CN107875819A - A kind of wet flue gas desulfurization tower - Google Patents

A kind of wet flue gas desulfurization tower Download PDF

Info

Publication number
CN107875819A
CN107875819A CN201711351258.6A CN201711351258A CN107875819A CN 107875819 A CN107875819 A CN 107875819A CN 201711351258 A CN201711351258 A CN 201711351258A CN 107875819 A CN107875819 A CN 107875819A
Authority
CN
China
Prior art keywords
level spray
cylinder
spray cylinder
level
flue gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711351258.6A
Other languages
Chinese (zh)
Other versions
CN107875819B (en
Inventor
田富姣
辛银平
葛怀波
谭鹏宇
李瑶瑶
殷军翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Teli Environmental Protection Technology Co ltd
Original Assignee
HENAN ZHENGDA ENVIRONMENT SCIENCE AND TECHNOLOGY CONSULTING ENGINEERING CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENAN ZHENGDA ENVIRONMENT SCIENCE AND TECHNOLOGY CONSULTING ENGINEERING CO LTD filed Critical HENAN ZHENGDA ENVIRONMENT SCIENCE AND TECHNOLOGY CONSULTING ENGINEERING CO LTD
Priority to CN201711351258.6A priority Critical patent/CN107875819B/en
Publication of CN107875819A publication Critical patent/CN107875819A/en
Application granted granted Critical
Publication of CN107875819B publication Critical patent/CN107875819B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D53/00Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
    • B01D53/34Chemical or biological purification of waste gases
    • B01D53/46Removing components of defined structure
    • B01D53/48Sulfur compounds
    • B01D53/50Sulfur oxides
    • B01D53/501Sulfur oxides by treating the gases with a solution or a suspension of an alkali or earth-alkali or ammonium compound
    • B01D53/504Sulfur oxides by treating the gases with a solution or a suspension of an alkali or earth-alkali or ammonium compound characterised by a specific device
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D53/00Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
    • B01D53/34Chemical or biological purification of waste gases
    • B01D53/74General processes for purification of waste gases; Apparatus or devices specially adapted therefor
    • B01D53/75Multi-step processes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D53/00Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
    • B01D53/34Chemical or biological purification of waste gases
    • B01D53/74General processes for purification of waste gases; Apparatus or devices specially adapted therefor
    • B01D53/80Semi-solid phase processes, i.e. by using slurries
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2251/00Reactants
    • B01D2251/40Alkaline earth metal or magnesium compounds
    • B01D2251/404Alkaline earth metal or magnesium compounds of calcium
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2258/00Sources of waste gases
    • B01D2258/02Other waste gases
    • B01D2258/0283Flue gases

Abstract

A kind of wet flue gas desulfurization tower, including tower body, spraying layer includes dividing plate, one-level spray cylinder, two level spray cylinder and three-level spray cylinder in tower body;Dividing plate is connected with tower body inwall, dividing plate is passed through at the top of one-level spray cylinder and is extended to above dividing plate, one-level spray cylinder over top is extended at the top of two level spray cylinder, two level spray cylinder over top is extended at the top of three-level spray cylinder, the bottom of one-level spray cylinder and two level spray cylinder is open, so as to form one-level spray chamber between one-level spray drum outer wall, dividing plate and tower body inwall, two level spray chamber is formed between one-level spray cylinder inwall and two level spray drum outer wall, three-level spray chamber is formed between two level spray cylinder inwall and three-level spray drum outer wall;The top of one-level spray chamber, two level spray chamber and three-level spray chamber is respectively equipped with the first passage, the second passage and the 3rd passage, and gas outlet is set at the top of three-level spray cylinder.Flue gas of the present invention is uniformly distributed in tower body, is fully contacted between slurries and flue gas, and desulfurized effect is good.

Description

A kind of wet flue gas desulfurization tower
Technical field
The invention belongs to desulfurating dust-removing equipment technical field, and in particular to a kind of wet flue gas desulfurization tower.
Background technology
Flue gas desulfurization refers to remove oxysulfide (SO from flue gas or other industrial waste gases2And SO3), the SO in flue gas2 Substantially acid, can be by removing SO from flue gas with appropriate alkali substance reaction2.The most frequently used alkali of flue gas desulfurization Property material is lime stone (calcium carbonate, CaCO3), quick lime (calcium oxide, CaO) and white lime (calcium hydroxide, Ca (OH)2).Lime Stone abundance, thus it is relatively cheap, and quick lime and white lime are all produced by lime stone by heating.In wet flue gas In desulphurization system, alkaline matter (being typically aqueous slkali, more situations are the slurries of alkali) meets with flue gas in spray tower.Cigarette SO in gas2It is dissolved in water, forms a kind of dilute acid soln, neutralization reaction then occurs with the alkaline matter being dissolved in water.Instead The sulphite and sulfate that should be generated separate out from the aqueous solution, separate out situation and depend on the relative of different salt present in solution Dissolubility.
Existing wet flue gas desulfurization tower generally comprises slurry pool, spraying layer and demister, wherein, spray Rotating fields letter Single, smoke distribution is uneven, causes slurries can not fully to be contacted with flue gas, and desulfurized effect is poor, also, flue gas can only enter with slurries Row once desulfurization, to multiple desulfurization, then it can only increase spraying layer, this inevitably results in the increase of desulfurization tower height degree, increases production Cost.
The content of the invention
It is an object of the invention to:Smoke distribution is uneven during for above-mentioned existing wet flue gas desulfurization tower spray desulfurization makes The problem of into desulfurized effect difference, the present invention provide a kind of wet flue gas desulfurization tower.
The technical solution adopted by the present invention is as follows:
A kind of wet flue gas desulfurization tower, including tower body, slurry pool, spraying layer and demisting are sequentially provided with from bottom to up in tower body Device, tower body bottom set smoke inlet, and exhanst gas outlet is set at the top of tower body, and the spraying layer includes dividing plate, one-level spray cylinder, set In the two level spray cylinder in one-level spray cylinder and the three-level spray cylinder in two level spray cylinder;The dividing plate and tower body inwall are close Envelope connection, the top of one-level spray cylinder through dividing plate and are extended to above dividing plate, and the top of two level spray cylinder sprays through one-level Cylinder top and the top extended at the top of one-level spray cylinder, the top of three-level spray cylinder through two level spray cylinder top and extend to Two level spray cylinder over top, the bottom of the one-level spray cylinder and two level spray cylinder are open, so that one-level spray drum outer wall, One-level spray chamber is formed between dividing plate and tower body inwall, two level spray is formed between one-level spray cylinder inwall and two level spray drum outer wall Chamber is drenched, three-level spray chamber is formed between two level spray cylinder inwall and three-level spray drum outer wall;The top of the one-level spray chamber is set There is the first passage connected with two level spray chamber, the top of two level spray chamber is provided with the second ventilation of three-level spray chamber connection Hole, the top of three-level spray chamber are provided with the 3rd passage connected with three-level spray cylinder, and the top of three-level spray cylinder sets outlet Mouthful;The top of the one-level spray chamber, two level spray chamber and three-level spray chamber is equipped with the toroidal nozzle being connected with slurry pool, ring Shape jet pipe is provided with equally distributed nozzle.
, it is necessary to which the flue gas of desulfurization enters tower body from smoke inlet during present invention work, then sprayed in one-level spray cylinder, two level Three parts are separated into the presence of leaching cylinder and three-level spray cylinder, the flue gas close to tower body inwall enters one-level spray chamber, is located at The flue gas in tower body centre position enters three-level spray chamber, and remaining flue gas then enters two level spray chamber, and then, slurry pool sprays to annular Pipe is passed through slurries, and spray desulfurization is carried out by equally distributed nozzle so that desulfurization in batches can be realized into the flue gas in tower body, And flue gas is uniformly distributed in tower body, be advantageous to fully contact between slurries and flue gas, desulfurized effect is good.In one-level spray chamber The flue gas for completing spray enters two level spray chamber through the first passage and secondary desulfuration is carried out in two level spray chamber, similarly, Flue gas in two level spray chamber continues desulfurization through the second passage into three-level spray chamber, and desulfurization is completed in three-level spray chamber Flue gas then enter three-level spray cylinder through the 3rd passage, then from gas outlet discharge after carry out demisting, finally from exhanst gas outlet Discharge, the slurries for completing spray are reentered in slurry pool.
Further, slurry pool is connected with oxidation fan.Oxidation fan provides oxygen for slurry pool and reacted, and makes sulfurous The stable sulfate of hydrochlorate generation and crystallization.
Further, it is provided with agitator in slurry pool.Agitator prevents slurry pool from precipitating, and oxidation reinforced effect.
Further, slurry pool by circulating pump by slurries pump to spraying layer.
In summary, by adopting the above-described technical solution, the beneficial effects of the invention are as follows:
1. the present invention makes flue gas uniform in tower body by setting one-level spray cylinder, two level spray cylinder and three-level spray cylinder Distribution, and desulfurization in batches is realized by toroidal nozzle, fully contacted between slurries and flue gas, desulfurized effect is good;
2. the flue gas in one-level spray chamber of the present invention can pass through two level spray chamber and three-level before three-level spray cylinder is entered Spray chamber, desulfurization three times is realized, desulfurization is thorough, and similarly, the flue gas in two level spray chamber can realize desulfurization twice;
Brief description of the drawings
Fig. 1 is schematic structural view of the invention;
Fig. 2 is spraying layer structural representation of the present invention.
Marked in figure:1- tower bodies, 2- demisters, 3- gas outlets, 4- two level spray cylinders, 5- one-level spray cylinders, 6- circulating pumps, 7- oxidation fans, 8- three-level spray cylinders, 9- slurry pools, 10- agitators, 11- smoke inlets, the passages of 12- first, 13- nozzles, 14- toroidal nozzles, 15- dividing plates, the passages of 16- second, the passages of 17- the 3rd, 18- exhanst gas outlets.
Embodiment
All features disclosed in this specification, can be with any in addition to mutually exclusive feature and/or step Mode combines.
The present invention is elaborated with reference to Fig. 1, Fig. 2.
Embodiment 1
A kind of wet flue gas desulfurization tower, including tower body 1, be sequentially provided with from bottom to up in tower body 1 slurry pool 9, spraying layer and Demister 2, the bottom of tower body 1 set smoke inlet 11, and the top of tower body 1 sets exhanst gas outlet 18, the spraying layer include dividing plate 15, One-level spray cylinder 5, the two level spray cylinder 4 in one-level spray cylinder 5 and the three-level spray cylinder 8 in two level spray cylinder 4;Institute Dividing plate 15 to be stated to be connected with the inner wall sealing of tower body 1, the top of one-level spray cylinder 5 through dividing plate 15 and extends to the top of dividing plate 15, and two The top of level spray cylinder 4 is through the top of one-level spray cylinder 5 and extends to the top at the top of one-level spray cylinder 5, three-level spray cylinder 8 Top is through the top of two level spray cylinder 4 and extends to the over top of two level spray cylinder 4, the one-level spray cylinder 5 and two level spray The bottom of cylinder 4 is open, so as to form one-level spray chamber, one-level between the outer wall of one-level spray cylinder 5, dividing plate 15 and the inwall of tower body 1 Two level spray chamber is formed between the inwall of spray cylinder 5 and the outer wall of two level spray cylinder 4, outside the inwall of two level spray cylinder 4 and three-level spray cylinder 8 Three-level spray chamber is formed between wall;The top of the one-level spray chamber is provided with the first passage 12 connected with two level spray chamber, The top of two level spray chamber is provided with the second passage 16 of three-level spray chamber connection, and the top of three-level spray chamber is provided with sprays with three-level The 3rd passage 17 that cylinder 8 connects is drenched, the top of three-level spray cylinder 8 sets gas outlet 3;The one-level spray chamber, two level spray The top of chamber and three-level spray chamber is equipped with the toroidal nozzle 14 being connected with slurry pool 9, and toroidal nozzle 14 is provided with and is uniformly distributed Nozzle 13.
, it is necessary to which the flue gas of desulfurization enters tower body 1 from smoke inlet 11, then in one-level spray cylinder 5, two during present invention work Three parts are separated into the presence of level spray cylinder 4 and three-level spray cylinder 8, the flue gas close to the inwall of tower body 1 sprays into one-level Chamber, the flue gas positioned at the centre position of tower body 1 enter three-level spray chamber, and remaining flue gas then enters two level spray chamber, then, slurry pool 9 are passed through slurries to toroidal nozzle 14, carry out spray desulfurization by equally distributed nozzle 13 so that the flue gas into tower body 1 Desulfurization in batches can be achieved, and flue gas is uniformly distributed in tower body 1, be advantageous to fully contact between slurries and flue gas, desulfurization effect Fruit is good.The flue gas that spray is completed in one-level spray chamber enters two level spray chamber through the first passage 12 and entered in two level spray chamber Row secondary desulfuration, similarly, the flue gas in two level spray chamber continue desulfurization through the second passage 16 into three-level spray chamber, The flue gas that desulfurization is completed in three-level spray chamber then enters three-level spray cylinder 8 through the 3rd passage 17, after then being discharged from gas outlet 3 Demisting is carried out, is finally discharged from exhanst gas outlet 18, the slurries for completing spray are reentered in slurry pool 9.
Embodiment 2
Based on embodiment 1, slurry pool 9 is connected with oxidation fan 7.Oxidation fan 7 is that slurry pool 9 provides oxygen progress instead Should, make the stable sulfate of sulphite generation and crystallization.
Embodiment 3
Based on Examples 1 and 2, agitator 10 is provided with slurry pool 9.Agitator 10 prevents slurry pool 9 from precipitating, and adds Strong oxdiative effect.
Embodiment 4
Based on Examples 1 and 2, slurry pool 9 is by circulating pump 6 by slurries pump to spraying layer.
It is embodiments of the invention as described above.The present invention is not limited to the above-described embodiments, anyone should learn that The structure change made under the enlightenment of the present invention, the technical schemes that are same or similar to the present invention, each fall within this Within the protection domain of invention.

Claims (4)

1. a kind of wet flue gas desulfurization tower, including tower body (1), tower body (1) is interior to be sequentially provided with slurry pool (9), spray from bottom to up Layer and demister (2), tower body (1) bottom set smoke inlet (11), exhanst gas outlet (18), its feature are set at the top of tower body (1) It is, the spraying layer includes dividing plate (15), one-level spray cylinder (5), the two level spray cylinder (4) in one-level spray cylinder (5) With the three-level spray cylinder (8) in two level spray cylinder (4);
The dividing plate (15) is connected with tower body (1) inner wall sealing, and the top of one-level spray cylinder (5) through dividing plate (15) and extends to Above dividing plate (15), the top of two level spray cylinder (4) through one-level spray cylinder (5) top and extends to one-level spray cylinder (5) top The top in portion, the top of three-level spray cylinder (8) through two level spray cylinder (4) top and are extended on two level spray cylinder (4) top The bottom of side, the one-level spray cylinder (5) and two level spray cylinder (4) is open, so that one-level spray cylinder (5) outer wall, dividing plate (15) one-level spray chamber is formed between tower body (1) inwall, between one-level spray cylinder (5) inwall and two level spray cylinder (4) outer wall Two level spray chamber is formed, three-level spray chamber is formed between two level spray cylinder (4) inwall and three-level spray cylinder (8) outer wall;
The top of the one-level spray chamber is provided with the first passage (12) connected with two level spray chamber, the top of two level spray chamber The second passage (16) provided with the connection of three-level spray chamber, the top of three-level spray chamber are provided with what is connected with three-level spray cylinder (8) 3rd passage (17), the top of three-level spray cylinder (8) set gas outlet (3);
The top of the one-level spray chamber, two level spray chamber and three-level spray chamber is equipped with the annular spray being connected with slurry pool (9) Manage (14), toroidal nozzle (14) is provided with equally distributed nozzle (13).
2. a kind of wet flue gas desulfurization tower according to claim 1, it is characterised in that slurry pool (9) connection is aerobic Wind transmission machine (7).
3. a kind of wet flue gas desulfurization tower according to claim 1 or 2, it is characterised in that be provided with the slurry pool (9) Agitator (10).
4. a kind of wet flue gas desulfurization tower according to claim 1 or 2, it is characterised in that the slurry pool (9) is by following Ring pump (6) is by slurries pump to spraying layer.
CN201711351258.6A 2017-12-15 2017-12-15 Wet flue gas desulfurization tower Active CN107875819B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711351258.6A CN107875819B (en) 2017-12-15 2017-12-15 Wet flue gas desulfurization tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711351258.6A CN107875819B (en) 2017-12-15 2017-12-15 Wet flue gas desulfurization tower

Publications (2)

Publication Number Publication Date
CN107875819A true CN107875819A (en) 2018-04-06
CN107875819B CN107875819B (en) 2024-01-30

Family

ID=61771556

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711351258.6A Active CN107875819B (en) 2017-12-15 2017-12-15 Wet flue gas desulfurization tower

Country Status (1)

Country Link
CN (1) CN107875819B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109012038A (en) * 2018-08-10 2018-12-18 杨明超 A kind of equipment for treating industrial waste gas
CN112275114A (en) * 2020-09-09 2021-01-29 程学芳 Two-stage wet desulphurization tower

Citations (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1066721A (en) * 1991-09-18 1992-12-02 哈尔滨市永吉实业有限公司 Gas-washing method and multifunctional air purifying device
JP3051003U (en) * 1998-01-29 1998-08-11 台典汚染防治股▲ふん▼有限公司 Chimney improvement structure capable of capturing harmful substances from combustion waste gas
CN2384670Y (en) * 1999-07-15 2000-06-28 孙伊凡 Spiral-flow spray-type desulfuring dust remover
CN2683235Y (en) * 2004-03-16 2005-03-09 沈杞生 Smoke-eliminating, dust-reducing and desulfurizing device
CN201040229Y (en) * 2007-04-06 2008-03-26 东南大学 Flue gas simultaneous desulfurize denitrate integrated two-stage spraying type absorption reactor
CN101890281A (en) * 2010-03-25 2010-11-24 上海洁美环保科技有限公司 Forward flow and backward flow combined spray desulfurizing tower
CN201871323U (en) * 2010-12-05 2011-06-22 长春高科能源环境工程有限公司 Energy-saving desulfurizing tower
CN201880482U (en) * 2010-11-19 2011-06-29 上海弗卡斯环保工程有限公司 Stepped spray tower for desulfurization by ammonia method
CN202570118U (en) * 2012-06-06 2012-12-05 上虞市双良化工设备有限公司 Spraying tower of improved spraying device
CN202983476U (en) * 2013-01-10 2013-06-12 蓝天环保设备工程股份有限公司 Flue spraying structure of absorption tower
JP2013176712A (en) * 2012-02-28 2013-09-09 Ricoh Co Ltd Fluid purification device
CN203564949U (en) * 2013-11-12 2014-04-30 广东智雄新能源有限公司 Flue gas cleaning system for biomass boiler
CN203777913U (en) * 2014-03-26 2014-08-20 洛阳豫新工程技术有限公司 Gas purification device after pyrolyzing biomass fuel
CN104096471A (en) * 2014-07-08 2014-10-15 中国华电工程(集团)有限公司 Near-zero sulfur dioxide emission absorption tower for coal-fired power plant
CN203955028U (en) * 2014-07-11 2014-11-26 东方电气集团东方锅炉股份有限公司 The two circulation wet flue gas desulfurizers of concurrent-countercurrent list tower
CN104722194A (en) * 2015-03-19 2015-06-24 永清环保股份有限公司 Deep flue gas purification device for efficient desulphurization and dust removal
CN205235755U (en) * 2015-12-29 2016-05-18 神华集团有限责任公司 Desulfurizing spray tower
CN205650072U (en) * 2016-01-27 2016-10-19 南京碧林环保科技有限公司 Dual cycle desulfurization absorption tower
EP3100781A1 (en) * 2015-06-01 2016-12-07 RUDIS poslovno zdruzenje za inzeniring in izgradnjo objekov d.o.o. Process and apparatus for high performance flue gas cleaning
CN206152618U (en) * 2016-08-30 2017-05-10 杭州玺清环保科技有限公司 Fit high -efficient desulphurization unit in four districts of doublestage
CN206199001U (en) * 2016-10-17 2017-05-31 上海锅炉厂有限公司 A kind of desulfurizer
CN206473953U (en) * 2017-01-19 2017-09-08 东莞市宇鑫净化工程有限公司 Waste gas water washing device
CN207786294U (en) * 2017-12-15 2018-08-31 河南省正大环境科技咨询工程有限公司 A kind of wet flue gas desulfurization tower

Patent Citations (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1066721A (en) * 1991-09-18 1992-12-02 哈尔滨市永吉实业有限公司 Gas-washing method and multifunctional air purifying device
JP3051003U (en) * 1998-01-29 1998-08-11 台典汚染防治股▲ふん▼有限公司 Chimney improvement structure capable of capturing harmful substances from combustion waste gas
CN2384670Y (en) * 1999-07-15 2000-06-28 孙伊凡 Spiral-flow spray-type desulfuring dust remover
CN2683235Y (en) * 2004-03-16 2005-03-09 沈杞生 Smoke-eliminating, dust-reducing and desulfurizing device
CN201040229Y (en) * 2007-04-06 2008-03-26 东南大学 Flue gas simultaneous desulfurize denitrate integrated two-stage spraying type absorption reactor
CN101890281A (en) * 2010-03-25 2010-11-24 上海洁美环保科技有限公司 Forward flow and backward flow combined spray desulfurizing tower
CN201880482U (en) * 2010-11-19 2011-06-29 上海弗卡斯环保工程有限公司 Stepped spray tower for desulfurization by ammonia method
CN201871323U (en) * 2010-12-05 2011-06-22 长春高科能源环境工程有限公司 Energy-saving desulfurizing tower
JP2013176712A (en) * 2012-02-28 2013-09-09 Ricoh Co Ltd Fluid purification device
CN202570118U (en) * 2012-06-06 2012-12-05 上虞市双良化工设备有限公司 Spraying tower of improved spraying device
CN202983476U (en) * 2013-01-10 2013-06-12 蓝天环保设备工程股份有限公司 Flue spraying structure of absorption tower
CN203564949U (en) * 2013-11-12 2014-04-30 广东智雄新能源有限公司 Flue gas cleaning system for biomass boiler
CN203777913U (en) * 2014-03-26 2014-08-20 洛阳豫新工程技术有限公司 Gas purification device after pyrolyzing biomass fuel
CN104096471A (en) * 2014-07-08 2014-10-15 中国华电工程(集团)有限公司 Near-zero sulfur dioxide emission absorption tower for coal-fired power plant
CN203955028U (en) * 2014-07-11 2014-11-26 东方电气集团东方锅炉股份有限公司 The two circulation wet flue gas desulfurizers of concurrent-countercurrent list tower
CN104722194A (en) * 2015-03-19 2015-06-24 永清环保股份有限公司 Deep flue gas purification device for efficient desulphurization and dust removal
EP3100781A1 (en) * 2015-06-01 2016-12-07 RUDIS poslovno zdruzenje za inzeniring in izgradnjo objekov d.o.o. Process and apparatus for high performance flue gas cleaning
CN205235755U (en) * 2015-12-29 2016-05-18 神华集团有限责任公司 Desulfurizing spray tower
CN205650072U (en) * 2016-01-27 2016-10-19 南京碧林环保科技有限公司 Dual cycle desulfurization absorption tower
CN206152618U (en) * 2016-08-30 2017-05-10 杭州玺清环保科技有限公司 Fit high -efficient desulphurization unit in four districts of doublestage
CN206199001U (en) * 2016-10-17 2017-05-31 上海锅炉厂有限公司 A kind of desulfurizer
CN206473953U (en) * 2017-01-19 2017-09-08 东莞市宇鑫净化工程有限公司 Waste gas water washing device
CN207786294U (en) * 2017-12-15 2018-08-31 河南省正大环境科技咨询工程有限公司 A kind of wet flue gas desulfurization tower

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109012038A (en) * 2018-08-10 2018-12-18 杨明超 A kind of equipment for treating industrial waste gas
CN112275114A (en) * 2020-09-09 2021-01-29 程学芳 Two-stage wet desulphurization tower

Also Published As

Publication number Publication date
CN107875819B (en) 2024-01-30

Similar Documents

Publication Publication Date Title
EP1958682B1 (en) Wet flue-gas desulfurization apparatus and method of wet flue-gas desulfurization
WO2021051448A1 (en) Ammonia desulphurization and oxidation apparatus and method
CN107875819A (en) A kind of wet flue gas desulfurization tower
CN105169912A (en) Novel desulphurization device
CA3021859C (en) A method and a device for oxidizing a solution for ammonia desulfurization
KR102309043B1 (en) A method and a device for oxidizing a solution for ammonia desulfurization
CN106345288B (en) A kind of method and system using phosphate ore pulp processing sulfur-containing smoke gas
CN107433113A (en) A kind of desulphurization denitration absorption tower
CN207786294U (en) A kind of wet flue gas desulfurization tower
CN201908048U (en) Desulphurized ash oxidation device
CN102210967A (en) Two-stage treatment wet desulphurization method for high-sulfur coal-fired flue gas
CN107519749A (en) A kind of ammonia ore deposit mixes sulfur removal technology technology
CN210786878U (en) Flue gas uniform distributor for deacidification tower
CN207822791U (en) A kind of fume desulfurizing tower
CN106076091A (en) A kind of head-on collision injection gravity sedimentation type desulfurizer and method
CN211215953U (en) Reaction tower for desulfurization and denitrification environment-friendly flue gas treatment
CN104587824B (en) A kind of flue gas desulfurization rapidly tower
CN110449009A (en) A kind of spray column of exhaust-gas treatment
CN206008428U (en) Flue gas desulphurization system
CN103977700A (en) Pneumatic emulsified limestone desulfurization system and process flow thereof
CN112999838A (en) Integrated desulfurization reactor
CN203862128U (en) Pneumatic emulsified limestone desulfurizing system
CN205832936U (en) A kind of head-on collision injection gravity sedimentation type desulfurizer
CN213725775U (en) SDS desulfurization reactor
CN205867977U (en) Flue gas depickling device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20240103

Address after: No. 6 Teli Street, Dongzhou District, Fushun City, Liaoning Province, 113000

Applicant after: Liaoning Teli Environmental Protection Technology Co.,Ltd.

Address before: No. A, 18th Floor, Jinguo Commercial Building, No. 56 Wenhua Road, Jinshui District, Zhengzhou City, Henan Province, 450003

Applicant before: Henan Zhengda environmental technology consulting engineering Co.,Ltd.

GR01 Patent grant
GR01 Patent grant