CN107869186A - A kind of assembled architecture flare window construction and its manufacture method - Google Patents

A kind of assembled architecture flare window construction and its manufacture method Download PDF

Info

Publication number
CN107869186A
CN107869186A CN201711020429.7A CN201711020429A CN107869186A CN 107869186 A CN107869186 A CN 107869186A CN 201711020429 A CN201711020429 A CN 201711020429A CN 107869186 A CN107869186 A CN 107869186A
Authority
CN
China
Prior art keywords
flare
window construction
construction
reinforcement
window
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711020429.7A
Other languages
Chinese (zh)
Inventor
胡维建
王闽松
张雪松
胡永平
赵玉冰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Panyu Polytechnic
Original Assignee
Guangzhou Panyu Polytechnic
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Panyu Polytechnic filed Critical Guangzhou Panyu Polytechnic
Priority to CN201711020429.7A priority Critical patent/CN107869186A/en
Publication of CN107869186A publication Critical patent/CN107869186A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

The invention discloses a kind of assembled architecture flare window construction and its manufacture method, it is made for the flare window construction and flare harden structure in skyscraper, it is not only able to reduce the discharge of building waste, save construction material, energy-conserving and environment-protective, simultaneously in obtained flare window construction and flare harden structure due to containing steel bar stress and stirrup specification be usually much larger than the distributing bar of general outer bay window and flare plate, so that flare window construction and flare harden structure have stronger safety stock, the completion simultaneously because manufacture of flare window construction and flare harden structure can be prefabricated in the factory, then assembling construction is carried out at the scene again, wet trade can be greatly reduced, reduce the construction period, reduce construction cost.

Description

A kind of assembled architecture flare window construction and its manufacture method
Technical field
The present invention relates to building field, more particularly to a kind of assembled architecture flare window construction and its manufacture method.
Background technology
A large amount of reinforced concrete members for needing dismounting discarded in existing architectural engineering be present, such as the steel in pattern foundation pit supporting structure Reinforced concrete support, Guan Liang, waist rail, the reinforced concrete member of technical requirements is unsatisfactory for caused by construction reason or because of other Reason needs to remove discarded reinforced concrete member, Ru Liang, plate, post etc., and these reinforced concrete members are typically after dismounting Discarded landfill disposal will be carried out, not only causes the waste of construction material, produces more building waste, pollutes environment, consumption is big The human and material resources of amount, financial resources, while Reinforcement in these components and hooping bars layout are larger.
Building residential houses in generally there are a large amount of outer bay window and flare harden structures, due to these structures be it is non-principal by Power component, only it need to meet tectonic sieving requirement typically in structure design, its reinforcing bar can meet force request, while these structures Part is that cast in situs at the construction field (site) is completed mostly in construction, and construction procedure is complicated, and the construction period is longer, expends simultaneously Substantial amounts of construction material, cost are higher.
The content of the invention
The defects of it is an object of the invention to overcome prior art, there is provided one kind can either meet each side stress performance, Construction cost, and the assembled architecture flare window construction and its manufacture method of energy-conserving and environment-protective again, the dress is greatly reduced in and can What the technical scheme with formula building flare window construction and its manufacture method was realized in:
A kind of assembled architecture flare window construction, in cuboid tube structure, including outer bay window top, bottom plate and and flare The outer bay window side plate that window top, bottom plate are arranged in a mutually vertical manner, the flare window construction part are mounted in structure wall, another portion Divide and encorbelment on the outside of structure wall, the flare window construction is made by discarded reinforced concrete member secondary use to be removed 's.
Preferably, the width of the flare window construction is 600~800mm, and thickness is 80~120mm, the outer bay window knot The width that structure is mounted in structure wall is 200~240mm, and the length encorbelmented on the outside of structure wall is 360~600mm.
Further, the manufacture method of the assembled architecture flare window construction mainly includes the following steps that:
(1) Impact direction of the discarded reinforced concrete member to be removed along reinforced concrete member is carried out into segmentation to cut Cut, obtain reinforced concrete member segmentation section;
(2) reinforced concrete member segmentation section is transported to thickness and outer bay window knot of the pre-fabricated factory according to flare window construction Window portal design size inside structure carries out layer and section cutting, and the flare window construction that at least ensure to obtain in cutting is female Include one layer of Reinforcement inside material and one layer is located at the vertically disposed stirrup of Reinforcement, Reinforcement Near the centre position of flare window construction mother metal, the reinforcement welding end of the reserved certain length in both ends of Reinforcement;
(3) flare window construction mother metal obtained above is carried out according to the window portal design size of outer bay window inside configuration Division, is divided into four sections, and marks division points, using middle Reinforcement as baseline, in division points in an intermediate position The lower section cutting at place cuts out 90 ° of v-notch, and 45 ° of the place of cutting triangle is cut at the division points in marginal position and is lacked Mouthful, and a bending line of cut is cut out on the top of division points respectively;
(4) mother metal structure obtained above is subjected to bending process at division points respectively successively, formed after bending Section is rectangle the flare window construction of the closing of structure;
(5) the reserved reinforcement welding end in the both ends at the division points finally bent is subjected to soldering;
(6) poured again after the rectangular v notch v formed at the flare window construction corner of the closing of formation being carried out into dabbing processing Complete assembled architecture flare window construction is formed after building new concrete.
Preferably, the length at the reserved reinforcement welding end in the both ends of the Reinforcement is 5~10mm.
Preferably, the v-notch, bending line of cut and vee are arrived at Reinforcement surface.
Preferably, by the layer and section cut length only containing Reinforcement that step (2) obtains along longitudinal stress steel The segmentation of muscle Impact direction is cut, and one end is exposed to the Bar Anchorage section of certain length, is fabricated to flare harden structure.
Preferably, the flare harden structure of one end containing Bar Anchorage section is embedded in agent structure wall, and by reinforcing bar anchor Gu section bending is stretched into the cast-in-place concrete construction beam being arranged in structure wall, flare plate is formed.
Beneficial effects of the present invention are:Discarded reinforced concrete member to be removed is subjected to secondary use, is made and is used for Flare window construction and flare harden structure in skyscraper, it is not only able to reduce the discharge of building waste, saves construction material, section Can environmental protection, while in obtained flare window construction and flare harden structure due to containing steel bar stress and stirrup specification generally much More than general outer bay window and the distributing bar of flare plate so that flare window construction and flare harden structure have stronger safety storage It is standby, the completion simultaneously because manufacture of flare window construction and flare harden structure can be prefabricated in the factory, then carry out group at the scene again Dress construction, can be greatly reduced wet trade, reduce the construction period, reduce construction cost.
Brief description of the drawings
Fig. 1 is the horizontal layout schematic diagram of discarded reinforced concrete member to be removed;
Fig. 2 is reinforced concrete member layer and section cutting schematic diagram;
Fig. 3 a-3c are outer bay window structure fabrication process schematic flow sheet;
Fig. 4 is the overall structure diagram of flare window construction;
Fig. 5 is section structure diagram when flare window construction is specifically used;
Fig. 6 is the facade structures schematic diagram (Fig. 5 A-A profiles) when flare window construction is specifically used;
Fig. 7 is the plane arrangement structure schematic diagram of flare harden structure;
Fig. 8 is facade structures schematic diagram when flare harden structure is specifically used.
Reference:1- reinforced concrete supports, 2- flare window constructions, 2a- flare window construction mother metals, 2b- flares are hardened Structure mother metal, 3- structure walls, 3a- cast-in-place concretes construction beam, 11- reinforced concrete supports separate disconnected, 12- longitudinal stress steel Muscle, 12a- Bar Anchorage sections, 13- stirrups, 21- outer bay windows top, bottom plate, 22- outer bay window side plates, 23-V type breach, 23a- triangles V notch v, 24- bending lines of cut, the rectangular v notch vs of 25-, 26- windows hole, 27- reinforcement weldings end.
Embodiment
The present invention is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
When it is implemented, discarded reinforced concrete member to be removed has a lot, the present invention is with the steel of foundation pit supporting construction Exemplified by reinforced concrete support, other reinforced concrete members are similar with the manufacture method of reinforced concrete support.
As shown in Fig. 1~8, a kind of assembled architecture flare window construction, in cuboid tube structure, including outer bay window top, Bottom plate 21 and the outer bay window side plate 22 being arranged in a mutually vertical manner with outer bay window top, bottom plate 21, the flare window construction 2 are a part of embedding Gu in structure wall 3, another part is encorbelmented in the outside of structure wall 3, and the flare window construction 2 is by discarded steel to be removed Made from reinforced concrete component secondary use.
Preferably, the width H of the flare window construction 2 is 600~800mm, and thickness B is 80~120mm, the outer bay window The width that structure 2 is mounted in structure wall 3 is 200~240mm, the length H1 to encorbelment in the outside of structure wall 3 for 360~ 600mm。
Further, the manufacture method of the assembled architecture flare window construction mainly includes the following steps that:
(1) Impact direction of the discarded reinforced concrete support 1 to be removed along reinforced concrete support 1 is carried out into segmentation to cut Cut, obtain reinforced concrete member segmentation section 11;
(2) reinforced concrete member segmentation section 11 is transported to thickness B and flare of the pre-fabricated factory according to flare window construction 2 The design size of window hole 26 inside window construction carries out layer and section cutting, at least to ensure obtained outer bay window in cutting Include one layer of Reinforcement 12 and one layer and the vertically disposed stirrup 13 of Reinforcement 12 inside structure mother metal 2a, indulge It is located to steel bar stress 12 near flare window construction mother metal 2a centre position, the both ends of Reinforcement 12 are reserved certain The reinforcement welding end 27 of length;
(3) according to the design size of window hole 26 inside flare window construction 2 to flare window construction mother metal obtained above 2a is divided, and is divided into four sections, and marks division points, is baseline with middle Reinforcement 13, in an intermediate position Division points at lower section cutting cut out 90 ° of v-notch 23, at the division points in marginal position cutting cut place 45 ° of vee 23a, and a bending line of cut 24 is cut out on the top of division points respectively;
(4) mother metal structure obtained above is subjected to bending process at division points respectively successively, formed after bending Section is rectangle the flare window construction 2 of the closing of structure;
(5) the reserved reinforcement welding end 27 in the both ends at the division points finally bent is subjected to soldering;
(6) weighed after the rectangular v notch v 25 formed at 2 four jiaos of the flare window construction of the closing of formation being carried out into dabbing processing Complete assembled architecture flare window construction is formed after newly pouring new concrete.
Preferably, the length at the reserved reinforcement welding end 27 in the both ends of the Reinforcement 12 is 5~10mm.
Preferably, the v-notch 23, bending line of cut 24 and vee 23a arrive Reinforcement 12 At surface.
Preferably, in order to further make full use of reinforced concrete support 1, by step (2) obtain only containing longitudinal direction by The layer and section cut length of power reinforcing bar 12 is segmented along the Impact direction of Reinforcement 12 as flare harden structure mother metal 2b and cut, And one end is exposed to the Bar Anchorage section 12a of certain length, it is fabricated to flare harden structure.
Preferably, by the flare harden structure embedded structure wall 3 of one end containing Bar Anchorage section 12a, and by reinforcing bar anchor Gu section 12a bendings are stretched into the cast-in-place concrete construction beam 3a being arranged in agent structure wall 3, flare plate is formed.
Preferably, the cantilever span of the flare harden structure is 400~1000mm, and width is 400~800mm.
Preferably, the flare harden structure can be used for the installation site of air-conditioning or other equipment electrical equipment.
Preferably, the flare harden structure can be individual layer flare plate or double-layer outer bay plate.
The technology contents and technical characteristic of the present invention have revealed that as above those skilled in the art are still potentially based on this The teaching of invention and make the replacement and modification without departing substantially from essence of the invention, therefore, the scope of the present invention is not limited to embodiment Disclosed content, also including various replacements and modification without departing substantially from essence of the invention.

Claims (7)

  1. A kind of 1. assembled architecture flare window construction, it is characterised in that:The flare window construction is in cuboid tube structure, including Outer bay window top, bottom plate and the outer bay window side plate being arranged in a mutually vertical manner with outer bay window top, bottom plate, the flare window construction part It is mounted in structure wall, another part is encorbelmented on the outside of structure wall, and the flare window construction is by discarded steel to be removed Made from reinforced concrete component secondary use.
  2. 2. assembled architecture flare window construction according to claim 1, it is characterised in that:The width of the flare window construction For 600~800mm, thickness is 80~120mm, the flare window construction be mounted in width in structure wall for 200~ 240mm, the length encorbelmented on the outside of structure wall are 360~600mm.
  3. 3. the manufacture method of the assembled architecture flare window construction according to claim 1~2 any claim, its feature It is:The manufacture method of the assembled architecture flare window construction mainly includes the following steps that:
    (1) Impact direction of the discarded reinforced concrete member to be removed along reinforced concrete member is subjected to segmentation cutting, obtained Split section to reinforced concrete member;
    (2) reinforced concrete member segmentation section is transported to pre-fabricated factory according in the thickness and flare window construction of flare window construction The window portal design size in portion carries out layer and section cutting, at least to ensure in cutting in obtained flare window construction mother metal Portion includes one layer of Reinforcement and one layer is located at flare with the vertically disposed stirrup of Reinforcement, Reinforcement Near the centre position of window construction mother metal, the reinforcement welding end of the reserved certain length in both ends of Reinforcement;
    (3) flare window construction mother metal obtained above is drawn according to the window portal design size of outer bay window inside configuration Point, four sections are divided into, and division points are marked, using middle Reinforcement as baseline, at division points in an intermediate position Lower section cutting cut out 90 ° of v-notch, at the division points in marginal position cutting cut the 45 ° of vees in place, And a bending line of cut is cut out on the top of division points respectively;
    (4) mother metal structure obtained above is subjected to bending process at division points respectively successively, section is formed after bending It is rectangle the flare window construction of the closing of structure;
    (5) the reserved reinforcement welding end in the both ends at the division points finally bent is subjected to soldering;
    (6) poured again newly after the rectangular v notch v formed at the flare window construction corner of the closing of formation being carried out into dabbing processing Concrete after form complete assembled architecture flare window construction.
  4. 4. the manufacture method of assembled architecture flare window construction according to claim 3, it is characterised in that:The longitudinal direction by The length at the reserved reinforcement welding end in the both ends of power reinforcing bar is 5~10mm.
  5. 5. the manufacture method of assembled architecture flare window construction according to claim 3, it is characterised in that:The V-type lacks Mouth, bending line of cut and vee are arrived at Reinforcement surface.
  6. 6. the manufacture method of assembled architecture flare window construction according to claim 3, it is characterised in that:By step (2) The obtained layer and section cut length only containing Reinforcement is segmented along Reinforcement Impact direction and cut, and by one The Bar Anchorage section of certain length is exposed at end, is fabricated to flare harden structure.
  7. 7. the manufacture method of assembled architecture flare window construction according to claim 6, it is characterised in that:Reinforcing bar will be contained The flare harden structure embedded structure wall of one end of anchoring section, and the bending of Bar Anchorage section is stretched into and is arranged on agent structure wall In cast-in-place concrete construction beam in, formed flare plate.
CN201711020429.7A 2017-10-27 2017-10-27 A kind of assembled architecture flare window construction and its manufacture method Pending CN107869186A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711020429.7A CN107869186A (en) 2017-10-27 2017-10-27 A kind of assembled architecture flare window construction and its manufacture method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711020429.7A CN107869186A (en) 2017-10-27 2017-10-27 A kind of assembled architecture flare window construction and its manufacture method

Publications (1)

Publication Number Publication Date
CN107869186A true CN107869186A (en) 2018-04-03

Family

ID=61753477

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711020429.7A Pending CN107869186A (en) 2017-10-27 2017-10-27 A kind of assembled architecture flare window construction and its manufacture method

Country Status (1)

Country Link
CN (1) CN107869186A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109977607A (en) * 2019-04-16 2019-07-05 广东华坤建设集团有限公司 A kind of environmentally friendly assembled heat insulation floats window production and construction method of installation

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202462589U (en) * 2011-12-31 2012-10-03 潍坊特钢集团新型建材有限公司 Cutting scrap recycling device for producing aerated concrete block
CN102863169A (en) * 2012-10-24 2013-01-09 陕西元方实业有限公司 Recycling method for waste concrete pavements
CN203131524U (en) * 2013-03-06 2013-08-14 乐健科技(珠海)有限公司 Bendable light-emitting diode (LED) light source module
CN203151860U (en) * 2013-03-06 2013-08-21 乐健科技(珠海)有限公司 Bendable metal-base printed circuit board
CN107218448A (en) * 2016-04-09 2017-09-29 江阴蔚蓝环境机械科技有限公司 A kind of double thickness shaped steel face rectangle composite air duct and its processing method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202462589U (en) * 2011-12-31 2012-10-03 潍坊特钢集团新型建材有限公司 Cutting scrap recycling device for producing aerated concrete block
CN102863169A (en) * 2012-10-24 2013-01-09 陕西元方实业有限公司 Recycling method for waste concrete pavements
CN203131524U (en) * 2013-03-06 2013-08-14 乐健科技(珠海)有限公司 Bendable light-emitting diode (LED) light source module
CN203151860U (en) * 2013-03-06 2013-08-21 乐健科技(珠海)有限公司 Bendable metal-base printed circuit board
CN107218448A (en) * 2016-04-09 2017-09-29 江阴蔚蓝环境机械科技有限公司 A kind of double thickness shaped steel face rectangle composite air duct and its processing method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109977607A (en) * 2019-04-16 2019-07-05 广东华坤建设集团有限公司 A kind of environmentally friendly assembled heat insulation floats window production and construction method of installation

Similar Documents

Publication Publication Date Title
CN107227822A (en) Building post and its construction technology that a kind of steel pipe is combined with batten plate
CN107313506B (en) Building frame structure with boundary beam and construction method thereof
CN107419824A (en) The full precast shear wall structural system of regenerative steel skeleton and construction method
CN108240041A (en) A kind of bean column node reinforcing bar avoiding structure and its construction method
CN211114425U (en) Prefabricated steel pipe concrete column
CN208430661U (en) A kind of vertical piece construction of line-styled self-heat conserving overlapped shear wall
CN104294920B (en) The node component of a kind of U-shaped steel-concrete combination beam and special-shaped steel pipe concrete post and preparation method
CN105625566A (en) Fabricated concrete orthogonal-diagonal lattice space grid box type tube-in-tube structure and making method thereof
CN111809796B (en) Assembled concrete superposed beam and construction method thereof
CN105863140A (en) Precast hollow floor's component for stress island based hollow floor system
CN114411945A (en) Bin jump construction method based on BIM technology
CN112196107A (en) Prefabricated assembled type steel reinforced concrete primary and secondary beam connecting joint
CN207017483U (en) The full precast shear wall structural system of regenerative steel skeleton
CN210713517U (en) Assembled superposed beam structure
CN111305372A (en) Fabricated steel reinforced concrete structure and construction method thereof
CN104895221B (en) Assembled shaped steel confined concrete shear wall structure
CN113898102A (en) Ribbed concrete laminated slab
CN107869186A (en) A kind of assembled architecture flare window construction and its manufacture method
CN109797902A (en) Prefabrication ash wall body plate
CN107869101A (en) A kind of prefabricated assembled Intercepting Drain Used in Highway and its manufacture method
CN107313551A (en) A kind of concrete prefabricated wallboard of steel bar girder and structural system and its construction method
CN215858257U (en) Connecting structure of prefabricated bay window and floor slab
CN213653761U (en) Prefabricated assembled type steel reinforced concrete primary and secondary beam connecting joint
CN114215345A (en) Construction method for independent support bracket template of post-cast strip of top plate of reservoir
CN205776898U (en) Overall assembled reinforced concrete shear wall structure system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180403