CN103742932B - The remodeling method of the anticorrosion chimney of coal fired power plant flue gas desulfurization - Google Patents

The remodeling method of the anticorrosion chimney of coal fired power plant flue gas desulfurization Download PDF

Info

Publication number
CN103742932B
CN103742932B CN201310747742.6A CN201310747742A CN103742932B CN 103742932 B CN103742932 B CN 103742932B CN 201310747742 A CN201310747742 A CN 201310747742A CN 103742932 B CN103742932 B CN 103742932B
Authority
CN
China
Prior art keywords
sheet rubber
chimney
rubber
stack
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310747742.6A
Other languages
Chinese (zh)
Other versions
CN103742932A (en
Inventor
张庆虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201310747742.6A priority Critical patent/CN103742932B/en
Publication of CN103742932A publication Critical patent/CN103742932A/en
Application granted granted Critical
Publication of CN103742932B publication Critical patent/CN103742932B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Chimneys And Flues (AREA)

Abstract

The present invention relates to the remodeling method of the anticorrosion chimney of a kind of coal fired power plant flue gas desulfurization, starting subsides downwards from chimney top, at inner wall of stack brush the first layer primer, after the glue of brush second layer face, the rubber back side, sheet rubber is vertically attached on inner wall of stack, left and right sheet rubber overlaps mutually, the mutual fissure of displacement crimping of sheet rubber up and down, exposes chimney top end surface part sheet rubber and wraps chimney top end surface and outside to turning up, prevents corrosive medium from pouring in down a chimney; During the 2nd circle line with rubber, its film upper end should cover the first circle film end (being called for short overlap joint), cover (overlap joint) width 20-30mm, when line with rubber is constructed, at inner wall of stack brush the first layer primer, after the glue of brush second layer face, the rubber back side, vertically being attached on inner wall of stack by sheet rubber, left and right sheet rubber overlaps mutually, the mutual fissure of displacement crimping of sheet rubber up and down; Until chimney bottom last lap, at inner wall of stack brush the first layer primer, after the glue of brush second layer face, the rubber back side, sheet rubber is vertically attached on inner wall of stack.

Description

The remodeling method of the anticorrosion chimney of coal fired power plant flue gas desulfurization
Technical field
The present invention relates to a kind of can fundamentally solve existing coal-fired chimney lining because vibrate, rocks, the technical barriers such as chimney lining crack that factor causes, delamination, seepage, corrosion such as stress is concentrated, make coal-fired chimney anticorrosion safety performance obtain thoroughly improvement and can greatly extend the remodeling method of the anticorrosion chimney of coal fired power plant flue gas desulfurization of coal-fired chimney work-ing life and reduction manufacturing cost, belong to coal-burning power plant's chimney and manufacture field.
Background technology
Chimney is the important component part of thermal power generation system, carries important task that the flue gas of boiler combustion is discharged in atmospheric layer. In the non-desulfurization epoch, flue gas is in line to atmospheric layer through chimney from boiler. This in period chimney the brick air retaining wall technology of interior anticorrosion mainly fire resistant anticorrosive, belong to dry flue system, smoke discharging temperature is about: 125 180 DEG C, does not substantially produce corrosion; And the arrival in current desulfurization epoch, then changing the Working environment of chimney greatly, dry flue originally becomes wet flue, boiler flue corrosion environment severe exacerbation. Show: a. corrosive medium: SO2, SO3; B. temperature < acid dew point, acid solution is trickled downwards along flue wall, and period evaporates repeatedly, trickling, be in for a long time acid invade bubble state, cause corrosion; C. the outer pressure of pressure in flue, has negative pressure; D. fast 3��8 times of the usual state of etch ratio. Working environment so brings great risk to the operating safety of chimney, and corrosion leakage happens occasionally, and causes greatly shorten the work-ing life of chimney, directly affects the normal power generation of power plant. Around this theme, chimney anticorrosion expanding extensive and deep research and industrial application discussion, concludes at present and have following two big types: one is brick inside lining anti-corrosive sealing ply, and acid resisting brick as various in interior block, plate are traditional anticorrosion means, it is not enough
Part is that globality is poor, easily produces crack, causes seepage anticorrosion; Two is the various protective system of coating, and as corrosion-resistant glass-flake coating and lining paste applied corrosion resistant lining, such as titanium composite panel etc., but this class aseptic technic shows versatility because of the difference of materials and process. As: the high performance corrosion resistant metal titanium plate of a. liner.But cost height, welding technique requires high, and weld seam easily produces corrosion. B. corrosion-resistant glass squama resin resistant coating is sprayed. Advantage is acidproof, high temperature resistant, impervious, but easily plays skin or come off.
Summary of the invention
Purpose of design: avoid the weak point in background technology, design a kind of can fundamentally solve existing coal-fired chimney lining because vibrate, rocks, stress the factor such as concentrate to cause chimney lining crack, delamination, seepage, the technical barrier such as corrosion, make coal-fired chimney anticorrosion safety performance obtain thoroughly improving and can greatly extend the remodeling method of the anticorrosion chimney of coal fired power plant flue gas desulfurization of coal-fired chimney work-ing life and reduction manufacturing cost.
Design: can have no to discuss different drawing from background technology: causing coal-fired chimney anticorrosion to damage the most direct factor is technological factor, but not the not resistance to Chemical Preservation of main material causes. As: brick liner produces the weld decay of crack, the delamination of glass flake coatings, crack, titanium composite panel etc. all because chimney shape is tall and big, easily vibrate, rock, cause stress concentrate and material coefficient of linear expansion inharmonious etc., chimney anticorrosion slabbing seam and delamination is caused to damage, thus exploitation is a kind of anti-shake dynamic, stress can be disperseed to concentrate, and the aseptic technic that can coordinate different coefficient of linear expansion is the key of technology of chimney anticorrosion. In order to realize this purpose. The present invention 1) select elastomeric material as the corrosion-proof lining layer of chimney, but not the air retaining wall of other material. 2) tackiness agent having and bonding as rubber and inner wall of stack with the tackiness agent of rubber liner layer and steel plate excellent bonds is selected. 3) select rubber lined self cure technique, make rubber have good shockproof, anticracking, antiseepage, protection against the tide, waterproof, ventilative, resistance to ozone, weather-resistant, weak acid resistant weak base performance.
Technical scheme: the remodeling method of the anticorrosion chimney of a kind of coal fired power plant flue gas desulfurization, in chimney steel, courage is made, hold up, anti-corrosion rubber lined construction line with rubber by upper end, top, that is: (1) from chimney top downwards (downward length how much rice looks the length of film used or the convenience of construction and different, is generally 10 meters) paste. At inner wall of stack brush the first layer primer, after the glue of brush second layer face, the rubber back side, sheet rubber is vertically attached on inner wall of stack, left and right sheet rubber overlaps mutually, the mutual fissure of displacement crimping of sheet rubber up and down, expose chimney top end surface part sheet rubber and wrap chimney top end surface and outside to turning up, prevent corrosive medium from pouring in down a chimney. During (2) the 2nd circle line with rubber, its film upper end should cover the first circle film end (being called for short overlap joint), cover (overlap joint) width 20-30mm, when line with rubber is constructed, at inner wall of stack brush the first layer primer, after the glue of brush second layer face, the rubber back side, vertically being attached on inner wall of stack by sheet rubber, left and right sheet rubber overlaps mutually, the mutual fissure of displacement crimping of sheet rubber up and down. (3) analogize successively, until chimney bottom last lap, at inner wall of stack brush the first layer primer, after the glue of brush second layer face, the rubber back side, being vertically attached on inner wall of stack by sheet rubber, left and right sheet rubber overlaps mutually, the upper and lower mutual fissure of displacement of sheet rubber crimps, last lap chimney film is concordant with chimney bottom, after the construction installations such as scaffolding are removed, lining pastes chimney bottom, and the sheet rubber that bottom lining pastes should turn over 30mm on bucket wall, and pressure viscosity is firm.
The present invention is compared with background technology, and one is owing to rubber-type glue is flexible, and the application adopts rubber-type glue can adapt to chimney deformation in use;Two is become to be integrated after the bonding between rubber with rubber adopts rubber solution to bond, to construction temperature not requirement, do not need the temperature by flue gas in flue to accelerate bonding yet, and solve vibration that background technology exists, rock, the technical barriers such as crack that factor causes, delamination, seepage, corrosion such as stress is concentrated; Three is that the life-span of its chimney can reach more than 30 years owing to the anticorrosion safety performance of chimney obtains thorough improvement, and construction technology simplifies, manufacturing cost obviously declines; Four is the technological gap having filled up chimney rubber anti-corrosive lining, changes traditional structure &processes of chimney anticorrosion.
Accompanying drawing explanation
Fig. 1 is the partial cutaway TV structure schematic diagram of the anticorrosion chimney of coal fired power plant flue gas desulfurization.
Fig. 2 is the structural representation of left and right overlap joint in Fig. 1, sheet rubber fissure of displacement crimping up and down.
Fig. 3 is the sectional structure schematic diagram of upper and lower sheet rubber fissure of displacement crimping.
Fig. 4 is the structural representation of overlap joint about sheet rubber.
Fig. 5 is chimney top sheet rubber package structure schematic diagram.
Embodiment
Embodiment 1: with reference to accompanying drawing 1-5. The remodeling method of the anticorrosion chimney of a kind of coal fired power plant flue gas desulfurization, in chimney steel, courage is made, hold up, anti-corrosion rubber lined construction line with rubber by upper end, top, that is: (1) from chimney top downwards (downward length how much rice looks the length of film used or the convenience of construction and different, is generally 10 meters) paste. At inner wall of stack brush the first layer primer, after the glue of brush second layer face, the rubber back side, sheet rubber is vertically attached on inner wall of stack, left and right sheet rubber overlaps mutually, the mutual fissure of displacement crimping of sheet rubber up and down, expose chimney top end surface part sheet rubber and wrap chimney top end surface and outside to turning up, prevent corrosive medium from pouring in down a chimney. During (2) the 2nd circle line with rubber, its film upper end should cover the first circle film end (being called for short overlap joint), cover (overlap joint) width 20-30mm, when line with rubber is constructed, at inner wall of stack brush the first layer primer, after the glue of brush second layer face, the rubber back side, vertically being attached on inner wall of stack by sheet rubber, left and right sheet rubber overlaps mutually, the mutual fissure of displacement crimping of sheet rubber up and down. (3) analogize successively, until chimney bottom last lap, at inner wall of stack brush the first layer primer, after the glue of brush second layer face, the rubber back side, sheet rubber is vertically attached on inner wall of stack, left and right sheet rubber overlaps mutually, the upper and lower mutual fissure of displacement of sheet rubber crimps, last lap chimney film is concordant with chimney bottom, after the construction installations such as scaffolding are removed, lining pastes chimney bottom, and the sheet rubber that bottom lining pastes should turn over about 30mm(on bucket wall, but it is not limited to this), pressure viscosity is firm.
Described rubber lining 4 is made up of the sheet rubber overlapped mutually about multi-disc sheet rubber, the fissure of displacement crimps mutually up and down. About described multi-disc sheet rubber, overlap joint refers to that the sheet rubber 41 ' limit on the right is pressed on left side sheet rubber 41 limit the rubber gasket formed mutually, or about multi-disc sheet rubber, overlap joint refers to that the sheet rubber 41 ' limit on the left side is pressed on sheet rubber 41 limit, the right the rubber gasket formed mutually. Described multi-disc sheet rubber up and down mutually fissure of displacement crimping refer to that the 2nd circle sheet rubber 42 top is pressed in the following of the first circle sheet rubber 41, analogize with this, or multi-disc sheet rubber up and down mutually fissure of displacement crimping refer to that the 2nd circle sheet rubber 42 top is crushed on the following of the first circle sheet rubber 41, analogize with this. Described primer 2 adopts rubber-type glue. Described glue 3 adopts rubber-type glue. Described chimney 1 upper surface and outside portion, upper surface are overlapped mutually the circle flange coated 43 formed about multi-disc sheet rubber.
Example: the anticorrosion chimney specific embodiment of coal fired power plant flue gas desulfurization is lifted:
(1) the anticorrosion inner layer material selected is rubber anti-corrosive material: its basic size is: 1000m �� 1m �� 0.0025m offset plate, it is possible to depending on the height of chimney and diameter in conjunction with site operation environment.
(2) real construction environment: construction environment temperature is advisable with 8��35 DEG C; Relative humidity is less than 80%; Atmospheric environment is minimum should remain on dew point more than 3 DEG C.
(3) chimney steel body inner surface treatment: with copper ore or quartz sand or other abrasive material, chimney steel body internal surface being carried out derusting by sandblast, derusting grade is more than Sa2.5 level.
(4) brushing adhesive stick: be included in offset plate and chimney steel body internal surface brushing adhesive stick.
(5) lining pastes: be attached to chimney barrel internal surface being coated with the offset plate lining being brushed with tackiness agent. Develop, compacting. Lining adopts lapping type, and lap width is determined according to the lining number of plies, and bilayer is 20 �� 5mm, and individual layer is 30 �� 5mm, and overlap joint requires that line operates, and accomplishes directly neat, must not adopt cross-like seam, should adopt T-shaped seam; During the T-shaped seam of stickers lining, first the face of lap-joint of lower floor should be whittled into inclined-plane, then stickers lining upper rubber plate. Seam should comply with the flow direction of flue gas, and should be not reverse.
(6) serve as a contrast after subsides complete and can come into operation, in use complete sulfuration.
Embodiment 2: on the basis of embodiment 1, old chimney is transformed, erect chimney outside chimney and hang cage, hanging cage puts in chimney, construction worker stands in and hangs in cage, construction worker relies on and hangs cage and inner wall of stack repeatedly fixing at different heights, first processes the corrosion of inner wall of stack, then anti-corrosion rubber lined construction line with rubber by upper end, top.
It is to be understood that: the detailed text description although the mentality of designing of the present invention is contrasted by above-described embodiment; but these text descriptions; just the simple text of inventive design thinking is described; instead of the restriction to inventive design thinking; any combination, increase or amendment not exceeding inventive design thinking, all falls within the scope of protection of the present invention.

Claims (6)

1. a remodeling method for the anticorrosion chimney of coal fired power plant flue gas desulfurization, is characterized in that in chimney steel, courage is made, holds up, anti-corrosion rubber lined construction line with rubber by upper end, top, that is:
(1) starting from chimney top to paste downwards, at inner wall of stack brush the first layer primer, after the glue of brush second layer face, the sheet rubber back side, sheet rubber is vertically attached on inner wall of stack, left and right sheet rubber overlaps mutually, expose chimney top end surface part sheet rubber and wrap chimney top end surface and outside to turning up, prevent corrosive medium from pouring in down a chimney;
During (2) the 2nd circle line with rubber, sheet rubber upper end should cover the first circle sheet rubber end, cover width 20-30mm, when line with rubber is constructed, at inner wall of stack brush the first layer primer, after the glue of brush second layer face, the sheet rubber back side, vertically being attached on inner wall of stack by sheet rubber, left and right sheet rubber overlaps mutually, the mutual fissure of displacement crimping of sheet rubber up and down;
(3) analogize successively, until chimney bottom last lap, at inner wall of stack brush the first layer primer, after the glue of brush second layer face, the sheet rubber back side, being vertically attached on inner wall of stack by sheet rubber, left and right sheet rubber overlaps mutually, the upper and lower mutual fissure of displacement of sheet rubber crimps, last lap sheet rubber is concordant with chimney bottom, after construction installation is removed, lining pastes chimney bottom, and the sheet rubber that bottom lining pastes should turn over 30mm on inner wall of stack, and pressure viscosity is firm.
2. the remodeling method of the anticorrosion chimney of coal fired power plant flue gas desulfurization according to claim 1, it is characterized in that: between about described sheet rubber, overlap joint refers to that the left end of middle sheet rubber is pressed on the sheet rubber of the left side mutually, the rubber gasket that the middle sheet rubber the other end is formed under being then pressed in the right sheet rubber.
3. the remodeling method of the anticorrosion chimney of coal fired power plant flue gas desulfurization according to claim 1, it is characterized in that: between described sheet rubber is upper and lower, fissure of displacement crimping refers to that the 2nd circle sheet rubber upper end is crushed on the bottom of the first circle sheet rubber mutually, analogize with this, or sheet rubber up and down between mutually fissure of displacement crimping refer to that the bottom of the first circle sheet rubber is pushed down in the 2nd circle sheet rubber upper end.
4. the remodeling method of the anticorrosion chimney of coal fired power plant flue gas desulfurization according to claim 1, is characterized in that: described primer adopts rubber-type glue.
5. the remodeling method of the anticorrosion chimney of coal fired power plant flue gas desulfurization according to claim 1, is characterized in that: described glue adopts rubber-type glue.
6. the remodeling method of the anticorrosion chimney of coal fired power plant flue gas desulfurization according to claim 1, is characterized in that: described upper chimney end face and outside portion, upper surface are coated by the circle flange that about multi-disc sheet rubber, overlap joint is formed mutually.
CN201310747742.6A 2013-12-31 2013-12-31 The remodeling method of the anticorrosion chimney of coal fired power plant flue gas desulfurization Expired - Fee Related CN103742932B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310747742.6A CN103742932B (en) 2013-12-31 2013-12-31 The remodeling method of the anticorrosion chimney of coal fired power plant flue gas desulfurization

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310747742.6A CN103742932B (en) 2013-12-31 2013-12-31 The remodeling method of the anticorrosion chimney of coal fired power plant flue gas desulfurization

Publications (2)

Publication Number Publication Date
CN103742932A CN103742932A (en) 2014-04-23
CN103742932B true CN103742932B (en) 2016-06-08

Family

ID=50499980

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310747742.6A Expired - Fee Related CN103742932B (en) 2013-12-31 2013-12-31 The remodeling method of the anticorrosion chimney of coal fired power plant flue gas desulfurization

Country Status (1)

Country Link
CN (1) CN103742932B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109631065A (en) * 2018-12-27 2019-04-16 上海辰鸣电力工程有限公司 A kind of flue duct retrofit method and its anticorrosion structure
CN110253901A (en) * 2019-05-06 2019-09-20 江苏科强新材料股份有限公司 A kind of rubber liner construction method of Anti-corrosive chimney

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4433202C1 (en) * 1994-09-17 1996-02-01 Theodor Vanck Gmbh & Co Kg Composite corrosion protection, for flue gas desulphurisation plant,
JP2007285513A (en) * 2006-03-22 2007-11-01 Tokai Rubber Ind Ltd Rubber member with metal fitting and method of fabricating the same
CN2892254Y (en) * 2006-04-07 2007-04-25 北京龙源环保工程有限公司 Wet desulfating flue exhausting integrated apparatus
CN101497773B (en) * 2009-01-24 2012-01-11 黑龙江省科学院石油化学研究院 Undercoat adhesive for bonding hot vulcanization and preparation thereof
CN101602927B (en) * 2009-03-27 2012-03-21 重庆大众防腐有限公司 Bottom bonding material used in preservative treatment of chimney and flue

Also Published As

Publication number Publication date
CN103742932A (en) 2014-04-23

Similar Documents

Publication Publication Date Title
CN103600941B (en) The coated anti-corrosion method of vertical storage tank bottom margin plate
CN101793105A (en) Anti-corrosion method of inner wall of stack
CN103742932B (en) The remodeling method of the anticorrosion chimney of coal fired power plant flue gas desulfurization
CN103759282B (en) A kind of anticorrosion method for interior of metal flue
CN105927822A (en) Corrosion-resistance composite pipe and manufacturing method thereof
CN104912208B (en) The anticorrosion structure and processing method of a kind of gas chamber cabinet outer bottom margin plate
CN103742931B (en) Coal-fired power plant flue gas desulfuration anti-corrosion chimney and manufacturing method thereof
CN202485016U (en) Wet-desulphurization anticorrosion system of inner-steel-cylinder chimney of thermal power plant
CN104989167B (en) A kind of chimney anticorrosion structure and its construction method
CN105674310A (en) New method for corrosion resistant transformation of flue gas desulfurization concrete chimney of coal-fired power plant
CN207716449U (en) A kind of anticorrosion structure of chimney deflector
CN203940448U (en) Coal fired power plant flue gas desulfurization Anti-corrosive chimney
CN210568513U (en) Maintenance anti-corrosion structure of metal chimney leakage area
CN202274497U (en) Corrosion-resistant structure for chimney liner
CN204717234U (en) Directional traversing pipeline sheath tube end annular space waterproof construction
CN208927892U (en) It is a kind of to carry out the liner that heavy antisepsis is reinforced at the pipe joint of absorption tower based on Photocurable sheet
CN102168500A (en) Antiseptic processing method for capping part of brick lining chimney
CN205897175U (en) Coal fired power plant flue gas desulfurization concrete chimney inner wall anticorrosion structure
CN205089031U (en) Chimney anticorrosion structure
CN202056901U (en) Corrosion-resistant chimney
CN205746927U (en) Coal fired power plant flue gas desulfurization coagulation great soil group chimney line with rubber metal composite precoated plate
CN207614627U (en) Desulphurization system absorption tower with anticorrosive function
CN209557893U (en) A kind of buried pipeline repairing anticorrosion coating external member
CN201705002U (en) Anticorrosive device for inner wall of chimney
CN201925940U (en) Flexible protective lining for chimney or flue

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20140423

Assignee: HANGZHOU SHOWER RUBBER ENGINEERING Co.,Ltd.

Assignor: Zhang Qinghu

Contract record no.: 2016330000121

Denomination of invention: Modification method of flue gas desulfuration corrosion-resistant chimney of coal-fired power plant

Granted publication date: 20160608

License type: Exclusive License

Record date: 20160811

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model