CN108837518A - The construction method of the soft bridge of recreation ground and amusement facility and soft bridge and amusement facility - Google Patents

The construction method of the soft bridge of recreation ground and amusement facility and soft bridge and amusement facility Download PDF

Info

Publication number
CN108837518A
CN108837518A CN201810586625.9A CN201810586625A CN108837518A CN 108837518 A CN108837518 A CN 108837518A CN 201810586625 A CN201810586625 A CN 201810586625A CN 108837518 A CN108837518 A CN 108837518A
Authority
CN
China
Prior art keywords
iron chains
bridge
foundation frame
cable wire
soft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810586625.9A
Other languages
Chinese (zh)
Other versions
CN108837518B (en
Inventor
刘军正
胡大伟
杨胜刚
郭重华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Shuo Ping Tourism Development Co Ltd
Original Assignee
Henan Shuo Ping Tourism Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Shuo Ping Tourism Development Co Ltd filed Critical Henan Shuo Ping Tourism Development Co Ltd
Priority to CN201810586625.9A priority Critical patent/CN108837518B/en
Publication of CN108837518A publication Critical patent/CN108837518A/en
Application granted granted Critical
Publication of CN108837518B publication Critical patent/CN108837518B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63GMERRY-GO-ROUNDS; SWINGS; ROCKING-HORSES; CHUTES; SWITCHBACKS; SIMILAR DEVICES FOR PUBLIC AMUSEMENT
    • A63G31/00Amusement arrangements
    • A63G31/007Amusement arrangements involving water

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to amusement facility fields, disclose the construction method of the soft bridge of recreation ground and amusement facility and soft bridge and amusement facility, soft bridge includes the foundation frame (2) at pontic (1) and both ends, the both ends of pontic (1) are connected with foundation frame (2), pontic (1) includes the bridge floor (4) for supporting chain component and being detachably connected on the upside of support chain component, and support chain component includes the first iron chains (31) on the left of pontic (1), the second iron chains (32) on the right side of pontic (1);The both ends of first iron chains (31) and the second iron chains (32) are connected with foundation frame (2);Bridge floor (4) includes several bridge plates (11), bridge plate (11) is successively laid with along the first iron chains (31), the second iron chains (32), one end of bridge plate (11) is detachably connected with the first iron chains (31), and the other end is detachably connected with the second iron chains (32).The pontic (1) with high security, can prevent from colliding, and bearing capacity is strong, interest, the advantages that athletics is high.

Description

The construction method of the soft bridge of recreation ground and amusement facility and soft bridge and amusement facility
Technical field
The present invention relates to water-based amusement rides fields, more particularly to a kind of soft bridge for water-based amusement rides and waterborne Amusement facility.
Background technique
With the development and the improvement of people's living standards of society, recreation ground is increasingly liked by broad masses, But the item of recreation of traditional recreation ground is relatively common, does not have challenge to the masses, and athletics is poor.For summer Speech, welcome of the aquatics programme by broad masses, but most aquatics programmes are mostly that parent-offspring plays, athletics is poor, the present invention A kind of soft bridge and soft bridge amusement facility are provided, have many advantages, such as that number can be simultaneously participated in more, athletics and interest are high.
Summary of the invention
The present invention for it is existing in the prior art the disadvantages of, provide the soft bridge of recreation ground and amusement facility and soft bridge and The construction method of amusement facility.
In order to solve the above technical problems, the present invention is addressed by following technical proposals:
For the soft bridge of recreation ground, the foundation frame including pontic and both ends, the both ends of pontic are connected with foundation frame, pontic packet The bridge floor for including support chain component and being detachably connected on the upside of support chain component, support chain component include the first iron on the left of pontic The second iron chains on the right side of chain, pontic;The both ends of first iron chains and the second iron chains and foundation frame pass through the one the second connector of setting It is detachable to be connected;Bridge floor includes several bridge plates, and bridge plate is successively laid with along the first iron chains, the second iron chains, one end of bridge plate and first Iron chains is detachably connected, and the other end is detachably connected with the second iron chains;Support chain component further includes protection cable wire, protects cable wire Both ends are connected with foundation frame, and the two sides of pontic are arranged in protection cable wire, and two sides protect the distance between cable wire less than the length of bridge plate Degree, protection cable wire is located at the downside of bridge plate and the first iron chains, the second iron chains are arranged in parallel, and protects and is provided with several second on cable wire Connector, the second connector, which passes through the first iron chains or the second iron chains, will protect cable wire to tie up phase with the first iron chains or the second iron chains Even.Cable wire is protected to provide second protection for pontic, to improve the safety of the body of a bridge, after iron chains disconnects, the iron chains of disconnection is logical Cable wire is crossed to be connected.
Preferably, the first iron chains and the second iron chains are made of the chain link mutually buckled, the hole in the middle part of chain link is to fix Hole, bridge plate include installation bolt and installation nut, install screw bolt passes bridge plate, fixation hole and nut thread cooperation for bridge plate It is connected with the first iron chains, the second iron chains.Bridge plate has many advantages, such as easy for installation, is conveniently replaceable.
Preferably, the both ends of bridge plate are provided with the cladding item of strip, the upper surface of bridge plate is arranged in the one end for coating item, The lower end surface of bridge plate is arranged in the other end, and cladding item is bolted to connection with bridge plate, and support chain component is coated on cladding item It is interior.The iron chains.Cable wire and connection bolt are coated in cladding item, to guarantee that iron chains cable wire and bolt will not hurt To tourist, safety is more preferable, and can influence of the less external environment to iron chains and cable wire, improve iron chains and cable wire Safety and service life.
Preferably, bridge floor is the secondary parabola type of opening upwards, the gradient is greater than 0 and less than or equal to 1%, so as to It provides and stablizes suitable rolling power, so that soft bridge is more in line with people and shakes demand.
Preferably, foundation frame includes the vertically disposed support column in pontic two sides, it is welded with and is vertically arranged on support column Mounting plate offers mounting hole on mounting plate, and support chain component is connected by mounting hole with foundation frame, and the side of mounting plate is arranged There is horizontal stiffening plate, stiffening plate is welded and fixed with mounting plate, support column.
It is welded with support rail as the bottom that preferred foundation frame is two support columns, two support columns are connected by support rail, The bottom of every support column is also welded with bottom bar, is welded with reinforcing rod between bottom bar and support column, the both ends of reinforcing rod respectively at Bottom bar and support column welding.
It further includes pond that the present invention also provides a kind of amusement facilities including above-mentioned soft bridge, and foundation frame is arranged in pond Two sides, soft bridge is across pond;The bottom in pond is provided with hardening of cement layer, the upper surface of hardening of cement layer be equipped with soft layer or Person's sandstone seed.
The present invention also provides a kind of construction methods of above-mentioned soft bridge, include the following steps,
Step 1: basic measurement, according to planning measurement body of a bridge axis, two sides be used to the abutment of immobilizing foundation frame axis, Permanent standard is arranged in ground excavation line;
Step 2: Bridge Pier Construction, filling hole is dug out in two sides, and foundation frame is fixed in filling hole by armored concrete, is filled out The upper end for filling hole is laid with horse block and forms abutment;
Step 3: the first iron chains and the installation of the second iron chains, carried out the first iron chains and the second iron chains using indexed mode The both ends of water process, the first iron chains and the second iron chains are connected and fixed with foundation frame by the first connector, then by adjusting the The sag of the connection length of one iron chains and the second iron chains adjusting body of a bridge;
Step 4: installation protection cable wire, protection cable wire are connected by second the first iron chains of connector and the second iron chains, protection The both ends of cable wire are fixed on foundation frame;
Step 5: being laid with bridge floor;Bridge plate is successively laid on the first iron chains and the second iron chains by installing bolt, laying In the process, the both ends of bridge plate, which are bolted, coats cladding item, the first iron chains, the second iron chains, protection cable wire and installation bolt, Installation nut is coated in the space that cladding item surrounds.
Preferably, step 2 specific implementation step is as follows, filling hole is first dug out, the bottom for being subsequently filled hole pours coagulation Then foundation frame and steel mesh are placed in soil face, then pouring reinforcement concrete, foundation frame are provided with gear close to the side of the body of a bridge Soil.
The present invention also provides a kind of construction methods of amusement facility, include the following steps,
Step 1: handling natural pond or excavating artificial pond, the span in pond is measured;
Step 2: basic measurement, according to planning measurement body of a bridge axis, two sides be used to the abutment of immobilizing foundation frame axis, Permanent standard is arranged in ground excavation line;
Step 3: Bridge Pier Construction, filling hole is dug out in two sides, and foundation frame is fixed in filling hole by armored concrete, is filled out The upper end for filling hole is laid with horse block and forms abutment;
Step 4: the first iron chains and the installation of the second iron chains, carried out the first iron chains and the second iron chains using indexed mode The both ends of water process, the first iron chains and the second iron chains are connected and fixed with foundation frame by the first connector, then by adjusting the The sag of the connection length of one iron chains and the second iron chains adjusting body of a bridge;
Step 5: installation protection cable wire, protection cable wire are connected by second the first iron chains of connector and the second iron chains, protection The both ends of cable wire are fixed on foundation frame;
Step 6: being laid with bridge floor;Bridge plate is successively laid on the first iron chains and the second iron chains by installing bolt, laying In the process, the both ends of bridge plate, which are bolted, coats cladding item, the first iron chains, the second iron chains, protection cable wire and installation bolt, Installation nut is coated in the space that cladding item surrounds;
Step 7: cleaning bottom of pond, bottom of pond make hardening of cement layer, it is laid with soft pack layer on hardened layer and is fixed or firmly Change and sets sandstone seed on layer;
Step 8: filling the water into pond, the depth of water is 80cm~100cm.
The present invention by adopting the above technical scheme, has the advantages that:
The present invention is supported bridge floor in such a way that iron chains adds cable wire, has supporting & stablizing, and security performance height etc. is excellent Point.And the length of the body of a bridge can be lengthened and be shortened according to actual needs, to change the gradient of bridge floor, be provided different Spring and rolling power, while bridge floor good integrity, the iron chains and cable wire are coated by coating item, to avoid swimming Visitor is run into during landing, and tourist is prevented to be knocked, and cladding item equally can provide protection for iron chains and cable wire, is reduced External erosion.And the bottom of pond in artificial pond is handled, and avoiding travelling falling into water occurs adhering on tumble injury and clothes Sludge.The people that the soft bridge can stand simultaneously is more, and support force is big, and interest and athletics are higher.
And the soft bridge construction methodological science, foundation frame tensile capacity is strong, it is small to environmental disruption the advantages that.
Detailed description of the invention
Fig. 1 is the schematic view of facade structure of soft bridge;
Fig. 2 is the top view of Fig. 1;
Fig. 3 is the structural schematic diagram of foundation frame and horse block;
Fig. 4 is the top view of Fig. 3;
Fig. 5 is the partial enlarged view of Fig. 1;
Fig. 6 is the schematic perspective view of part bridge floor;
Fig. 7 is the schematic perspective view of Fig. 6 removal cladding item;
Fig. 8 is bridge plate and chain connection schematic diagram;
Fig. 9 is the structural schematic diagram of foundation frame.
Appended drawing reference in figure corresponds to following technical name:1 one pontics, 2 one foundation frames, 3 one support chain components, 4 one bridges Face, the 31 one the first iron chains, the 32 one the second iron chains, 11 1 bridge plates, 310 1 chain links, 311 1 fixation holes, 312 1 installation bolts, 313 One installation nut, 314 1 gaskets, 315 1 hoses, 33 1 protection cable wires, the 331 one the second connectors, 34 1 cladding items, 21 1 Dagger, 22 1 mounting plates, 23 1 mounting holes, 24 1 stiffening plates, 5 one ponds, 51 1 hardening of cement layers, 52 1 soft layers.
Specific embodiment
Present invention is further described in detail with embodiment with reference to the accompanying drawing.
Embodiment 1
As shown in Figure 1 to 9, for the soft bridge of recreation ground, including pontic 1 and the foundation frame at both ends 2, the both ends of pontic 1 with Foundation frame 2 is connected, and pontic 1 includes support chain component and is detachably connected on the bridge floor 4 supported on the upside of chain component, supports chain component Second iron chains 32 of the first iron chains 31,1 right side of pontic including 1 left side of pontic;First iron chains 31 and the second iron chains 32 are not only Bridge floor 4 provides support force, and provides spring and rolling power when playing and using for bridge floor 4.First iron chains 31 and the second iron The both ends of chain 32 are connected with foundation frame 2;Bridge floor 4 include several bridge plates 11, bridge plate 11 along the first iron chains 31, the second iron chains 32 successively It is laid with, is closely laid between adjacent bridge plate 11, one end of bridge plate 11 is detachably connected with the first iron chains 31, the other end and the second iron Chain 32 is detachably connected.
Bridge plate 11 is with the first iron chains 31 and the specific connection type of the second iron chains 32:Apparent first iron chains 31 and Two iron chains 32 are made of the chain link 310 mutually buckled.For ease of description, the hole at 310 middle part of name chain link is fixation hole 311, bridge plate 11 include installation bolt 312 and installation nut 313, installation bolt 312 sequentially pass through bridge plate 11, fixation hole 311 with Bridge plate 11 and the first iron chains 31, the second iron chains 32 are connected by nut thread cooperation, and the bolt is Kosé bolt, each bolt The nut of upper connection is two;It further include gasket to guarantee the service life of bolt and reduce the shearing force that is subject to of bolt 314, the outer diameter of gasket 314 is greater than the width of mounting hole 23, is all provided between nut and chain link 310, between chain link 310 and bridge plate 11 It is equipped with gasket 314, is arranged with hose 315 on setting installation bolt 312 on the downside of bridge plate 11, the hose 315 is plastic tube.
Support chain component further includes protection cable wire 33, and the both ends of protection cable wire 33 are connected with foundation frame 2, and protection cable wire 33 is set It sets in the two sides of pontic 1, two sides protect the distance between cable wire 33 to be less than the length of bridge plate 11, and cable wire 33 is protected to be located at bridge plate 11 Downside be arranged in parallel with the first iron chains 31, the second iron chains 32, protect and be provided with several second connectors 331 on cable wire 33, the Two connectors 331, which pass through the first iron chains 31 or the second iron chains 32, will protect cable wire 33 to tie up with the first iron chains 31 or the second iron chains 32 It is connected.Wherein, the second connector 331 is the first shackle, and the fixation hole 311 that the first shackle passes through chain link 310 will protect cable wire 33 It is banded together with chain link 310, so that double guarantee is provided for the first chain, the second chain, in the first chain and the second chain When fracture, protection cable wire 33 provides interim attachment force and is unlikely to directly to disconnect by the first chain or the second chain, avoids bridge floor 4 It steps on disconnected, tourist is enable to possess the reaction time.
In order to guarantee tourist during playing overboard, bridge floor 4 will not damage tourist;The both ends of bridge plate 11 are set It is equipped with the cladding item 34 of strip, cladding item 34 is plastic foam or is other compared with softwood matter, and one end setting for coating item 34 exists The lower end surface of bridge plate 11 is arranged in the upper surface of bridge plate 11, the other end, and cladding item 34 is bolted to connection with bridge plate 11, props up Support chain component is coated in the space that cladding item 34 surrounds;Specifically for the first iron chains 31, the second iron chains 32, protection steel wire and Installation bolt 312 is coated in cladding item 34.
Bridge floor 4 is the secondary parabola type of opening upwards, and the gradient is greater than 0 and less than or equal to 1%, which can be just Being unlikely to excessively to rock during often walking makes tourist fall, and the bridge floor 4 has and rocks surely during rocking It is fixed, the advantages that not resonating is rocked, power required for rocking can also be approved by tourist.
Specific to the present embodiment, the linear span of the bridge floor 4 is 22 meters, and the length of bridge floor 4 is 24 meters, the width of bridge floor 4 For 1250mm, bridge plate 11 is pinus sylvestris var. mongolica plank.
In order to provide stable pulling force to the bridge, foundation frame 2 is fixed on underground using armored concrete for tripod, basis Exposed frame 2 is support column 21 on the ground, and the mounting plate 22 of vertical direction is welded on support column 21, is opened up on mounting plate 22 There is mounting hole 23, support chain component is connected by mounting hole 23 with foundation frame 2, and the outside of mounting plate 22 is provided with horizontal reinforcement Plate 24, setting are to avoid personnel from colliding with to guarantee the safety of the pavement between support column 21 on the outside.Stiffening plate 24 and installation Plate 22, support column 21 are welded and fixed.First iron chains 31 and the second iron chains 32 passes through mounting hole 23 by the second shackle 50 It is connected with support column 21.
The foundation frame 2 is that the bottom of two support columns 21 is welded with rectangular frame, and two support columns 21 are located at rectangular frame Corner, rectangular frame include connect support column 21 support rail 25 and the bottom bar 26 vertical with support rail 25, bottom bar Reinforcing rod 27 is welded between 26 and support column 21, the both ends of reinforcing rod 27 are welded respectively at bottom bar 26 and support column 21.Two The middle part of dagger 21, which is welded with, reinforces cross bar 28, reinforces the lower section that cross bar 28 is located at horse block or pedal 29.
It further include the second shackle 50, the first iron chains 31 and the second iron chains 32 pass through the second shackle 50 and be mounted on mounting plate 22 On.So that iron chains is connected with support column 21 by shackle, has many advantages, such as that 4 elasticity of bridge floor is easy to adjust.
The playing property of the soft bridge is, the personnel on bridge, which can take up bridge floor by double swerve, to be occurred teetertottering and left Right swing brings challenges to the balance of tourist, and the tourist of following and timely center-of-gravity regulating will be from 4 left and right side of bridge floor It falls into water, the two sides and pond 5 of bridge floor 4 will not damage tourist.
The construction method of the soft bridge includes the following steps:
Step 1: basic measurement, according to planning measurement body of a bridge axis, two sides be used to the abutment of immobilizing foundation frame 2 axis, Permanent standard is arranged in ground excavation line;
Step 2: Bridge Pier Construction, filling hole is dug out in two sides, and foundation frame 2 is fixed in filling hole by armored concrete, is filled out The upper end for filling hole is laid with horse block and forms abutment;
Step 3: the first iron chains 31 and the installation of the second iron chains 32, using indexed mode to the first iron chains 31 and the second iron chains 32 carried out water process, and the both ends of the first iron chains 31 and the second iron chains 32 are connected and fixed with foundation frame 2 by the first connector, so The sag of the body of a bridge is adjusted by adjusting the connection length of the first iron chains 31 and the second iron chains 32 afterwards;First connector is the One shackle;
Step 4: installation protection cable wire 33, protection cable wire 33 pass through second connector the first iron chains 31 and the second iron chains 32 It is connected, the both ends of protection cable wire 33 are fixed on foundation frame 2;
Step 5: being laid with bridge floor;Bridge plate 11 is successively laid on the first iron chains 31 and the second iron chains 32 by installing bolt 312 On, during laying, the both ends of bridge plate 11 are bolted cladding cladding item 34, and the first iron chains 31, is protected second iron chains 32 Shield cable wire 33 and installation bolt 312, installation nut 313 are coated in the space that cladding item 34 surrounds.
Wherein step 2 specific implementation step is as follows, first digs out filling hole, with being subsequently filled the bottom casting concrete in hole Then foundation frame 2 and steel mesh are placed in face, then pouring reinforcement concrete, foundation frame 2 are provided with gear close to the side of the body of a bridge Soil.The earth-retaining is to grout rubble earth-retaining.
Embodiment 2
A kind of amusement facility is present embodiments provided, the soft bridge including embodiment 1 further includes pond 5, and foundation frame 2 is arranged In the two sides in pond 5, soft bridge is across pond 5;The bottom in pond 5 is provided with the upper surface of hardening of cement layer 51, hardening of cement layer 51 It is equipped with soft layer 52 or sandstone seed.The depth in pond 5 is 80cm~100cm.
The present embodiment additionally provides the construction method of the amusement facility, includes the following steps,
Step 1: handling natural pond 5 or excavating artificial pond 5, the span in pond 5 is measured;
Step 2: basic measurement, according to planning measurement body of a bridge axis, two sides be used to the abutment of immobilizing foundation frame 2 axis, Permanent standard is arranged in ground excavation line;
Step 3: Bridge Pier Construction, filling hole is dug out in two sides, and foundation frame 2 is fixed in filling hole by armored concrete, is filled out The upper end for filling hole is laid with horse block and forms abutment;
Step 4: the first iron chains 31 and the installation of the second iron chains 32, using indexed mode to the first iron chains 31 and the second iron chains 32 carried out water process, and the both ends of the first iron chains 31 and the second iron chains 32 are connected and fixed with foundation frame 2 by the first connector, so The sag of the body of a bridge is adjusted by adjusting the connection length of the first iron chains 31 and the second iron chains 32 afterwards;
Step 5: installation protection cable wire 33, protection cable wire 33 pass through second connector the first iron chains 31 and the second iron chains 32 It is connected, the both ends of protection cable wire 33 are fixed on foundation frame 2;
Step 6: being laid with bridge floor;Bridge plate 11 is successively laid on the first iron chains 31 and the second iron chains 32 by installing bolt 312 On, during laying, the both ends of bridge plate 11 are bolted cladding cladding item 34, and the first iron chains 31, is protected second iron chains 32 Shield cable wire 33 and installation bolt 312, installation nut 313 are coated in the space that cladding item 34 surrounds;
Step 7: cleaning bottom of pond, bottom of pond make hardening of cement layer 51, soft pack layer 52 is laid on hardened layer and be fixed or Sandstone seed is set on person's hardened layer;
Step 8: filling the water into pond, the depth of water is 80cm~100cm
In short, the foregoing is merely presently preferred embodiments of the present invention, it is all according to equalization made by scope of the present invention patent Variation and modification, shall all be covered by the patent of the invention.

Claims (10)

1. it is used for the soft bridge of recreation ground, the foundation frame (2) including pontic (1) and both ends, the both ends and foundation frame (2) of pontic (1) It is connected, it is characterised in that:Pontic (1) includes the bridge floor (4) for supporting chain component and being detachably connected on the upside of support chain component, branch Supportting chain component includes the first iron chains (31) on the left of pontic (1), the second iron chains (32) on the right side of pontic (1);First iron chains (31) Detachably it is connected with the both ends of the second iron chains (32) and foundation frame (2) by the one the second connector of setting;Bridge floor (4) is if include Dry bridge plate (11), bridge plate (11) are successively laid with along the first iron chains (31), the second iron chains (32), one end of bridge plate (11) and the first iron Chain (31) is detachably connected, and the other end is detachably connected with the second iron chains (32);Support chain component further includes protection cable wire (33), The both ends of protection cable wire (33) are connected with foundation frame (2), and protection cable wire (33) setting protects steel in the two sides of pontic (1), two sides The distance between rope (33) is less than the length of bridge plate (11), and protection cable wire (33) is located at downside and the first iron chains of bridge plate (11) (31), the second iron chains (32) is arranged in parallel, and is provided with several second connectors (331), the second connector in protection cable wire (33) (331) cable wire (33) and the first iron chains (31) or the second iron chains (32) will be protected by passing through the first iron chains (31) or the second iron chains (32) It ties up connected.
2. the soft bridge according to claim 1 for recreation ground, it is characterised in that:First iron chains (31) and the second iron chains (32) it is made of the chain link (310) mutually buckled, the hole in the middle part of chain link (310) is fixation hole (311), and bridge plate (11) includes peace Bolt (312) and installation nut (313) are filled, installation bolt (312) sequentially passes through bridge plate (11), fixation hole (311) and nut spiral shell Bridge plate (11) and the first iron chains (31), the second iron chains (32) are connected by line cooperation.
3. the soft bridge according to claim 2 for recreation ground, it is characterised in that:The both ends of bridge plate (11) are provided with strip Cladding item (34), in the upper surface of bridge plate (11), the other end is arranged under bridge plate (11) for one end setting of cladding item (34) End face, cladding item (34) are bolted to connection with bridge plate (11), and support chain component is coated on the sky that cladding item (34) surrounds In.
4. the soft bridge according to claim 1 or 2 or 3 for recreation ground, it is characterised in that:Bridge floor (4) is opening upwards Secondary parabola type, the gradient be greater than 0 and be less than or equal to 1%.
5. the soft bridge according to claim 1 for recreation ground, it is characterised in that:Foundation frame (2) includes pontic (1) two sides Vertically disposed support column (21), the mounting plate (22) of vertical direction is welded on support column (21), and mounting plate opens up on (22) Have mounting hole (23), support chain component is connected by mounting hole (23) with foundation frame (2), and the one or both sides of mounting plate (22) are set It is equipped with horizontal stiffening plate (24), stiffening plate (24) is welded and fixed with mounting plate (22), support column (21).
6. the soft bridge according to claim 1 for recreation ground, it is characterised in that:Foundation frame (2) is two support columns (21) Bottom be welded with rectangular frame, two support columns (21) are located at the corner of rectangular frame, and rectangular frame includes connection support column (21) support rail (25) and the bottom bar vertical with support rail (25) (26), are welded between bottom bar (26) and support column (21) Have reinforcing rod (27), the both ends of reinforcing rod (27) are welded with bottom bar (26) and support column (21) respectively;In two support columns (21) Portion, which is connected with, reinforces cross bar (28), reinforces the lower section that cross bar (28) are located at horse block or pedal (29).
7. a kind of amusement facility, it is characterised in that:It further include pond (5), foundation frame (2) including soft bridge as claimed in claim 4 Two sides in pond (5) are set, and soft bridge is across pond (5);The bottom in pond (5) is provided with hardening of cement layer (51), and cement is hard Change the upper surface of layer (51) and is equipped with soft layer (52) or sandstone seed.
8. a kind of construction method for soft bridge described in claim 4, it is characterised in that:Include the following steps,
Step 1: basic measurement, according to planning measurement body of a bridge axis, two sides be used to the abutment of immobilizing foundation frame (2) axis, Permanent standard is arranged in base excavation line;
Step 2: Bridge Pier Construction, filling hole is dug out in two sides, and foundation frame (2) is fixed in filling hole by armored concrete, filling The upper end in hole is laid with horse block and forms abutment;
Step 3: the first iron chains (31) and the second iron chains (32) installation, using indexed mode to the first iron chains (31) and the second iron Chain (32) carried out water process, and the both ends and foundation frame (2) of the first iron chains (31) and the second iron chains (32) pass through the first connector It is connected and fixed, the sag of the body of a bridge is then adjusted by adjusting the connection length of the first iron chains (31) and the second iron chains (32);
Step 4: installation protection cable wire (33), protection cable wire (33) passes through second the first iron chains of connector (31) and the second iron chains (32) it is connected, the both ends of protection cable wire (33) are fixed on foundation frame (2);
Step 5: being laid with bridge floor;Bridge plate (11) is successively laid on the first iron chains (31) and the second iron chains by installing bolt (312) (32) on, during laying, the both ends of bridge plate (11) are bolted cladding cladding item (34), the first iron chains (31), the Two iron chains (32), protection cable wire (33) and installation bolt (312), installation nut (313) are coated on the sky that cladding item (34) surrounds In.
9. soft bridge construction method according to claim 8, it is characterised in that:Step 2 specific implementation step is as follows, first digs Filling hole out, is subsequently filled the bottom casting concrete ground in hole, then places foundation frame (2) and steel mesh, then pours steel Reinforced concrete, foundation frame (2) are provided with earth-retaining close to the side of the body of a bridge
10. a kind of construction method for amusement facility described in claim 7, it is characterised in that:Include the following steps,
Step 1: handling natural pond (5) or excavating artificial pond (5), the span of pond (5) is measured;
Step 2: basic measurement, according to planning measurement body of a bridge axis, two sides be used to the abutment of immobilizing foundation frame (2) axis, Permanent standard is arranged in base excavation line;
Step 3: Bridge Pier Construction, filling hole is dug out in two sides, and foundation frame (2) is fixed in filling hole by armored concrete, filling The upper end in hole is laid with horse block and forms abutment;
Step 4: the first iron chains (31) and the second iron chains (32) installation, using indexed mode to the first iron chains (31) and the second iron Chain (32) carried out water process, and the both ends and foundation frame (2) of the first iron chains (31) and the second iron chains (32) pass through the first connector It is connected and fixed, the sag of the body of a bridge is then adjusted by adjusting the connection length of the first iron chains (31) and the second iron chains (32);
Step 5: installation protection cable wire (33), protection cable wire (33) passes through second the first iron chains of connector (31) and the second iron chains (32) it is connected, the both ends of protection cable wire (33) are fixed on foundation frame (2);
Step 6: being laid with bridge floor;Bridge plate (11) is successively laid on the first iron chains (31) and the second iron chains by installing bolt (312) (32) on, during laying, the both ends of bridge plate (11) are bolted cladding cladding item (34), the first iron chains (31), the Two iron chains (32), protection cable wire (33) and installation bolt (312), installation nut (313) are coated on the sky that cladding item (34) surrounds In;
Step 7: cleaning bottom of pond, bottom of pond made hardening of cement layer (51), soft pack layer (52) are laid on hardened layer and be fixed or Sandstone seed is set on person's hardened layer;
Step 8: filling the water into pond, the depth of water is 80cm~100cm.
CN201810586625.9A 2018-06-08 2018-06-08 Playground soft bridge, playfacility and construction method of soft bridge and playfacility Expired - Fee Related CN108837518B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810586625.9A CN108837518B (en) 2018-06-08 2018-06-08 Playground soft bridge, playfacility and construction method of soft bridge and playfacility

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810586625.9A CN108837518B (en) 2018-06-08 2018-06-08 Playground soft bridge, playfacility and construction method of soft bridge and playfacility

Publications (2)

Publication Number Publication Date
CN108837518A true CN108837518A (en) 2018-11-20
CN108837518B CN108837518B (en) 2020-09-22

Family

ID=64211651

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810586625.9A Expired - Fee Related CN108837518B (en) 2018-06-08 2018-06-08 Playground soft bridge, playfacility and construction method of soft bridge and playfacility

Country Status (1)

Country Link
CN (1) CN108837518B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109364494A (en) * 2018-11-29 2019-02-22 白银桦新石农业科技发展有限公司 A kind of amusement on water suspension bridge protective device

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2077877U (en) * 1990-02-17 1991-05-29 昆明工学院 New steel cable bridge
JPH07102523A (en) * 1993-10-01 1995-04-18 Kurimoto Ltd Cable-stayed panel bridge
CN2243932Y (en) * 1994-06-30 1997-01-01 沈阳市植物园 Bridge for recreation
KR101364045B1 (en) * 2013-06-04 2014-02-26 주식회사 디에스글로벌이엔씨 Pedestraion suspension bridge and the construction method for the same
CN103981800A (en) * 2014-04-25 2014-08-13 浙江省隧道工程公司 Float bridge system and float bridge construction method
CN203954666U (en) * 2014-07-28 2014-11-26 浙江飞友康体设备有限公司 A kind of amusement platform V-type bridge for adventure playground
CN206408962U (en) * 2017-01-19 2017-08-15 毛玉平 A kind of safety protection device of municipal road foundation pit
CN206956550U (en) * 2017-07-24 2018-02-02 三峡大学 A kind of suspension bridge wind resistance rubber rope

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2077877U (en) * 1990-02-17 1991-05-29 昆明工学院 New steel cable bridge
JPH07102523A (en) * 1993-10-01 1995-04-18 Kurimoto Ltd Cable-stayed panel bridge
CN2243932Y (en) * 1994-06-30 1997-01-01 沈阳市植物园 Bridge for recreation
KR101364045B1 (en) * 2013-06-04 2014-02-26 주식회사 디에스글로벌이엔씨 Pedestraion suspension bridge and the construction method for the same
CN103981800A (en) * 2014-04-25 2014-08-13 浙江省隧道工程公司 Float bridge system and float bridge construction method
CN203954666U (en) * 2014-07-28 2014-11-26 浙江飞友康体设备有限公司 A kind of amusement platform V-type bridge for adventure playground
CN206408962U (en) * 2017-01-19 2017-08-15 毛玉平 A kind of safety protection device of municipal road foundation pit
CN206956550U (en) * 2017-07-24 2018-02-02 三峡大学 A kind of suspension bridge wind resistance rubber rope

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109364494A (en) * 2018-11-29 2019-02-22 白银桦新石农业科技发展有限公司 A kind of amusement on water suspension bridge protective device

Also Published As

Publication number Publication date
CN108837518B (en) 2020-09-22

Similar Documents

Publication Publication Date Title
CN106758831B (en) Across railway bridge swivel continuous beam construction method
CN108004928B (en) A kind of asymmetric rigid frame-continuous girder construction technology
CN106758841B (en) A kind of whole construction process of the double rope face low-pylon cable-stayed bridges of double tower
CN107030874A (en) Precast lattice beam for slope reinforcement and preparation method thereof and construction method
CN204456167U (en) Prestress anchoraging blower foundation
CN104481552B (en) Super-huge karst cave hole roof fall stone protection construction method
CN203361030U (en) Box beam or T-shaped beam reinforcing structure combining unbonded pre-stress and steel plate concrete
CN110306524A (en) The foundation reinforcing structure and method of the Heavy Equipment-hoisting of the unclosed building of proximity
CN108643938B (en) Smooth surface shotcrete supporting structure of deep coal mine tunnel and construction method thereof
CN114164764B (en) Construction method of high-filling bridge bearing platform structure
CN103382704A (en) Unbonded prestress and steel plate-concrete combined reinforcement structure for box girder or T-shaped girder
CN107974942B (en) A kind of abrupt slope side rigid frame-continuous girder end bay construction method
CN107964979A (en) A kind of transmission line of electricity combining structure assembled cushion cap anchor rod foundation
CN205576955U (en) Raft foundation's reinforced structure is displaced into to strip footing
CN111894641B (en) Treatment and construction process for tunnel to penetrate through super-huge water-containing cavity karst cave
JP2016084690A (en) Base type foundation unit
CN113152262A (en) Bridge single-column pier reinforcement construction method
CN114892552A (en) Box girder type bridge reconstruction construction method
CN108837518A (en) The construction method of the soft bridge of recreation ground and amusement facility and soft bridge and amusement facility
CN109083660A (en) Soft Rock Roadway (tunnel) road pucking based on armored concrete bottom beam administers supporting construction and method
CN112281873A (en) Construction method of anchoring pile
CN208668244U (en) A kind of soft bridge and water-based amusement rides for water-based amusement rides
CN111733824A (en) Deep foundation pit supporting structure
RU2459908C1 (en) Method to erect support of aerial cableway
CN209011132U (en) A kind of fixed foundation pit berm structure of assembled two point

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200922

Termination date: 20210608