CN107878652A - A kind of nonmetallic bicycle frame structure and its manufacture method - Google Patents
A kind of nonmetallic bicycle frame structure and its manufacture method Download PDFInfo
- Publication number
- CN107878652A CN107878652A CN201710979112.XA CN201710979112A CN107878652A CN 107878652 A CN107878652 A CN 107878652A CN 201710979112 A CN201710979112 A CN 201710979112A CN 107878652 A CN107878652 A CN 107878652A
- Authority
- CN
- China
- Prior art keywords
- joint
- pipe
- pipe beam
- nonmetallic
- frame structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B62—LAND VEHICLES FOR TRAVELLING OTHERWISE THAN ON RAILS
- B62K—CYCLES; CYCLE FRAMES; CYCLE STEERING DEVICES; RIDER-OPERATED TERMINAL CONTROLS SPECIALLY ADAPTED FOR CYCLES; CYCLE AXLE SUSPENSIONS; CYCLE SIDE-CARS, FORECARS, OR THE LIKE
- B62K19/00—Cycle frames
- B62K19/02—Cycle frames characterised by material or cross-section of frame members
- B62K19/16—Cycle frames characterised by material or cross-section of frame members the material being wholly or mainly of plastics
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C69/00—Combinations of shaping techniques not provided for in a single one of main groups B29C39/00 - B29C67/00, e.g. associations of moulding and joining techniques; Apparatus therefore
- B29C69/02—Combinations of shaping techniques not provided for in a single one of main groups B29C39/00 - B29C67/00, e.g. associations of moulding and joining techniques; Apparatus therefore of moulding techniques only
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B62—LAND VEHICLES FOR TRAVELLING OTHERWISE THAN ON RAILS
- B62K—CYCLES; CYCLE FRAMES; CYCLE STEERING DEVICES; RIDER-OPERATED TERMINAL CONTROLS SPECIALLY ADAPTED FOR CYCLES; CYCLE AXLE SUSPENSIONS; CYCLE SIDE-CARS, FORECARS, OR THE LIKE
- B62K19/00—Cycle frames
- B62K19/18—Joints between frame members
- B62K19/22—Adhesive joints
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29L—INDEXING SCHEME ASSOCIATED WITH SUBCLASS B29C, RELATING TO PARTICULAR ARTICLES
- B29L2031/00—Other particular articles
- B29L2031/30—Vehicles, e.g. ships or aircraft, or body parts thereof
- B29L2031/3091—Bicycles
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
Abstract
The present invention relates to a kind of nonmetallic bicycle frame structure and its manufacture method, comprise the following steps:Frame fittings are prepared, frame fittings include pallet and pipe fitting, and the pallet is made using fiber reinforcement engineering plastics, thermosetting or thermoplastic resin, including head tube joint, seat pipe joint, five-way joint and back vent hook joint;The pipe fitting uses one or more of making in fiber reinforcement engineering plastics, thermosetting or thermoplastic resin, including cant beam pipe, seat pipe, seat stay pipe, chainstay;(2) frame fittings are surface-treated;(3) pallet is Nian Jie with pipe;(4) application is carried out to vehicle frame.Whole vehicle frame employs the forming method of pipe joint type, and material high-strength light, and the vehicle frame made using the method is in light weight, structure is strong, has higher dimensional accuracy, is adapted to high-volume low cost production.
Description
Technical field
The present invention relates to a kind of nonmetallic bicycle frame structure and its manufacture method, conventional composite material the method overcome
The shortcomings that truck frame manufacturing cost is high, low production efficiency, made body frame structure for automotive is simple, strong light-weight and can be significantly
Degree reduces the manufacturing cost of composite frame;Meanwhile this method can quick copy, be especially suitable for industrial mass life
Production.This method belongs to cycle frame manufacture technology field.
Background technology
Bicycle is the short distance trip very easily vehicles, and the fitness campaign mode of fashion, green, is obtained
Consumers in general's likes.Vehicle frame is the core component of whole bicycle, also referred to as " soul " of bicycle, its weight, performance,
The cost determination class of bicycle.
The material that in the market is generally used for cycle frame has carbon steel, aluminium alloy, titanium alloy and polymer matrix composites
Four kinds.Carbon steel, the Al-alloy bicycle vehicle frame of routine are although cheap, but weight is larger;And the high price of titanium alloy is difficult to
Ordinary consumer is allowed to receive.Polymer matrix composites are because with designability is strong, material selects diversified, in light weight, specific strength
Outstanding advantages of specific stiffness is high, it is widely used in the manufacture of cycle frame.But common composite unitized frame is deposited
In expensive, complex manufacturing, batch stability is poor, heavy dependence experienced operator, production cycle length, inconvenient maintenance etc. lack
Point, turn into the obstacle for restricting the application of composite unitized frame further genralrlization.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of nonmetallic bicycle frame structure and its manufacture method, whole
Individual cycle frame is made by the way of nonmetallic joint and non-metallic pipe grafting combination, and this kind of preparation method can obtain relatively low
Vehicle frame cost, higher frame strength and preferable vehicle frame profile, comparatively fame dimensions are more accurate, and solve existing
There are poor composite frame production cost height, complex manufacturing, batch stability, heavy dependence experienced operator, production cycle
The problems such as length, inconvenient maintenance.Cycle frame in the present invention is the joint and tubular construction of bicycle, and its center tap includes forming
The part of bicycle running function, the metal nesting such as contacted with metal shaft.
In order to solve the above technical problems, the technical scheme is that:
A kind of nonmetallic bicycle frame structure, including Guan Liang and joint are provided;Described Guan Liang is fiber reinforcement engineering
One or more in plastics, thermosetting or thermoplastic resin, joint are that fiber reinforcement engineering plastics, thermosetting or thermoplastic resin make;
Described pipe beam end and joint grafting;It is inserted on joint formed with protuberance, described pipe beam end set on the protuberance
Form firm connection.The pipe beam end hollow space portion of being raised is filled, i.e., pipe beam end suppresses to the support inside the offer of pipe beam
Deformation of the pipe beam end under stressing conditions, and between pipe beam inwall and joint protuberance be gemel connection.
Further, described protuberance includes projection and land, and projection diameter is adapted with pipe beam internal diameter, land external diameter
It is identical with pipe beam external diameter.Pipe beam casing is outside protuberance so that connecting portion is smooth attractive in appearance.
Further, the joint includes head tube joint, seat pipe joint, five-way joint and back vent hook joint.
Further, the Guan Liang includes cant beam pipe, seat pipe, seat stay pipe and chainstay.
Particularly, routing path is provided with joint, routing path one end line outlet is in joint outside wall surface, other end outlet
Mouth connects in protuberance, the routing path with cavity in Guan Liang, for arranging brake cable, electric wire, control line or signal wire.
Further, the line outlet position is provided with arc groove, for for line it is spacing and be oriented to.
Further, passage is provided with described joint, for the air pressure inside and outside balance pipe beam.In view of overall outer
Effect is seen, steam vent aperture should be as far as possible a little bit smaller.
A kind of manufacture method of nonmetallic bicycle frame structure is also provided, including pipe beam prepares and prepared by joint, specifically
Step is as follows:
Injection molding is carried out Step 1: carbon fiber nylon injection-molding material is injected into the good steel joint mould of designed in advance
Obtain joint (arranging corresponding inserts in advance according to design requirement), the carbon fiber in the carbon fiber nylon injection-molding material is the fibre that is chopped
Dimension;Guan Liang is obtained by pultrusion after carbon fiber prepreg winding or carbon fibre initial rinse liquid-state epoxy resin;
Step 2: joint and Guan Liang are fixed in frock in order using assembly tool, and connection in need
Joint boss and pipe beam inwall smearing structure glue, pipe beam inwall smearing depth boss corresponding with joint is consistent, need to smear uniformly;
Further, before step 2, pipe beam inwall and joint protuberance is cleaned with acetone, reaches the purpose of cleaning, goes
Except the releasing agent and grease of surface attachment.
Further, be integrally formed logical line path during injection, the routing path after connecting tube beam can with Guan Liang
Cavity connects, for arranging brake cable, electric wire, control line or signal wire.
Further, before washing, pipe beam inwall and joint protuberance are roughened, improve gemel connection
Effect.
More particularly, glue thickness is 0.1-0.2mm, quickly inserts composite material tube on pallet boss.
Advantage is caused by the technology of the present invention:1. pallet and pipe fitting can the quick manufactures of low cost;2. plug-in position
There is provided 30-40mm bonding boss, using the teaching of the invention it is possible to provide enough adhesive strengths;3. being bonded the taper that boss carries 1-5 °, can make
Structure glue is uniformly spread out, and facilitates joint to be positioned with pipe;4. joint versatility and interchangeability are stronger, according to wanting for different size vehicle frames
Ask, can be arranged in pairs or groups out various sizes of vehicle frame specification, and condition is provided for vehicle frame variation, overcome existing vehicle frame single uncurrent
Shortcoming;5. whole vehicle frame is decomposed into independent several parts, it can individually be processed, lowered molding difficulty by specialized factory, be advantageous to carry
High finished product rate;6. pallet employs structure glue bonding forming with pipe, static strength and fatigue behaviour are relatively reliable;7. vehicle frame group
Dress process has corrected that corresponding size, without also needing to correct size as the traditional handicraft later stage.
Brief description of the drawings
Fig. 1 is vehicle frame overall structure diagram;
Fig. 2 is head tube joint design schematic diagram;
Fig. 3 is threading hole enlarged diagram;
Fig. 4 is passage enlarged diagram;
Wherein:1- pipes beam, 2- joints, 3- line outlets, 4- arc grooves, 5- passages, 6- metal inserts
Embodiment
With reference to Figure of description, the invention will be further described.
As shown in Figures 1 to 3, there is provided a kind of nonmetallic bicycle frame structure, including Guan Liang and joint;The pipe fitting uses
One or more of making in fiber reinforcement engineering plastics, thermosetting or thermoplastic resin, the pallet use fiber reinforcement work
Engineering plastics, thermosetting or thermoplastic resin make;Described pipe beam end and joint grafting;It is described formed with protuberance on joint
Pipe beam end set, which is inserted on the protuberance, forms firm connection.The pipe beam end hollow space portion of being raised is filled, i.e. pipe beam-ends
Portion is to the support inside the offer of pipe beam, it is suppressed that deformation of the pipe beam end under stressing conditions, and pipe beam inwall and joint protrusion
It is gemel connection between portion;Described protuberance includes projection and land, and projection diameter is adapted with pipe beam internal diameter, land external diameter with
Pipe beam external diameter is identical;Pipe beam casing is outside protuberance so that connecting portion is smooth attractive in appearance;The joint includes head tube joint, seat
Pipe joint and five-way joint;The Guan Liang includes cant beam pipe, seat pipe, seat stay pipe and chainstay.
A kind of manufacture method of nonmetallic bicycle frame structure is also provided, including pipe beam prepares and prepared by joint, specifically
Step is as follows:
Injection molding is carried out Step 1: carbon fiber nylon injection-molding material is injected into the good steel joint mould of designed in advance
Obtain joint (arranging corresponding inserts in advance according to design requirement), the carbon fiber in the carbon fiber nylon injection-molding material is the fibre that is chopped
Dimension;Guan Liang is obtained by pultrusion after carbon fiber prepreg winding or carbon fibre initial rinse liquid-state epoxy resin;
Step 2: joint and Guan Liang are fixed in frock in order using assembly tool, and connection in need
Joint boss and pipe beam inwall smearing structure glue, pipe beam inwall smearing depth boss corresponding with joint is consistent, need to smear uniformly;
Further, before step 2, pipe beam inwall and joint protuberance is cleaned with acetone, reaches the purpose of cleaning, goes
Except the releasing agent and grease of surface attachment.
Further, be integrally formed logical line path during injection, the routing path after connecting tube beam can with Guan Liang
Cavity connects, for arranging brake cable, electric wire, control line or signal wire.
Further, before washing, pipe beam inwall and joint protuberance are roughened, improve gemel connection
Effect.
More particularly, glue thickness is 0.1-0.2mm, quickly inserts composite material tube on pallet boss.
Claims (10)
1. a kind of nonmetallic bicycle frame structure, including Guan Liang and joint;Described Guan Liang is fiber reinforcement engineering plastics, heat
Gu or the one or more in thermoplastic resin, joint are that fiber reinforcement engineering plastics, thermosetting or thermoplastic resin make;Described pipe
Beam end and joint grafting;Formed with protuberance on joint, described pipe beam end set is inserted in be formed on the protuberance and consolidated
Connection.The pipe beam end hollow space portion of being raised is filled, i.e., pipe beam end is to the support inside the offer of pipe beam, it is suppressed that pipe beam-ends
Deformation of the portion under stressing conditions, and be gemel connection between pipe beam inwall and joint protuberance.
A kind of 2. nonmetallic bicycle frame structure as claimed in claim 1, it is characterised in that:Described protuberance includes convex
Post and land, projection diameter are adapted with pipe beam internal diameter, and land external diameter is identical with pipe beam external diameter, pipe beam casing outside protuberance,
So that connecting portion is smooth.
A kind of 3. nonmetallic bicycle frame structure as claimed in claim 1 or 2, it is characterised in that:The joint includes head
Pipe joint, seat pipe joint, five-way joint and back vent hook joint.
A kind of 4. nonmetallic bicycle frame structure as claimed in claim 1 or 2, it is characterised in that:The Guan Liang includes oblique
Liang Guan, seat pipe, seat stay pipe and chainstay.
A kind of 5. nonmetallic bicycle frame structure as claimed in claim 1 or 2, it is characterised in that:Cloth is provided with joint
Line path, routing path one end line outlet is in joint outside wall surface, and other end line outlet is in protuberance, the routing path and Guan Liang
Middle cavity connection, for arranging brake cable, electric wire, control line or signal wire.
A kind of 6. nonmetallic bicycle frame structure as claimed in claim 1 or 2, it is characterised in that:The line outlet position
Be provided with arc groove, for for line it is spacing and be oriented to.
A kind of 7. nonmetallic bicycle frame structure as claimed in claim 1 or 2, it is characterised in that:On described joint
Passage is provided with, for the air pressure inside and outside balance pipe beam.In view of overall appearance effect, steam vent aperture should be as far as possible a little bit smaller.
8. a kind of manufacture method of nonmetallic bicycle frame structure, including pipe beam prepares and prepared by joint, comprises the following steps that:
Obtained Step 1: carbon fiber nylon injection-molding material is injected into the good steel joint mould of designed in advance and carries out injection molding
Joint (arranges corresponding inserts according to design requirement) in advance, and the carbon fiber in the carbon fiber nylon injection-molding material is chopped strand;
Guan Liang is obtained by pultrusion after carbon fiber prepreg winding or carbon fibre initial rinse liquid-state epoxy resin;
Step 2: joint and Guan Liang are fixed in frock in order using assembly tool, and connection in need joint
Boss and pipe beam inwall smearing structure glue, pipe beam inwall smearing depth boss corresponding with joint is consistent, need to smear uniformly.
A kind of 9. manufacture method of nonmetallic bicycle frame structure as claimed in claim 1 or 2, it is characterised in that:Step
Before two, pipe beam inwall and joint protuberance are cleaned with acetone, reaches the purpose of cleaning, removes the releasing agent and oil of surface attachment
Fat.
A kind of 10. manufacture method of nonmetallic bicycle frame structure as claimed in claim 1 or 2, it is characterised in that:Injection
When integrally formed logical line path, the routing path can connect after connecting tube beam with cavity in Guan Liang, for arrange brake cable,
Electric wire, control line or signal wire.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710979112.XA CN107878652A (en) | 2017-10-19 | 2017-10-19 | A kind of nonmetallic bicycle frame structure and its manufacture method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710979112.XA CN107878652A (en) | 2017-10-19 | 2017-10-19 | A kind of nonmetallic bicycle frame structure and its manufacture method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107878652A true CN107878652A (en) | 2018-04-06 |
Family
ID=61782046
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710979112.XA Pending CN107878652A (en) | 2017-10-19 | 2017-10-19 | A kind of nonmetallic bicycle frame structure and its manufacture method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107878652A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110682989A (en) * | 2019-11-08 | 2020-01-14 | 台州华锐电动科技股份有限公司 | Rear bottom fork of wheel type power vehicle and manufacturing method thereof |
CN111389086A (en) * | 2020-03-23 | 2020-07-10 | 浙江千岛人净水科技有限公司 | Hollow structure of H-shaped support frame and processing technology |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0195987A (en) * | 1987-10-08 | 1989-04-14 | Kusuo Shimomori | Structure of frame connecting section of bicycles |
GB2248807A (en) * | 1990-10-18 | 1992-04-22 | Lo Kun Nan | Composite plastic bicycle frame with tubes and connectors bonded by a fibrous wrapping |
TW200734235A (en) * | 2006-03-06 | 2007-09-16 | Advanced Int Multitech Co Ltd | Method to manufacture bike frame |
CN102049830A (en) * | 2009-10-28 | 2011-05-11 | 合肥杰事杰新材料有限公司 | Method for manufacturing bicycle frame by using composite material |
CN102059768A (en) * | 2009-11-16 | 2011-05-18 | 合肥杰事杰新材料有限公司 | Method for manufacturing all-plastic bicycle frame |
CN202574523U (en) * | 2012-05-15 | 2012-12-05 | 厦门坤骑复材科技有限公司 | Head tube for composite material bicycle |
CN203047467U (en) * | 2012-09-13 | 2013-07-10 | 佛山市铭特铝业科技有限公司 | Bicycle frame |
KR20150137238A (en) * | 2014-05-28 | 2015-12-09 | 주식회사 티포엘 | Bicycle frame using composite materials and its manufacturing method |
CN105291421A (en) * | 2015-10-21 | 2016-02-03 | 东莞泰合复合材料有限公司 | Manufacturing process for bicycle frame made of carbon fiber composite |
CN106741500A (en) * | 2016-11-18 | 2017-05-31 | 中航复材(北京)科技有限公司 | A kind of string hybrid composite body frame structure for automotive |
CN206520709U (en) * | 2017-02-24 | 2017-09-26 | 中航复材(北京)科技有限公司 | A kind of body frame structure for automotive of advanced composite material (ACM) pipe and splice combinations |
-
2017
- 2017-10-19 CN CN201710979112.XA patent/CN107878652A/en active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0195987A (en) * | 1987-10-08 | 1989-04-14 | Kusuo Shimomori | Structure of frame connecting section of bicycles |
GB2248807A (en) * | 1990-10-18 | 1992-04-22 | Lo Kun Nan | Composite plastic bicycle frame with tubes and connectors bonded by a fibrous wrapping |
TW200734235A (en) * | 2006-03-06 | 2007-09-16 | Advanced Int Multitech Co Ltd | Method to manufacture bike frame |
CN102049830A (en) * | 2009-10-28 | 2011-05-11 | 合肥杰事杰新材料有限公司 | Method for manufacturing bicycle frame by using composite material |
CN102059768A (en) * | 2009-11-16 | 2011-05-18 | 合肥杰事杰新材料有限公司 | Method for manufacturing all-plastic bicycle frame |
CN202574523U (en) * | 2012-05-15 | 2012-12-05 | 厦门坤骑复材科技有限公司 | Head tube for composite material bicycle |
CN203047467U (en) * | 2012-09-13 | 2013-07-10 | 佛山市铭特铝业科技有限公司 | Bicycle frame |
KR20150137238A (en) * | 2014-05-28 | 2015-12-09 | 주식회사 티포엘 | Bicycle frame using composite materials and its manufacturing method |
CN105291421A (en) * | 2015-10-21 | 2016-02-03 | 东莞泰合复合材料有限公司 | Manufacturing process for bicycle frame made of carbon fiber composite |
CN106741500A (en) * | 2016-11-18 | 2017-05-31 | 中航复材(北京)科技有限公司 | A kind of string hybrid composite body frame structure for automotive |
CN206520709U (en) * | 2017-02-24 | 2017-09-26 | 中航复材(北京)科技有限公司 | A kind of body frame structure for automotive of advanced composite material (ACM) pipe and splice combinations |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110682989A (en) * | 2019-11-08 | 2020-01-14 | 台州华锐电动科技股份有限公司 | Rear bottom fork of wheel type power vehicle and manufacturing method thereof |
CN111389086A (en) * | 2020-03-23 | 2020-07-10 | 浙江千岛人净水科技有限公司 | Hollow structure of H-shaped support frame and processing technology |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4548422A (en) | Bicycle frame having an assembled-unit shell structure | |
CN103261007B (en) | Body modules component and manufacture method thereof | |
KR101346783B1 (en) | bike using injection molding frame | |
CN107878652A (en) | A kind of nonmetallic bicycle frame structure and its manufacture method | |
CA2934814C (en) | Composite bicycle frame and method of manufacturing same | |
CN106182812A (en) | A kind of bicycle frame of carbon fiber integral forming process | |
US20080303240A1 (en) | Bicycle fork assembly with integral crown and steer tube | |
CN110114232A (en) | Running gear part for a motor vehicle and method for producing a running gear part | |
CN104626603A (en) | Manufacturing method of carbon fiber frame and molding mold | |
US20070289136A1 (en) | Customizable carbon frames for bicycle or other vehicles | |
CN210999620U (en) | Carbon fiber special-shaped spring forming die | |
CN206184930U (en) | Extrusion die of seamless tubular goods | |
CN201400267Y (en) | Car frame formed by combining carbon and aluminum | |
KR20190006802A (en) | Bycycle frame having lug | |
CN101850818B (en) | Folding bicycle frame and manufacturing process thereof | |
CN202965219U (en) | Plastic extruding machine for manufacturing fiber reinforced composite eccentric wear prevention continuous sucker rod | |
CN102092446B (en) | Bamboo joint type composite frame pipe fittings and forming method | |
CN213231099U (en) | Compound leading wheel | |
CN206520709U (en) | A kind of body frame structure for automotive of advanced composite material (ACM) pipe and splice combinations | |
US20220144373A1 (en) | Arrangement for a bicycle frame and method of manufacture | |
CN201971105U (en) | Preforming device of non-stress concentration composite fiber tube for bicycle | |
CN207241917U (en) | A kind of carbon fiber bicycle | |
CN210372846U (en) | Be applied to combined material and metal co-curing structure | |
CN206779394U (en) | Foot pedal of motorcycle mould | |
CN204979070U (en) | Pitch down after bicycle integral type |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180406 |