CN1078524A - Brick-and-concrete buildings constructional column, collar tie beam cast-in-situ construction method and device - Google Patents

Brick-and-concrete buildings constructional column, collar tie beam cast-in-situ construction method and device Download PDF

Info

Publication number
CN1078524A
CN1078524A CN 92108116 CN92108116A CN1078524A CN 1078524 A CN1078524 A CN 1078524A CN 92108116 CN92108116 CN 92108116 CN 92108116 A CN92108116 A CN 92108116A CN 1078524 A CN1078524 A CN 1078524A
Authority
CN
China
Prior art keywords
collar tie
constructional column
tie beam
brick
floor slab
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 92108116
Other languages
Chinese (zh)
Other versions
CN1026604C (en
Inventor
范家声
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 92108116 priority Critical patent/CN1026604C/en
Publication of CN1078524A publication Critical patent/CN1078524A/en
Application granted granted Critical
Publication of CN1026604C publication Critical patent/CN1026604C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The present invention relates to a kind of brick-and-concrete buildings constructional column, collar tie beam cast-in-situ construction method and device, the characteristics of this method are to set up bracing frame behind building wall, and precast floor slab is installed earlier, build again.Its bracing frame is made of cross bar and vertical rod, the bracing frame support shuttering, template supports precast floor slab, the present invention is because first good and sound precast floor slab concreting again, so the people can stand on the precast plate and construct, but primary concreting constructional column, collar tie beam, balcony, stair, kitchen, lavatory and insertion piece, thus construction safety, easy to operate, strengthened the globality and the shock resistance of structure, material-saving saves time.

Description

Brick-and-concrete buildings constructional column, collar tie beam cast-in-situ construction method and device
The present invention relates to constructional column, collar tie beam cast-in-situ construction method and the device of a kind of construction techniques, particularly brick-and-concrete buildings.
The brick-and-concrete buildings cost is lower, and is applied widely, in mixed industry of general brick and the civilian construction design, constructs the requirement of setting up defences for the rigidity that strengthens building with satisfying, and the great majority design is that collar tie beam and more constructional column are arranged layer by layer.The step of existing building with brick-concrete structure constructional column, collar tie beam cast-in-situ construction method is: form removal → instrument error centering, repairing → installation precast floor slab after building wall → set up operating platform → group bundle constructional column, the collar tie beam reinforcing bar → pillar beam forms → preheating embedding line → concreting → concrete final set.This job practices must be set up operating platform when concreting, the people stands on the operating platform and builds, so difficulty of construction is big, operates dangerous, simultaneously, need smoothing behind the concreting,, also need repair as constructional column, the whole injustice of collar tie beam, thereby increase cost, prolonged the duration, and respectively had constuction joint between the section of building, whole building and shock resistance are relatively poor.
The objective of the invention is to overcome above-mentioned the deficiencies in the prior art, a kind of precast floor slab that installs earlier is provided, concreting again, thereby has labor and material saving, handling safety, convenience, brick-and-concrete buildings constructional column, collar tie beam cast-in-situ construction method and the device of enhancing whole building and shock resistance.
Brick-and-concrete buildings constructional column of the present invention, collar tie beam cast-in-situ construction method adopt following construction sequence:
(1) building wall;
(2) set up constructional column, collar tie beam bracing frame;
(3) constructional column, collar tie beam reinforcing bar are pricked by group;
(4) set up template on group ties the constructional column, collar tie beam of reinforcing bar, wherein: template is supported by formwork-support;
(5) precast floor slab is installed on template, and centering is more flat;
(6) concreting.
The bracing frame of realizing said method is by support rail, and is vertical with support rail, and constitutes with supporting rod that support rail is fastenedly connected, and wherein: support rail passes the body of wall that need build collar tie beam, supports the bottom of vertical rod and contacts to earth.The top of supporting vertical rod also can contact with precast floor slab, to support the certain pressure of precast floor slab.
Building wall of the present invention is set up formwork-support behind predetermined height, the cross bar of bracing frame passes the preformed hole of body of wall, makes the pressure of precast floor slab be pressed on the support rail by template, at last by supporting vertical rod and body of wall load-bearing.As long as suitably select the quantity of support rail and support vertical rod, whole support system is just very safe.After the good and sound smoothing of precast floor slab, the constructor can stand in and build constructional column, collar tie beam on the precast floor slab, handling safety, convenience like this, but and make constructional column, collar tie beam, balcony, stair, kitchen, lavatory and insert the piece primary concreting, both strengthen the globality and the shock resistance of structure, do not had constuction joint again.Because good and sound precast floor slab is smoothed,, just need not after building to proofread and correct, thereby save time and material as long as build on request.
The present invention compares with existing job practices owing to be erected with formwork-support, can safety install precast floor slab earlier, build again, so construction safety of the present invention is easy to operate, strengthened the globality of structure, improved design function, saved time and raw material.
The schematic diagram that Fig. 1 sets up for bracing frame of the present invention.
Embodiments of the invention are as follows:
Job practices of the present invention is carried out according to the following steps:
(1) building wall;
(2) set up constructional column, ring beam template supporting frame, bracing frame is by cross bar 1, vertical with cross bar 1, and constitute with vertical rod 2 and the backstay 7 that fastener 4 is connected with cross bar 1, wherein cross bar 1 passes body of wall 3, and template 5 is supported by cross bar 1, and precast floor slab 6 is supported by template 5, backstay 7 holds out against template 5, contacts to earth in vertical rod 2 bottoms;
(3) constructional column, collar tie beam reinforcing bar are pricked by group;
(4) on tying the constructional column, collar tie beam of reinforcing bar, group sets up template;
(5) preheating embedding line;
(6) precast floor slab is installed on template, is installed and carry out levelling behind whole precast floor slabs of one deck and proofread and correct;
(7) concreting;
(8) remove template after the concrete final set.
Promptly on this one deck basis, set up new one deck after the concrete final set, new one deck job practices and above-mentioned identical.

Claims (2)

1, a kind of brick-and-concrete buildings constructional column, collar tie beam cast-in-situ construction method is characterized in that it comprises the following steps:
(1) building wall;
(2) set up constructional column, ring beam template supporting frame;
(3) constructional column, collar tie beam reinforcing bar are pricked by group;
(4) set up template on constructional column, collar tie beam, wherein template is supported by formwork-support;
(5) precast floor slab is installed on template, and the levelling calibration;
(6) concreting.
2, the isolated plant of brick-and-concrete buildings constructional column described in a kind of claim 1, collar tie beam cast-in-situ construction method, it is characterized in that bracing frame is by support rail 1, vertical with support rail 1, and constitute with the supporting rod 2 that support rail 1 is fastenedly connected, wherein: support rail 1 passes the body of wall 3 that need build collar tie beam, supports the bottom of vertical rod 2 and contacts to earth.
CN 92108116 1992-05-04 1992-05-04 Pouring in situ construction method for brick hybrid building structure of column girth and equipments thereof Expired - Fee Related CN1026604C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 92108116 CN1026604C (en) 1992-05-04 1992-05-04 Pouring in situ construction method for brick hybrid building structure of column girth and equipments thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 92108116 CN1026604C (en) 1992-05-04 1992-05-04 Pouring in situ construction method for brick hybrid building structure of column girth and equipments thereof

Publications (2)

Publication Number Publication Date
CN1078524A true CN1078524A (en) 1993-11-17
CN1026604C CN1026604C (en) 1994-11-16

Family

ID=4943239

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 92108116 Expired - Fee Related CN1026604C (en) 1992-05-04 1992-05-04 Pouring in situ construction method for brick hybrid building structure of column girth and equipments thereof

Country Status (1)

Country Link
CN (1) CN1026604C (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100526573C (en) * 2008-08-28 2009-08-12 温州建设集团公司 Construction method of structure conversion layer concrete girder steel bracket formwork support
CN102535851A (en) * 2012-03-26 2012-07-04 郑州大学 Board integrated construction process of prefabricated floor board of masonry house
CN102889004A (en) * 2012-11-04 2013-01-23 西安建筑科技大学 Method for increasing ring beam for brick masonry wall
CN103470065A (en) * 2013-09-05 2013-12-25 邯郸市第二建筑安装有限公司天津分公司 Steel tube truss connection part and connection method thereof
CN105317216A (en) * 2015-02-11 2016-02-10 中建四局第三建筑工程有限公司 Wall body reversed construction method and wall body and concrete framework casting structure
CN106284653A (en) * 2016-09-10 2017-01-04 广西建工集团第四建筑工程有限责任公司 The construction method that a kind of balcony construct capital interspaces in advance
CN108457402A (en) * 2017-02-21 2018-08-28 黄靓 A kind of concrete structure construction method with assembled masonry filler wall
CN108457469A (en) * 2017-02-21 2018-08-28 黄靓 A kind of concrete structure construction method with assembled masonry filler wall
CN113565205A (en) * 2021-08-24 2021-10-29 中建四局华南建设有限公司 One-time pouring forming method for interlayer beam
CN115637776A (en) * 2022-11-15 2023-01-24 中建三局第一建设工程有限责任公司 Walkway sandwich structure building and construction method thereof

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100526573C (en) * 2008-08-28 2009-08-12 温州建设集团公司 Construction method of structure conversion layer concrete girder steel bracket formwork support
CN102535851A (en) * 2012-03-26 2012-07-04 郑州大学 Board integrated construction process of prefabricated floor board of masonry house
CN102889004B (en) * 2012-11-04 2014-12-31 西安建筑科技大学 Method for increasing ring beam for brick masonry wall
CN102889004A (en) * 2012-11-04 2013-01-23 西安建筑科技大学 Method for increasing ring beam for brick masonry wall
CN103470065B (en) * 2013-09-05 2016-02-10 邯郸市第二建筑安装有限公司天津分公司 A kind of steel pipe truss connector and attaching method thereof
CN103470065A (en) * 2013-09-05 2013-12-25 邯郸市第二建筑安装有限公司天津分公司 Steel tube truss connection part and connection method thereof
CN105317216A (en) * 2015-02-11 2016-02-10 中建四局第三建筑工程有限公司 Wall body reversed construction method and wall body and concrete framework casting structure
CN106284653A (en) * 2016-09-10 2017-01-04 广西建工集团第四建筑工程有限责任公司 The construction method that a kind of balcony construct capital interspaces in advance
CN106284653B (en) * 2016-09-10 2018-09-21 广西建工集团第四建筑工程有限责任公司 A kind of construction method that balcony construct capital interspaces in advance
CN108457402A (en) * 2017-02-21 2018-08-28 黄靓 A kind of concrete structure construction method with assembled masonry filler wall
CN108457469A (en) * 2017-02-21 2018-08-28 黄靓 A kind of concrete structure construction method with assembled masonry filler wall
CN113565205A (en) * 2021-08-24 2021-10-29 中建四局华南建设有限公司 One-time pouring forming method for interlayer beam
CN115637776A (en) * 2022-11-15 2023-01-24 中建三局第一建设工程有限责任公司 Walkway sandwich structure building and construction method thereof
CN115637776B (en) * 2022-11-15 2023-08-29 中建三局第一建设工程有限责任公司 Pavement sandwich structure building and construction method thereof

Also Published As

Publication number Publication date
CN1026604C (en) 1994-11-16

Similar Documents

Publication Publication Date Title
CN104947792B (en) Green light steel assembling house and installation method are built in a kind of letter
CN103422672A (en) Construction method for reinforced concrete prefabricated house
CN102787560B (en) Integrated construction method of support of large cantilevered capping beam and vertical column
CN1026604C (en) Pouring in situ construction method for brick hybrid building structure of column girth and equipments thereof
CN206352391U (en) Socket joint type key slot type Quick Release support system
CN112796511A (en) Supporting structure and construction method of double-layer fair-faced concrete arc-shaped roof formwork
CN103321155B (en) Viaduct pier operation platform system and build this system and pour into a mould the method for bridge pier
CN105332506A (en) Formwork support system for parallel multi-section stair and method for constructing same
CN205224332U (en) Prefabricated wall body and prefabricated wallboard
CN201794297U (en) Early-dismantling formwork support system for large-span cast-in-place beam ribbed floorslabs
CN111851827A (en) Assembly type prefabricated steel bar truss disassembly-free template system and manufacturing method thereof
CN204753834U (en) Partition plate of scissors stair and connection structure of floor roof beam
CN214459673U (en) Tower limb sealing section construction support
CN213203667U (en) Supporting structure for post-cast strip-striding temporary lane of top plate of ground depot
CN212359061U (en) PC staircase safety protection operation platform
CN205224420U (en) Anticorrosive industry factory building precast concrete stand
CN102418417A (en) Long-slab-span cast-in-situ beam ribbed floor early-dismantling template formwork system
CN2305453Y (en) In site casting concrete platform device
CN215254565U (en) Supporting structure of double-layer fair-faced concrete arc-shaped roof formwork
CN115162697B (en) Special-shaped column construction work I-shaped steel cantilever platform and construction method
CN205224417U (en) An anticorrosive industry factory building precast concrete U type supporting beam
CN213926982U (en) Prefabricated coincide floor node structure in board area falls
CN216713527U (en) Assembled plane superstructure
CN115075613B (en) Assembled building supporting system and construction method thereof
CN1046659C (en) Aerial prefabricating and constructing tech. for prestressed concrete arch-bar roof truss

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee