CN107841683A - High speed heavy rail head edger roll ring and its preparation technology - Google Patents
High speed heavy rail head edger roll ring and its preparation technology Download PDFInfo
- Publication number
- CN107841683A CN107841683A CN201711098042.3A CN201711098042A CN107841683A CN 107841683 A CN107841683 A CN 107841683A CN 201711098042 A CN201711098042 A CN 201711098042A CN 107841683 A CN107841683 A CN 107841683A
- Authority
- CN
- China
- Prior art keywords
- edger roll
- roll ring
- heat
- high speed
- rail head
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C38/00—Ferrous alloys, e.g. steel alloys
- C22C38/02—Ferrous alloys, e.g. steel alloys containing silicon
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D13/00—Centrifugal casting; Casting by using centrifugal force
- B22D13/04—Centrifugal casting; Casting by using centrifugal force of shallow solid or hollow bodies, e.g. wheels or rings, in moulds rotating around their axis of symmetry
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
- C21D9/00—Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
- C21D9/40—Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for rings; for bearing races
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C38/00—Ferrous alloys, e.g. steel alloys
- C22C38/002—Ferrous alloys, e.g. steel alloys containing In, Mg, or other elements not provided for in one single group C22C38/001 - C22C38/60
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C38/00—Ferrous alloys, e.g. steel alloys
- C22C38/04—Ferrous alloys, e.g. steel alloys containing manganese
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C38/00—Ferrous alloys, e.g. steel alloys
- C22C38/06—Ferrous alloys, e.g. steel alloys containing aluminium
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C38/00—Ferrous alloys, e.g. steel alloys
- C22C38/18—Ferrous alloys, e.g. steel alloys containing chromium
- C22C38/40—Ferrous alloys, e.g. steel alloys containing chromium with nickel
- C22C38/44—Ferrous alloys, e.g. steel alloys containing chromium with nickel with molybdenum or tungsten
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C38/00—Ferrous alloys, e.g. steel alloys
- C22C38/18—Ferrous alloys, e.g. steel alloys containing chromium
- C22C38/40—Ferrous alloys, e.g. steel alloys containing chromium with nickel
- C22C38/46—Ferrous alloys, e.g. steel alloys containing chromium with nickel with vanadium
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C38/00—Ferrous alloys, e.g. steel alloys
- C22C38/18—Ferrous alloys, e.g. steel alloys containing chromium
- C22C38/40—Ferrous alloys, e.g. steel alloys containing chromium with nickel
- C22C38/52—Ferrous alloys, e.g. steel alloys containing chromium with nickel with cobalt
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
- C21D2211/00—Microstructure comprising significant phases
- C21D2211/008—Martensite
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Crystallography & Structural Chemistry (AREA)
- Heat Treatment Of Articles (AREA)
Abstract
The invention discloses a kind of high speed heavy rail head edger roll ring and its preparation technology, technique comprises the following steps:Step 1: it is chemically defined;C:2.55 2.95%;Si:0.50 1.0%;Mn:0.35 0.65%;Cr:3.5 3.85%;Ni:>=0.35%;Mo:1.6 1.95%;V:9.0 9.5%;Co:>=0.3%;P≤0.030%;S≤0.025%;Al:0≤0.03%;Re >=0.15%;Surplus is Fe and inevitable impurity;Step 2: centrifugal casting:Melting is carried out by electric arc furnaces, ensures that the chemical composition of molten steel meets the requirements;Before tapping deoxidation and anti-oxidation is carried out with aluminium block and glass dregs;Step 3: heat treatment:Blank carries out heat at 450 550 ° and unpacked, and immediately enters heat-treatment furnace and is made annealing treatment, is heat-treated again after roughing, then obtains qualified high-vanadium high-speed steel finished product after testing.The edger roll ring of the present invention is high-vanadium high-speed steel, improves wearability, the heat resistanceheat resistant crack performance of roll.
Description
Technical field
The present invention relates to a kind of high speed heavy rail head edger roll ring and its preparation technology.
Background technology
For the sane development of supporting National Highway railway, the country shares 4 high speed heavy rail production lines, is Anshan steel respectively
Company, bag Wuhan Iron and Steel Company, Baotou Iron and Steel Company, Panzhihua Iron, can roll after transformation in 2007~2010 years respectively
100mm processed high speed rail, to meet the development of the high ferro of country.Base steel collars with ultrahigh hardness super abrasive, high speed heavy rail
Producer is referred to as head edger roll ring, and the rolling position of this edger roll ring is located in contact tread of the rail with train, it is desirable to precision it
High, the features such as deflection is small, surface smoothness is good.Heavy-rail Production in China enterprise is all using the forging collars of Japanese Nissan import
Production, cost are high.
The content of the invention
It is an object of the invention to provide a kind of high speed heavy rail head edger roll ring and its preparation technology.
The technical scheme for realizing the object of the invention is the preparation technology of high speed heavy rail head edger roll ring, including following step
Suddenly:
Step 1: it is chemically defined;C:2.55-2.95%;Si:0.50-1.0%;Mn:0.35-0.65%;Cr:
3.5-3.85%;Ni:>=0.35%;Mo:1.6-1.95%;V:9.0-9.5%;Co:>=0.3%;P≤0.030%;S≤
0.025%;Al:0≤0.03%;Re >=0.15%;Surplus is Fe and inevitable impurity;
Step 2: centrifugal casting:Melting is carried out by electric arc furnaces, ensures that the chemical composition of molten steel meets the requirements;Tapping
It is preceding to carry out deoxidation and anti-oxidation with aluminium block and glass dregs;
Step 3: heat treatment:Blank carries out heat at 450-550 ° and unpacked, and immediately enters heat-treatment furnace and is made annealing treatment,
It is heat-treated again after roughing, then obtains qualified high-vanadium high-speed steel finished product after testing.
In the step 2, on the basis of liquidus temperature, 100-150 DEG C of tapping is heated.
In the step 2, during melting, add 0.20-0.30% steel alterant and carry out Metamorphism treatment, through 5-8 minute towns
It is quiet, poured into a mould after then stirring 0.5-1 minutes with electromagnetic mixer.
In the step 2,0.1-0.2% vanadium iron microparticle carries out Metamorphism treatment while adding steel alterant.
Present invention simultaneously provides the high speed heavy rail head edger roll ring that previous process to be utilized is prepared, edger roll ring base
Metallographic structure is:Martensitic matrix+and rich Nb, rich Mo, rich V wear resistant carbide+a small amount of retained austenite.
After employing above-mentioned technical proposal, the present invention has following positive effect:(1) edger roll ring of the invention is height
Vanadium high-speed steel, improve wearability, the heat resistanceheat resistant crack performance of roll.
(2) collars of the invention is using metal pattern production and the production of centrifuging process method, using metal die Quench and
The method of operating on centrifugal force, cause to obtain the qualified products of no casting flaw with collars product.
(3) present invention is directed to the characteristics of high vanadium is oxidizable, and casting process uses molten steel antioxidant all standing, and glass dregs connect
It is in a liquid state after touching high temperature liquid iron and floats on surface, is played a part of in molten iron in air insulated.
(4) chemical composition of the invention configures entirely different and conventional high-speed steels roll, improves rolling yield and shaped steel
Surface quality, more meet the market requirement, meet the specific demand of product.
(5) vanadium of the invention largely can be solid-solution in iron, played and crystallized closely knit, the matrix of effective hardened material, can prevent
Only coarse grains contribute to crystalline structure granular, and can improve quenching property.
Embodiment
(embodiment 1)
The high speed heavy rail head preparation technology of edger roll ring of the present embodiment, comprises the following steps:
Step 1: it is chemically defined;C:2.55-2.95%;Si:0.50-1.0%;Mn:0.35-0.65%;Cr:
3.5-3.85%;Ni:>=0.35%;Mo:1.6-1.95%;V:9.0-9.5%;Co:>=0.3%;P≤0.030%;S≤
0.025%;Al:0≤0.03%;Re >=0.15%;Surplus is Fe and inevitable impurity;
Step 2: centrifugal casting:Melting is carried out by electric arc furnaces, ensures that the chemical composition of molten steel meets the requirements;During melting,
The vanadium iron microparticle for adding 0.20-0.30% steel alterant and 0.1-0.2% carries out Metamorphism treatment progress Metamorphism treatment, through 5-8
Minute is calm, on the basis of being cast in liquidus temperature after then stirring 0.5-1 minutes with electromagnetic mixer, heats 100-150 DEG C
Tapping, deoxidation and anti-oxidation is carried out with aluminium block and glass dregs before tapping;
Step 3: heat treatment:Blank carries out heat at 450-550 ° and unpacked, and immediately enters heat-treatment furnace and is made annealing treatment,
It is heat-treated again after roughing, then obtains qualified high-vanadium high-speed steel finished product after testing.Edger roll ring base metallographic structure is:Horse
Family name's body matrix+and rich Nb, rich Mo, rich V wear resistant carbide+a small amount of retained austenite.
Particular embodiments described above, the purpose of the present invention, technical scheme and beneficial effect are carried out further in detail
Describe in detail it is bright, should be understood that the foregoing is only the present invention specific embodiment, be not intended to limit the invention, it is all
Within the spirit and principles in the present invention, any modification, equivalent substitution and improvements done etc., it should be included in the guarantor of the present invention
Within the scope of shield.
Claims (6)
1. the high speed heavy rail head preparation technology of edger roll ring, it is characterised in that comprise the following steps:
Step 1: it is chemically defined;C:2.55-2.95%;Si:0.50-1.0%;Mn:0.35-0.65%;Cr:3.5-
3.85%;Ni:>=0.35%;Mo:1.6-1.95%;V:9.0-9.5%;Co:>=0.3%;P≤0.030%;S≤
0.025%;Al:0≤0.03%;Re >=0.15%;Surplus is Fe and inevitable impurity;
Step 2: centrifugal casting:Melting is carried out by electric arc furnaces, ensures that the chemical composition of molten steel meets the requirements;Used before tapping
Aluminium block and glass dregs carry out deoxidation and anti-oxidation;
Step 3: heat treatment:Blank carries out heat at 450-550 ° and unpacked, and immediately enters heat-treatment furnace and is made annealing treatment, thick to add
It is heat-treated again after work, then obtains qualified high-vanadium high-speed steel finished product after testing.
2. the preparation technology of high speed heavy rail head edger roll ring according to claim 1, it is characterised in that:The step 2
In, on the basis of liquidus temperature, heat 100-150 DEG C of tapping.
3. the preparation technology of high speed heavy rail head edger roll ring according to claim 2, it is characterised in that:The step 2
In, during melting, add 0.20-0.30% steel alterant and carry out Metamorphism treatment, it is calm through 5-8 minutes, then use electromagnetic mixer
Poured into a mould after stirring 0.5-1 minutes.
4. the preparation technology of high speed heavy rail head edger roll ring according to claim 3, it is characterised in that:The step 2
In, 0.1-0.2% vanadium iron microparticle carries out Metamorphism treatment while adding steel alterant.
5. high speed heavy rail head edger roll ring, it is characterised in that:Produce to obtain using the preparation technology of claim 3.
6. high speed heavy rail head edger roll ring according to claim 5, it is characterised in that:The edger roll ring base metallographic group
It is woven to:Martensitic matrix+and rich Nb, rich Mo, rich V wear resistant carbide+a small amount of retained austenite.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711098042.3A CN107841683A (en) | 2017-11-09 | 2017-11-09 | High speed heavy rail head edger roll ring and its preparation technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711098042.3A CN107841683A (en) | 2017-11-09 | 2017-11-09 | High speed heavy rail head edger roll ring and its preparation technology |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107841683A true CN107841683A (en) | 2018-03-27 |
Family
ID=61681512
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711098042.3A Pending CN107841683A (en) | 2017-11-09 | 2017-11-09 | High speed heavy rail head edger roll ring and its preparation technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107841683A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111996439A (en) * | 2020-10-30 | 2020-11-27 | 常州凯达重工科技有限公司 | Large-scale high-chromium iron roll collar and preparation method of assembly type roll thereof |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6144154A (en) * | 1984-08-07 | 1986-03-03 | Hitachi Metals Ltd | Wear resistant alloy cast iron |
JPS6220854A (en) * | 1985-07-19 | 1987-01-29 | Sumitomo Metal Ind Ltd | Tool steel excellent in toughness |
CN105463308A (en) * | 2015-11-26 | 2016-04-06 | 常州凯达重工科技有限公司 | Centrifugal metal roll ring and manufacturing process thereof |
JP2016180168A (en) * | 2015-03-25 | 2016-10-13 | 日立金属株式会社 | Consecutive tinkering padding casting-made composite roll for rolling |
CN106282821A (en) * | 2016-08-17 | 2017-01-04 | 三鑫重工机械有限公司 | A kind of high-speed steel centrifugal compound steel core roll manufacture method of graphitiferous |
-
2017
- 2017-11-09 CN CN201711098042.3A patent/CN107841683A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6144154A (en) * | 1984-08-07 | 1986-03-03 | Hitachi Metals Ltd | Wear resistant alloy cast iron |
JPS6220854A (en) * | 1985-07-19 | 1987-01-29 | Sumitomo Metal Ind Ltd | Tool steel excellent in toughness |
JP2016180168A (en) * | 2015-03-25 | 2016-10-13 | 日立金属株式会社 | Consecutive tinkering padding casting-made composite roll for rolling |
CN105463308A (en) * | 2015-11-26 | 2016-04-06 | 常州凯达重工科技有限公司 | Centrifugal metal roll ring and manufacturing process thereof |
CN106282821A (en) * | 2016-08-17 | 2017-01-04 | 三鑫重工机械有限公司 | A kind of high-speed steel centrifugal compound steel core roll manufacture method of graphitiferous |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111996439A (en) * | 2020-10-30 | 2020-11-27 | 常州凯达重工科技有限公司 | Large-scale high-chromium iron roll collar and preparation method of assembly type roll thereof |
CN111996439B (en) * | 2020-10-30 | 2021-03-23 | 常州凯达重工科技有限公司 | Large-scale high-chromium iron roll collar and preparation method of assembly type roll thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104775065B (en) | A kind of high toughness wear resistant magnesium iron rocking arm and preparation method thereof | |
CN104148399B (en) | For abrasion-resistant roller of mill stand and preparation method thereof in steel rolling | |
CN101671792B (en) | Spring steel and preparation method thereof | |
CN100404152C (en) | High speed steel composite roll and its preparing method | |
CN100574910C (en) | Centrifugal casting half steel/steel/graphite steel composite roll collar and preparation method thereof | |
CN104264043B (en) | A kind of centrifugal casting wear-resistant high speed steel composite roll and preparation method thereof | |
CN103614634B (en) | Alloy spring silk and preparation method thereof | |
CN109252104A (en) | High-speed steel and production method thereof | |
CN108754068B (en) | High-speed steel roll collar for high-speed wire pre-finish rolling and preparation method thereof | |
CN102676946B (en) | Segmented hardness low-alloy steel hammer head and manufacturing method thereof | |
CN103526125A (en) | Semi-steel roll and manufacturing method thereof | |
CN110257695B (en) | Copper-containing CADI (copper-activated carbon dioxide) wear-resistant material and heat treatment process thereof | |
CN112695242B (en) | Cogging roll and preparation method thereof | |
CN104878296A (en) | High vanadium anti-wear alloy material for rolling mill guide roller and rolling mill guide roller heat treatment method | |
CN107760983A (en) | A kind of production method of low-alloy super-strength steel and its casting | |
CN101773935B (en) | High speed steel compound roll and manufacture method thereof | |
CN102864383B (en) | Low alloy steel | |
CN110964973A (en) | High-manganese CADI and heat treatment method thereof | |
CN106544596A (en) | A kind of aluminium alloying high-boron high-speed steel composite roller and preparation method thereof | |
CN105648325A (en) | High-tenacity high-speed steel and production technique thereof | |
CN103215526B (en) | Centrifugally-cast high-carbon high-alloy steel and heat treatment method thereof | |
CN106244908A (en) | A kind of hot continuous rolling finishing roll and manufacture method thereof | |
CN110042324B (en) | Container corner fitting production process | |
CN108004458A (en) | A kind of high ferrochrome roll of the modified of tungsten Metamorphism treatment | |
CN107841683A (en) | High speed heavy rail head edger roll ring and its preparation technology |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180327 |
|
RJ01 | Rejection of invention patent application after publication |