CN1786397A - Chimney with preventing flue permeating corrosion and its method - Google Patents

Chimney with preventing flue permeating corrosion and its method Download PDF

Info

Publication number
CN1786397A
CN1786397A CN 200510123029 CN200510123029A CN1786397A CN 1786397 A CN1786397 A CN 1786397A CN 200510123029 CN200510123029 CN 200510123029 CN 200510123029 A CN200510123029 A CN 200510123029A CN 1786397 A CN1786397 A CN 1786397A
Authority
CN
China
Prior art keywords
chimney
flue gas
urceolus
tube
corrosion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200510123029
Other languages
Chinese (zh)
Other versions
CN100420819C (en
Inventor
孙克勤
彭祖辉
顾华敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gcl Engineering Ltd
Gu Huamin
Peng Zuhui
Sun Keqin
Zhao Jin
Original Assignee
Jiangsu Suyuan Environment Protection Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Suyuan Environment Protection Engineering Co Ltd filed Critical Jiangsu Suyuan Environment Protection Engineering Co Ltd
Priority to CNB200510123029XA priority Critical patent/CN100420819C/en
Publication of CN1786397A publication Critical patent/CN1786397A/en
Application granted granted Critical
Publication of CN100420819C publication Critical patent/CN100420819C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to chimney used to prevent flue gas penetration corrosion and its method. It is used to keep negative pressure running in chimney after setting flue gas desulfurizing installation. The chimney is formed by four layers. They are chimney internal lining, heat-insulating layer, chimney outer cylinder, and outer packing cylinder. There is gap layer between the outer packing cylinder and chimney outer cylinder. The gap layer is sealed, and connected to outer blast system. Its method is used the blast system to supply air for the gap layer to make its pressure higher than flue gas in chimney to keep relative negative pressure running. It can prevent the flue gas from leaking to corrupt chimney.

Description

Prevent the chimney and the method thereof of flue permeating corrosion
Technical field
The present invention relates to a kind of be used for installing keep behind flue gas desulfurization (FGD) device in the chimney to negative pressure operation or similar field are used to keep in the chimney to be relative negative pressure or other similar pipeline air drafts, corrosion-resistant a set of equipment system, to belong to the technical field of heat power equipment.
Background technology
Chimney is important production equipment type structure in the steam power station, mostly is reinforced concrete structure, and the safe operation of power plant requires the life-span of chimney identical with boiler even longer at least.On the structure design of chimney, the omnidistance cylinder pressure of general requirements chimney so just can guarantee can not take place flue gas to chimney outer wall infiltration problem less than tube external pressure (forming relative negative pressure) operation.If occur relative malleation in the chimney, then flue gas can penetrate into by the crack of chimney in the reinforced concrete structure, because this place's temperature is lower and low more the closer to outer wall than flue-gas temperature, when being cooled to be lower than dewpoint temperature, flue gas will separate out sulfuric acid, cause particularly reinforcement corrosion of load-carrying members, thereby reduced the chimney life-span, even caused chimney to collapse.So it is unfavorable to the safety of chimney to occur zone of positive pressure in the chimney.
Fired power generating unit adopts after the FGD system particularly the wet chimney without heat regenerative system, the flue-gas temperature of chimney import reduces, the water capacity of flue gas increases, and this will cause smoke density to increase, the reducing from suction capactity of chimney, the chimney internal pressure is distributed change, interior pressure improves.Press the relative malleation that is higher than external pressure in certainly leading to if do not take measures, flue gas leaks laterally by the crack under pressure-driven and causes above-mentioned corrosion phenomenon.Therefore must adopt relative measures to prevent to press in the chimney situation that is higher than external pressure to occur.
Summary of the invention
Technical problem: the purpose of this invention is to provide a kind of chimney and method thereof that prevents flue permeating corrosion, this chimney can be regulated accordingly according to operation condition in the chimney and extraneous meteorological variation, guarantees that under any operating mode chimney keeps the negative pressure operation.
Technical scheme: the chimney of flue permeating corrosion that prevents of the present invention is formed by four layers, outwards is chimney lining from the lining, isolation layer, chimney urceolus, outsourcing tube; Leave clearance layer between outsourcing tube and the chimney urceolus, in outsourcing tube and the sealing of chimney urceolus closed at both ends, form the clearance layer of a sealing, this clearance layer is connected with the blower system of outside.The outsourcing tube is fixedly mounted on the chimney urceolus by the method for anchoring.
The method that prevents flue permeating corrosion that prevents the chimney of flue permeating corrosion is to replenish air for continuously the clearance layer between outsourcing tube and the chimney urceolus by blower system, the pressure that improves this clearance layer is kept chimney and is interior negative pressure operation relatively to being higher than flue gas pressures in the chimney.
This device also can be set up the outsourcing tube in the periphery of building chimney, and main material is for can resist the coated steel sheet of atmospheric corrosion, and the bag tube leaves certain interval with the chimney external surface, and is fixed together by the form and the chimney of anchoring.The outsourcing tube seals whole chimney wall, and leaves a small amount of ventilation opening at the top.By blower system, just can keep certain pressure in the gap area with bag tube and chimney external surface.Because the pressure in the gap area can be controlled, so even the flue gas pressures in the chimney forms so-called " malleation " when operation greater than air pressure, because the pressure in the gap area is controlled at than in the bigger scope of flue gas pressures, so, maintain " negative pressure relatively " operation in the chimney with respect to clearance layer.
Beneficial effect: chimney structure 1. of the present invention is simple, can guarantee to keep in the chimney relative negative pressure, guarantees the normal operation of FGD system, the influence of having avoided chimney to be corroded.2. outsourcing tube resistance to pressure by force, not yielding, install simply, ancillary methods such as support are simple.3. in work progress, the leakage situation of having built chimney can also be checked, shutoff can be in time implemented as finding leakage point.4. adopt the scheme of outside construction under the situation that chimney is not stopped transport, to construct, solved traditional, implement anticorrosive construction at inner wall of stack and require many boiler problems of bringing heavy economic losses out of service, can reduce the expense that the chimney house of correction needs greatly.
Description of drawings
Fig. 1 is a contour structures schematic diagram of the present invention.
Fig. 2 is the cross-sectional view of chimney of the present invention.
Chimney lining 1 is arranged, isolation layer 2, chimney urceolus 3, outsourcing tube 4, blower system 5 among the above figure.
The specific embodiment
The present invention is further described below in conjunction with accompanying drawing.
This chimney is mainly by chimney lining 1, isolation layer 2, and chimney urceolus 3, outsourcing tube 4, blower system 5 is formed.The outsourcing tube encloses and is connected into an external bag tube 4 of the trapezoidal column more bigger than chimney external surface, be fixed together by anchor structure and chimney urceolus 3, the outside wall surface of whole chimney urceolus 3 is sealed, and form a clearance layer that only leaves a small amount of ventilation opening at the top, replenish air to clearance layer continuously by blower system 5 then.The power of blower system 5 can adjust accordingly according to operation condition in the chimney and extraneous meteorological variation, so, pressure in the clearance layer has stoped the possibility that flue gas is outwards revealed by the chimney slit in the chimney always greater than the pressure of flue gas in the chimney, prevents the generation of chimney corrosion.
When the design of engineering, adopt CFD (Fluid Mechanics Computation simulation) and CAE (computer-aided engineering analysis), stressing conditions when at length analyzing outsourcing tube 4 and influenced by typhoon, earthquake etc., scientifically arrange the anchor point of outsourcing tube 4 and chimney urceolus 3, the assessment foundation of science is provided for the installation of apparatus of the present invention.
In work progress, can check the operating condition of having built chimney, the leakage slit that exists is in time handled.

Claims (3)

1. chimney that prevents flue permeating corrosion is characterized in that this chimney forms by four layers, outwards is chimney lining (1) from the lining, isolation layer (2), chimney urceolus (3), outsourcing tube (4); Leave clearance layer between outsourcing tube (4) and the chimney urceolus (3), in outsourcing tube (4) and the sealing of chimney urceolus (3) closed at both ends, form the clearance layer of a sealing, this clearance layer is connected with the blower system (5) of outside.
2. according to the described chimney that prevents flue permeating corrosion of claim 1, it is characterized in that outsourcing tube (4) is fixedly mounted on the chimney urceolus (3) by the method for anchoring.
3. method that prevents flue permeating corrosion that prevents the chimney of flue permeating corrosion as claimed in claim 1, it is characterized in that replenishing air for continuously the clearance layer between outsourcing tube (4) and the chimney urceolus (3) by blower system (5), the pressure that improves this clearance layer is kept chimney and is interior negative pressure operation relatively to being higher than flue gas pressures in the chimney.
CNB200510123029XA 2005-12-14 2005-12-14 Chimney with preventing flue permeating corrosion and its method Expired - Fee Related CN100420819C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB200510123029XA CN100420819C (en) 2005-12-14 2005-12-14 Chimney with preventing flue permeating corrosion and its method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB200510123029XA CN100420819C (en) 2005-12-14 2005-12-14 Chimney with preventing flue permeating corrosion and its method

Publications (2)

Publication Number Publication Date
CN1786397A true CN1786397A (en) 2006-06-14
CN100420819C CN100420819C (en) 2008-09-24

Family

ID=36783997

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB200510123029XA Expired - Fee Related CN100420819C (en) 2005-12-14 2005-12-14 Chimney with preventing flue permeating corrosion and its method

Country Status (1)

Country Link
CN (1) CN100420819C (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102168503A (en) * 2010-11-26 2011-08-31 重庆大众防腐有限公司 Anticorrosion structure for intersection joint of steel flue and chimney of brick lining chimney and anticorrosion treatment method
CN102605988A (en) * 2012-04-18 2012-07-25 永升建设集团有限公司 Synchronous construction method for chimney lining external concrete
CN104165368A (en) * 2013-05-16 2014-11-26 奥莎茨有限公司 Apparatus for cooling exhaust gases
CN104406181A (en) * 2014-11-25 2015-03-11 湖南天通无腐烟囱工程有限公司 Thermal insulating layer pressurizing corrosion-resistant chimney
CN104406182A (en) * 2014-11-25 2015-03-11 湖南天通无腐烟囱工程有限公司 Thermal insulating layer heating and pressurizing corrosion-resistant chimney
CN105737883A (en) * 2016-04-26 2016-07-06 西安西热电站化学科技有限公司 Positive pressure protection simulating device and method for wet chimney
CN107860014A (en) * 2017-09-28 2018-03-30 华电电力科学研究院 A kind of method of power plant sleeve-type chimney control corrosion rate leakage

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102168499A (en) * 2010-11-26 2011-08-31 重庆大众防腐有限公司 Anticorrosion treatment method for liquid discharge opening of brick lining chimney

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT398106B (en) * 1981-03-30 1994-09-26 Schiedel Gmbh & Co MULTI-SHELLED CHIMNEY
JP3096032B1 (en) * 1999-06-25 2000-10-10 川崎重工業株式会社 Smoke exhaust method using multi-tube chimney

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102168503A (en) * 2010-11-26 2011-08-31 重庆大众防腐有限公司 Anticorrosion structure for intersection joint of steel flue and chimney of brick lining chimney and anticorrosion treatment method
CN102168503B (en) * 2010-11-26 2012-12-26 重庆大众防腐有限公司 Anticorrosion structure for intersection joint of steel flue and chimney of brick lining chimney and anticorrosion treatment method
CN102605988A (en) * 2012-04-18 2012-07-25 永升建设集团有限公司 Synchronous construction method for chimney lining external concrete
CN102605988B (en) * 2012-04-18 2014-12-24 永升建设集团有限公司 Synchronous construction method for chimney lining external concrete
CN104165368A (en) * 2013-05-16 2014-11-26 奥莎茨有限公司 Apparatus for cooling exhaust gases
CN104406181A (en) * 2014-11-25 2015-03-11 湖南天通无腐烟囱工程有限公司 Thermal insulating layer pressurizing corrosion-resistant chimney
CN104406182A (en) * 2014-11-25 2015-03-11 湖南天通无腐烟囱工程有限公司 Thermal insulating layer heating and pressurizing corrosion-resistant chimney
CN104406182B (en) * 2014-11-25 2017-01-25 湖南天通无腐烟囱工程有限公司 Thermal insulating layer heating and pressurizing corrosion-resistant chimney
CN105737883A (en) * 2016-04-26 2016-07-06 西安西热电站化学科技有限公司 Positive pressure protection simulating device and method for wet chimney
CN107860014A (en) * 2017-09-28 2018-03-30 华电电力科学研究院 A kind of method of power plant sleeve-type chimney control corrosion rate leakage

Also Published As

Publication number Publication date
CN100420819C (en) 2008-09-24

Similar Documents

Publication Publication Date Title
CN100420819C (en) Chimney with preventing flue permeating corrosion and its method
CN102561787B (en) Anticorrosive composite chimney unit and chimney
CN109028119A (en) A kind of anti-corrosion chimney and its construction method of installation
CN2856278Y (en) Externally sheathed chimmery preventing fume and smoke corrosion
CN202299177U (en) Novel roof exhaust system
CN102661075B (en) Method for manufacturing sectional chimney with single-barrel concrete structure and
CN204285491U (en) The first anti-thawing apparatus of cylinder after a kind of single-drum chimney desulfurization
CN108952304B (en) Semi-sleeve anti-corrosion chimney
CN207797101U (en) A kind of wet desulphurization chimney heating system
CN204717716U (en) A kind of chimney anticorrosion system of applicable desulfurization wet flue gas
CN206398737U (en) A kind of combined type tenon structure glass reinforced plastic inner cylinder for coal-burning boiler chimney anticorrosion
CN215255051U (en) Chimney after being reformed based on glass steel inner cylinder to reinforced concrete dry chimney
JP2007147171A (en) Heating-cooling air conditioner using underground constant temperature
CN106765240B (en) Device for washing down smoke-proof feather of chimney
CN216384234U (en) Wet flue gas delivery system
CN204268499U (en) A kind of prefabricated stainless steel chimney systems
CN206944122U (en) A kind of furnace bottom water seal water replenishing system
CN107860014B (en) A kind of method of power plant sleeve-type chimney control corrosion rate leakage
CN202546796U (en) Anticorrosive coating structure at desulfurized steel base flue expansion joint
CN220666403U (en) Device for strengthening ventilation of sewage pipe network
CN203231324U (en) Exhaust emission device for smoke desulfurizing tower
Deng et al. Biogas Storage
CN201476035U (en) Chimney corrosion prevention structure
CN102692064A (en) A wind pressure and temperature pressure-driven air delivery and exhaust energy recovery system
CN213836715U (en) Dust removal explosion-proof system is with sending exhaust pipe road foundation structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 210008, Nanjing, Zhongshan North Road, Jiangsu No. 30 International Plaza, 46 floor

Co-patentee after: Peng Zuhui

Patentee after: Sun Keqin

Co-patentee after: Gu Huamin

Co-patentee after: GCL Engineering Ltd.

Co-patentee after: Zhao Jin

Address before: 210008, Nanjing, Zhongshan North Road, Jiangsu No. 30 International Plaza, 46 floor

Co-patentee before: Peng Zuhui

Patentee before: Sun Keqin

Co-patentee before: Gu Huamin

Co-patentee before: Jiangsu Suyuan Environmental Protection Engineering Co.,Ltd.

Co-patentee before: Zhao Jin

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080924