CN107871205A - A kind of production management system - Google Patents
A kind of production management system Download PDFInfo
- Publication number
- CN107871205A CN107871205A CN201710937068.6A CN201710937068A CN107871205A CN 107871205 A CN107871205 A CN 107871205A CN 201710937068 A CN201710937068 A CN 201710937068A CN 107871205 A CN107871205 A CN 107871205A
- Authority
- CN
- China
- Prior art keywords
- production
- service end
- account
- board
- task
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- Operations Research (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Marketing (AREA)
- Educational Administration (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention provides a kind of production management system, applied to the production management of board, wherein, including:Service end, the production task of each board is preserved in service end;Multiple production boards, to perform the production task that service end issues, and work state information when performing production task is fed back into service end;Management client, management client can pass through multiple user's Account Logon Connection Service ends;For service end to judge whether work state information meets one in multiple preparatory conditions, each preparatory condition is correspondingly arranged on a default prompt message, and the corresponding user's account of each preparatory condition;When service end judges that work state information meets a preparatory condition, it will be prompted to information and send into the management client of corresponding user's Account Logon.The beneficial effect of its technical scheme is, the administrative staff at Workshop Production scene can be facilitated to receive different briefing information, and then can effectively ensure production efficiency.
Description
Technical field
The present invention relates to semiconductor production field, more particularly to a kind of production management system.
Background technology
In recent years, due to extensive use of the semiconductor chip in the field such as computer, communication, semiconductor manufacturing industry is also complete
Ball is developed rapidly.In semiconductor manufacturing industry, due to the sensitiveness of its expensive device and the complexity of manufacturing process,
Existing to be all based on to plant site workflow management in plant site production process, it is existing primarily directed to one of product
Management, monitoring and tracking, it is more concern Workshop Production discipline and the problems such as with the presence or absence of potential safety hazard, and for
The technical staff such as producer of board equipment and related management person such as gaffer or group leader, lack systematization, targetedly appoint
Business arranges, and lacks the problem of technical staff, gaffer or group leader obtain in time to different management things.
The content of the invention
For above mentioned problem existing for production link in the prior art, one kind is now provided and is intended to that production can be grasped in time
The production task of board, and perform production task work state information, and then according to production board work state information,
Preset task prompt message is sent into the management client of corresponding user's Account Logon, facilitates making for management client
User grasps the production management system of briefing information assurance production efficiency in time.
Concrete technical scheme is as follows:
A kind of production management system, applied to the production management of board, wherein, including:
Service end, the production task of each board is preserved in the service end;
Multiple production boards, are connected with the service end respectively, and the production issued to perform the service end is appointed
Business, each production board by work state information when performing the production task also feeding back to the service end;
Management client, it is arranged on each production board, the management client can pass through multiple user's accounts
Family, which logs in, connects the service end;
The service end is to judge whether the work state information meets one in multiple preparatory conditions, Mei Gesuo
State preparatory condition and be correspondingly arranged on a default briefing information, and the corresponding use of each preparatory condition
Person's account;
When the service end judges that the work state information meets a preparatory condition, the briefing is believed
Breath is sent into the management client of corresponding user's Account Logon.
Preferably, each production board includes:
Information acquisition module, to the work state information that gathers include the production board working condition, with
And the information of duration in idle condition, the information of the task currently performed and remaining task;
Sending module, it is connected with described information acquisition module, the work state information is sent to the service
Preserved in end.
Preferably, user's account is included in the producer that workshop execution produces and accessed to your account;
The service end includes:
First judge module, to be judged to perform the work times when the board is according to the work state information
The working condition of business, and when the remaining time for having performed the current task is less than first preset time, shape
Into one first judged result;
Processing module, it is connected with first judge module, according to first judged result, to match described appoint
It is engaged in prompt message, and the briefing information is sent to the corresponding producer to the managing customer for the login that accesses to your account
In end.
Preferably, user's account is included in first kind manager's account that workshop performs management, the clothes
Business end includes:
Second judge module, it is connected with the processing module, to be judged to work as the machine according to the work state information
Platform be in idle condition time exist more than one second preset time and when more than second preset time it is pending
The task when formed one second judged result;
The processing module matches the briefing information, and the task is carried according to second judged result
Show that information is sent into the management client of the corresponding first kind manager Account Logon.
Preferably, user's account is included in first kind manager's account that workshop performs management, Duo Gesuo
Stating board includes standby board and main engine bed, and the service end includes:
3rd judge module, it is connected with the processing module, to be judged to work as the master according to the work state information
The task that board performs is more than one first predetermined threshold value, and the task that the standby board performs is less than
During one second predetermined threshold value, one the 3rd judged result is formed;
The processing module matches the briefing information according to the 3rd judged result, and by the task
Prompt message is sent into the management client of the first kind manager Account Logon.
Preferably, user's account is included in second class manager's account that workshop performs management, the clothes
Business end includes:
4th judge module, it is connected with the processing module, to be judged to work as the machine according to the work state information
The free time of platform altogether forms one the 4th judged result when surpassing three preset time;
The processing module matches the briefing information, and the task is carried according to the 4th judged result
Show that information is sent into the management client of corresponding second class manager's Account Logon.
Preferably, the service end also includes a memory module, to preserve the work state information, and described
Business prompt message.
Preferably, the service end includes an authority management module, and the authority management module is assigning the use
Person's account is in the authority of the briefing information corresponding to service end acquisition.
Preferably, second preset time is 2 hours.
Preferably, the 3rd preset time is 4 hours.
Above-mentioned technical proposal has the following advantages that or beneficial effect:Service end can timely grasp the work of each production board
Make status information, and judge whether work state information meets preparatory condition, and will appoint when meeting corresponding to preparatory condition
Business prompt message is sent into the management client of corresponding user's Account Logon, and then can facilitate the pipe at Workshop Production scene
Reason personnel receive different briefing information, and then can effectively ensure production efficiency.
Brief description of the drawings
With reference to appended accompanying drawing, more fully to describe embodiments of the invention.However, appended accompanying drawing be merely to illustrate and
Illustrate, and be not meant to limit the scope of the invention.
Fig. 1 is a kind of structural representation of the embodiment of production management system of the present invention.
Reference represents:
1st, service end;2nd, board is produced;11st, processing module;12nd, the first judge module;13rd, the second judge module;14th,
Three judge modules;15th, memory module;21st, acquisition module;22nd, sending module;3rd, management client.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on
Embodiment in the present invention, those of ordinary skill in the art obtained on the premise of creative work is not made it is all its
His embodiment, belongs to the scope of protection of the invention.
It should be noted that in the case where not conflicting, the feature in embodiment and embodiment in the present invention can phase
Mutually combination.
The invention will be further described with specific embodiment below in conjunction with the accompanying drawings, but not as limiting to the invention.
Technical scheme includes a kind of production management system.
As shown in figure 1, a kind of embodiment of production management system, applied to the production management of board, wherein, bag
Include:
Service end 1, the production task of each board is preserved in service end 1;
Multiple production boards 2, are connected with service end 1, to perform the production task that service end 1 issues, Mei Gesheng respectively
Production board 2 also to by perform production task when work state information feed back to service end 1;
Management client 3, it is arranged on each production board 2, management client 3 can pass through multiple user's Account Logons
Connection Service end 1;
Service end 1 is to judge whether work state information meets one in multiple preparatory conditions, each preparatory condition
It is correspondingly arranged on a default briefing information, and the corresponding user's account of each preparatory condition;
When service end 1 judges that work state information meets a preparatory condition, briefing information is sent to corresponding
In the management client 3 of user's Account Logon.
For in the prior art, workshop is based only on workflow management, and for the task of the production execution of board 2
When work state information scene administrative staff can not grasp, cause administrative staff effectively to arrange to deposit during management role
The defects of.
In the present invention, work state information when performing task can be sent to service by each production board 2
End 1, whether the work state information for judging each production board 2 by service end 1 meets preparatory condition, wherein needing what is illustrated
Administrative staff corresponding to being user's account may include the technical staff for performing production, gaffer, and group leader, each preparatory condition
A corresponding default briefing information, and the also corresponding user of each condition manages account, such as when therein one pre-
If corresponding to condition being user's account of technical staff, when the work state information for producing board 2 meets the preparatory condition,
Briefing information corresponding to the preparatory condition is sent into the management client 3 of user's Account Logon of technical staff,
Wherein briefing information can be the information for prompting technical staff to be ready to carry out subsequent work task in advance.Above-mentioned technology can
Facilitate the administrative staff at Workshop Production scene to receive different briefing information, and then can effectively ensure production efficiency.
In a kind of preferably embodiment, each board 2 that produces includes:
Information acquisition module 21, the work state information to gather include the working condition of production board 2 and are in
The information of the duration of idle condition, the information of the task currently performed and remaining task;
Sending module 22, it is connected with information acquisition module 21, is protected work state information is sent into service end 1
Deposit.
It in above-mentioned technical proposal, may also include in the production information that production board 2 is sent, survey machine information, board maintenance letter
Breath etc..
In a kind of preferably embodiment, the producer that user's account is included in workshop execution production accesses to your account;
Service end 1 includes:
First judge module 12, to be judged according to work state information when board is in the work shape of execution task
State, and when the remaining time for having performed current task is less than first preset time, forms one first and judge knot
Fruit;
Processing module, it is connected with the first judge module 12, according to the first judged result, to match briefing letter
Breath, and the briefing information is sent in the management client 3 for accessing to your account login to the corresponding producer.
In above-mentioned technical proposal, the producer corresponds to the technical staff of the production board 2 in workshop, and it is mainly responsible for operation life
Produce board 2 and perform task, the first above-mentioned preset time is that current production board 2 is carrying out production task, and is held
Remaining time of work at present task gone when being less than first preset time, it is necessary to notification technique personnel be ready to carry out it is next
Task, make fully be docked between both tasks, avoid raw empty run of production board 2 from causing the wasting of resources
Problem.
Service end 1 also has the task being not carried out to judge to work as production board 2, but currently at production board 2
In halted state, now service end 1 can be by the information pre-set such as " please perform production task " transmission to corresponding user
The management client 3 of the production board 2 of Account Logon.
In a kind of preferably embodiment, user's account is included in the first kind manager that workshop performs management
Account, service end 1 include:
Second judge module 13, is connected with processing module, to be judged according to work state information when board is in the free time
The time of state shape more than one second preset time and when pending task be present when more than the second preset time
Into one second judged result;
Processing module matches briefing information according to the second judged result, and by the briefing information send to
In the management client 3 of corresponding first kind manager Account Logon.
In above-mentioned technical proposal, first kind account executive can be with the gaffer inside workshop, when in the judgement of service end 1
When stating preparatory condition and meeting, the information pre-set can be sent to corresponding neck such as " asking notification technique portion personnel placement production "
In the management client 3 of user's Account Logon of class, gaffer is facilitated to obtain the prompt message and then urgency technology of correlation in time
Personnel placement produces.
In a kind of preferably embodiment, user's account is included in the first kind manager that workshop performs management
Account, multiple boards include standby board and main engine bed, and service end 1 includes:
3rd judge module 14, is connected with processing module, to judge what is performed when main engine bed according to work state information
Task is more than one first predetermined threshold value, and when the task that performs of standby board is less than second predetermined threshold value, formation
One the 3rd judged result;
Processing module matches briefing information, and briefing information is sent to according to the 3rd judged result
In the management client 3 of a kind of manager's Account Logon.
In above-mentioned technical proposal, the production board 2 of workshop may include the preferable board of performance as main engine bed,
Slightly weak board can be used as standby board, when service end 1 judges to meet above-mentioned preparatory condition, then it represents that main engine bed is held
Row task is too many, and standby board can share part task, and service end 1 now can be by the information pre-set such as
" please by task perform be dispatched to standby board ", send in the management client 3 logged in gaffer by user's account,
Gaffer can arrange work task scheduling according to the information.
In a kind of preferably embodiment, user's account is included in the second class manager that workshop performs management
Account, service end 1 include:
4th judge module, is connected with processing module, to be judged to work as the free time of board altogether according to work state information
Time forms one the 4th judged result when surpassing three preset time;
Processing module matches briefing information according to the 4th judged result, and by the briefing information send to
In the management client 3 of corresponding second class manager's Account Logon.
In above-mentioned technical proposal, the second class manager account can be the group leader of workshop, when service end 1 judges to meet
During above-mentioned preparatory condition, service end 1 sends this information to the information pre-set " notifying gaffer to inquire the condition of production "
In the management client 3 of user's Account Logon of group leader, group leader can find related gaffer according to the information and arrange production, and avoid
Influence normal production.
In a kind of preferably embodiment, service end 1 also includes the memory module 1511 of a memory module 15, to preserve
Work state information, and briefing information.
In above-mentioned technical proposal, each above-mentioned preparatory condition, and each user's account are preserved in service end 1
Family information.
In a kind of preferably embodiment, service end 1 includes an authority management module, and authority management module is assigning
User's account obtains the authority of corresponding briefing information in service end 1.
In above-mentioned technical proposal, authority management module can be connected with memory module 15, when user passes through management client 3
After the success of registered user's account, service end 1 assigns different identity by authority management module to current user's account
Access right, to ensure that briefing information is sent to corresponding user's account;
Wherein, in addition to when task the instruction production time
In a kind of preferably embodiment, the second preset time is 2 hours.
In a kind of preferably embodiment, the 3rd preset time is 4 hours.
In above-mentioned technical proposal, the 3rd preset time can be bigger than the second preset time in principle, wherein the second preset time
With the 3rd preset time according to different mission bit stream requirements, the preset time of setting can be different, can be flexible according to production requirement
Adjustment, is not limited to this.
Preferred embodiments of the present invention are the foregoing is only, not thereby limit embodiments of the present invention and protection model
Enclose, to those skilled in the art, should can appreciate that all with made by description of the invention and diagramatic content
Scheme obtained by equivalent substitution and obvious change, should be included in protection scope of the present invention.
Claims (10)
1. a kind of production management system, the production management applied to board, it is characterised in that including:
Service end, the production task of each board is preserved in the service end;
Multiple production boards, are connected with the service end respectively, to perform the production task that the service end issues, often
The individual production board by work state information when performing the production task also feeding back to the service end;
Management client, it is arranged on each production board, the management client can be stepped on by multiple user's accounts
Record connects the service end;
The service end is each described pre- to judge whether the work state information meets one in multiple preparatory conditions
If condition is correspondingly arranged on a default prompt message, and the corresponding user's account of each preparatory condition;
When the service end judges that the work state information meets a preparatory condition, by the prompt message send to
In the management client of corresponding user's Account Logon.
2. production management system according to claim 1, it is characterised in that each production board includes:
Information acquisition module, the work state information to gather include working condition and the place of the production board
The information of duration, the task currently performed and the information of remaining task in idle condition;
Sending module, it is connected with described information acquisition module, the work state information is sent into the service end
Preserve.
3. production management system according to claim 1, it is characterised in that user's account is included in workshop execution
The producer of production accesses to your account;
The service end includes:
First judge module, to be judged to perform the task when the board is according to the work state information
Working condition, the and when remaining time for having performed the current task is less than first preset time, formation 1 the
One judged result;
Processing module, it is connected with first judge module, according to first judged result, to match the prompting letter
Breath, and the prompt message is sent in the management client for accessing to your account login to the corresponding producer.
4. production management system according to claim 3, it is characterised in that user's account is included in workshop
First kind manager's account of management is performed, the service end includes:
Second judge module, it is connected with the processing module, to be judged according to the work state information at the board
Pending institute more than one second preset time and when more than second preset time be present in the time of idle condition
One second judged result is formed when stating task;
The processing module matches the prompt message according to second judged result, and by the prompt message send to
In the management client of the corresponding first kind manager Account Logon.
5. production management system according to claim 3, it is characterised in that user's account is included in workshop
First kind manager's account of management is performed, multiple boards include standby board and main engine bed, the service end bag
Include:
3rd judge module, it is connected with the processing module, to be judged to work as the main engine bed according to the work state information
The task performed is more than one first predetermined threshold value, and the task that performs of the standby board is the less than 1
During two predetermined threshold values, one the 3rd judged result is formed;
The processing module matches the prompt message, and the prompt message is sent according to the 3rd judged result
Into the management client of the first kind manager Account Logon.
6. production management system according to claim 3, it is characterised in that user's account is included in workshop
Second class manager's account of management is performed, the service end includes:
4th judge module, it is connected with the processing module, to be judged according to the work state information when the board is total
Common free time forms one the 4th judged result when surpassing three preset time;
The processing module matches the prompt message according to the 4th judged result, and by the prompt message send to
In the management client of corresponding second class manager's Account Logon.
7. production management system according to claim 3, it is characterised in that the service end also includes a memory module,
To preserve the work state information, and the prompt message.
8. production management system according to claim 1, it is characterised in that the service end includes a rights management mould
Block, the authority management module obtain assigning user's account in the service end corresponding to the prompt message
Authority.
9. production management system according to claim 4, it is characterised in that second preset time is 2 hours.
10. production management system according to claim 6, it is characterised in that the 3rd preset time is 4 hours.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710937068.6A CN107871205A (en) | 2017-10-10 | 2017-10-10 | A kind of production management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710937068.6A CN107871205A (en) | 2017-10-10 | 2017-10-10 | A kind of production management system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107871205A true CN107871205A (en) | 2018-04-03 |
Family
ID=61753039
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710937068.6A Pending CN107871205A (en) | 2017-10-10 | 2017-10-10 | A kind of production management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107871205A (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101604159A (en) * | 2008-06-12 | 2009-12-16 | 联准科技股份有限公司 | The real-time monitoring system of production equipment and environmental aspect |
CN102346888A (en) * | 2011-11-17 | 2012-02-08 | 杭州开源电脑技术有限公司 | Production management system and method adopting order lists as core |
CN105096021A (en) * | 2014-05-23 | 2015-11-25 | 中芯国际集成电路制造(上海)有限公司 | System and method for tracing a queue time of a semiconductor |
-
2017
- 2017-10-10 CN CN201710937068.6A patent/CN107871205A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101604159A (en) * | 2008-06-12 | 2009-12-16 | 联准科技股份有限公司 | The real-time monitoring system of production equipment and environmental aspect |
CN102346888A (en) * | 2011-11-17 | 2012-02-08 | 杭州开源电脑技术有限公司 | Production management system and method adopting order lists as core |
CN105096021A (en) * | 2014-05-23 | 2015-11-25 | 中芯国际集成电路制造(上海)有限公司 | System and method for tracing a queue time of a semiconductor |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109862048A (en) | Shop equipment processing system, device databases server and method | |
CN206322012U (en) | A kind of MES system for coal preparation plant | |
CN103197640B (en) | Production technology intelligence managing and control system and method | |
CN106774240A (en) | A kind of service-oriented industrial production control and monitoring method and system | |
CN106506256B (en) | A kind of equipment monitoring system and method based on platform+plug-in | |
CN106709612A (en) | System and method for carrying out data interaction between ERP and MES | |
CN206298231U (en) | Elevator repair and maintenance managing device based on bluetooth and Mobile Data Communication Technology | |
CN103914026B (en) | Production status monitoring system and production status monitoring method | |
CN106910004A (en) | A kind of overall process blower fan workmanship monitoring system based on workflow | |
CN106572186A (en) | Production supervision method and system | |
CN101707528A (en) | Method for transmitting alarm data of centralized monitoring system | |
CN108696527A (en) | A kind of real-time data transmission system for mine automated system | |
CN104635506B (en) | A kind of semiconductor production line handling system device simulating method | |
CN208255671U (en) | A kind of paper production workshop operation monitoring device | |
CN106548327A (en) | A kind of Workflow system and the integrated method of other Third party systems | |
CN105356597B (en) | The intensive managing and control system of unattended substation | |
CN107871205A (en) | A kind of production management system | |
CN106897807A (en) | A kind of business risk control method and equipment | |
CN111194014A (en) | Equipment fault real-time repair reporting system and method thereof | |
CN108445858A (en) | One kind is had furniture made to order production process digital management system and information synchronization method | |
CN114971521A (en) | Staff fixed-point inspection system based on task automatic generation | |
CN208681158U (en) | Intelligent tool detection system | |
CN104901982B (en) | A kind of online data monitoring system and monitoring method | |
CN113269387A (en) | Real-time management system and management method for digital labor force | |
CN112785203A (en) | Production line management and control system based on test |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: 401331 No. 25 Xiyong Avenue, Shapingba District, Chongqing Applicant after: CHINA RESOURCES MICROELECTRONICS (CHONGQING) Co.,Ltd. Address before: 401331 No. 25 Xiyong Avenue, Shapingba District, Chongqing Applicant before: SKYSILICON Co.,Ltd. |
|
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180403 |