CN107844873A - One introduces a collection net coordinates performance whole-life cycle fee system and its management method - Google Patents
One introduces a collection net coordinates performance whole-life cycle fee system and its management method Download PDFInfo
- Publication number
- CN107844873A CN107844873A CN201610730804.6A CN201610730804A CN107844873A CN 107844873 A CN107844873 A CN 107844873A CN 201610730804 A CN201610730804 A CN 201610730804A CN 107844873 A CN107844873 A CN 107844873A
- Authority
- CN
- China
- Prior art keywords
- unit
- management
- equipment
- life cycle
- information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Health & Medical Sciences (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Educational Administration (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention, which provides introduces a collection net coordination performance whole-life cycle fee system and its management method, the system, to be included:System configuration module, life cycle management module, on-line monitoring module and the statistical analysis module being sequentially connected.Its method includes:The prophase management of equipment, equipment operation management, the dynamic monitoring management of equipment, equipment rotation and scrap management.Technical scheme provided by the invention improves source net coordinated management level, realizes comprehensive, real-time, dynamic and grasps unit source net coordination performance.
Description
Technical field
The present invention relates to a kind of whole-life cycle fee system, an in particular to introduces a collection net coordinates performance life cycle management
Management system and its management method.
Background technology
Whole-life cycle fee refer to a system or equipment from early stage, go into operation, to run to the life cycle such as retired each
Individual link carries out the management of overall process, and to be better understood by the system or equipment, targetedly the system or equipment has been carried out
It is kind.
The quality that generating set source net coordinates performance has vital influence on electricity net safety stable.Source net is coordinated at present
Performance management is mainly verified and verified by field test of new machine when grid-connected, is then passed through after unit commitment commercial operation
Artificial report carries out management with offline verification mode.As extra-high voltage alternating current-direct current power network is fast-developing, and distributed and concentration
The new energy large-scale grid connection such as wind-powered electricity generation and photovoltaic of formula, power network dynamic characteristic is increasingly sophisticated, simultaneously because unit generates electricity after putting into operation
Enterprise from improving performance angle considers that light maintenance, overhaul can be carried out, partly or wholly transformed, and repairs every time and improved unit is joined
For number all by that may readjust, other part source net coordinates performance can not bring direct generation of electricity benefit, power plant to power plant in itself
Side is for number one considers possible adjustment control system parameter, therefore field test and artificial pattern verification are difficult in time comprehensively
Grasp generating set source net and coordinate performance.
For this reason, it may be necessary to providing a kind of generating set source net coordinates performance whole-life cycle fee system and method, with lifting
Source net coordinated management is horizontal, and comprehensive, real-time, dynamic grasps unit source net coordination performance.
The content of the invention
In order to solve the above-mentioned deficiency in the presence of prior art, the present invention provides a kind of generating set source net and coordinates performance
Whole-life cycle fee system and method.
Technical scheme provided by the invention is:A kind of generating set source net coordinate performance whole-life cycle fee system and its
Method, the system include:System configuration module, life cycle management module, on-line monitoring module and the statistics being sequentially connected
Analysis module.
Preferably, the system configuration module includes:
(1) submodule of acquisition system configuring maintenance information;
(2) submodule of the relation database table structure of system configuration is established;
(3) typing generating set information and it is stored in the submodule of relational database;
(4) submodule safeguarded to system.
Preferably, the life cycle management module includes:Relation database table construction unit, the thermoelectricity hydroelectric machine of parallel connection
Group archives and information management unit, wind-powered electricity generation photovoltaic unit archives and information management unit, test report information management unit, definite value change
Information management unit, operation maintenance information management unit, unit increase-volume information management unit, unit equipment change information management list
Member, unit change of title information management unit, equipment deficiency information management unit, on-line monitoring assay administrative unit, report
Useless record information administrative unit, equipment state change management unit and running status management function.
Preferably, the on-line monitoring module includes:Source net coordinates performance on-line monitoring unit and definite value changes online prison
Survey unit.
Preferably, the statistical analysis module includes:Test report statistical report form submodule, equipment deficiency statistical report form
Module, unit source net coordinate performance state Real-Time Evaluation statistical report form submodule, unit source net coordinates whole-life cycle fee system
Count form submodule, subregion statistical report form submodule and divide electricity power group's statistical report form submodule.
One introduces a collection net coordinates performance whole-life cycle fee method, and methods described includes:
1) prophase management of equipment;
2) operational management of equipment;
3) dynamic monitoring management of equipment;
4) rotation of equipment and management is scrapped.
Preferably, the prophase management of the step 1) equipment includes:Establish life cycle management archives, acquisition system configuration dimension
Information, opening relationships database table structure are protected, typing generating set information is simultaneously stored in relational database, system is safeguarded.
Preferably, the operational management of the step 2) equipment includes:Grid-connected examination, the filing and management of test report;
The grid-connected examination includes:Grid-connected examination to unit, and the suggestion feedback of examination is proposed whole to electricity power enterprise
Change opinion and regulation rectification time limit;
The filing and management of the test report include:To grid-connected conditions identification, grid-connected examination opinion, written rectification situation
Report, grid connection test report and unit relate to net experiment correlation report and are filed and managed.
Preferably, the dynamic monitoring management of the step 3) equipment includes:Unit definite value is become by monitoring module on-line
Dynamic information, On-Line Dynamic Monitoring index and evaluation result carry out filing management.
Preferably, the rotation of the step 4) equipment and scrap management and include:Unit technological transformation overhaul maintenance, equipment rotation,
Equipment operation maintenance, tissue test and hidden troubles removing improvement and equipment scrapping.
With immediate prior art ratio, count protocol provided by the invention has following excellent effect:
1st, technical scheme provided by the invention reaches comprehensive, real-time, dynamic is slapped by the information system management to generating set
Hold unit source net and coordinate performance, it is horizontal effectively to improve source net coordinated management;
2nd, technical scheme provided by the invention promotes the up to standard of power plant unit performance by monitoring, examining and manage,
Avoid in time and power grid risk occur because unit performance is not up to standard.Technical scheme provided by the invention is formulated and has issued a system
Row specialized management system, it is ensured that source net dynamic characteristic on-line monitoring and management is implemented;To promoting power network and power supply to coordinate to transport
Row, power system controllability and reliability are enhanced, improves power system comprehensive energy efficiency, ensure that power system security is stable
Quality and economy is run.
3rd, technical scheme provided by the invention according to " one grade of a machine " principle, to each unit and its control system
Source net coordinates performance and establishes life cycle management archives, and complete documentation design early stage review comment, new set grid-connection check and accept meaning
See and rectify and improve situation, new set grid-connection test report, performance test report and assess record, operation hidden danger after unit technological transformation overhaul
Special project investigation improvement situation and online dynamic evaluation result etc., realize the key of unit source net coordination information one have access to, related system
Count the generation of the key of information one.
Brief description of the drawings
The generating set source net that Fig. 1 is the present invention coordinates performance whole-life cycle fee system schematic diagram;
The generating set source net that Fig. 2 is the present invention coordinates performance whole-life cycle fee system flow chart;
The generating set source net that Fig. 3 is the present invention coordinates performance whole-life cycle fee system structure diagram.
Embodiment
For a better understanding of the present invention, present disclosure is done further with reference to Figure of description and example
Explanation.
The present invention provides a kind of generating set source net and coordinates performance whole-life cycle fee system and method, the system
Including:System configuration module, life cycle management module, on-line monitoring module and the statistical analysis module being sequentially connected;
The system configuration module includes:
(1) acquisition system configuring maintenance information:
Including with possessory lien unit, affiliated electricity power group, affiliated area, producer's unit, device type, test type, dimension
Shield type, value type, scrap type, fault type, voltage class, the title of machine set type.
(2) the relation database table structure of system configuration is established:
Establishing is included with possessory lien unit, affiliated electricity power group, affiliated area, producer's unit, device type, experiment class
Type, safeguard type, value type, scrap type, fault type, voltage class, the relation database table of the title of machine set type
Structure.
(3) typing generating set information and it is stored in relational database:
Typing is included with possessory lien unit, affiliated electricity power group, affiliated area, producer's unit, device type, experiment class
Type, type, value type are safeguarded, the information such as type, fault type, voltage class, the title of machine set type, code is scrapped and deposits
Enter in relational database.
(4) system is safeguarded:
System maintenance is mainly to manage, create and adjust role, user and its authority of system, and carries out system operatio power
Limit distribution;Set and the real time information of adjustment system is fed back;Operation Log, data backup and data recovery operation are completed, is ensured
System well operates.
The life cycle management module includes:The relation database table construction unit that is connected in parallel, thermoelectricity Hydropower Unit
Archives and information management unit, wind-powered electricity generation photovoltaic unit archives and information management unit, test report information management unit, definite value change letter
Cease administrative unit, operation maintenance information management unit, unit increase-volume information management unit, unit equipment and change information management list
Member, unit change of title information management unit, equipment deficiency information management unit, on-line monitoring assay administrative unit, report
Useless record information administrative unit, equipment state change management unit and running status management function;
Relation database table construction unit includes thermoelectricity Hydropower Unit archives and information management table, wind-powered electricity generation photovoltaic unit archives are believed
Breath management table, test report information management table, definite value change information management table, operation maintenance information management table, unit increase-volume letter
Breath management table, unit equipment change information management table, equipment deficiency information management table, scrap the relation numbers such as record information management table
According to database table structure.
Thermoelectricity Hydropower Unit archives and information management unit, there is provided human-computer interaction interface, realize the hair to thermoelectricity Hydropower Unit
Group of motors Chinese name, voltage class, unit model, the time of putting into operation, property right unit, electricity power group, affiliated area, producer's unit,
The increase of the information such as machine set type, modification, deletion action, and in real time guest operation record renewal into database.
Wind-powered electricity generation photovoltaic unit archives and information management unit, there is provided human-computer interaction interface, realize the factory to wind-powered electricity generation photovoltaic unit
Station name, voltage class, the wiring map title, wind energy turbine set installed capacity, wind power plant installation number of units, Reactive Compensation in Wind Farm capacity, wind
Electric field geography information longitude, wind power plant geography information latitude, wind power plant abbreviation, wind power plant address, the time of putting into operation, property right unit,
The increase of the information such as electricity power group, affiliated area, producer's unit, grid connection capacity, machine set type, modification, deletion action, and in real time
Guest operation record renewal into database.
Test report information management unit, there is provided human-computer interaction interface, realize that the grid connection test report to unit carries out pipe
Reason.Every record include generating set Chinese name, test period, whether qualified, pdf forms test report document, test in
The information fields such as appearance, device type, test type, and record can be increased, change, delete, preserving operation.
Definite value change information management unit, there is provided human-computer interaction interface, realize that changing record to the definite value of unit carries out pipe
Reason.Every record includes generating set Chinese name, changes the time, changes the information fields such as record, record sign, value type, and
Record can be increased, change, delete, preserving operation.
Operation maintenance information management unit, there is provided human-computer interaction interface, realize that the record of the operation maintenance to unit carries out pipe
Reason.Every record, which includes generating set Chinese name, maintenance time, maintenance record, record, to be indicated, safeguards the information fields such as type, and
Record can be increased, change, delete, preserving operation.
Unit increase-volume information management unit, there is provided human-computer interaction interface, realize that the record of the unit increase-volume to unit carries out pipe
Reason.Every record include generating set Chinese name, the increase-volume time, increase-volume record, record indicate etc. information field, and can to record into
Row increase, modification, delete, preserve operation.
Unit equipment change information management unit, there is provided human-computer interaction interface, realize the equipment replacement to unit record into
Row management.Every record includes generating set Chinese name, replacing construction, changes the information such as record, record sign, device type
Domain, and record can be increased, change, delete, preserving operation.
Unit change of title information management unit, there is provided human-computer interaction interface, realize the change of title to unit record into
Row management.Every record includes generating set Chinese name, change time, originates in the letters such as power affiliated unit, existing property right affiliated unit
Domain is ceased, and record can be increased, be changed, delete, preserving operation.
Equipment deficiency information management unit, there is provided human-computer interaction interface, realize and pipe is carried out to the equipment deficiency record of unit
Reason.Every record includes the information fields such as generating set Chinese name, fault time, defect content, fault type, device type, and
Record can be increased, change, delete, preserving operation.
Monitor assay administrative unit on-line, there is provided human-computer interaction interface, to definite value transition information, On-Line Dynamic Monitoring
Index and evaluation result carry out filing management, netted according to unit source coordinate performance state Real-Time Evaluation result, Optimizing Suggestions and
The information such as the recessive defect of set speed adjustment system, excitation system and PSS, and record can be increased, change, delete, preserving
Operation.
Scrap record information administrative unit, there is provided human-computer interaction interface, realize and the record of scrapping of unit is managed.Often
Bar record include generating set Chinese name, failure time, scrap record, scrap the information fields such as type, remarks, and can to record into
Row increase, modification, delete, preserve operation.
Equipment state change management unit, there is provided human-computer interaction interface, recording equipment are enabled, disabled, leaving unused, rent into,
Lease, be transferred to, produce, failure, accident, the management scrapped etc., quickly and accurately provide equipment current state for administrative decision layer,
And record can be increased, change, delete, preserving operation.
Running status management function, there is provided human-computer interaction interface, recording equipment day-to-day operation man-hour information, the energy disappear
Information, operator message etc. are consumed, and record can be increased, be changed, delete, preserving operation.
The on-line monitoring module includes:Source net coordinates performance on-line monitoring unit and definite value changes on-line monitoring unit.
Realize that the generator sets in power plant based on WAMS information relates to network parameters model configuration feature, including:Parameter name, parameter type,
The functions such as parameter value, protection type, protection title, protection definite value, remarks, establish generating set motor excitation system, PSS parameter
Model, transformer unit voltage protection, frequency protection, field loss protection, loss of synchronism protection etc. relate to net and protect important definite value model.
Power plant field performance statistical appraisal advanced application function of the realization based on WAMS information, including generating set are effective
Excitation output response lag time, excitation system transient state multiplication factor, dynamic multiplication factor and stable state amplification under voltage disturbance
The indexs such as multiple;Frequency of oscillation, oscillation damping ratio, PSS dynamics multiplication factor, PSS dynamical output phases under system oscillation etc.
Function, the active power of generator loading step response evaluation and the evaluation of excitation system nominal response etc..
Realize the advanced application function of generating set primary frequency regulation performance evaluation based on WAMS information, including generating set ginseng
Frequency modulation contributing electricity, primary frequency modulation effectiveness indicator, primary frequency modulation performance indicator-specific statistics, primary frequency modulation action with primary frequency modulation are just
The function such as true rate and devoting rate statistics.
The statistical analysis module includes:Test report statistical report form, equipment deficiency statistical report form, unit source net are coordinated
Performance state Real-Time Evaluation statistical report form, unit source net coordinate whole-life cycle fee statistical report form, subregion statistical report form and
Electricity power group's statistical report form is divided to carry out comprehensive statistics analysis.
Test report statistical report form is to look into according to test period, whether qualified, content of the test, device type, test type
Inquiry condition, statistical separates out the unit test data sheet in the period from relational database.
Equipment deficiency statistical report form is querying condition according to fault time, defect content, fault type, device type, from
Analysis shows the unit equipment defect record in the period in relational database.
Unit source net coordinates performance state Real-Time Evaluation statistical report form, on-line computer group excitation actuating accuracy and once
Frequency modulation acts accuracy, netted according to unit source coordinate performance state Real-Time Evaluation result, Optimizing Suggestions and set speed adjustment system,
The information such as excitation system and PSS recessive defect.
Unit source net coordinates whole-life cycle fee statistical report form, including unit experiment, definite value variation, system maintenance, machine
The generating sets such as group increase-volume, equipment replacement, equipment changing, system defect, unit are scrapped, excitation event and primary frequency modulation event are complete
The Information Statistics of life cycle closed loop management are analyzed.
Subregion statistical report form and divide electricity power group's statistical report form, according to area belonging to unit, to unit in the region
Comprehensive condition carries out statistical analysis and counted according to the affiliated electricity power group of unit, the comprehensive condition to electricity power group's unit
Analysis.
Count equipment items technical-economic index and comprehensive state, there is provided defeated for the form of different management leveled demands
Go out.By various statistics and index, manager comprehensively, is fast and accurately understood current enterprise generator set device makes
With situation, auxiliary leader carries out enterprise management decision making.
A kind of generating set source net coordinates performance whole-life cycle fee method, and methods described includes:
1) plan diagram;
2) equipment operation management;
3) dynamic monitoring management of equipment;
4) equipment rotation and management is scrapped.
The step 1) includes:Establish life cycle management archives, acquisition system configuring maintenance information, opening relationships database
Table structure, typing generating set information are simultaneously stored in relational database, system are safeguarded.
Principle of the life cycle management archives according to " one grade of a machine " is established, to each unit and its net source of control system
Coordinate performance and establish life cycle management archives, including the affiliated plant stand of every unit, affiliated voltage class, affiliated property right unit, institute
Belong to the Back ground Informations such as electricity power group, affiliated area, unit model and time of putting into operation.
Before filing management, including project being carried out to new-built unit project's earlier stage, engineering early stage and Construction Phase data
Phase tissue establishment, feasibility study evaluation and approval data, the evaluation of engineering preliminary stage preliminary design and construction bid data, Construction Phase
Go into operation with asbuilt documentation etc..
The prophase management of generator set device:Including programmed decision-making, plan, investigation, purchase, stock, until installation and debugging,
Grid connection test, all processes of trial operation.According to unit archive information unique mark, improving includes thermoelectricity, water power, wind-powered electricity generation and light
Lie prostrate buying early stage of unit engineering, stock control, installation construction period and operation phase data and carry out filing management.
The step 2) includes:The filing management of grid-connected receipt control and test report;
The grid-connected receipt control includes:Grid-connected work is responsible for by saving to adjust, and participating department is sales department of provincial electric power company, section
Letter portion and DianKeYuan, the grid-connected examination to unit, and suggestion feedback will be checked and accepted to electricity power enterprise, specify every reform advice and whole
Change the date limit, after completing rectifying and improving, rectification situation report is submitted to saving to adjust;
The filing management of the test report includes:To grid-connected conditions identification, grid-connected examination opinion, written rectification situation report
Accuse, grid connection test report and unit relate to net experiment correlation report and carry out filing management.
Unit relate to net experiment correlation report relates to net pilot project etc. including fired power generating unit, wind power plant relates to net pilot project etc.,
Photovoltaic plant relates to net pilot project etc..
The step 3) includes:By monitor on-line module to unit definite value transition information, On-Line Dynamic Monitoring index and
Evaluation result carries out filing management.
Monitor assay management on-line:Definite value transition information, On-Line Dynamic Monitoring index and evaluation result are returned
Shelves management, nets according to unit source and coordinates performance state Real-Time Evaluation result, Optimizing Suggestions and set speed adjustment system, excitation system
And the information such as PSS recessive defect.
The step 4) includes:Unit technological transformation overhaul maintenance management, equipment rotation management, equipment operation maintenance management, group
Knit experiment and management and equipment scrapping management are administered in hidden troubles removing.
Unit technological transformation overhaul maintenance management:Including excitation system reconstruction, governing system replacing, unit capacity-increasing transformation, unit
The data such as equipment replacement, unit change of title, equipment deficiency information carry out filing management.
Equipment rotation management:For part repairable queue, equipment periodically carries out rotation and offline repair is maintained, Ran Houji
Continuous change is on active service.Rotation management is purchased for reduction and maintenance cost, and recycling equipment has certain meaning.
Equipment operation maintenance management:Including the daily maintenance for preventing inferior equipment function and carrying out, check, monitoring,
Diagnosis and the management such as repairing, renewal, the purpose is to ensure equipment in the process of running often in good technique state, and have
Effect ground reduces maintenance cost.
Management is administered in tissue test and hidden troubles removing:Including being recorded to performance test report, assessment after unit technological transformation overhaul
Situation is administered in report, special hidden troubles removing and unit scraps record information and carries out filing management.
Equipment scrapping management:Equipment has integrally arrived service life, Frequent Troubles, has influence on the reliability of equipment group, it is tieed up
Accomplish this exceeds equipment purchase cost, it is necessary to equipment is changed, the asset of equipments after replacing sold off or transferred the possession of or
Disposal, Erecting and improving scrap flow.Scrap management and represent that equipment life formally terminates, so that equipment full life cycle management
Form closed loop.
Embodiments of the invention are these are only, are not intended to limit the invention, it is all in the spirit and principles in the present invention
Within, any modification, equivalent substitution and improvements done etc., be all contained in apply pending scope of the presently claimed invention it
It is interior.
Claims (10)
1. an introduces a collection net coordinates performance whole-life cycle fee system, the system includes:The system configuration module that is sequentially connected,
Life cycle management module, on-line monitoring module and statistical analysis module.
2. source net as claimed in claim 1 coordinates performance whole-life cycle fee system, it is characterised in that the system configuration
Module includes:
(1) submodule of acquisition system configuring maintenance information;
(2) submodule of the relation database table structure of system configuration is established;
(3) typing generating set information and it is stored in the submodule of relational database;
(4) submodule safeguarded to system.
3. source net as claimed in claim 1 coordinates performance whole-life cycle fee system, it is characterised in that the life cycle
Management module includes:Relation database table construction unit, thermoelectricity Hydropower Unit archives and information management unit, the wind-powered electricity generation photovoltaic of parallel connection
Unit archives and information management unit, test report information management unit, definite value change information management unit, operation maintenance message tube
Manage unit, unit increase-volume information management unit, unit equipment and change information management unit, unit change of title information management list
Member, equipment deficiency information management unit, monitor assay administrative unit on-line, scrap record information administrative unit, equipment shape
State change management unit and running status management function.
4. source net as claimed in claim 1 coordinates performance whole-life cycle fee system, it is characterised in that the on-line monitoring
Module includes:Source net coordinates performance on-line monitoring unit and definite value changes on-line monitoring unit.
5. source net as claimed in claim 1 coordinates performance whole-life cycle fee system, it is characterised in that the statistical analysis
Module includes:Test report statistical report form submodule, equipment deficiency statistical report form submodule, the unit source net of parallel connection coordinate performance
State Real-Time Evaluation statistical report form submodule, unit source net coordinate whole-life cycle fee statistical report form submodule, subregion system
Count form submodule and divide electricity power group's statistical report form submodule.
6. an introduces a collection net coordinates performance whole-life cycle fee method, it is characterised in that methods described includes:
1) prophase management of equipment;
2) operational management of equipment;
3) dynamic monitoring management of equipment;
4) rotation of equipment and management is scrapped.
7. generating set source net as claimed in claim 6 coordinates performance whole-life cycle fee method, it is characterised in that described
The prophase management of step 1) equipment includes:Life cycle management archives are established, acquisition system configuring maintenance information, establish system configuration
Relation database table structure, typing generating set information are simultaneously stored in relational database, system are safeguarded.
8. generating set source net as claimed in claim 6 coordinates performance whole-life cycle fee method, it is characterised in that described
The operational management of step 2) equipment includes:Grid-connected examination, the filing and management of test report;
The grid-connected examination includes:Grid-connected examination to unit, and the suggestion feedback of examination is proposed into rectification meaning to electricity power enterprise
See and regulation rectifies and improves the time limit;
The filing and management of the test report include:To grid-connected conditions identification, grid-connected examination opinion, written rectification situation report
Accuse, grid connection test report and unit relate to net experiment correlation report and filed and managed.
9. generating set source net as claimed in claim 6 coordinates performance whole-life cycle fee method, it is characterised in that described
The dynamic monitoring management of step 3) equipment includes:By monitoring module on-line to unit definite value transition information, On-Line Dynamic Monitoring
Index and evaluation result carry out filing management.
10. generating set source net as claimed in claim 6 coordinates performance whole-life cycle fee method, it is characterised in that institute
Stating the rotation of step 4) equipment and scrapping management includes:Unit technological transformation overhaul maintenance, equipment rotation, equipment operation maintenance, tissue
Experiment and hidden troubles removing improvement and equipment scrapping.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610730804.6A CN107844873A (en) | 2016-08-26 | 2016-08-26 | One introduces a collection net coordinates performance whole-life cycle fee system and its management method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610730804.6A CN107844873A (en) | 2016-08-26 | 2016-08-26 | One introduces a collection net coordinates performance whole-life cycle fee system and its management method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107844873A true CN107844873A (en) | 2018-03-27 |
Family
ID=61656389
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610730804.6A Pending CN107844873A (en) | 2016-08-26 | 2016-08-26 | One introduces a collection net coordinates performance whole-life cycle fee system and its management method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107844873A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112365173A (en) * | 2020-11-16 | 2021-02-12 | 云南电网有限责任公司昆明供电局 | Method for standardizing field acceptance test of power transformation equipment |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101320259A (en) * | 2007-12-14 | 2008-12-10 | 上海发电设备成套设计研究院 | Important component service life management method and system for unit generator set main unit |
CN104200245A (en) * | 2014-08-10 | 2014-12-10 | 国家电网公司 | Quick checking method for life cycle asset of power asset |
CN104361419A (en) * | 2014-09-10 | 2015-02-18 | 国家电网公司 | Electric transmission and transformation equipment state monitoring defect management system and method based on regulation and control integration |
CN104503399A (en) * | 2014-12-09 | 2015-04-08 | 华电电力科学研究院 | Group stage wind power generator set state monitoring and fault diagnosis platform |
CN105741053A (en) * | 2016-03-07 | 2016-07-06 | 特瑞斯能源装备股份有限公司 | Whole life-cycle management model for intelligent gas device |
-
2016
- 2016-08-26 CN CN201610730804.6A patent/CN107844873A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101320259A (en) * | 2007-12-14 | 2008-12-10 | 上海发电设备成套设计研究院 | Important component service life management method and system for unit generator set main unit |
CN104200245A (en) * | 2014-08-10 | 2014-12-10 | 国家电网公司 | Quick checking method for life cycle asset of power asset |
CN104361419A (en) * | 2014-09-10 | 2015-02-18 | 国家电网公司 | Electric transmission and transformation equipment state monitoring defect management system and method based on regulation and control integration |
CN104503399A (en) * | 2014-12-09 | 2015-04-08 | 华电电力科学研究院 | Group stage wind power generator set state monitoring and fault diagnosis platform |
CN105741053A (en) * | 2016-03-07 | 2016-07-06 | 特瑞斯能源装备股份有限公司 | Whole life-cycle management model for intelligent gas device |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112365173A (en) * | 2020-11-16 | 2021-02-12 | 云南电网有限责任公司昆明供电局 | Method for standardizing field acceptance test of power transformation equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Denholm et al. | The challenges of achieving a 100% renewable electricity system in the United States | |
Feng et al. | Power system operation risk assessment using credibility theory | |
CN104361419B (en) | Power transmission and transformation equipment state monitoring fault management system and method based on regulation and control unification | |
Varela et al. | The IGREENGrid project: Increasing hosting capacity in distribution grids | |
Wu et al. | GENCO's risk-based maintenance outage scheduling | |
Ding et al. | Multi-period active distribution network planning using multi-stage stochastic programming and nested decomposition by SDDIP | |
CN107766457A (en) | A kind of thermal power plant's operation management system and its task executing method | |
CN104657824B (en) | Modern power distribution net power supply plan automatic creation system | |
CN107169617A (en) | A kind of controller switching equipment state evaluation system | |
CN104182902A (en) | Monitoring method based on centralized operation and maintenance system of dispatching data network | |
CN106228300A (en) | A kind of distributed power source operation management system | |
CN103093303A (en) | Outage schedule management apparatus and method in ems | |
CN108460467A (en) | A kind of photovoltaic operation management system | |
Boardman | The role of integrated distribution management systems in smart grid implementations | |
Raza et al. | Towards improving technical performance of a 747 MW thermal power plant | |
CN107844873A (en) | One introduces a collection net coordinates performance whole-life cycle fee system and its management method | |
Judson et al. | Application of a resilience framework to military installations: A methodology for energy resilience business case decisions | |
Parzen et al. | Reducing energy system model distortions from unintended storage cycling through variable costs | |
CN101409396A (en) | Power usage management system for electric power system | |
CN114372594A (en) | Distributed power supply comprehensive analysis and safety management and control system | |
Payyala et al. | Sizing of distributed generation plant through techno-economic feasibility assessment | |
Armanda et al. | Plans for upgrading existing conventional 150 kv substations into digital substations in Sulawesi-Indonesia, accompanied by Financial Studies | |
JP4597076B2 (en) | Power system blackout work plan setting method and system | |
He et al. | Maintenance risk management in Daya Bay nuclear power plant: PSA model, tools and applications | |
CN107317393A (en) | Intelligent distribution network application management system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180327 |