CN107860014A - A kind of method of power plant sleeve-type chimney control corrosion rate leakage - Google Patents

A kind of method of power plant sleeve-type chimney control corrosion rate leakage Download PDF

Info

Publication number
CN107860014A
CN107860014A CN201710893386.7A CN201710893386A CN107860014A CN 107860014 A CN107860014 A CN 107860014A CN 201710893386 A CN201710893386 A CN 201710893386A CN 107860014 A CN107860014 A CN 107860014A
Authority
CN
China
Prior art keywords
chimney
pressure
power plant
10kpa
corrosion rate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710893386.7A
Other languages
Chinese (zh)
Other versions
CN107860014B (en
Inventor
邓宇强
叶智
张小平
张少勇
程家庆
涂伟
张继光
蔡国保
赵文亮
王思卜
张童童
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huadian Electric Power Research Institute Co Ltd
Original Assignee
Huadian Electric Power Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huadian Electric Power Research Institute Co Ltd filed Critical Huadian Electric Power Research Institute Co Ltd
Priority to CN201710893386.7A priority Critical patent/CN107860014B/en
Publication of CN107860014A publication Critical patent/CN107860014A/en
Application granted granted Critical
Publication of CN107860014B publication Critical patent/CN107860014B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23JREMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES 
    • F23J13/00Fittings for chimneys or flues 
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/28Chimney stacks, e.g. free-standing, or similar ducts
    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B7/00Special arrangements or measures in connection with doors or windows
    • E06B7/02Special arrangements or measures in connection with doors or windows for providing ventilation, e.g. through double windows; Arrangement of ventilation roses
    • E06B7/10Special arrangements or measures in connection with doors or windows for providing ventilation, e.g. through double windows; Arrangement of ventilation roses by special construction of the frame members

Abstract

The invention belongs to chimney anticorrosion erosion leakage technology field, disclose a kind of method of power plant sleeve-type chimney control corrosion rate leakage, solve smoke spillage at the chimney internal cylinder corrosion hole of power plant sleeve-type chimney, further corrode chimney structure, corrosion hole deteriorates the problem of increasing.Chimney outer barrel is carried out encapsulation process by the present invention, it is ensured that the tightness of chimney outer barrel.Then using the pressure being passed through when the one way in which maintenance chimney mezzanine space pressure such as compressed air, nitrogen cylinder supply, air blower air-supply is more than fume emission in chimney internal cylinder, and pressure differential is more than 1KPa therebetween, prevent that flue gas leaks caused by chimney internal cylinder corrosion failure, the volatile alkaline substances such as ammonia, ring amine can also be passed through in interlayer simultaneously, to neutralize the sour gas of leakage position, continue to corrode the situation generation for deteriorating expansion so as to prevent from corroding hole, it is ensured that chimney overall structure long-term safety stable operation.

Description

A kind of method of power plant sleeve-type chimney control corrosion rate leakage
Technical field
The invention belongs to chimney anticorrosion erosion leakage technology field, and in particular to a kind of power plant sleeve-type chimney control corrosion rate The method of leakage.
Background technology
Increasingly strict with domestic and international environmental requirement, current domestic coal-burning power plant is the SO in control fume emission2Contain Amount, it is most of all to employ Wet Flue Gas Desulfurization Technique, but flue gas reduces through wet-method desulfurized fume temperature, and humidity increases, in addition portion Point power plant does not put into operation GGH, after wet flue gas enters chimney internal cylinder, passes through remaining sour gas from chimney with the state of pressure-fired Body is easy to condense into the strong acid solution of corrosivity on chimney wall, and the material of chimney internal cylinder structure is caused to corrode.Generally In order to avoid chimney wall corrodes, the fume side of chimney internal cylinder has all carried out preservative treatment, and conventional anti-corrosion method mainly has: Apply anticorrosive paint, paste acid-resistant glass brick, steel stack wall laying titanium plate the methods of.Because chimney height is in 200m or so, Anti-corrosion area is huge(More in 8000m2Left and right), all there is different degrees of defect in anti_corrosion construction quality, therefore most chimneys at present All occur different corrosion leakage situations in running after anti-corrosion, bring and have a strong impact on to power plant safety production.
Date of publication is on 2 25th, 2015, and publication No. is in CN104372980A Chinese patent, discloses a kind of anti-corrosion The method of chimney lining structure and the chimney anticorrosion erosion of erosion, the chimney pass through in chimney laid inside vitreous foam brick lining Mode makes chimney reach etch-proof effect, and anti-corrosion area is huge, and anticorrosive construction gigantic project, difficulty of construction is big, anticorrosive construction Many defects be present in quality.
The day for announcing is on November 25th, 2015, and publication No. is in CN102269417B Chinese patent, is disclosed a kind of anti- Corrode chimney and chimney anticorrosion etching method, the chimney by way of chimney laid inside frp lining reaching chimney To etch-proof effect, its anti-corrosion area is huge, and anticorrosive construction gigantic project, difficulty of construction is big, and anti_corrosion construction quality exists all More defects.
The content of the invention
The present invention causes corrosion location hole to prevent sleeve-type chimney inner cylinder sour corrosion flue gas caused by corrosion from leaking Further corrosion failure of the fume leakage to chimney interlayer inner structure at hole area increase, corrosion hole, it is proposed that one kind generates electricity The side of factory's sleeve-type chimney control corrosion rate leakage, this method mainly comprise the following steps:1)Chimney outer barrel is subjected to encapsulation process, it is ensured that cigarette The tightness of chimney outer barrel;2)Then take be passed through compressed air, nitrogen cylinder supply, air blower air-supply etc. mode maintain chimney interlayer The pressure when pressure in space is more than fume emission in chimney internal cylinder, prevent that flue gas leaks caused by internal cylinder chimney corrosion failure; 3)The volatile alkaline substances such as ammonia, ring amine are passed through in interlayer simultaneously, to neutralize the sour gas of leakage position.Using this Method can reach control corrosion rate hole and continue the purpose that corrosion deteriorates expansion, it is ensured that the long-term safety and stability of chimney overall structure Operation.
The technical solution adopted for the present invention to solve the technical problems is:A kind of power plant sleeve-type chimney control corrosion rate is let out The method of leakage, chimney outer barrel is subjected to encapsulation process, it is ensured that the tightness of chimney outer barrel;Pressure is provided to chimney interlayer, makes cigarette The pressure in chimney internal cylinder space when the pressure of chimney mezzanine space is more than fume emission, when the chimney mezzanine space is with fume emission The pressure differential in chimney internal cylinder space be more than 1KPa;Meanwhile it is passed through volatile alkaline substance in chimney interlayer.When chimney interlayer When the pressure in space is more than fume emission during the pressure in chimney internal cylinder space, the flue gas in chimney internal cylinder cannot be introduced into chimney folder In layer, chimney can be controlled from further corrosion;The volatile alkaline substance alkalescence being passed through in chimney, can be neutralized in chimney The acidic materials in flue gas at cylinder corrosion hole, prevent that corroding hole further deteriorates expansion.
The pressure of chimney mezzanine space is maintained by way of being passed through compressed air, nitrogen cylinder supply or air blower air-supply In 10KPa.
Using the clay, elastic caoutchouc or plastics of UV resistant as filler, by chimney top, flue adapter and other Gap is filled sealing between building structure, and carries out consolidation process to filler, it is ensured that chimney interlayer pressure is filled out in 10KPa Thing is filled not loosen.When the pressure of chimney mezzanine space maintains 10KPa, chimney mezzanine space and cigarette during fume emission The pressure differential in chimney inner cylinder space is more than 1KPa, can prevent the smoke spillage in chimney internal cylinder completely into chimney interlayer.
The observation vent window of chimney outer barrel is the plastic-steel structure glass material of tolerable 10KPa pressure.Plastic-steel structure glass The observation vent window of material both can conveniently observe chimney inner case, can ensure to observe the intensity of vent window again.
Encapsulation process is carried out to the installation gap for observing vent window with the clay, elastic caoutchouc or plastics of UV resistant, really Guarantor's chimney interlayer pressure is observed vent window in 10KPa and not loosened.
Pressure-measuring instrument is set at the observation vent window at 50m, 100m, 150m and 200m height, and the pressure is surveyed Measuring appratus is with solar energy electrical transfer signal.The setting of pressure-measuring instrument, it is easy to monitor the pressure in chimney interlayer, to ensure Pressure energy in chimney interlayer maintains 10KPa.
The chimney bottom is provided with the doorframe structure of tolerable 10KPa pressure, and the inleakage of the doorframe structure is less than 10 m3/min。
2-6 passage and a sliding door are provided with the doorframe structure, the passage is used to connect air supply pipe Road, the sliding door pass in and out for inspection personnel.
A length of 50-500cm of the passage, a width of 50-500cm of the passage.
A height of 1000cm-1500cm of the sliding door, a width of 500cm-1000cm of the sliding door.
The volatile alkaline substance is ammonia or ring amine.
Compared with prior art, its advantage is the present invention:By doing encapsulation process to chimney interlayer, chimney folder is maintained Stressor layer is more than chimney internal cylinder pressure so that the flue gas in inner cylinder does not leak to chimney interlayer at corrosion hole;Simultaneously in cigarette Volatile alkaline substance is passed through in chimney interlayer, to neutralize the acid ingredient in the flue gas at corrosion hole position.The present invention can be controlled The further corrosion of tobacco curing chimney corrosion hole, which deteriorates, to be expanded, it is ensured that chimney overall structure long-term safety stable operation.
Embodiment
Technical scheme is described in further detail below by embodiment, following examples are to this hair Bright explanation and the invention is not limited in following examples.
Embodiment 1.
The method of a kind of power plant sleeve-type chimney control corrosion rate leakage, in the present embodiment, first with the clay of UV resistant As filler to gap carries out encapsulation process between other building structure at chimney top, flue adapter, it is ensured that chimney outer barrel Tightness, and to filler carry out consolidation process, make filler can tolerate 10KPa pressure;To be passed through the side of compressed air Formula, the pressure of chimney mezzanine space is set to maintain 10KPa, now, the chimney when pressure of chimney mezzanine space is more than fume emission The pressure in inner cylinder space, the chimney mezzanine space and the pressure differential in chimney internal cylinder space during fume emission are more than 1KPa;Together When, it is passed through ammonia in chimney interlayer.When the pressure of chimney mezzanine space maintains 10KPa, chimney mezzanine space and flue gas The pressure differential in chimney internal cylinder space during discharge is more than 1KPa, and the smoke spillage in chimney internal cylinder can be prevented to be pressed from both sides to chimney completely In layer, chimney can be controlled from further corrosion;The ammonia being passed through in chimney, it can neutralize at chimney internal cylinder corrosion hole Acidic materials in flue gas, prevent that corroding hole further deteriorates expansion.
In the present embodiment, chimney outer barrel observes the plastic-steel structure glass material that vent window is tolerable 10KPa pressure, institute State and carry out encapsulation process with the clay of UV resistant at the installation gap of observation vent window, it is ensured that chimney interlayer pressure is in 10KPa When observation vent window do not loosen.The observation vent window of plastic-steel structure glass material both can conveniently observe feelings inside chimney Condition, it can ensure to observe the intensity of vent window again.
In the present embodiment, pressure-measuring instrument is set at the observation vent window at 50m, 100m, 150m and 200m height, The pressure-measuring instrument is with solar energy electrical transfer signal.The setting of pressure-measuring instrument, it is easy to monitor in chimney interlayer Pressure, to ensure that the pressure energy in chimney interlayer maintains 10KPa.
In the present embodiment, the chimney bottom is provided with the doorframe structure of tolerable 10KPa pressure, the doorframe structure Inleakage is less than 10 m3/min.2-6 passage and a sliding door are provided with the doorframe structure, the passage is used In connection supply air line, the sliding door passes in and out for inspection personnel.A length of 50-500cm of the passage, the passage A width of 50-500cm.A height of 1000cm-1500cm of the sliding door, a width of 500cm-1000cm of the sliding door.
Embodiment 2.
The method of a kind of power plant sleeve-type chimney control corrosion rate leakage, in the present embodiment, first with the elasticity of UV resistant Rubber is as filler to gap carries out encapsulation process between other building structure at chimney top, flue adapter, it is ensured that chimney The tightness of outer barrel, and consolidation process is carried out to filler, filler is can tolerate 10KPa pressure;To be passed through compressed air Mode, the pressure of chimney mezzanine space is maintained 10KPa, now, when the pressure of chimney mezzanine space is more than fume emission The pressure in chimney internal cylinder space, the chimney mezzanine space and the pressure differential in chimney internal cylinder space during fume emission are more than 1KPa;Meanwhile it is passed through ammonia in chimney interlayer.When the pressure of chimney mezzanine space maintains 10KPa, chimney mezzanine space It is more than 1KPa with the pressure differential in chimney internal cylinder space during fume emission, completely the smoke spillage in chimney internal cylinder can be prevented to arrive In chimney interlayer, chimney can be controlled from further corrosion;The ammonia being passed through in chimney, chimney internal cylinder etch pit can be neutralized The acidic materials in flue gas at hole, prevent that corroding hole further deteriorates expansion.
In the present embodiment, chimney outer barrel observes the plastic-steel structure glass material that vent window is tolerable 10KPa pressure, institute State and carry out encapsulation process with UV resistant elastic caoutchouc at the installation gap of observation vent window, it is ensured that chimney interlayer pressure exists Vent window is observed during 10KPa not loosen.The observation vent window of plastic-steel structure glass material both can be conveniently in observation chimney Portion's situation, it can ensure to observe the intensity of vent window again.
In the present embodiment, pressure-measuring instrument is set at the observation vent window at 50m, 100m, 150m and 200m height, The pressure-measuring instrument is with solar energy electrical transfer signal.The setting of pressure-measuring instrument, it is easy to monitor in chimney interlayer Pressure, to ensure that the pressure energy in chimney interlayer maintains 10KPa.
In the present embodiment, the chimney bottom is provided with the doorframe structure of tolerable 10KPa pressure, the doorframe structure Inleakage is less than 10 m3/min.2-6 passage and a sliding door are provided with the doorframe structure, the passage is used In connection supply air line, the sliding door passes in and out for inspection personnel.A length of 50-500cm of the passage, the passage A width of 50-500cm.A height of 1000cm-1500cm of the sliding door, a width of 500cm-1000cm of the sliding door.
Embodiment 3.
The method of a kind of power plant sleeve-type chimney control corrosion rate leakage, in the present embodiment, first with the plastics of UV resistant As filler to gap carries out encapsulation process between other building structure at chimney top, flue adapter, it is ensured that chimney outer barrel Tightness, and to filler carry out consolidation process, make filler can tolerate 10KPa pressure;To be passed through the side of compressed air Formula, the pressure of chimney mezzanine space is set to maintain 10KPa, now, the chimney when pressure of chimney mezzanine space is more than fume emission The pressure in inner cylinder space, the chimney mezzanine space and the pressure differential in chimney internal cylinder space during fume emission are more than 1KPa;Together When, it is passed through ammonia in chimney interlayer.When the pressure of chimney mezzanine space maintains 10KPa, chimney mezzanine space and flue gas The pressure differential in chimney internal cylinder space during discharge is more than 1KPa, and the smoke spillage in chimney internal cylinder can be prevented to be pressed from both sides to chimney completely In layer, chimney can be controlled from further corrosion;The ammonia being passed through in chimney, it can neutralize at chimney internal cylinder corrosion hole Acidic materials in flue gas, prevent that corroding hole further deteriorates expansion.
In the present embodiment, chimney outer barrel observes the plastic-steel structure glass material that vent window is tolerable 10KPa pressure, institute State and carry out encapsulation process with the plastics of UV resistant at the installation gap of observation vent window, it is ensured that chimney interlayer pressure is in 10KPa When observation vent window do not loosen.The observation vent window of plastic-steel structure glass material both can conveniently observe feelings inside chimney Condition, it can ensure to observe the intensity of vent window again.
In the present embodiment, pressure-measuring instrument is set at the observation vent window at 50m, 100m, 150m and 200m height, The pressure-measuring instrument is with solar energy electrical transfer signal.The setting of pressure-measuring instrument, it is easy to monitor in chimney interlayer Pressure, to ensure that the pressure energy in chimney interlayer maintains 10KPa.
In the present embodiment, the chimney bottom is provided with the doorframe structure of tolerable 10KPa pressure, the doorframe structure Inleakage is less than 10 m3/min.2-6 passage and a sliding door are provided with the doorframe structure, the passage is used In connection supply air line, the sliding door passes in and out for inspection personnel.A length of 50-500cm of the passage, the passage A width of 50-500cm.A height of 1000cm-1500cm of the sliding door, a width of 500cm-1000cm of the sliding door.
Embodiment 4.
The method of a kind of power plant sleeve-type chimney control corrosion rate leakage, in the present embodiment, first with the clay of UV resistant As filler to gap carries out encapsulation process between other building structure at chimney top, flue adapter, it is ensured that chimney outer barrel Tightness, and to filler carry out consolidation process, make filler can tolerate 10KPa pressure;In a manner of nitrogen cylinder supplies, The pressure of chimney mezzanine space is set to maintain 10KPa, now, the chimney internal cylinder when pressure of chimney mezzanine space is more than fume emission The pressure in space, the chimney mezzanine space and the pressure differential in chimney internal cylinder space during fume emission are more than 1KPa;Meanwhile Ammonia is passed through in chimney interlayer.When the pressure of chimney mezzanine space maintains 10KPa, when chimney mezzanine space is with fume emission The pressure differential in chimney internal cylinder space be more than 1KPa, the smoke spillage in chimney internal cylinder can be prevented completely into chimney interlayer, Chimney can be controlled from further corrosion;The ammonia being passed through in chimney, the flue gas at chimney internal cylinder corrosion hole can be neutralized In acidic materials, prevent corrode hole further deteriorate expansion.
In the present embodiment, chimney outer barrel observes the plastic-steel structure glass material that vent window is tolerable 10KPa pressure, institute State and carry out encapsulation process with the clay of UV resistant at the installation gap of observation vent window, it is ensured that chimney interlayer pressure is in 10KPa When observation vent window do not loosen.The observation vent window of plastic-steel structure glass material both can conveniently observe feelings inside chimney Condition, it can ensure to observe the intensity of vent window again.
In the present embodiment, pressure-measuring instrument is set at the observation vent window at 50m, 100m, 150m and 200m height, The pressure-measuring instrument is with solar energy electrical transfer signal.The setting of pressure-measuring instrument, it is easy to monitor in chimney interlayer Pressure, to ensure that the pressure energy in chimney interlayer maintains 10KPa.
In the present embodiment, the chimney bottom is provided with the doorframe structure of tolerable 10KPa pressure, the doorframe structure Inleakage is less than 10 m3/min.2-6 passage and a sliding door are provided with the doorframe structure, the passage is used In connection supply air line, the sliding door passes in and out for inspection personnel.A length of 50-500cm of the passage, the passage A width of 50-500cm.A height of 1000cm-1500cm of the sliding door, a width of 500cm-1000cm of the sliding door.
Embodiment 5.
The method of a kind of power plant sleeve-type chimney control corrosion rate leakage, in the present embodiment, first with the clay of UV resistant As filler to gap carries out encapsulation process between other building structure at chimney top, flue adapter, it is ensured that chimney outer barrel Tightness, and to filler carry out consolidation process, make filler can tolerate 10KPa pressure;In a manner of air blower is blown, The pressure of chimney mezzanine space is set to maintain 10KPa, now, the chimney internal cylinder when pressure of chimney mezzanine space is more than fume emission The pressure in space, the chimney mezzanine space and the pressure differential in chimney internal cylinder space during fume emission are more than 1KPa;Meanwhile Ammonia is passed through in chimney interlayer.When the pressure of chimney mezzanine space maintains 10KPa, when chimney mezzanine space is with fume emission The pressure differential in chimney internal cylinder space be more than 1KPa, the smoke spillage in chimney internal cylinder can be prevented completely into chimney interlayer, Chimney can be controlled from further corrosion;The ammonia being passed through in chimney, the flue gas at chimney internal cylinder corrosion hole can be neutralized In acidic materials, prevent corrode hole further deteriorate expansion.
In the present embodiment, chimney outer barrel observes the plastic-steel structure glass material that vent window is tolerable 10KPa pressure, institute State and carry out encapsulation process with the clay of UV resistant at the installation gap of observation vent window, it is ensured that chimney interlayer pressure is in 10KPa When observation vent window do not loosen.The observation vent window of plastic-steel structure glass material both can conveniently observe feelings inside chimney Condition, it can ensure to observe the intensity of vent window again.
In the present embodiment, pressure-measuring instrument is set at the observation vent window at 50m, 100m, 150m and 200m height, The pressure-measuring instrument is with solar energy electrical transfer signal.The setting of pressure-measuring instrument, it is easy to monitor in chimney interlayer Pressure, to ensure that the pressure energy in chimney interlayer maintains 10KPa.
In the present embodiment, the chimney bottom is provided with the doorframe structure of tolerable 10KPa pressure, the doorframe structure Inleakage is less than 10 m3/min.2-6 passage and a sliding door are provided with the doorframe structure, the passage is used In connection supply air line, the sliding door passes in and out for inspection personnel.A length of 50-500cm of the passage, the passage A width of 50-500cm.A height of 1000cm-1500cm of the sliding door, a width of 500cm-1000cm of the sliding door.
Embodiment 6.
The method of a kind of power plant sleeve-type chimney control corrosion rate leakage, in the present embodiment, first with the clay of UV resistant As filler to gap carries out encapsulation process between other building structure at chimney top, flue adapter, it is ensured that chimney outer barrel Tightness, and to filler carry out consolidation process, make filler can tolerate 10KPa pressure;In a manner of air blower is blown, The pressure of chimney mezzanine space is set to maintain 10KPa, now, the chimney internal cylinder when pressure of chimney mezzanine space is more than fume emission The pressure in space, the chimney mezzanine space and the pressure differential in chimney internal cylinder space during fume emission are more than 1KPa;Meanwhile Cyclohexylamine is passed through in chimney interlayer.When the pressure of chimney mezzanine space maintains 10KPa, chimney mezzanine space and fume emission When the pressure differential in chimney internal cylinder space be more than 1KPa, smoke spillage in chimney internal cylinder can be prevented completely to chimney interlayer In, chimney can be controlled from further corrosion;The ring amine being passed through in chimney, it can neutralize at chimney internal cylinder corrosion hole Acidic materials in flue gas, prevent that corroding hole further deteriorates expansion.
In the present embodiment, chimney outer barrel observes the plastic-steel structure glass material that vent window is tolerable 10KPa pressure, institute State and carry out encapsulation process with the clay of UV resistant at the installation gap of observation vent window, it is ensured that chimney interlayer pressure is in 10KPa When observation vent window do not loosen.The observation vent window of plastic-steel structure glass material both can conveniently observe feelings inside chimney Condition, it can ensure to observe the intensity of vent window again.
In the present embodiment, pressure-measuring instrument is set at the observation vent window at 50m, 100m, 150m and 200m height, The pressure-measuring instrument is with solar energy electrical transfer signal.The setting of pressure-measuring instrument, it is easy to monitor in chimney interlayer Pressure, to ensure that the pressure energy in chimney interlayer maintains 10KPa.
In the present embodiment, the chimney bottom is provided with the doorframe structure of tolerable 10KPa pressure, the doorframe structure Inleakage is less than 10 m3/min.2-6 passage and a sliding door are provided with the doorframe structure, the passage is used In connection supply air line, the sliding door passes in and out for inspection personnel.A length of 50-500cm of the passage, the passage A width of 50-500cm.A height of 1000cm-1500cm of the sliding door, a width of 500cm-1000cm of the sliding door.

Claims (6)

  1. A kind of 1. method of power plant sleeve-type chimney control corrosion rate leakage, it is characterised in that with the clay of UV resistant, elasticity Rubber or plastics will be filled sealing as filler at the chimney top on chimney outer barrel, flue adapter, and to filler Consolidation process is carried out to ensure that filler does not loosen under 10KPa pressure, it is ensured that the tightness of chimney outer barrel;To chimney Interlayer provides pressure, the pressure in chimney internal cylinder space when making the pressure of chimney mezzanine space be more than fume emission, the chimney folder The pressure differential in chimney internal cylinder space when sheaf space and fume emission is more than 1KPa, the observation vent window of the chimney 50m, 100m, 150m and 200m highly locate to set pressure-measuring instrument, and the pressure-measuring instrument is with solar energy electrical transfer signal, institute The doorframe structure that chimney bottom is provided with tolerable 10KPa pressure is stated, 2-6 passage and one are provided with the doorframe structure Individual sliding door, the passage are used to connect supply air line, and the sliding door passes in and out for inspection personnel, the length of the passage For 50-500cm, a width of 50-500cm of the passage;Meanwhile volatile alkaline substance is passed through in interlayer.
  2. 2. the method for power plant sleeve-type chimney control corrosion rate leakage according to claim 1, it is characterised in that by logical Entering the mode of compressed air, nitrogen cylinder supply or air blower air-supply makes the pressure of chimney mezzanine space maintain 10KPa.
  3. 3. the method for power plant sleeve-type chimney control corrosion rate leakage according to claim 1, it is characterised in that described to wave Hair property alkaline matter is ammonia or ring amine.
  4. 4. the method for power plant sleeve-type chimney control corrosion rate leakage according to claim 1, it is characterised in that outside chimney The observation vent window of cylinder is the plastic-steel structure glass material of tolerable 10KPa pressure.
  5. 5. the method for power plant sleeve-type chimney control corrosion rate leakage according to claim 1, it is characterised in that the door The inleakage of mount structure is less than 10 m3/min。
  6. 6. the method for power plant sleeve-type chimney control corrosion rate leakage according to claim 7, it is characterised in that described to push away The a height of 1000cm-1500cm, a width of 500cm-1000cm of the sliding door of sliding door.
CN201710893386.7A 2017-09-28 2017-09-28 A kind of method of power plant sleeve-type chimney control corrosion rate leakage Active CN107860014B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710893386.7A CN107860014B (en) 2017-09-28 2017-09-28 A kind of method of power plant sleeve-type chimney control corrosion rate leakage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710893386.7A CN107860014B (en) 2017-09-28 2017-09-28 A kind of method of power plant sleeve-type chimney control corrosion rate leakage

Publications (2)

Publication Number Publication Date
CN107860014A true CN107860014A (en) 2018-03-30
CN107860014B CN107860014B (en) 2019-04-02

Family

ID=61698186

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710893386.7A Active CN107860014B (en) 2017-09-28 2017-09-28 A kind of method of power plant sleeve-type chimney control corrosion rate leakage

Country Status (1)

Country Link
CN (1) CN107860014B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1786397A (en) * 2005-12-14 2006-06-14 孙克勤 Chimney with preventing flue permeating corrosion and its method
CN200989079Y (en) * 2006-04-03 2007-12-12 陈海渊 Boiler chimney body
JP2009085452A (en) * 2007-09-27 2009-04-23 Stella Kankyo Kagaku:Kk Solid biomass-firing compact incinerator for waste plastic to suppress generation of dioxine, and upper structure of chimney
CN202733312U (en) * 2012-06-12 2013-02-13 金川集团股份有限公司 Sulfuric exhaust gas emptying control device
CN203654852U (en) * 2013-11-22 2014-06-18 浙江开尔新材料股份有限公司 Corrosion resistant chimney inner wall steel inner cylinder for thermal power plant
CN104406182A (en) * 2014-11-25 2015-03-11 湖南天通无腐烟囱工程有限公司 Thermal insulating layer heating and pressurizing corrosion-resistant chimney
CN204630274U (en) * 2015-05-12 2015-09-09 湖南涉外经济学院 Hot blast laminar flow negative-pressure sealing drying and sterilizing device
CN105737883A (en) * 2016-04-26 2016-07-06 西安西热电站化学科技有限公司 Positive pressure protection simulating device and method for wet chimney

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1786397A (en) * 2005-12-14 2006-06-14 孙克勤 Chimney with preventing flue permeating corrosion and its method
CN200989079Y (en) * 2006-04-03 2007-12-12 陈海渊 Boiler chimney body
JP2009085452A (en) * 2007-09-27 2009-04-23 Stella Kankyo Kagaku:Kk Solid biomass-firing compact incinerator for waste plastic to suppress generation of dioxine, and upper structure of chimney
CN202733312U (en) * 2012-06-12 2013-02-13 金川集团股份有限公司 Sulfuric exhaust gas emptying control device
CN203654852U (en) * 2013-11-22 2014-06-18 浙江开尔新材料股份有限公司 Corrosion resistant chimney inner wall steel inner cylinder for thermal power plant
CN104406182A (en) * 2014-11-25 2015-03-11 湖南天通无腐烟囱工程有限公司 Thermal insulating layer heating and pressurizing corrosion-resistant chimney
CN204630274U (en) * 2015-05-12 2015-09-09 湖南涉外经济学院 Hot blast laminar flow negative-pressure sealing drying and sterilizing device
CN105737883A (en) * 2016-04-26 2016-07-06 西安西热电站化学科技有限公司 Positive pressure protection simulating device and method for wet chimney

Also Published As

Publication number Publication date
CN107860014B (en) 2019-04-02

Similar Documents

Publication Publication Date Title
CN100420819C (en) Chimney with preventing flue permeating corrosion and its method
CN109028119A (en) A kind of anti-corrosion chimney and its construction method of installation
CN107860014A (en) A kind of method of power plant sleeve-type chimney control corrosion rate leakage
CN205509393U (en) Cable bridge with from function of putting out a fire
CN203990298U (en) A kind of thermal power generation desulphurization system
CN205479984U (en) Gas piping outer wall anticorrosion structure
CN204254643U (en) Thermal insulation layer heating, pressurising Anti-corrosive chimney
CN205746927U (en) Coal fired power plant flue gas desulfurization coagulation great soil group chimney line with rubber metal composite precoated plate
CN102921283A (en) Wet flue gas desulfurization device
CN205897175U (en) Coal fired power plant flue gas desulfurization concrete chimney inner wall anticorrosion structure
CN203771431U (en) Wet desulphurization single-cylinder chimney shaft of coal-fired power plant
CN104895392A (en) Chimney multilayer corrosion prevention system compound rubber brick system
CN207786164U (en) The anti-corrosion structure of flue gas injection system
CN211694959U (en) Expansion joint structure made of glass fiber reinforced plastic
CN204127982U (en) Coal-burning power plant's wet desulphurization single-drum chimney bracket node
CN107587629B (en) Anti-corrosion damp type air-tightness plugging structure
CN209341285U (en) Expansion joint for steel inner cylinder of chimney
CN108096947A (en) A kind of anti-corrosion structure of flue gas injection system
CN109432971A (en) A kind of drying tower tower body
CN104406182A (en) Thermal insulating layer heating and pressurizing corrosion-resistant chimney
CN212157224U (en) Anticorrosive lining device of chimney steel inner tube
CN2856278Y (en) Externally sheathed chimmery preventing fume and smoke corrosion
CN213610695U (en) Seawater desulfurization rapid cooling water system with ventilation anti-corrosion device
CN203777924U (en) Absorption tower wet chimney
CN204177223U (en) Be applied to the heat pipe economizer in Discussion on technology for production of SA with joint product cement from phosphogypsum equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant