CN107882061A - A kind of lattice guest gabion baffling and its slope protection construction method - Google Patents

A kind of lattice guest gabion baffling and its slope protection construction method Download PDF

Info

Publication number
CN107882061A
CN107882061A CN201711038869.5A CN201711038869A CN107882061A CN 107882061 A CN107882061 A CN 107882061A CN 201711038869 A CN201711038869 A CN 201711038869A CN 107882061 A CN107882061 A CN 107882061A
Authority
CN
China
Prior art keywords
plate
gabion
lattice guest
location
cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711038869.5A
Other languages
Chinese (zh)
Other versions
CN107882061B (en
Inventor
吴明桦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NINGBO SHUNXING GARDEN CONSTRUCTION CO., LTD.
Original Assignee
Zhejiang Xin Xin Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Xin Xin Construction Co Ltd filed Critical Zhejiang Xin Xin Construction Co Ltd
Priority to CN201711038869.5A priority Critical patent/CN107882061B/en
Publication of CN107882061A publication Critical patent/CN107882061A/en
Application granted granted Critical
Publication of CN107882061B publication Critical patent/CN107882061B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0208Gabions
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Revetment (AREA)

Abstract

The invention discloses a kind of lattice guest gabion baffling and its slope protection construction method, including lattice guest's gabion monomer, lattice guest's gabion monomer includes upper location-plate, lower location-plate, reinforced bar support structure and cylinder, upper location-plate is horizontally set on the surface of lower location-plate, lower location-plate connects upper location-plate by reinforced bar support structure, cylinder is fixedly connected at the end face center of lower location-plate, and stone is filled with respectively in cylinder, between cylinder and reinforced bar support structure.Its construction method includes:Surveying and locating, shield slope leveling, the installation of lattice guest's gabion monomer and the splicing of lattice guest's gabion monomer are launched.The present invention improves the strength and stability of whole lattice guest gabion monomer, and existing lattice guest gabion can be avoided due to the intensity of at steel wire winding and wire basket junction it is difficult to ensure that the problem of, avoid due to the stone in gabion the continuous frictional metal net in the presence of current, so as to cause the rupture of gabion grid, extend the service life and practicality of lattice guest's gabion baffling.

Description

A kind of lattice guest gabion baffling and its slope protection construction method
Technical field
The present invention relates to a kind of lattice guest gabion baffling and its slope protection construction method.
Background technology
Traditional bank protection mainly grouts or laid dry block bank protection, cast-in-place concrete bank protection, precast concrete block bank protection etc.. These traditional slope protection projects, mainly emphasize its intensity effect, but often ignore other destructions to environment.
In recent years, as people are to the continuous understanding and raising, lattice of the contents such as garden landscape, ecological, environmental protective, the art of architecture The utilization of guest's gabion baffling is also more and more extensive.Lattice guest's gabion baffling belongs to gravity type block stone structure, and being will be anticorrosive, wear-resisting Damage, the high zinc-coated wire of the low-carbon of high intensity, are woven into plane net trellis with galvanized hexagonal wire mesh net twisting machine, are assembled into difference at the construction field (site) The net cage or gauze pad of dimensions, but at steel wire winding and wire basket junction intensity it is difficult to ensure that, and due to current Effect causes the continuous frictional metal net of stone in gabion, so as to cause the rupture of gabion grid;The stone quality of filling is not hard enough Hard or small volume, with the continuous erosion of current, constantly rubs, volume constantly reduces, finally from gabion mesh between block stone Middle outflow, influence the overall bank protection performance of lattice guest's gabion baffling.
The content of the invention
Present invention aims at provide a kind of lattice guest gabion baffling and its bank protection for the deficiency present in prior art The technical scheme of construction method, improves the strength and stability of whole lattice guest gabion monomer, and can avoid existing lattice guest stone Cage due at steel wire winding and wire basket junction intensity it is difficult to ensure that the problem of, avoid because the stone in gabion is in current In the presence of continuous frictional metal net, so as to cause the rupture of gabion grid.
In order to solve the above-mentioned technical problem, the present invention adopts the following technical scheme that:
A kind of lattice guest gabion baffling, it is characterised in that:Including lattice guest's gabion monomer, lattice guest's gabion monomer includes upper positioning Plate, lower location-plate, reinforced bar support structure and cylinder, upper location-plate are horizontally set on the surface of lower location-plate, and lower location-plate leads to Reinforced bar support structure connection upper location-plate is crossed, cylinder is fixedly connected at the end face center of lower location-plate, in cylinder, cylinder and steel Stone is filled with respectively between muscle supporting construction;By the design of reinforced bar support structure, whole lattice guest gabion can be not only improved The strength and stability of monomer, and intensity of the existing lattice guest gabion due at steel wire winding and wire basket junction can be avoided It is difficult to ensure that the problem of, the continuous frictional metal net in the presence of current is avoided due to the stone in gabion, so as to cause gabion The rupture of grid, the design of cylinder, a part of stone can be protected, prevent that flow rate of water flow is too high, the stone matter of filling Ground is not hard enough or small volume, with the continuous erosion of current, is constantly rubbed between stone, and volume constantly reduces, finally from Flowed out in gabion mesh, extend the service life and practicality of lattice guest's gabion baffling.
Further, reinforced bar support structure includes the first reinforcing bar and the second reinforcing bar, and the first reinforcing bar is uniformly arranged on upper location-plate Between lower location-plate, and the first reinforcing bar vertical connection upper location-plate and lower location-plate, the second reinforcing bar are uniformly arranged from top to bottom Between two neighboring first reinforcing bar, and adjacent two the second reinforcing bars in left and right are staggered up and down, can not only improve reinforcing bar The strength and stability of supporting construction, and the loss of stone can be reduced, extend the service life of lattice guest's gabion baffling.
Further, filling chamber is provided with cylinder, the right angle for loading chamber is evenly arranged with crushing block from top to bottom, filling Intracavitary can load stone, prevent current from directly causing erosion to the stone in cylinder, reduce stone with the continuous punching of current Lose, the friction between stone is reduced, and stone is existed for a long time and in cylinder, is played the protective action of lattice guest's gabion baffling, is squeezed Briquetting can improve active force of the stone to cylinder.
Further, the spacing between the height of cylinder and upper location-plate and lower location-plate matches, and the design of this structure can So that current directly contact with the outer wall or upper location-plate of cylinder, slow down current into the speed in cylinder, and then reduce water Flow the erosion to inner barrel stone.
Further, groove is provided with upper location-plate, cover plate is rotatably connected on groove, grid is provided with cover plate, is covered The end set of plate has button block, and neck is provided with upper location-plate, and button block matches with neck, can be filled stone by groove Enter in cylinder and reinforced bar support structure, and be fixedly connected by button block and neck, be easy to the growth of water plant, on cover plate Grid and stone can bear the weight of pedestrian, improve security.
Further, the first stopper slot and the first limited block, the first limited block and are provided with the lateral surface of upper location-plate One stopper slot matches, and the first screwed hole is provided with the first limited block and the first stopper slot, passes through the first limited block and The upper location-plate of two neighboring lattice guest gabion monomer can be fixedly connected by one stopper slot, and pass through the first spiral shell by screw Pit progress is spacing, improves the strength and stability of whole lattice guest gabion baffling.
Further, the second stopper slot and the second limited block, the second limited block and are provided with the lateral surface of lower location-plate Two stopper slots match, and the second screwed hole is provided with the second limited block and the second stopper slot, pass through the second limited block and The lower location-plate of two neighboring lattice guest gabion monomer can be fixedly connected by two stopper slots, and pass through the second spiral shell by screw Pit progress is spacing, improves the strength and stability of whole lattice guest gabion baffling.
The method for carrying out slope protection construction using a kind of lattice guest gabion baffling described above, it is characterised in that including following step Suddenly:
1) surveying and locating
Bank protection face is measured first, determines length, width and the absolute altitude in bank protection face, then by the weeds on bank protection face Remove, mark is carried out according to the design attitude of barricade on bank protection face with white marking line;
2) slope leveling is protected
Kerve is opened up first along the bottom level in bank protection face, the depth of kerve is more than the thickness of lower location-plate, and the bottom of to The side of groove carries out compacting processing, side wall is tamped successively upwardly then along bank protection, the length tamped every time and bottom The equal length of groove, the width tamped every time are 1.5~3m, until being tamped to whole bank protection face;
3) lattice guest gabion monomer is installed
A, corresponding upper location-plate, lower location-plate, cylinder and reinforcement bar support are selected according to the length in bank protection face and depth first Support structure, groove and neck are first opened up in upper location-plate, matched lid is then selected according to the size of groove Plate, after grid and button block are installed on the cover board, cover plate is rotatably connected on groove, cover plate is closed rear button block spacing in neck It is interior, the first stopper slot is uniformly then opened up along the lateral wall of upper location-plate, and install at equal intervals in the side of the first stopper slot First limited block, the size and the size of the first stopper slot for making the first limited block match, finally on the first limited block and the Screwed hole is opened up on the top surface of one stopper slot;
B, and then on the lateral wall of lower location-plate the second stopper slot is uniformly opened up, and between side of the second stopper slot etc. The second limited block is installed away from position, the size and the size of the second stopper slot for making the second limited block match, then in the second limit Screwed hole is opened up on the block of position and on the bottom surface of the second stopper slot;
C, by upper location-plate by reinforced bar support structure welding in the surface of lower location-plate, make upper location-plate and lower positioning Plate keeping parallelism, in welded reinforcement supporting construction, first by the first reinforcement welding between upper location-plate and lower location-plate, ensure First reinforcing bar is vertical with upper location-plate and lower location-plate, then by the second reinforcing bar level it is equidistant from top to bottom be welded on it is adjacent Between two the first reinforcing bars, the second adjacent reinforcing bar of left and right is staggered;
D, then cylinder is inserted in reinforced bar support structure through the groove in upper location-plate, is vertically connected on down cylinder At the end face center of location-plate, and cylinder and lower location-plate are welded;
4) lattice guest gabion monomer splicing is launched
A, after lattice guest's gabion monomer of requirement installs, the lattice of respective numbers are selected according to the length in bank protection face Guest's gabion monomer, two adjacent lattice guest's gabion monomers of left and right are attached successively, in connection by between upper location-plate First limited block is inserted in the first stopper slot, and two neighboring upper location-plate is fixed into company through the first screwed hole with screw Connect, the second limited block between lower location-plate is inserted in the second stopper slot, will be two neighboring through the second screwed hole with screw Lower location-plate is fixedly connected;
B, after lattice guest's gabion monomer is spliced to form single barricade, stone is first loaded successively in lattice guest's gabion monomer, by stone Block is put between inner barrel and cylinder and reinforced bar support structure, is closed cover plate after filling, then by kerve Single barricade is transferred single barricade into kerve by hoisting machine, hoisting machine is removed after fixed, by single barricade close to bank protection Casting concrete at the side gap in face;
C, and then circulation step a and step b, the construction of the single barricade of last layer is carried out, until whole lattice guest gabion baffling Construction finishes.
The present invention is by adopting the above-described technical solution, have the advantages that:
1st, by the design of reinforced bar support structure, the strength and stability of whole lattice guest gabion monomer can be not only improved, And existing lattice guest gabion can be avoided due to the intensity of at steel wire winding and wire basket junction it is difficult to ensure that the problem of, avoid Due to the stone in gabion in the presence of current continuous frictional metal net, so as to cause the rupture of gabion grid.
2nd, the design of cylinder, a part of stone can be protected, prevents that flow rate of water flow is too high, the stone quality of filling Not hard enough or small volume, with the continuous erosion of current, constantly rubbed between stone, volume constantly reduces, finally from stone Flowed out in cage mesh, extend the service life and practicality of lattice guest's gabion baffling.
3rd, the construction method step of lattice guest gabion baffling of the present invention is simple, can meet different length, depth and width bank protection The construction in face, construction period is shortened, protection effect is good, service life length.
Brief description of the drawings
The invention will be further described below in conjunction with the accompanying drawings:
Fig. 1 is the structural representation of lattice guest's gabion monomer in a kind of lattice guest gabion baffling of the present invention and its slope protection construction method Figure;
Fig. 2 is the structural representation of middle cylinder body of the present invention;
Fig. 3 is the structural representation of lattice guest's gabion baffling in the present invention.
In figure:1- upper location-plates;Location-plate under 2-;The reinforcing bars of 3- first;The reinforcing bars of 4- second;5- cylinders;The stopper slots of 6- first; The limited blocks of 7- first;8- grooves;9- cover plates;10- grids;11- necks;12- button blocks;The stopper slots of 13- second;14- second is spacing Block;15- loads chamber;16- crushing blocks.
Embodiment
As shown in Figure 1 to Figure 3, it is a kind of lattice guest gabion baffling of the present invention, including lattice guest's gabion monomer, lattice guest's gabion monomer Including upper location-plate 1, lower location-plate 2, reinforced bar support structure and cylinder 5, upper location-plate 1 is being horizontally set on lower location-plate 2 just Top, groove 8 is provided with upper location-plate 1, cover plate 9 is rotatably connected on groove 8, grid 10, cover plate 9 are provided with cover plate 9 End set have button block 12, neck 11 is provided with upper location-plate 1, button block 12 matches with neck 11, can be with by groove 8 Stone is loaded in cylinder 5 and reinforced bar support structure, and is fixedly connected by button block 12 and neck 11, is easy to water plant Growth, grid 10 and stone on cover plate 9 can bear the weight of pedestrian, improve security, on the lateral surface of upper location-plate 1 The first stopper slot 6 and the first limited block 7 are provided with, the first limited block 7 matches with the first stopper slot 6, the first limited block 7 and The first screwed hole is provided with one stopper slot 6, can be by two neighboring lattice guest by the first limited block 7 and the first stopper slot 6 The upper location-plate 1 of gabion monomer is fixedly connected, and spacing through the progress of the first screwed hole by screw, improves whole lattice guest The strength and stability of gabion baffling.
The second stopper slot 13 and the second limited block 14, the second limited block 14 and are provided with the lateral surface of lower location-plate 2 Two stopper slots 13 match, and the second screwed hole is provided with the second limited block 14 and the second stopper slot 13, spacing by second The lower location-plate 2 of two neighboring lattice guest gabion monomer can be fixedly connected by the stopper slot 13 of block 14 and second, and pass through spiral shell Nail is spacing through the progress of the second screwed hole, improves the strength and stability of whole lattice guest gabion baffling.
Lower location-plate 2 connects upper location-plate 1 by reinforced bar support structure, and reinforced bar support structure includes the first reinforcing bar 3 and the Two reinforcing bars 4, the first reinforcing bar 3 are uniformly arranged between upper location-plate 1 and lower location-plate 2, and are positioned in the vertical connection of the first reinforcing bar 3 Plate 1 and lower location-plate 2, the second reinforcing bar 4 is uniformly arranged between two neighboring first reinforcing bar 3 from top to bottom, and left and right is adjacent Two the second reinforcing bars are staggered about 4, can not only improve the strength and stability of reinforced bar support structure, and can reduce The loss of stone, extend the service life of lattice guest's gabion baffling.
Cylinder 5 is fixedly connected at the end face center of lower location-plate 2, in cylinder 5, between cylinder 5 and reinforced bar support structure Stone is filled with respectively, filling chamber 15 is provided with cylinder 5, and the right angle of filling chamber 15 is evenly arranged with crushing block from top to bottom 16, stone can be loaded by loading in chamber 15, prevent current from directly causing erosion to the stone in cylinder 5, reduce stone with dampening The continuous erosion of stream, the friction between stone are reduced, and stone is existed for a long time with cylinder 5, playing lattice guest's gabion baffling Protective action, crushing block 16 can improve active force of the stone to cylinder 5, height and upper location-plate 1 and the lower location-plate of cylinder 5 Spacing between 2 matches, the design of this structure, and current can be made directly to be contacted with the outer wall or upper location-plate 1 of cylinder 5, subtracted The speed that slow current enter in cylinder 5, and then reduce erosion of the current to the inside stone of cylinder 5;Pass through reinforced bar support structure Design, can not only improve the strength and stability of whole lattice guest gabion monomer, and can avoid existing lattice guest gabion by At steel wire winding and wire basket junction intensity it is difficult to ensure that the problem of, avoid because the stone in gabion is in the work of current With lower constantly frictional metal net, so as to cause the rupture of gabion grid, the design of cylinder 5, a part of stone can be protected Shield, prevents that flow rate of water flow is too high, and the stone quality of filling is not hard enough or small volume, with the continuous erosion of current, stone Between constantly rub, volume constantly reduces, and is finally flowed out from gabion mesh, extend lattice guest's gabion baffling service life and reality The property used.
The method for carrying out slope protection construction using a kind of lattice guest gabion baffling described above, comprises the following steps:
1) surveying and locating
Bank protection face is measured first, determines length, width and the absolute altitude in bank protection face, then by the weeds on bank protection face Remove, mark is carried out according to the design attitude of barricade on bank protection face with white marking line;
2) slope leveling is protected
Kerve is opened up first along the bottom level in bank protection face, the depth of kerve is more than the thickness of lower location-plate 2, and the bottom of to The side of groove carries out compacting processing, side wall is tamped successively upwardly then along bank protection, the length tamped every time and bottom The equal length of groove, the width tamped every time are 1.5~3m, until being tamped to whole bank protection face;
3) lattice guest gabion monomer is installed
A, corresponding upper location-plate 1, lower location-plate 2, cylinder 5 and reinforcing bar are selected according to the length in bank protection face and depth first Supporting construction, groove 8 and neck 11 are first opened up in upper location-plate 1, phase therewith is then selected according to the size of groove 8 The cover plate 9 matched somebody with somebody, after grid 10 and button block 12 are installed on cover plate 9, cover plate 9 is rotatably connected on groove 8, closes cover plate 9 Button block 12 is spacing in neck 11 afterwards, then uniformly opens up the first stopper slot 6 along the lateral wall of upper location-plate 1, and in the first limit The first limited block 7 is installed in the side of position groove 6 at equal intervals, makes the size and the size phase of the first stopper slot 6 of the first limited block 7 Match somebody with somebody, finally open up screwed hole on the first limited block 7 and on the top surface of the first stopper slot 6;
B, and then on the lateral wall of lower location-plate 2 the second stopper slot 13 is uniformly opened up, and in the side of the second stopper slot 13 Side equally spaced position installs the second limited block 14, and the size and the size of the second stopper slot 13 for making the second limited block 14 match, Then screwed hole is opened up on the second limited block 14 and on the bottom surface of the second stopper slot 13;
C, by upper location-plate 1 by reinforced bar support structure welding in the surface of lower location-plate 2, make upper location-plate 1 with The keeping parallelism of location-plate 2, in welded reinforcement supporting construction, the first reinforcing bar 3 is first welded on upper location-plate 1 and lower location-plate 2 Between, ensure that the first reinforcing bar 3 is vertical with upper location-plate 1 and lower location-plate 2, then by the level of the second reinforcing bar 4 from top to bottom etc. Distance is welded between two neighboring first reinforcing bar 3, and the second adjacent reinforcing bar 4 of left and right is staggered;
D, then cylinder 5 is inserted in reinforced bar support structure through the groove 8 in upper location-plate 1, makes the vertical connection of cylinder 5 Welded at the end face center of lower location-plate 2, and by cylinder 5 and lower location-plate 2;
4) lattice guest gabion monomer splicing is launched
A, after lattice guest's gabion monomer of requirement installs, the lattice of respective numbers are selected according to the length in bank protection face Guest's gabion monomer, two adjacent lattice guest's gabion monomers of left and right are attached successively, in connection by between upper location-plate 1 First limited block 7 is inserted in the first stopper slot 6, and two neighboring upper location-plate 1 is fixed through the first screwed hole with screw Connection, the second limited block 14 between lower location-plate 2 is inserted in the second stopper slot 13, and the second screwed hole is passed through by phase with screw Adjacent two lower location-plates 2 are fixedly connected;
B, after lattice guest's gabion monomer is spliced to form single barricade, stone is first loaded successively in lattice guest's gabion monomer, by stone Block is put between the inside of cylinder 5 and cylinder 5 and reinforced bar support structure, is closed cover plate 9 after filling, then will be arranged in kerve Single barricade single barricade is transferred into kerve by hoisting machine, hoisting machine is removed after fixed, by single barricade close to shield Casting concrete at domatic side gap;
C, and then circulation step a and step b, the construction of the single barricade of last layer is carried out, until whole lattice guest gabion baffling Construction finishes.
The specific embodiment of the present invention is these are only, but the technical characteristic of the present invention is not limited thereto.It is any with this hair Based on bright, to realize essentially identical technique effect, made ground simple change, equivalent substitution or modification etc., all cover Among protection scope of the present invention.

Claims (8)

  1. A kind of 1. lattice guest gabion baffling, it is characterised in that:Including lattice guest's gabion monomer, the lattice guest gabion monomer includes upper positioning Plate, lower location-plate, reinforced bar support structure and cylinder, the upper location-plate are horizontally set on the surface of the lower location-plate, institute State lower location-plate and the upper location-plate is connected by the reinforced bar support structure, the cylinder is fixedly connected on the lower location-plate End face center at, be filled with stone respectively in the cylinder, between the cylinder and the reinforced bar support structure.
  2. A kind of 2. lattice guest gabion baffling according to claim 1, it is characterised in that:The reinforced bar support structure includes first Reinforcing bar and the second reinforcing bar, first reinforcing bar are uniformly arranged between the upper location-plate and the lower location-plate, and described Upper location-plate described in one reinforcing bar vertical connection and the lower location-plate, second reinforcing bar are uniformly arranged on adjacent two from top to bottom Between individual first reinforcing bar, and adjacent two second reinforcing bars in left and right are staggered up and down.
  3. A kind of 3. lattice guest gabion baffling according to claim 1, it is characterised in that:Filling chamber is provided with the cylinder, The right angle of the filling chamber is evenly arranged with crushing block from top to bottom.
  4. A kind of 4. lattice guest gabion baffling according to claim 3, it is characterised in that:The height of the cylinder with it is described fixed Spacing between position plate and the lower location-plate matches.
  5. A kind of 5. lattice guest gabion baffling according to claim 1, it is characterised in that:It is provided with the upper location-plate logical Groove, cover plate is rotatably connected on the groove, grid is provided with the cover plate, the end set of the cover plate has button block, institute State and neck is provided with upper location-plate, the button block matches with the neck.
  6. A kind of 6. lattice guest gabion baffling according to claim 5, it is characterised in that:Set on the lateral surface of the upper location-plate The first stopper slot and the first limited block are equipped with, first limited block matches with first stopper slot, and described first is spacing The first screwed hole is provided with block and first stopper slot.
  7. A kind of 7. lattice guest gabion baffling according to claim 1, it is characterised in that:Set on the lateral surface of the lower location-plate The second stopper slot and the second limited block are equipped with, second limited block matches with second stopper slot, and described second is spacing The second screwed hole is provided with block and second stopper slot.
  8. 8. the method for carrying out slope protection construction using a kind of lattice guest gabion baffling as claimed in claim 1, it is characterised in that including Following steps:
    1) surveying and locating
    Bank protection face is measured first, determines length, width and the absolute altitude in bank protection face, it is then that the weeds on bank protection face are clear Remove, mark is carried out according to the design attitude of barricade on bank protection face with white marking line;
    2) slope leveling is protected
    Kerve is opened up first along the bottom level in bank protection face, the depth of kerve is more than the thickness of lower location-plate, and to kerve Side carries out compacting processing, and side wall is tamped successively upwardly then along bank protection, the length tamped every time and kerve Equal length, the width tamped every time are 1.5~3m, until being tamped to whole bank protection face;
    3) lattice guest gabion monomer is installed
    A, corresponding upper location-plate, lower location-plate, cylinder and reinforced bar support knot are selected according to the length in bank protection face and depth first Structure, groove and neck are first opened up in upper location-plate, matched cover plate is then selected according to the size of groove, After grid and button block are installed on cover plate, cover plate is rotatably connected on groove, cover plate is closed rear button block spacing in neck, connects Along the lateral wall of upper location-plate and uniformly open up the first stopper slot, and installation first limits at equal intervals in the side of the first stopper slot Position block, the size and the size of the first stopper slot for making the first limited block match, finally spacing with first on the first limited block Screwed hole is opened up on the top surface of groove;
    B, and then on the lateral wall of lower location-plate the second stopper slot is uniformly opened up, and in the equidistant position in the side of the second stopper slot The second limited block of installation is put, the size and the size of the second stopper slot for making the second limited block match, then in the second limited block Screwed hole is opened up on upper and the second stopper slot bottom surface;
    C, by upper location-plate by reinforced bar support structure welding in the surface of lower location-plate, upper location-plate is protected with lower location-plate Maintain an equal level row, in welded reinforcement supporting construction, first by the first reinforcement welding between upper location-plate and lower location-plate, ensures first Reinforcing bar is vertical with upper location-plate and lower location-plate, then by the second reinforcing bar level it is equidistant from top to bottom be welded on it is two neighboring Between first reinforcing bar, the second adjacent reinforcing bar of left and right is staggered;
    D, then cylinder is inserted in reinforced bar support structure through the groove in upper location-plate, cylinder is vertically connected on lower positioning At the end face center of plate, and cylinder and lower location-plate are welded;
    4) lattice guest gabion monomer splicing is launched
    A, after lattice guest's gabion monomer of requirement installs, lattice guest's stone of respective numbers is selected according to the length in bank protection face Cage monomer, two adjacent lattice guest's gabion monomers of left and right are attached successively, in connection by first between upper location-plate Limited block is inserted in the first stopper slot, is fixedly connected two neighboring upper location-plate through the first screwed hole with screw, will The second limited block between lower location-plate is inserted in the second stopper slot, and the second screwed hole is passed through by two neighboring lower positioning with screw Plate is fixedly connected;
    B, after lattice guest's gabion monomer is spliced to form single barricade, stone is first loaded successively in lattice guest's gabion monomer, stone is put Enter between inner barrel and cylinder and reinforced bar support structure, close cover plate after filling, then will be single in kerve Barricade is transferred single barricade into kerve by hoisting machine, hoisting machine is removed after fixed, by single barricade close to bank protection face Casting concrete at the gap of side;
    C, and then circulation step a and step b, the construction of the single barricade of last layer is carried out, until whole lattice guest gabion baffling is constructed Finish.
CN201711038869.5A 2017-10-30 2017-10-30 Gabion retaining wall and slope protection construction method thereof Active CN107882061B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711038869.5A CN107882061B (en) 2017-10-30 2017-10-30 Gabion retaining wall and slope protection construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711038869.5A CN107882061B (en) 2017-10-30 2017-10-30 Gabion retaining wall and slope protection construction method thereof

Publications (2)

Publication Number Publication Date
CN107882061A true CN107882061A (en) 2018-04-06
CN107882061B CN107882061B (en) 2019-12-20

Family

ID=61783046

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711038869.5A Active CN107882061B (en) 2017-10-30 2017-10-30 Gabion retaining wall and slope protection construction method thereof

Country Status (1)

Country Link
CN (1) CN107882061B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109440792A (en) * 2018-11-14 2019-03-08 浙江景昌建设有限公司 A kind of flood control cofferdam device and its construction method
CN111980749A (en) * 2020-08-23 2020-11-24 昆明理工大学 Novel detachable recycling filling retaining wall construction device and method
CN113529521A (en) * 2021-07-10 2021-10-22 南京华宇建设股份有限公司 Soft soil roadbed reinforced structure

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR3130302B1 (en) * 2021-12-13 2024-10-04 Loic Sapede CONSTRUCTION ELEMENT AND ASSEMBLY OF SUCH ELEMENTS

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06313309A (en) * 1992-10-07 1994-11-08 Setouchi Kinmo Shoko Kk Stone cramming basket mat and its construction method
DE20014332U1 (en) * 2000-08-16 2000-12-07 Betz, Manfred, 71229 Leonberg Hollow body for receiving bulk goods
JP2012219465A (en) * 2011-04-06 2012-11-12 Aomori Showa Sangyo Kk Stone-packing basket and inner basket
CN206110089U (en) * 2016-10-19 2017-04-19 上海博大园林建设发展有限公司 Sustainable tree stone ecological revetment module of scour prevention
CN206173889U (en) * 2016-10-09 2017-05-17 江西南方隧道工程有限公司 Perpendicular ecological revetment structure
EP3173528A1 (en) * 2015-11-30 2017-05-31 Gabriele Camomilla Device for supporting traffic barriers, traffic barrier system and installing method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06313309A (en) * 1992-10-07 1994-11-08 Setouchi Kinmo Shoko Kk Stone cramming basket mat and its construction method
DE20014332U1 (en) * 2000-08-16 2000-12-07 Betz, Manfred, 71229 Leonberg Hollow body for receiving bulk goods
JP2012219465A (en) * 2011-04-06 2012-11-12 Aomori Showa Sangyo Kk Stone-packing basket and inner basket
EP3173528A1 (en) * 2015-11-30 2017-05-31 Gabriele Camomilla Device for supporting traffic barriers, traffic barrier system and installing method
CN206173889U (en) * 2016-10-09 2017-05-17 江西南方隧道工程有限公司 Perpendicular ecological revetment structure
CN206110089U (en) * 2016-10-19 2017-04-19 上海博大园林建设发展有限公司 Sustainable tree stone ecological revetment module of scour prevention

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109440792A (en) * 2018-11-14 2019-03-08 浙江景昌建设有限公司 A kind of flood control cofferdam device and its construction method
CN111980749A (en) * 2020-08-23 2020-11-24 昆明理工大学 Novel detachable recycling filling retaining wall construction device and method
CN113529521A (en) * 2021-07-10 2021-10-22 南京华宇建设股份有限公司 Soft soil roadbed reinforced structure

Also Published As

Publication number Publication date
CN107882061B (en) 2019-12-20

Similar Documents

Publication Publication Date Title
CN107882061A (en) A kind of lattice guest gabion baffling and its slope protection construction method
CN208701710U (en) A kind of landslide control slope retaining structure
CN103806451B (en) A kind of anchorage type foundation ditch strengthening structure and construction method thereof
CN213086712U (en) Slope dike protection body of gabion mesh box structure
CN102704505A (en) Onshore wind generating set foundation
CN101314942A (en) Wave breaker of inverse T shaped pipe wall pile
CN110670901A (en) Protection method for integrally moving ancient tomb chamber by adopting steel sleeve box
CN207130765U (en) A kind of Construction of Civil Engineering retaining wall with greening and discharge structure
CN206986907U (en) A kind of side slope down-the-hole drill drilling operation platform
CN109457995A (en) A kind of civil engineering builds reinforcing wall and its reinforcement means
CN211006689U (en) Concrete spraying and supporting structure for hanging net between columns
CN209339011U (en) A kind of railway gravity pier defense anti-seismic strengthening device
CN207891897U (en) A kind of protective slope structure of side slope
CN207672557U (en) Water conservancy slope protection net
CN108837518A (en) The construction method of the soft bridge of recreation ground and amusement facility and soft bridge and amusement facility
CN108867219A (en) A kind of construction method of green roadbed peg board wall construction
CN202194146U (en) Single-row-pile foundation pit bracing structure
CN211898175U (en) Ecological protection structure of river course bank slope
CN211948542U (en) Anti-skid weight-balancing retaining wall assembly and retaining wall system
CN211395576U (en) Ecological bank protection structure of reservoir
RU77878U1 (en) CONSTRUCTION UNIT FOR SAVING WALL AND SAVING WALL
CN202090357U (en) Pile cap for cluster type pile foundation and immersed tunnel pile foundation
CN206986915U (en) A kind of fan platform installation foundation
CN208792365U (en) Cement-soil gravity type retaining wall
KR100994578B1 (en) Debris barrier

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20191115

Address after: 315000 room M103, building 1, Lane 60, siyanqi street, Yinzhou District, Ningbo City, Zhejiang Province

Applicant after: NINGBO SHUNXING GARDEN CONSTRUCTION CO., LTD.

Address before: 323800 Songyuan New Road, Qingyuan County, Lishui City, Zhejiang Province, 17

Applicant before: Zhejiang Xin Xin Construction Co., Ltd.

GR01 Patent grant
GR01 Patent grant