CN205897175U - Coal fired power plant flue gas desulfurization concrete chimney inner wall anticorrosion structure - Google Patents

Coal fired power plant flue gas desulfurization concrete chimney inner wall anticorrosion structure Download PDF

Info

Publication number
CN205897175U
CN205897175U CN201620043245.7U CN201620043245U CN205897175U CN 205897175 U CN205897175 U CN 205897175U CN 201620043245 U CN201620043245 U CN 201620043245U CN 205897175 U CN205897175 U CN 205897175U
Authority
CN
China
Prior art keywords
power plant
flue gas
chimney
fired power
coal fired
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620043245.7U
Other languages
Chinese (zh)
Inventor
张庆虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Shun Hao new materials Co., Ltd.
Original Assignee
HANGZHOU SHOWER RUBBER ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANGZHOU SHOWER RUBBER ENGINEERING Co Ltd filed Critical HANGZHOU SHOWER RUBBER ENGINEERING Co Ltd
Priority to CN201620043245.7U priority Critical patent/CN205897175U/en
Application granted granted Critical
Publication of CN205897175U publication Critical patent/CN205897175U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Chimneys And Flues (AREA)

Abstract

The utility model relates to a coal fired power plant flue gas desulfurization concrete chimney inner wall anticorrosion structure, including coal fired power plant flue gas desulfurization concrete class chimney, the compound prefabricated plate of polylith line with rubber metal covers the chimney internal face with the predetermined contact connection of chimney inner wall, leaves between the compound prefabricated plate of polylith line with rubber metal to be stained with the anticorrosive lid of autovulcanization on expansion joint and the expansion joint face and to stitch the offset plate. The advantage: firstly, the non -corrosibility can be reliable high, and the live time is long, secondly, cheap relatively, the construction convenience of cost has great economic benefit and environment -protection meaning to the transformation that coal fired power plant desulfurization chimney is anticorrosive.

Description

A kind of coal fired power plant flue gas desulfurization concrete chimney inner wall anti-corrosive structure
Technical field
This utility model is related to a kind of coal fired power plant flue gas desulfurization coagulation great soil group inner wall of stack anticorrosion structure, pre- using factory Line with rubber composite metal plate processed, scene splicing assembling are it is adaptable to newly-built or operation cement concrete type coal-fired plant flue gas take off The anti-corrosion transformation of sulfur chimney and maintenance.
Background technology
Coal-burning power plant's chimney is the important component part of thermal power generation system, carries and is discharged to greatly the flue gas of boiler combustion Important task in gas-bearing formation.Coal-fired plant flue gas are sulfur dioxide (so2) and sulfur trioxide (so3) to atmospheric environment major pollutants Deng, for environment protection, for coal-fired plant flue gas must carry out desulfurization (flue gas desulfurizationg, Abbreviation fgd) after could discharge.
In early days, the fume exhausting type of coal-burning power plant be all straight-line it may be assumed that flue gas from boiler through chimney in line to atmosphere, arrange Cigarette temperature is about 125~180 DEG C.Inner wall of stack is in drying regime with this understanding, and flue gas is not straight to inner wall of stack material Life of practicing midwifery is corroded.Implement continuing to increase of national environmental protection policy dynamics with power industry, Thermal generation unit must time limit Install desulfurizer additional, especially for Wet Flue Gas Desulfurization Technique, the flue gas water content entering chimney is big, and temperature is low.Inner wall of stack has sternly Condense again, have acid solution trickling produced by condensation along inner wall of stack, cause the saturation that inner wall of stack is chronically at acid to invade blister state, Extremely strong corrosion is produced to chimney.Domestic once had such case, although certain coal-burning power plant adds in original smoke evacuation system Fill desulfurizer, but anti-corrosion transformation has not been carried out to original cement concrete chimney, inner wall of stack heavy corrosion within 5 years, Almost crisis to whole generating set normal operation [Xing Jun, Liu Fuyun. the anti-corrosion present situation of domestic thermal power plant wet desulphurization chimney And prospect [j]. general risk management system, 2013,27(4): 1-5;Cui Yongzhong etc. heat-engine plant desulfurized system and chimney corrosion condition Analysis [j]. Guangxi electric power, 2010,33 (3): 47-49].Coal-fired plant's desulfuration chimney is anti-corrosion particularly important as can be seen here.
At present, as coal-burning power plant's wet desulphurization chimney aseptic technic mainly adopt inner wall of stack lining cutting foamed glass brick, The rigid corrosion protective lining material such as spraying resin/glass flake anticorrosive paint, the anticorrosive titanium of liner or nickel alloy material [Feng Yungang. FGD after funnel antiseptical inquires into [j]. Shanghai Electric Power, 2008, (1): 39-41;Li Yange, Xu great Wei, Sun Qiang, Wang Maolin. the selection [j] of Wet chimney inside lining anti-corrosive material. environmental protection for electric power, 2008,24(1): 22-24;Magnify thickness. The problem of the anti-corrosion presence of Chimney in Fossil Power Plant and suggestion [j]. high-tech and industrialization, 2009, (1): 88-92].But due to All more than 100, high reaches 240m to the chimney height of coal-burning power plant.Rocking and swinging by a relatively large margin will certainly be produced, work Period also can produce certain vibration.Meanwhile, when equipment breaks down shutdown, instantaneously great temperature change can be produced, on The rigid corrosion protective lining stated will produce structural deterioration.And the load-bearing of whole glass steel chimney and long-term ageing all exist greatly The risk of long-effective corrosion safety.There is the erosion-resisting titanium of highest or the solder technology of nickel alloy lining requires harshness, cost is very High.But more seriously occurring as soon as weld corrosion phenomenon it is seen that this technology fails thoroughly to solve titanium using not interior for a long time The stress concentration of composite board soldering joint and stress corrosion problem.
Utility model content
Purpose of design: in order to avoid existing anti-corrosion brick adds adhesive class scheme, anticorrosive paint class scheme, fiberglass class side Weak point in the technology such as case, liner corrosion resistant metal inner core scheme, provides one kind can fundamentally solve newly-built or The cement concrete type fire coal chimney running is because vibrate, rocking, the factor such as stress concentration causes chimney anticorrosion lining crack, take off The technical barriers such as layer, seepage, corrosion, make chimney anticorrosion security performance thoroughly be improved and can greatly extend it to use the longevity Life and the coal fired power plant flue gas desulfurization coagulation great soil group inner wall of stack anticorrosion structure reducing anti-corrosion improvement cost.
Design: in order to realize above-mentioned purpose of design.This utility model is according to coal-fired to existing cement concrete type The analysis of power plant desulfurization chimney anticorrosion present situation, find the brick liner of chimney anticorrosion produce crack, the delamination of glass flake coatings or The anticorrosive coat cracks such as crack, the load-bearing of fiberglass and aging, liner corrosion resistant metal plate weld corrosion and delamination damage and are all Because chimney shape is tall and big, easily vibrate, rock, cause stress concentration and material linear expansion coefficient is inharmonious etc. caused by factor. For solving the above problems, this utility model is directed to newly-built or operation cement concrete type coal fired power plant flue gas desulfurization chimney Anti-corrosion transformation and maintenance adopt the following technical scheme that
1st, pinpoint pre-buried according to design requirement in inner wall of stack first or reset some metal hangers or bolt link Point, more connected and fixing by being provided with the line with rubber metal composite precoated plate that can fix suspension member or connection, successively by line with rubber metal Composite precast slab splices and covers the anti-corrosion face of inner wall of stack, using autovulcanization joint glue by splice reserved expansion joint fill and lead up and An autovulcanization corrosion cap seam offset plate is pasted so as to sealing, surface smooths above this seam.
2nd, line with rubber metal composite precoated plate in-site installation connecting method can need spirit according to the physical dimension of chimney and construction Live and design and adjust.
3rd, line with rubber metal composite precoated plate used is the butyl rubber excellent using antiseptic property or other rubber and metal Plate can live autovulcanization or be prepared from by high temperature vulcanized adhesion technique in factory, metal back is prevented through spraying or cladding Rotten process, its size and dimension can according to the construction of chimney it needs to be determined that.
4th, autovulcanization joint glue used and lid seam glue are also with the butyl rubber of anti-corrosion excellent performance as matrix, through modification Process, to ensure the cohesive of itself and line with rubber metal pre-casting plate rubber.
Technical scheme: a kind of coal fired power plant flue gas desulfurization coagulation great soil group inner wall of stack anticorrosion structure, including coal-burning power plant's cigarette Desulfurization coagulation great soil group chimney, polylith line with rubber metal composite precoated plate contact default with inner wall of stack is connected covering inner wall of stack Face, leaves between polylith line with rubber metal composite precoated plate and is stained with autovulcanization corrosion cap seam offset plate on expansion joint and expansion joint face.
Compared with background technology, one is that antiseptic property is reliable high to this utility model, and use time is long;Two is that cost is relatively low Honest and clean, easy construction, has very great economic interests and environment protection significance to the transformation of Desulphurization for Coal-fired Power Plant chimney anticorrosion antiseptical.
Brief description
Fig. 1 is the structural representation of line with rubber metal composite precoated plate.
Fig. 2 be in Fig. 1 a-a to cross section structure diagram.
Fig. 3 is inner wall of stack pre-buried (or default) suspension member setting schematic diagram.
Fig. 4 is the partial enlargement structural representation of Fig. 3.
Specific embodiment
Embodiment 1: 1-4 referring to the drawings.A kind of coal fired power plant flue gas desulfurization coagulation great soil group inner wall of stack anticorrosion structure, bag Include coal fired power plant flue gas desulfurization coagulation great soil group chimney, polylith line with rubber metal composite precoated plate 5 is with the default contact of inner wall of stack 6 even Connect covering inner wall of stack face, leave between polylith line with rubber metal composite precoated plate 5 and be stained with autovulcanization on expansion joint and expansion joint face Corrosion cap stitches offset plate.Constitute and be equipped with one layer of antiseptic rubber layer 2 and metal on metallic plate 1 face in line with rubber metal composite precoated plate 5 Plate 1 is provided with the suspension member being fixedly connected with inner wall of stack or connects part 4.Described antiseptic rubber layer 2 adopts butyl layers.Described gold Belong to plate 1 back side to be equipped with one layer of spraying corrosion resistant coating or be coated with preservative treatment layer 3.Described suspension member or connector are hook or bolt.
The new method of cement concrete type coal fired power plant flue gas desulfurization chimney anticorrosion transformation, its specific implementation method is as follows:
1st, the physical dimension according to chimney and construction requirement, design line with rubber metal composite precoated plate 5 physical dimension and It splices arrangement mode, with chimney Synchronization Design, can run the transformation of chimney for newly-built chimney or maintenance can be according to original design Drawing carries out conceptual design, and carries out on-site land survey and checking.On this basis, just can determine that pre-buried (or default) hook or spiral shell The position of bolt 4 link and quantity, and then determine corresponding suspension member or the position that is connected on every piece of line with rubber metal composite precoated plate Put and quantity, hook (or bolt) and suspension member and fastening structure are designed simultaneously.
2nd, according to above-mentioned design, in pre-buried (or default) suspension member of the inner wall of stack needing anti-corrosion transformation or maintenance or bolt chain Fitting.
3rd, manufacture and design line with rubber metal composite precoated plate 5 according to above-mentioned, first steel plate is cut into certain size, and weld extension Part or chaining part 4, surface sand-blasting rust cleaning line with rubber, the back side (one side of welding suspension member) with anticorrosive paint spraying or coats process layer 3.
4th, prefabricated line with rubber composite metal plate 5 scene is carried out assembly, assembled line with rubber metal composite precoated plate is wanted and chimney Pre-buried (or default) suspension member of inwall 6 or bolt connection simultaneously fasten.
5th, after the completion of the prefabricated scene of line with rubber metal composite carries out assembly, filled out splicing flexible gap using autovulcanization joint glue Flat and lining lid seam glue is sealed against.
It is to be understood that: the detailed word although above-described embodiment is contrasted to mentality of designing of the present utility model Description, but these word descriptions, simply describe to the simple text of this utility model mentality of designing, rather than new to this practicality The restriction of type mentality of designing, any combination, increase or modification without departing from this utility model mentality of designing, each fall within this practicality new In the protection domain of type.

Claims (5)

1. a kind of coal fired power plant flue gas desulfurization concrete chimney inner wall anti-corrosive structure, including coal fired power plant flue gas desulfurization concrete cigarette Chimney, is characterized in that: polylith line with rubber metal composite precoated plate (5) contact default with inner wall of stack is connected covering inner wall of stack face, Leave between polylith line with rubber metal composite precoated plate (5) and autovulcanization corrosion cap seam offset plate is stained with expansion joint and expansion joint face.
2. coal fired power plant flue gas desulfurization concrete chimney inner wall anti-corrosive structure according to claim 1, is characterized in that: line with rubber One layer of antiseptic rubber layer (2) is equipped with metallic plate (1) face in metal composite precoated plate (5) and metallic plate (1) is provided with and cigarette Suspension member or company's part (4) that chimney inwall is fixedly connected.
3. coal fired power plant flue gas desulfurization concrete chimney inner wall anti-corrosive structure according to claim 1, is characterized in that: described Antiseptic rubber layer (2) adopts butyl layers.
4. coal fired power plant flue gas desulfurization concrete chimney inner wall anti-corrosive structure according to claim 2, is characterized in that: described Metallic plate (1) back side is equipped with one layer of spraying corrosion resistant coating or is coated with preservative treatment layer (3).
5. coal fired power plant flue gas desulfurization concrete chimney inner wall anti-corrosive structure according to claim 2, is characterized in that: described Suspension member or connector are hook or bolt.
CN201620043245.7U 2016-01-18 2016-01-18 Coal fired power plant flue gas desulfurization concrete chimney inner wall anticorrosion structure Active CN205897175U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620043245.7U CN205897175U (en) 2016-01-18 2016-01-18 Coal fired power plant flue gas desulfurization concrete chimney inner wall anticorrosion structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620043245.7U CN205897175U (en) 2016-01-18 2016-01-18 Coal fired power plant flue gas desulfurization concrete chimney inner wall anticorrosion structure

Publications (1)

Publication Number Publication Date
CN205897175U true CN205897175U (en) 2017-01-18

Family

ID=57765266

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620043245.7U Active CN205897175U (en) 2016-01-18 2016-01-18 Coal fired power plant flue gas desulfurization concrete chimney inner wall anticorrosion structure

Country Status (1)

Country Link
CN (1) CN205897175U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110195877A (en) * 2019-05-01 2019-09-03 浙江顺豪新材料有限公司 The inexpensive steel liner chimney anticorrosion lining offset plate and method that service life is 30 years

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110195877A (en) * 2019-05-01 2019-09-03 浙江顺豪新材料有限公司 The inexpensive steel liner chimney anticorrosion lining offset plate and method that service life is 30 years

Similar Documents

Publication Publication Date Title
CN201381670Y (en) Chimney adopting sectional glass reinforced plastic inner cylinder for exhausting low-temperature flue gas after wet desulfurization
CN102979351A (en) Method for corrosion resistance of rigid and flexible type composite integral casting material inner lining of wet chimney of thermal power plant
CN109028119A (en) A kind of anti-corrosion chimney and its construction method of installation
CN105674310A (en) New method for corrosion resistant transformation of flue gas desulfurization concrete chimney of coal-fired power plant
CN205897175U (en) Coal fired power plant flue gas desulfurization concrete chimney inner wall anticorrosion structure
CN205746927U (en) Coal fired power plant flue gas desulfurization coagulation great soil group chimney line with rubber metal composite precoated plate
CN201593795U (en) Sealed lining antiseptic structure of wet chimney
CN103982079A (en) Construction method for anticorrosion device of thermal power chimney
CN105841173B (en) A kind of inner wall of stack anti-corrosion high-molecular polythene layer and its construction method
CN206018670U (en) One kind is used for sectional formula chimney glass reinforced plastic inner cylinder body attachment means
CN104989167B (en) A kind of chimney anticorrosion structure and its construction method
CN103742932B (en) The remodeling method of the anticorrosion chimney of coal fired power plant flue gas desulfurization
CN102661075B (en) Method for manufacturing sectional chimney with single-barrel concrete structure and
CN107575080A (en) Impervious anti-corrosion type single-cylinder type reinforced concrete chimney and its construction method
CN205089031U (en) Chimney anticorrosion structure
CN207614627U (en) Desulphurization system absorption tower with anticorrosive function
CN204285491U (en) The first anti-thawing apparatus of cylinder after a kind of single-drum chimney desulfurization
CN203010645U (en) Chimney steel internal cylinder connected via flanges
CN202328301U (en) Bracket anticorrosion system for reinforced concrete single-tube chimney after wet desulphurization
CN217978854U (en) Anticorrosive structure of prefabricated chimney flange joint of sectional type metal
CN205860057U (en) A kind of inner wall of stack anticorrosion high-molecular polythene layer
CN204127982U (en) Coal-burning power plant's wet desulphurization single-drum chimney bracket node
CN205042615U (en) Glass steel anticorrosion structure of cross steel framework
CN211694959U (en) Expansion joint structure made of glass fiber reinforced plastic
CN209341285U (en) Expansion joint for steel inner cylinder of chimney

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180830

Address after: 311121 No. 1, Dragon Boat Road, Cang Qian street, Yuhang District, Hangzhou, Zhejiang

Patentee after: Zhejiang Shun Hao new materials Co., Ltd.

Address before: 311121 No. 1, Dragon Boat Road, Cang Qian street, Yuhang District, Hangzhou, Zhejiang

Patentee before: Hangzhou Shower Rubber Engineering Co., Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Coal fired power plant flue gas desulfurization concrete chimney inner wall anticorrosion structure

Effective date of registration: 20200617

Granted publication date: 20170118

Pledgee: Hangzhou High-tech Financing Guarantee Co.,Ltd.

Pledgor: Zhejiang Shunhao New Materials Co.,Ltd.

Registration number: Y2020330000357