling within this disclosure.Combined with one of which and entered with reference to one of which application scenarios below Row illustrates.
As shown in Fig. 2 Fig. 2 is showing for another inquiry into balance method of this specification according to an exemplary embodiment It is intended to.Return on assets module can send inquiry batch when needing to carry out return on assets to the inquiry into balance module in database Desired asset is measured in the inquiry request (step 202) of the remaining sum of scheduled date, desired asset can be wherein carried in inquiry request Assets account (can abbreviation desired asset account).Scheduled date can be the historical date for including the date.Inquiry into balance Module inquires about the daily variation record for meeting date terms and assets account condition from the daily variation data module of database.Date Condition:The date of daily variation record is less than or equal to scheduled date, assets account condition:The assets account of daily variation record is mesh The assets account of assets is marked, that is, from daily variation data module, Query Dates are less than or equal to the scheduled date and provided Produce account and record (step 204) for the daily variation of desired asset account.Wherein, daily variation note is stored with daily variation data module Record, daily variation record are the record informations carried out when assets generation remaining sum changes.Inquiry into balance module is according to daily variation data Response results carry out daily variation record and judge, recorded if there is daily variation, will according to the asset identification of every desired asset Keep accounts data and data of entering an item of expenditure in the accounts in daily variation record are grouped;By the summation for the data that kept accounts in every group of data and data of entering an item of expenditure in the accounts Summation seek difference, obtain remaining sum of the desired asset in the scheduled date corresponding to this group of data, the remaining sum can be understood as end day Remaining sum (step 206).If wherein one or more desired assets record in the absence of daily variation, daily variation record there will be no The remaining sum of desired asset be arranged to zero (step 208).Inquiry into balance module sends batch day end remaining sum to return on assets meter Calculate module (step 210).
By taking end day remaining sum as an example, surplus daily variation record is often recorded in billing and accounting system, it is main to include with properties: Asset account, balance type, currency type, day inflow data, day outflow data and current balance.It is related to remaining sum with other building account During variation can more new balance daily variation record, by user buy fund share exemplified by:
The first stroke desired asset:
A1. on January 1st, 2016 opens an account, and asset account is:2088XXX10156, increase the remaining sum that the date is 20160101 newly Daily variation records, and record same day remaining sum is 0.0000 (part), flows into 0.0000 (part), flows out 0.0000 (part).
A2. 200.0000 (parts) are applied to purchase and confirmed on January 10th, 2016, increases newly and becomes the remaining sum day that the date is 20160110 Dynamic record, record same day remaining sum is 200.0000 (parts), flows into 200.0000 (parts), flows out 0.0000 (part).
A3. redeem on January 10th, 2017 and confirm 20.0000 (parts), increase the remaining sum daily variation that the date is 20170110 newly Record, record same day remaining sum is 180.0000 (parts), flows into 0.0000 (part), flows out 20.0000 (parts).
Second desired asset:
B1. on May 1st, 2017 opens an account, and asset account is:2088XXX20156, increase the remaining sum that the date is 20170501 newly Daily variation records, and record same day remaining sum is 0.0000 (part), flows into 0.0000 (part), flows out 0.0000 (part).
B2. 100.0000 (parts) are applied to purchase and confirmed on May 3rd, 2017, increases the remaining sum daily variation that the date is 20170503 newly Record, record same day remaining sum is 100.0000 (parts), flows into 100.0000 (parts), flows out 0.0000 (part).
B3. redeem on May 10th, 2017 and confirm 20.0000 (parts), increase the remaining sum daily variation that the date is 20170510 newly Record, record same day remaining sum is 80.0000 (parts), flows into 0.0000 (part), flows out 20.0000 (parts).
B4. 1000.0000 (parts) are applied to purchase and confirmed on May 20th, 2017 again, increases the remaining sum that the date is 20170520 newly Daily variation records, and record same day remaining sum is 1080.0000 (parts), flows into 1000.0000 (parts), flows out 0.0000 (part).
Remaining sum daily variation record only can just be recorded when remaining sum changes, and on the one hand daily record becomes day Dynamic record, do not possess corresponding condition (not having trigger event) when no remaining sum changes, become in the absence of day another aspect one day When dynamic, end day remaining sum can be obtained by this specification embodiment, all record a large amount of wastes that can exist to storage resource daily.
When the return on assets of scheduled date to be carried out calculates the end day remaining sum for obtaining account, query steps can be such as step 204 to 208.With on May 11st, 2017 for the scheduled date, using the asset identification of desired asset as 2088XXX10156 and Exemplified by 2088XXX20156, keep accounts data and number of entering an item of expenditure in the accounts before on May 11st, 2017 and 11 days Mays in 2017 can be obtained According to because the assets that asset identification is 2088XXX10156 flow into 0.0000 (part), outflow 0.0000 on January 1st, 2016 (part);200.0000 (parts) are flowed on January 10th, 2016, flow out 0.0000 (part);0.0000 is flowed on January 10th, 2017 (part), flow out 20.0000 (parts);And the assets that asset identification is 2088XXX20156 flowed into 0.0000 on May 1st, 2017 (part), 0.0000 (part) is flowed out, flow into 100.0000 (parts) on May 3rd, 2017, flow out 0.0000 (part);On May 10th, 2017 0.0000 (part) is flowed into, flows out 20.0000 (parts).Therefore, according to the asset identification of every desired asset, entering for acquisition will be inquired about Account data and data of entering an item of expenditure in the accounts are grouped;The summation of the summation for the data that kept accounts in every group of data and data of entering an item of expenditure in the accounts is sought into difference, obtained Remaining sum of the desired asset in the scheduled date corresponding to this group of data is obtained, so as to obtain the assets that asset identification is 2088XXX10156 It is 180.0000 (parts) in the remaining sum on May 11st, 2017, asset identification is 2088XXX20156 assets May 11 in 2017 The remaining sum of day is 80.0000 (parts).
It can be seen that the daily variation Time Inconsistency of the first stroke desired asset and second desired asset, then two desired assets The irregular discrete distribution of target data, the present embodiment obtains two desired assets by using the scheduled date as a timeline All intermediate data (flow into data and outflow data), so as to turn parts into the whole, inquiry times are effectively reduced, so as to improve inquiry Efficiency.
Corresponding with the embodiment of foregoing inquiry into balance method, this specification additionally provides inquiry into balance device and its answered The embodiment of electronic equipment.
The embodiment of this specification inquiry into balance device can be applied in computer equipment.Device embodiment can be by soft Part is realized, can also be realized by way of hardware or software and hardware combining.Exemplified by implemented in software, as a logical meaning On device, be by corresponding computer program instructions in nonvolatile memory by the processor of computer equipment where it Read what operation in internal memory was formed.For hardware view, as shown in figure 3, being counted where this specification inquiry into balance device Calculate machine equipment a kind of hardware structure diagram, except the processor 310 shown in Fig. 3, internal memory 330, network interface 320 and it is non-easily Outside the property lost memory 340, the computer equipment in embodiment where device 331 is gone back generally according to the actual functional capability of the equipment Other hardware can be included, this is repeated no more.
As shown in figure 4, be a kind of block diagram of inquiry into balance device of this specification according to an exemplary embodiment, institute Stating device includes:
Request receiving module 410, for receiving inquiry request, the inquiry request is used to inquire about at least two desired assets It is identical in the remaining sum of scheduled date, the scheduled date of at least two desired assets;
Data inquiry module 420, for according at least two desired assets in the scheduled date and inquiry request Asset identification build a query statement, for inquire about at least two desired assets less than or equal in the scheduled date occur more than Keep accounts data and data of entering an item of expenditure in the accounts when volume changes;
Remaining sum obtains module 430, for carrying out remaining sum calculating with data of entering an item of expenditure in the accounts according to the data that keep accounts of every desired asset, Obtain remaining sum of the every desired asset in the scheduled date.
In an optional implementation, the scheduled date also includes by minimum time unit, described device of day Data recordin module (Fig. 4 is not shown), is used for:It is newly-built to keep accounts if remaining sum variation occurs first within same day for an assets Data and/or data of entering an item of expenditure in the accounts;If an assets during the non-remaining sum variation of generation first, update the number that keeps accounts established within same day According to and/or data of entering an item of expenditure in the accounts so that an assets contain up to keep accounts data and/or a data of entering an item of expenditure in the accounts within same day.
In an optional implementation, changing record based on remaining sum, structure concordance list, the concordance list include in advance Keep accounts data and four attributes of data of entering an item of expenditure in the accounts when asset identification, remaining sum transfer date, remaining sum variation, the remaining sum change record It is updated when remaining sum changes;
The data inquiry module 420 is specifically used for:
Asset identification based at least two desired assets in the inquiry request and less than or equal to scheduled date structure Build a query statement;
According to constructed query statement, one query goes out the remaining sum variation less than or equal to the scheduled date from concordance list Date and asset identification are data and the data of entering an item of expenditure in the accounts of being kept accounts corresponding to the asset identification of desired asset.
In an optional implementation, the remaining sum obtains module 430 and is specifically used for:
According to the asset identification of every desired asset, keep accounts data and the data of entering an item of expenditure in the accounts that inquire about acquisition are grouped;
The summation of the summation for the data that kept accounts in every group of data and data of entering an item of expenditure in the accounts is sought into difference, obtains mesh corresponding to this group of data Mark remaining sum of the assets in the scheduled date.
In an optional implementation, the remaining sum obtains module 430 and is additionally operable to:
If keep accounts data or data of entering an item of expenditure in the accounts are not present in desired asset within less than or equal to the scheduled date, by desired asset Zero is arranged in the remaining sum of scheduled date.
For device embodiment, because it corresponds essentially to embodiment of the method, so related part is real referring to method Apply the part explanation of example.Device embodiment described above is only schematical, wherein described be used as separating component The module of explanation can be or may not be physically separate, can be as the part that module is shown or can also It is not physical module, you can with positioned at a place, or can also be distributed on multiple mixed-media network modules mixed-medias.Can be according to reality Need to select some or all of module therein to realize the purpose of this specification scheme.Those of ordinary skill in the art are not In the case of paying creative work, you can to understand and implement.
Accordingly, this specification embodiment also provides a kind of computer equipment, including:Processor;For storing processor The memory of executable instruction;Wherein, the processor is configured as:
Inquiry request is received, the inquiry request is used to inquire about remaining sum of at least two desired assets in the scheduled date, institute The scheduled date for stating at least two desired assets is identical;
One inquiry is built according to the asset identification of at least two desired assets in the scheduled date and inquiry request Sentence, for inquire about at least two desired assets less than or equal in the scheduled date occur remaining sum change when keep accounts data and Enter an item of expenditure in the accounts data;
According to keep accounts data and the data progress remaining sum calculating of entering an item of expenditure in the accounts of every desired asset, obtain every desired asset and referring to The remaining sum fixed the date.
Each embodiment in this specification is described by the way of progressive, identical similar portion between each embodiment Divide mutually referring to what each embodiment stressed is the difference with other embodiment.It is real especially for equipment For applying example, because it is substantially similar to embodiment of the method, so description is fairly simple, related part is referring to embodiment of the method Part explanation.
A kind of computer-readable storage medium, have program stored therein in the storage medium instruction, and described program instruction includes:
Inquiry request is received, the inquiry request is used to inquire about remaining sum of at least two desired assets in the scheduled date, institute The scheduled date for stating at least two desired assets is identical;
One inquiry is built according to the asset identification of at least two desired assets in the scheduled date and inquiry request Sentence, for inquire about at least two desired assets less than or equal in the scheduled date occur remaining sum change when keep accounts data and Enter an item of expenditure in the accounts data;
According to keep accounts data and the data progress remaining sum calculating of entering an item of expenditure in the accounts of every desired asset, obtain every desired asset and referring to The remaining sum fixed the date.
This specification embodiment can use wherein includes the storage medium of program code (including but not in one or more Be limited to magnetic disk storage, CD-ROM, optical memory etc.) on the form of computer program product implemented.Computer is available to be deposited Storage media includes permanent and non-permanent, removable and non-removable media, can realize letter by any method or technique Breath storage.Information can be computer-readable instruction, data structure, the module of program or other data.The storage of computer is situated between The example of matter includes but is not limited to:Phase transition internal memory (PRAM), static RAM (SRAM), dynamic random access memory Device (DRAM), other kinds of random access memory (RAM), read-only storage (ROM), the read-only storage of electrically erasable Device (EEPROM), fast flash memory bank or other memory techniques, read-only optical disc read-only storage (CD-ROM), digital versatile disc (DVD) or other optical storages, magnetic cassette tape, the storage of tape magnetic rigid disk or other magnetic storage apparatus or any other non-biography Defeated medium, the information that can be accessed by a computing device available for storage.
Those skilled in the art will readily occur to this specification after considering specification and putting into practice the invention applied here Other embodiments.This specification is intended to any modification, purposes or adaptations of this specification, these modifications, Purposes or adaptations follow the general principle of this specification and not applied in the art including this specification Common knowledge or conventional techniques.Description and embodiments be considered only as it is exemplary, the true scope of this specification and Spirit is pointed out by following claim.
It should be appreciated that the precision architecture that this specification is not limited to be described above and is shown in the drawings, And various modifications and changes can be being carried out without departing from the scope.The scope of this specification is only limited by appended claim System.
The preferred embodiment of this specification is the foregoing is only, it is all in this explanation not to limit this specification Within the spirit and principle of book, any modification, equivalent substitution and improvements done etc., the model of this specification protection should be included in Within enclosing.

Claims (11)

1. a kind of inquiry into balance method, methods described include:
Receive inquiry request, the inquiry request be used for inquire about remaining sum of at least two desired assets in the scheduled date, it is described extremely The scheduled date of few two desired assets is identical;
One query statement is built according to the asset identification of at least two desired assets in the scheduled date and inquiry request, Data and entered an item of expenditure in the accounts for inquiring about at least two desired assets less than or equal to keeping accounts when remaining sum changes occurs in the scheduled date Data;
According to keep accounts data and the data progress remaining sum calculating of entering an item of expenditure in the accounts of every desired asset, every desired asset is obtained in specified day The remaining sum of phase.
2. according to the method for claim 1, the scheduled date is using day as minimum time unit, if an assets are same When remaining sum variation in a few days occurring first, newly-built data and/or the data of entering an item of expenditure in the accounts of keeping accounts;Sent out first if an assets are non-within same day When raw remaining sum changes, keep accounts data and/or the data of entering an item of expenditure in the accounts established are updated, so that an assets contain up within same day One keep accounts data and/or a data of entering an item of expenditure in the accounts.
3. according to the method for claim 1, changing record structure concordance list in advance based on remaining sum, the concordance list includes money Keep accounts data and four attributes of data of entering an item of expenditure in the accounts when mark, the variation of remaining sum transfer date, remaining sum are produced, the remaining sum, which changes, to be recorded in It is updated when remaining sum changes;
The asset identification according at least two desired assets in the scheduled date and inquiry request builds an inquiry Sentence, for inquire about at least two desired assets less than or equal in the scheduled date occur remaining sum change when keep accounts data and Enter an item of expenditure in the accounts data, including:
Asset identification based at least two desired assets in the inquiry request and less than or equal to scheduled date structure one Bar query statement;
According to constructed query statement from concordance list one query go out the remaining sum transfer date less than or equal to the scheduled date, And asset identification is data and the data of entering an item of expenditure in the accounts of being kept accounts corresponding to the asset identification of desired asset.
4. according to the method described in any one of claims 1 to 3, keep accounts data and the number of entering an item of expenditure in the accounts according to every desired asset According to remaining sum calculating is carried out, remaining sum of the every desired asset in the scheduled date is obtained, including:
According to the asset identification of every desired asset, keep accounts data and the data of entering an item of expenditure in the accounts that inquire about acquisition are grouped;
The summation of the summation for the data that kept accounts in every group of data and data of entering an item of expenditure in the accounts is sought into difference, target corresponding to this group of data is obtained and provides Produce the remaining sum in the scheduled date.
5. according to the method described in any one of claims 1 to 3, methods described also includes:
If keep accounts data or data of entering an item of expenditure in the accounts are not present in desired asset within less than or equal to the scheduled date, desired asset is being referred to The remaining sum fixed the date is arranged to zero.
6. a kind of inquiry into balance device, described device include:
Request receiving module, for receiving inquiry request, the inquiry request is used to inquire about at least two desired assets specified The remaining sum on date, the scheduled date of at least two desired assets are identical;
Data inquiry module, for the asset identification according at least two desired assets in the scheduled date and inquiry request A query statement is built, for inquiring about at least two desired assets when less than or equal to remaining sum variation occurs in the scheduled date Keep accounts and data and enter an item of expenditure in the accounts data;
Remaining sum obtains module, for keep accounts data and the data progress remaining sum calculating of entering an item of expenditure in the accounts according to every desired asset, obtains every The remaining sum of desired asset in the scheduled date.
7. device according to claim 6, the scheduled date, described device also included number using day as minimum time unit According to logging modle, it is used for:If remaining sum occurs first within same day for an assets when changing, newly-built keep accounts and/or is entered an item of expenditure in the accounts at data Data;If an assets during the non-remaining sum variation of generation first, update keep accounts data and/or the number of entering an item of expenditure in the accounts established within same day According to so that an assets contain up to keep accounts data and/or a data of entering an item of expenditure in the accounts within same day.
8. device according to claim 6, record structure concordance list in advance is changed based on remaining sum, the concordance list includes money Keep accounts data and four attributes of data of entering an item of expenditure in the accounts when mark, the variation of remaining sum transfer date, remaining sum are produced, the remaining sum, which changes, to be recorded in It is updated when remaining sum changes;
The data inquiry module is specifically used for:
Asset identification based at least two desired assets in the inquiry request and less than or equal to scheduled date structure one Bar query statement;
According to constructed query statement from concordance list one query go out the remaining sum transfer date less than or equal to the scheduled date, And asset identification is data and the data of entering an item of expenditure in the accounts of being kept accounts corresponding to the asset identification of desired asset.
9. according to the device described in any one of claim 6 to 8, the remaining sum obtains module and is specifically used for:
According to the asset identification of every desired asset, keep accounts data and the data of entering an item of expenditure in the accounts that inquire about acquisition are grouped;
The summation of the summation for the data that kept accounts in every group of data and data of entering an item of expenditure in the accounts is sought into difference, target corresponding to this group of data is obtained and provides Produce the remaining sum in the scheduled date.
10. according to the device described in any one of claim 6 to 8, the remaining sum obtains module and is additionally operable to:
If keep accounts data or data of entering an item of expenditure in the accounts are not present in desired asset within less than or equal to the scheduled date, desired asset is being referred to The remaining sum fixed the date is arranged to zero.
11. a kind of computer equipment, including:
Processor;
For storing the memory of processor-executable instruction;
Wherein, the processor is configured as:
Receive inquiry request, the inquiry request be used for inquire about remaining sum of at least two desired assets in the scheduled date, it is described extremely The scheduled date of few two desired assets is identical;
One query statement is built according to the asset identification of at least two desired assets in the scheduled date and inquiry request, Data and entered an item of expenditure in the accounts for inquiring about at least two desired assets less than or equal to keeping accounts when remaining sum changes occurs in the scheduled date Data;
According to keep accounts data and the data progress remaining sum calculating of entering an item of expenditure in the accounts of every desired asset, every desired asset is obtained in specified day The remaining sum of phase.
CN201711047857.9A 2017-10-31 2017-10-31 Inquiry into balance method, apparatus and equipment Pending CN107885802A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711047857.9A CN107885802A (en) 2017-10-31 2017-10-31 Inquiry into balance method, apparatus and equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711047857.9A CN107885802A (en) 2017-10-31 2017-10-31 Inquiry into balance method, apparatus and equipment

Publications (1)

Publication Number Publication Date
CN107885802A true CN107885802A (en) 2018-04-06

Family

ID=61783246

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711047857.9A Pending CN107885802A (en) 2017-10-31 2017-10-31 Inquiry into balance method, apparatus and equipment

Country Status (1)

Country Link
CN (1) CN107885802A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109978223A (en) * 2019-01-08 2019-07-05 阿里巴巴集团控股有限公司 Generate the high performance method and its device of account balance snapshot
CN110263050A (en) * 2019-05-06 2019-09-20 阿里巴巴集团控股有限公司 Data processing method, device, equipment and storage medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1480347A (en) * 2003-08-07 2004-03-10 范志炯 deposit and loan united bankbood type receipt and method of use
US20070192167A1 (en) * 2005-10-24 2007-08-16 Ying Lei Methods and systems for managing transaction card customer accounts
CN105446990A (en) * 2014-07-04 2016-03-30 阿里巴巴集团控股有限公司 Service data processing method and equipment
CN106022908A (en) * 2016-05-17 2016-10-12 中国建设银行股份有限公司 Method and system for querying information of assets and liabilities
CN106940866A (en) * 2017-02-22 2017-07-11 深圳市喜悦智慧实验室有限公司 A kind of asset management system based on many account managements

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1480347A (en) * 2003-08-07 2004-03-10 范志炯 deposit and loan united bankbood type receipt and method of use
US20070192167A1 (en) * 2005-10-24 2007-08-16 Ying Lei Methods and systems for managing transaction card customer accounts
CN105446990A (en) * 2014-07-04 2016-03-30 阿里巴巴集团控股有限公司 Service data processing method and equipment
CN106022908A (en) * 2016-05-17 2016-10-12 中国建设银行股份有限公司 Method and system for querying information of assets and liabilities
CN106940866A (en) * 2017-02-22 2017-07-11 深圳市喜悦智慧实验室有限公司 A kind of asset management system based on many account managements

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
COOLMSN8786: "通过变动日志获取某一时刻所有用户的帐号余额", 《HTTPS://BLOG.CSDN.NET/COOLMSN8786/ARTICLE/DETAILS/100377115》 *
CSDN: "如何得出存取款流水余额", 《HTTPS://BBS.CSDN.NET/TOPICS/380229589》 *
刘刚: "金融自助服务系统余额查询模块设计与实现", 《中国优秀硕士学位论文全文数据库信息科技辑》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109978223A (en) * 2019-01-08 2019-07-05 阿里巴巴集团控股有限公司 Generate the high performance method and its device of account balance snapshot
CN110263050A (en) * 2019-05-06 2019-09-20 阿里巴巴集团控股有限公司 Data processing method, device, equipment and storage medium
CN110263050B (en) * 2019-05-06 2023-10-27 创新先进技术有限公司 Data processing method, device, equipment and storage medium

Similar Documents

Publication Publication Date Title
CN110415119B (en) Model training method, bill transaction prediction method, model training device, bill transaction prediction device, storage medium and equipment
Starr General equilibrium models of monetary economies: Studies in the static foundations of monetary theory
JP2010522375A (en) Using indices based on accounting data to create portfolios of financial targets
CN110458556B (en) Funds checking method, funds checking device, computer equipment and system architecture
WO2020024718A1 (en) Method and device for predicting foreign exchange transaction volume
CN111125535A (en) Financial product recommendation method and device
CN107885802A (en) Inquiry into balance method, apparatus and equipment
Jung et al. Next generation models for portfolio risk management: An approach using financial big data
CN101645158A (en) Method suitable for parallel computation of multi-currency asset depreciation of multiple assets
JP2010118083A (en) Bond property calculating system and spread change rate calculating system
Lin et al. Analytically pricing European options under a new two-factor Heston model with regime switching
CN110033154A (en) Resource allocation method, device and equipment
CN107403374A (en) A kind of data processing method and device
JP2821258B2 (en) Duration analysis system
Mesarić Ratio analysis and Piotroski scoring system in the automobile industry in Croatia
JP4828953B2 (en) System and method for supporting analysis of asset management outcomes
Banerjee Performance Evaluation of Indian Factoring Business: A Study of SBI Factors and Commercial Services Limited, and Canbank Factors Limited
US8266022B2 (en) Risk-cost analysis of currency exposure reduction for currency exposure management
US20190108592A1 (en) Analyzing a performance of at least one asset in a portfolio
CN108256719B (en) Resource processing system and method
Artus et al. Investment, output and labor constraints, and financial constraints: the estimation of a model with several regimes
CN115205048A (en) Information pushing method and device, electronic equipment and storage medium
JP4384795B2 (en) Bond characteristic calculation system
Vazquez et al. Rethinking Inventory Forecasting Problems in E-commerce: Exploring the effect of integrating forecasting and inventory decisions
JP2003085359A (en) Method and system for predicting stock exchange cost

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
REG Reference to a national code

Ref country code: HK

Ref legal event code: DE

Ref document number: 1251687

Country of ref document: HK

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20200925

Address after: Cayman Enterprise Centre, 27 Hospital Road, George Town, Grand Cayman Islands

Applicant after: Advanced innovation technology Co.,Ltd.

Address before: A four-storey 847 mailbox in Grand Cayman Capital Building, British Cayman Islands

Applicant before: Alibaba Group Holding Ltd.

Effective date of registration: 20200925

Address after: Cayman Enterprise Centre, 27 Hospital Road, George Town, Grand Cayman Islands

Applicant after: Innovative advanced technology Co.,Ltd.

Address before: Cayman Enterprise Centre, 27 Hospital Road, George Town, Grand Cayman Islands

Applicant before: Advanced innovation technology Co.,Ltd.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180406