CN107834431A - A kind of downward Evacuation method of transmission line of electricity under power-off condition - Google Patents

A kind of downward Evacuation method of transmission line of electricity under power-off condition Download PDF

Info

Publication number
CN107834431A
CN107834431A CN201711193226.8A CN201711193226A CN107834431A CN 107834431 A CN107834431 A CN 107834431A CN 201711193226 A CN201711193226 A CN 201711193226A CN 107834431 A CN107834431 A CN 107834431A
Authority
CN
China
Prior art keywords
rescue
personnel
wire
ground
rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711193226.8A
Other languages
Chinese (zh)
Inventor
赵生传
许永刚
宋晓东
朱坤双
怀亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Shandong Electric Power Co Ltd
Maintenance Branch of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Shandong Electric Power Co Ltd
Maintenance Branch of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Shandong Electric Power Co Ltd, Maintenance Branch of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201711193226.8A priority Critical patent/CN107834431A/en
Publication of CN107834431A publication Critical patent/CN107834431A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
    • AHUMAN NECESSITIES
    • A62LIFE-SAVING; FIRE-FIGHTING
    • A62BDEVICES, APPARATUS OR METHODS FOR LIFE-SAVING
    • A62B1/00Devices for lowering persons from buildings or the like

Landscapes

  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Emergency Lowering Means (AREA)

Abstract

The invention discloses a kind of downward Evacuation method of the transmission line of electricity under power-off condition, including:Height rescue personnel carry the main rope of rescue and safe short rope is reached above the stranded wire of trapped personnel, carry out self-protection;Height rescue personnel set personal protection station above operation, connect safe short rope:Ground rescue personnel will decline protector and is linked into safety belt protection ring in advance, locks and locks a door;After rescuing main rope fag end landing, anticreep knot is accomplished fluently, selects appropriate location to rescue main rope loaded on protector is declined, protection is carried out after self-test and is prepared;Height rescue personnel, which carry, rescues main rope fag end, drops to trapped personnel position along safe short rope using protector is declined;The main lock connection trapped personnel safety belt back hanging point of main rope fag end will be rescued;Height rescue personnel cooperate with ground rescue personnel C trapped personnel stress being transferred to main rope:Rescue personnel at the uniform velocity discharges the main rope of rescue using protector is declined, and trapped personnel is evacuated downwards to ground, ground rescue personnel D and scooped out, and completes rescue.

Description

A kind of downward Evacuation method of transmission line of electricity under power-off condition
Technical field
The invention discloses a kind of downward Evacuation method of transmission line of electricity under power-off condition, a kind of particularly power failure feelings The downward Evacuation method of transmission line of electricity under condition.
Background technology
In recent years, China's extra-high voltage, supergrid Large scale construction are gone into operation.Extra-high voltage, extra high voltage network have Region span is wide, distance to the ground is high, path circumstances are complicated, " three across " are (logical across high-speed railway, highway and important transmission of electricity Road) the features such as risk is big, meteorological disaster is changeable.The unit such as State Grid Corporation of China and each transmission line construction, O&M is worked out, is real A series of management and control measures of prevention high fallings are applied;But tower, cabling are stepped in transmission line of electricity, annex installation, tight unwrapping wire, is tested During a large amount of work high above the ground such as receipts, operating personnel is it is possible to because of burst feelings such as health, operating environment, wire torsions Condition, occur high falling, by safety belt for a long time suspention in the air will produce suspention wound (safety belt suspention syndrome) and by Consciousness is gradually lost, it is very urgent without self-saving ability, rescue time plus factors such as frightened, impact injuries.If fall generation In " three across " the Great span section such as section or high mountain, valley, river, rescue difficulty will be bigger.Transmission line of electricity is located at field mostly Remote districts, limited by factors such as landform, microclimate, wire elasticity, road traffics, conventional work high above the ground Work tool, high-altitude The rescue modes such as breakdown lorry, helicopter suffer from limitation;
And build (structure) different from common high level because of transmission line high-altitude rescue and build rescue, rescue personnel generally requires to have The special expertises such as steel tower climbing, wire displacement, Society rescue strength (People's Armed Police, fire brigade, rescue group among the people etc.) is often to circuit Height rescue special expertise grasps deficiency, can not effectively implement rescue work.A kind of it is, therefore, desirable to provide rescue that can implement Method.
The content of the invention
It is high during the present invention is for 330 kilovolts and the super of above, extra-high voltage alternating current-direct current transmission line operation Idle job personnel are fallen, and operating personnel is suspended in into wire (bar after safety belt back hanging point and falling protective rope stress Tower) lower section, when losing the ability to act saved oneself, a kind of rescue mode that he rescues is proposed, is specifically power transmission line under power-off condition Evacuation method under road direction, the blank of China's transmission line high-altitude rescue is filled up;220 kilovolts and following transmission line of electricity can Implement.
The technical solution adopted by the present invention is:
The downward Evacuation method of transmission line of electricity, comprises the following steps under a kind of power-off condition:
Step 1 reports application line outage from work permit people to scheduling, and asks to rescue;
Step 2 rescue personnel is in place.Rescue director and formulate rescue method, specify rescue method and the task division of labor, rescue Personnel confirm.Arrange Work tool:Rescue tool, the electroscope of relevant voltage grade of pass the test, ground wire, insulating glove, Rope ladder, backup protection rope etc.;Multiple-circuit on same tower single back line (DC line monopole), which has a power failure, should also prepare a pass the test full set Screening clothing, universal meter, insulating non-polar rope circle.After rescue director obtains the instruction of work permit people's line outage, organize Field rescue works.
Step 3 prevents induced electricity from hurting sb.'s feelings
(1) insulated static wire should be regarded as electrical body;The distance between rescue personnel and insulated static wire are no less than 0.4m (1000kV 0.6m), such as need to be in operation on insulated static wire, and application of grounding line or personal safety wire are reliable by its Ground connection is carried out using equipotential mode;
(2) multiple-circuit on same tower single back line has a power failure (power failure of DC line monopole), carries out rescue work on this section of circuit Make, height rescue personnel answer the qualified a full set of screening clothing of wearing test, and each position should connect reliably;Detected before work with universal meter Screening clothing resistance, the resistance value between a whole set of screening clothing distalmost end cannot be greater than 20 Ω;
(3) circuit is rescued such as above another loop line road, and must be rescued under the circuit not power-off condition During work, safe and reliable measure should be taken;Safety measure should be approved to execute after staff discusses fully through work area;
Step 4 prevents from stepping on powered shaft tower or mistakenly entering into charged side cross-arm by mistake, point out license, height rescue personnel electrical verification, Hang ground wire;
(1) on single back line to point out permission step as follows:
1. before rescue, all rescue personnels face steel tower tower number plate side, rescue director explains rescue to operating personnel Task and personnel's division of labor;
The personal rescue work undertaken 2. rescue personnel briefly rehearses respectively, and it is errorless through rescuing director's confirmation;
3. before stepping on tower, rescue personnel checks line name, pylon No., colour code, and loudly reads aloud;
4. after rescue point duty people's confirmation, the rescue personnel that orders can step on tower;
After 5. rescue personnel reaches precalculated position, self-protection is carried out, using qualified electroscope, wears insulating glove, identified Attaching ground wire, connection reliably, first connect earth terminal, are followed by conductor wire end, not handy hand directly contacts ground connection immediately after true no-voltage Line.;
6. rescue personnel reports to rescue director, " ground wire has been hung up properly!", after rescue director checks, order is rescued The personnel of helping start to rescue.
(2) on double-circuit line to point out permission step as follows:
1. before rescue, all rescue personnels face steel tower tower number plate side, rescue director explains rescue to operating personnel Task and personnel's division of labor;, and explicitly point out the position of dead line;
The content that rescue director explains 2. rescue personnel briefly rehearses respectively, and the personal rescue task undertaken, and It is errorless through rescuing director's confirmation;
3. before stepping on tower, rescue personnel checks line name, pylon No., colour code, and loudly reads aloud;
4. after rescuing director's confirmation, the rescue personnel that orders can step on tower;
5. rescue personnel is stepped on to cross-arm respectively, and an arm level is stretched to the orientation for representing dead line, rescue Line name, the colour code that director is checked on circuit tower number plate are errorless, make the gesture of license and send the order that can enter Afterwards, rescue personnel is allowed for access dead line side cross-arm;
6. rescue personnel in place after, carry out personal protection, using qualified electroscope, wear insulating glove, identify true no-voltage Attaching ground wire, connection reliably, first connect earth terminal, are followed by conductor wire end, not handy hand directly contacts ground wire immediately afterwards;
7. rescue personnel reports " ground wire has been hung up properly " to rescue director, after rescue director checks, order is rescued The personnel of helping start to rescue.
Step 5 height rescue personnel are under steel tower to wire:
(1), should be according to development claimed below to wire under tangent tower:1. shifted up and down along porcelain, glass insulator, after Standby protection rope length degree should meet job requirements;2. shifted up and down along composite insulator, the porcelain for spraying RTV, glass insulator etc. Rope ladder should be used, rope ladder will be tightened up and colligation is firm;Forbid to trample and climb composite insulator and spraying RTV porcelain, glass it is exhausted Edge;
(2) wire is entered along strain insulator string:Rescue personnel should tie up to backup protection rope on insulator chain, and accompany Enter to bring into;
Step 6 height rescue personnel cabling is to setting;High-altitude, ground staff cooperate, and carry out rescue work;
(1) height rescue personnel and ground rescue personnel are before being rescued, safe wearing cap;And should use have standby guarantor The dual control back belt type all-position safety band of shield rope or speed difference self-locking device;
(2) height rescue personnel, which carry, rescues above main rope and the stranded wire of safe short rope arrival trapped personnel, carries out certainly I protects;
(3) height rescue personnel set personal protection station above operation, connect safe short rope:It is specific as follows:
3-1 will be linked into wire with the safe short rope that K locks;
3-2 latches two self-protection K into wire;
3-3 sets up protection station on wire with wirerope bandlet, two main locks, and (protection station rack sets optional two shapings bandlet Instead of), and two main locks of the main rope one end fag end through protection station will be rescued, fag end is accomplished fluently stevedore knot, rescued with main lock hanging On personal security band, the main rope other end of smooth-going decentralization to entire rope to ground;
3-4 is connected to oneself safety belt protection ring by protector is declined, and locks and locks a door, and installed in safe short rope and tightens up remaining Rope is locked after making decline protector stress;
Centre of body weight is transferred to below wire by 3-5.
(4) decline protector is linked into safety belt protection ring by ground rescue personnel in advance, is locked and is locked a door;Rescue main rope fag end After landing, anticreep knot is accomplished fluently, selects appropriate location to rescue main rope loaded on protector is declined, protection is carried out after self-test and is prepared;
(5) height rescue personnel, which carry, rescues main rope fag end, oppressive using declining protector along safe short rope and dropping to Member position;The main lock connection trapped personnel safety belt back hanging point of main rope fag end will be rescued;
(6) after height rescue personnel and ground rescue personnel communication are errorless, cooperate with and trapped personnel stress is transferred to main rope:
6-1 height rescue personnel's both legs hold trapped personnel oxter, and firmly lifting upwards, makes trapped personnel rise on a small quantity;
6-2 ground rescue personnel tightens up protection rope using protection act above standard as far as possible simultaneously, assists firmly and pays attention to Rope closing;
6-3 height rescues personnel release the connection of trapped personnel and suspension protection rope, and captive body wt is transferred to Rescue on main rope;
(7) ground rescue personnel at the uniform velocity discharges the main rope of rescue using protector is declined, and trapped personnel is evacuated downwards to ground Face, another ground rescue personnel scoop out, and complete rescue.
After the completion of step 7 rescue task, height rescue personnel instrument carries cabling and returned, to steel tower.It is true to rescue director The instrument and material recognize on wire, do not left on insulator chain, order to remove the ground wire that job site both ends are hung, remove When first tear conductor wire end open, after disconnect ground terminal, not handy hand directly contacts ground wire, confirms on shaft tower and wire without lower beam after legacy Tower returns to ground;
Step 8 rescues director and reports rescue work termination to work permit people;
Step 9 work permit people reports the work termination to scheduling, applies for circuit power transmission.
Further, when backup protection rope is more than 3m, buffer should be used.
Further, apart from operation of the ground more than 80 meters or Great span, extreme terrain operation, every work high above the ground personnel Reliable communication tool (such as intercom with Earphone with microphone) should be equipped with, is kept in communication with care provider unimpeded.
Further, work high above the ground is carried out under low temperature or hot environment, warming or measures of heat control should be taken.
Further, work high above the ground personnel should wear cotton long sleeves work clothes, soft primer spikes.
Further, when wire where indicator of trapped personnel does not twist, rescue personnel is directly reached stranded by cabling Personnel positions are rescued;When wire where indicator of trapped personnel twists, according to arrangement of conductor, optional in the following manner is entered Enter trapped personnel position to be rescued.
1. the horizontally arranged mode of wire (single loop, direct current):Rescue personnel is adopted by the ground wire (or optical cable) above wire Rescued with instruments such as coaster, terraced head, rope ladders into indicator of trapped personnel position (both sides phase) or ground wire coaster, ladder are passed through by ground Head, the mode of rope ladder are rescued into indicator of trapped personnel neighbouring position (middle phase);
2. wire vertical arrangement:In lower phase conductor, rescue personnel is entered stranded indicator of trapped personnel by middle phase conductor Personnel positions are rescued;In middle phase conductor, rescue personnel is entered indicator of trapped personnel by upper phase conductor into indicator of trapped personnel position Row rescue;For indicator of trapped personnel in upper phase conductor, rescue personnel enters indicator of trapped personnel position by ground wire (or optical cable) above wire Rescued.
Beneficial effects of the present invention are as follows:
The rescue mode is adapted to the operation under power down mode, and this rescue mode cost is than relatively low, and rescue mode It is fairly simple, there is extensive use value.The rescue mode of the present invention, suitable for 330 kilovolts and above it is super, Phase operation under single loop alternating current circuit, DC line or double loop alternating current circuit in extra-high voltage alternating current-direct current transmission line of electricity.High-altitude When operating personnel falls, by other rescue personnels up close to after trapped personnel, after being disengaged it from by lifting, release Trapped personnel drops to ground;It can will suspend skyborne trapped personnel in midair quickly to save, avoid accident.
The rescue mode of the present invention, the setting at station is protected by operation, it is ensured that the peace in height rescue person works Entirely, and in operation protect station bottom that safe short rope is set, height rescue personnel can be rapidly achieved trapped personnel by safe short rope Position, after rescue aid and trapped personnel are reliably connected, ground rescue personnel release trapped personnel to ground, operation is succinct, More rapidly trapped personnel can be rescued, save the rescue time.
Brief description of the drawings
The Figure of description for forming the part of the application is used for providing further understanding of the present application, and the application's shows Meaning property embodiment and its illustrate be used for explain the application, do not form the improper restriction to the application.
The implementation schematic diagram of Fig. 1 present invention;
Embodiment
It is noted that described further below is all exemplary, it is intended to provides further instruction to the application.It is unless another Indicate, all technologies used herein and scientific terminology are with usual with the application person of an ordinary skill in the technical field The identical meanings of understanding.
It should be noted that term used herein above is merely to describe embodiment, and be not intended to restricted root According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singulative It is also intended to include plural form, additionally, it should be understood that, when in this manual using term "comprising" and/or " bag Include " when, it indicates existing characteristics, step, operation, device, component and/or combinations thereof.
High-altitude circuit evacuates downwards drop emergency management and rescue method under blackout condition, comprises the following steps:
1.1 report application line outage from work permit people to scheduling, and ask to rescue;
1.2 rescue personnels are in place.Rescue director and formulate rescue method, specify rescue method and the task division of labor, rescue people Member confirms.Arrange Work tool:It is rescue tool, the electroscope of relevant voltage grade of pass the test, ground wire, insulating glove, soft Ladder, backup protection rope etc.;Multiple-circuit on same tower single back line (DC line monopole), which has a power failure, should also prepare a full set of screen of pass the test Cover clothes, universal meter, insulating non-polar rope circle.After rescue director obtains the instruction of work permit people's line outage, organize existing Field rescue work.
1.3 prevent induced electricity from hurting sb.'s feelings
(1) insulated static wire should be regarded as electrical body.The distance between rescue personnel and insulated static wire are no less than 0.4m (1000kV 0.6m), such as need to be in operation on insulated static wire, and application of grounding line or personal safety wire are reliable by its Ground connection is carried out using equipotential mode.
(2) multiple-circuit on same tower single back line has a power failure (power failure of DC line monopole), carries out rescue work on this section of circuit Make, height rescue personnel answer the qualified a full set of screening clothing of wearing test, and each position should connect reliably.Detected before work with universal meter Screening clothing resistance, the resistance value between a whole set of screening clothing distalmost end cannot be greater than 20 Ω.Sling in dead line side or to During the objects such as lower let-down instrument, material, it should be transmitted using insulating non-polar rope circle, object should be kept with live wire《Safety》Following table Regulation safe distance.
Table is neighbouring or intersects the safe distance of other power lines work
(3) circuit is rescued such as above another loop line road, and must be rescued under the circuit not power-off condition During work, safe and reliable measure should be taken.Safety measure should be approved to execute after staff discusses fully through work area.Arrange Apply and should ensure that:1. rescuing the wire of ground wire rope of circuit etc. and alive circuit should keep《Safety》The regulation safety of following table Distance.2. having prevents ground wire from coming off, slides the back-up protection measure run.
Table is neighbouring or intersects the safe distance of other power lines work
1.4 prevent from stepping on powered shaft tower or mistakenly entering into charged side cross-arm by mistake
(1) license (single back line) is pointed out
1. before rescue, all rescue personnels face steel tower tower number plate side, rescue director explains rescue to operating personnel Task and personnel's division of labor;
The personal rescue work undertaken 2. rescue personnel briefly rehearses respectively, and it is errorless through rescuing director's confirmation;
3. before stepping on tower, rescue personnel checks line name, pylon No., colour code, and loudly reads aloud;
4. after rescue point duty people's confirmation, the rescue personnel that orders can step on tower;
5. after rescue personnel reaches precalculated position, carrying out self-protection, electrical verification will use relevant voltage of pass the test etc. The electroscope of level, insulating glove should be worn during electrical verification, and have special messenger's monitoring;After the clear and definite no-voltage of circuit experience, it should work immediately Two sections of location hangs ground wire;During installing ground wire, earth terminal should be first connect, is followed by conductor wire end, ground wire should contact good, connection Should be reliable.Attaching ground wire should use insulating bar or special insulating cord, and human body must not touch ground wire or unearthed wire;
6. rescue personnel reports to rescue director, " ground wire has been hung up properly!", after rescue director checks, order is rescued The personnel of helping start to rescue.
(2) license (double-circuit line) is pointed out
1. before rescue, all rescue personnels face steel tower tower number plate side, rescue director explains rescue to operating personnel Task and personnel's division of labor;, and explicitly point out the position of dead line;
The content that rescue director explains 2. rescue personnel briefly rehearses respectively, and the personal rescue task undertaken, and It is errorless through rescuing director's confirmation;
3. before stepping on tower, rescue personnel checks line name, pylon No., colour code, and loudly reads aloud;
4. after rescuing director's confirmation, the rescue personnel that orders can step on tower;
5. rescue personnel is stepped on to cross-arm respectively, and an arm level is stretched to the orientation for representing dead line, rescue Director check circuit tower number plate on line name, colour code it is errorless, make the gesture of license and send " upper, middle and lower mutually can enter Enter ×× kV ×× lines cross-arm " order after, rescue personnel is allowed for access dead line side cross-arm;
6. after rescue personnel reaches precalculated position, carrying out self-protection, electrical verification will use relevant voltage of pass the test etc. The electroscope of level, insulating glove should be worn during electrical verification, and have special messenger's monitoring;After the clear and definite no-voltage of circuit experience, it should work immediately Two sections of location hangs ground wire;During installing ground wire, earth terminal should be first connect, is followed by conductor wire end, ground wire should contact good, connection Should be reliable.Attaching ground wire should use insulating bar or special insulating cord, and human body must not touch ground wire or unearthed wire;
7. rescue personnel reports " ground wire has been hung up properly " to rescue director, after rescue director checks, order is rescued The personnel of helping start to rescue;
1.5 height rescue personnel are under steel tower to wire:
(1), should be according to development claimed below to wire under tangent tower:1. shifted up and down along porcelain, glass insulator, after Standby protection rope length degree should meet job requirements;2. shifted up and down along composite insulator, the porcelain for spraying RTV, glass insulator etc. Rope ladder should be used, rope ladder will be tightened up and colligation is firm;Forbid to trample and climb composite insulator and spraying RTV porcelain, glass it is exhausted Edge;
(2) wire is entered along strain insulator string:Rescue personnel should tie up to backup protection rope on insulator chain, and accompany Enter to bring into;
1.6 height rescue personnel cablings are to setting;High-altitude, ground staff cooperate, and carry out rescue work;
(1) height rescue personnel and ground rescue personnel are before being rescued, safe wearing cap;And should use have standby guarantor The dual control back belt type all-position safety band of shield rope or speed difference self-locking device;
(2) height rescue personnel, which carry, rescues above main rope and the stranded wire of safe short rope arrival trapped personnel, carries out certainly I protects;
(3) height rescue personnel set personal protection station above operation, connect safe short rope:It is specific as follows:
3-1 will be linked into wire with the safe short rope that K locks;
3-2 latches two self-protection K into wire;
3-3 sets up protection station on wire with wirerope bandlet, two main locks, and (protection station rack sets optional two shapings bandlet Instead of), and two main locks of the main rope one end fag end through protection station will be rescued, fag end is accomplished fluently stevedore knot, rescued with main lock hanging On personal security band, the main rope other end of smooth-going decentralization to entire rope to ground;
3-4 is connected to oneself safety belt protection ring by protector is declined, and locks and locks a door, and installed in safe short rope and tightens up remaining Rope is locked after making decline protector stress;
Centre of body weight is transferred to below wire by 3-5.
(4) decline protector is linked into safety belt protection ring by ground rescue personnel in advance, is locked and is locked a door;Rescue main rope fag end After landing, anticreep knot is accomplished fluently, selects appropriate location to rescue main rope loaded on protector is declined, protection is carried out after self-test and is prepared;
(5) height rescue personnel, which carry, rescues main rope fag end, oppressive using declining protector along safe short rope and dropping to Member position;The main lock connection trapped personnel safety belt back hanging point of main rope fag end will be rescued;
(6) after height rescue personnel and ground rescue personnel communication are errorless, cooperate with and trapped personnel stress is transferred to main rope:
6-1 height rescue personnel's both legs hold trapped personnel oxter, and firmly lifting upwards, makes trapped personnel rise on a small quantity;
6-2 ground rescue personnel tightens up protection rope using protection act above standard as far as possible simultaneously, assists firmly and pays attention to Rope closing;
6-3 height rescues personnel release the connection of trapped personnel and suspension protection rope, and captive body wt is transferred to Rescue on main rope;
(7) ground rescue personnel at the uniform velocity discharges the main rope of rescue using protector is declined, and trapped personnel is evacuated downwards to ground Face, another ground rescue personnel scoop out, and complete rescue.
After the completion of 1.7 rescue tasks, height rescue personnel instrument carries cabling and returned, to steel tower.Director is rescued to confirm The instrument and material do not left on wire, on insulator chain, order to remove the ground wire that job site both ends are hung, during dismounting First tear conductor wire end open, after disconnect ground terminal, not handy hand directly contacts ground wire, confirms on shaft tower and wire without lower shaft tower after legacy Return to ground;
1.8 rescue directors report rescue work termination to work permit people;
1.9 work permit people report the work termination to scheduling, apply for circuit power transmission.
Further, when backup protection rope is more than 3m, buffer should be used.
Further, apart from operation of the ground more than 80 meters or Great span, extreme terrain operation, every work high above the ground personnel Reliable communication tool (such as intercom with Earphone with microphone) should be equipped with, is kept in communication with care provider unimpeded.
Further, work high above the ground is carried out under low temperature or hot environment, warming or measures of heat control should be taken.
Further, when wire where indicator of trapped personnel does not twist, rescue personnel is directly reached stranded by cabling Personnel positions are rescued;When wire where indicator of trapped personnel twists, according to arrangement of conductor, optional in the following manner is entered Enter trapped personnel position to be rescued.
1. the horizontally arranged mode of wire (single loop, direct current):Rescue personnel is adopted by the ground wire (or optical cable) above wire Rescued with instruments such as coaster, terraced head, rope ladders into indicator of trapped personnel position (both sides phase) or ground wire coaster, ladder are passed through by ground Head, the mode of rope ladder are rescued into indicator of trapped personnel neighbouring position (middle phase);
2. wire vertical arrangement:In lower phase conductor, rescue personnel is entered stranded indicator of trapped personnel by middle phase conductor Personnel positions are rescued;In middle phase conductor, rescue personnel is entered indicator of trapped personnel by upper phase conductor into indicator of trapped personnel position Row rescue;For indicator of trapped personnel in upper phase conductor, rescue personnel enters indicator of trapped personnel position by ground wire (or optical cable) above wire Rescued.
The rescue bag of above-mentioned rescue mode is as follows:
Specific equipment is introduced:
Although above-mentioned the embodiment of the present invention is described with reference to accompanying drawing, model not is protected to the present invention The limitation enclosed, one of ordinary skill in the art should be understood that on the basis of technical scheme those skilled in the art are not Need to pay various modifications or deformation that creative work can make still within protection scope of the present invention.

Claims (8)

1. a kind of downward Evacuation method of transmission line of electricity under power-off condition, it is characterised in that comprise the following steps:
Step 1 reports application line outage from work permit people to scheduling, and asks to rescue;
Step 2 rescue personnel in place, after rescue director obtains the instruction of work permit people's line outage, rescue by the scene of organizing Help work;
Step 3 prevents induced electricity from hurting sb.'s feelings;
Step 4 prevents from stepping on powered shaft tower or mistakenly entering into charged side cross-arm by mistake, carries out pointing out license, height rescue personnel electrical verification, hang Ground wire;
Step 5 height rescue personnel are under steel tower to wire:
Step 6 height rescue personnel cabling is to setting;High-altitude, ground staff cooperate, and carry out rescue work;
(1) height rescue personnel and ground rescue personnel are before being rescued, safe wearing cap;And should use have backup protection rope Or the dual control back belt type all-position safety band of speed difference self-locking device;
(2) height rescue personnel carry the main rope of rescue and safe short rope is reached above the stranded wire of trapped personnel, carry out self and protect Shield;
(3) height rescue personnel set personal protection station above operation, connect safe short rope:It is specific as follows:
(4) decline protector is linked into safety belt protection ring by ground rescue personnel in advance, is locked and is locked a door;Rescue main rope fag end landing Afterwards, anticreep knot is accomplished fluently, selects appropriate location to rescue main rope loaded on protector is declined, protection is carried out after self-test and is prepared;
(5) height rescue personnel, which carry, rescues main rope fag end, drops to trapped personnel position along safe short rope using protector is declined Put;The main lock connection trapped personnel safety belt back hanging point of main rope fag end will be rescued;
(6) after height rescue personnel and ground rescue personnel communication are errorless, cooperate with and trapped personnel stress is transferred to main rope:
(7) ground rescue personnel at the uniform velocity discharges the main rope of rescue using protector is declined, and trapped personnel is evacuated downwards to ground, separately An outer ground rescue personnel scoops out, and completes rescue;
After the completion of step 7 rescue task, height rescue personnel instrument carries cabling and returned, to steel tower;Rescue director confirms to lead The instrument and material do not left on line, on insulator chain, order to remove the ground wire that job site both ends are hung, first during dismounting Tear conductor wire end open, after disconnect ground terminal, not handy hand directly contacts ground wire, confirms to return without lower shaft tower after legacy on shaft tower and wire Go back to ground;
Step 8 rescues director and reports rescue work termination to work permit people;
Step 9 work permit people reports the work termination to scheduling, applies for circuit power transmission.
2. high-altitude transmission line of electricity evacuates downwards drop emergency management and rescue method under blackout condition as claimed in claim 1, its feature exists In the detailed process of the step (3) in step 6 is as follows:
3-1 will be linked into wire with the safe short rope that K locks;
3-2 latches two self-protection K into wire;
3-3 sets up protection station on wire with wirerope bandlet, two main locks, and (protection station rack sets optional two shaping bandlet generations For), and two main locks of the main rope one end fag end through protection station will be rescued, fag end accomplishes fluently stevedore knot, with main lock hanging in rescue people On member's safety belt, the main rope other end of smooth-going decentralization to entire rope to ground;
3-4 is connected to oneself safety belt protection ring by protector is declined, and locks and locks a door, and installed in safe short rope and tightens up remaining rope and makes It is locked after declining protector stress;
Centre of body weight is transferred to below wire by 3-5.
3. high-altitude transmission line of electricity evacuates downwards drop emergency management and rescue method under blackout condition as claimed in claim 1, its feature exists In the detailed process of the step (6) in step 3 is as follows:
6-1 height rescue personnel's both legs hold trapped personnel oxter, and firmly lifting upwards, makes trapped personnel rise on a small quantity;
6-2 ground rescue personnel tightens up protection rope using protection act above standard as far as possible simultaneously, assists firmly and pays attention to rope closing;
6-3 height rescues personnel release the connection of trapped personnel and suspension protection rope, and captive body wt is transferred into rescue On main rope.
4. rescue mode as claimed in claim 1, it is characterised in that apart from operation of the ground more than 80 meters or Great span, spy Different landform operation, height rescue staffing have communication tool, kept in communication with care provider unimpeded.
5. rescue mode as claimed in claim 1, it is characterised in that when wire where indicator of trapped personnel twists, and wire Horizontally arranged mode:Rescue personnel enters indicator of trapped personnel position both sides by the ground wire above wire or optical cable using ground wire coaster Mutually rescued or entered by ground by way of insulated flexible ladder adds ground wire coaster in indicator of trapped personnel neighbouring position and mutually rescued Help.
6. rescue mode as claimed in claim 1, it is characterised in that when wire where indicator of trapped personnel twists, and wire Vertical arrangement:In lower phase conductor, rescue personnel is rescued indicator of trapped personnel by middle phase conductor into indicator of trapped personnel position Help;In middle phase conductor, rescue personnel is rescued indicator of trapped personnel by upper phase conductor into indicator of trapped personnel position;Indicator of trapped personnel In upper phase conductor, rescue personnel is rescued by ground wire above wire or optical cable into indicator of trapped personnel position.
7. rescue mode as claimed in claim 1, it is characterised in that point out permission step on single back line in step 4 It is as follows:
1. before rescue, all rescue personnels face steel tower tower number plate side, rescue director explains rescue task to operating personnel And personnel's division of labor;
The personal rescue work undertaken 2. rescue personnel briefly rehearses respectively, and it is errorless through rescuing director's confirmation;
3. before stepping on tower, rescue personnel checks line name, pylon No., colour code, and loudly reads aloud;
4. after rescue point duty people's confirmation, the rescue personnel that orders can step on tower;
After 5. rescue personnel reaches precalculated position, self-protection is carried out, using qualified electroscope, wears insulating glove, identifies true nothing Attaching ground wire, connection reliably, first connect earth terminal, are followed by conductor wire end, not handy hand directly contacts ground wire immediately after voltage.;
6. rescue personnel reports to rescue director, " ground wire has been hung up properly!", after rescue director checks, order rescue people Member starts to rescue.
8. rescue mode as claimed in claim 1, it is characterised in that point out permission step on double-circuit line in step 4 It is as follows:
1. before rescue, all rescue personnels face steel tower tower number plate side, rescue director explains rescue task to operating personnel And personnel's division of labor;, and explicitly point out the position of dead line;
The content that rescue director explains 2. rescue personnel briefly rehearses respectively, and the personal rescue task undertaken, and through rescuing It is errorless to help director's confirmation;
3. before stepping on tower, rescue personnel checks line name, pylon No., colour code, and loudly reads aloud;
4. after rescuing director's confirmation, the rescue personnel that orders can step on tower;
5. rescue personnel is stepped on to cross-arm respectively, and an arm level is stretched to the orientation for representing dead line, rescue is responsible for People check circuit tower number plate on line name, colour code it is errorless, make the gesture of license and send " upper, middle and lower mutually can enter After the order of so-and-so kV so-and-so line cross-arm ", rescue personnel is allowed for access dead line side cross-arm;
6. rescue personnel in place after, carry out personal protection, using qualified electroscope, wear insulating glove, identify and stand after true no-voltage That is attaching ground wire, connection is reliable, first connects earth terminal, is followed by conductor wire end, not handy hand directly contacts ground wire;
7. rescue personnel reports " ground wire has been hung up properly " to rescue director, after rescue director checks, order rescue people Member starts to rescue.
CN201711193226.8A 2017-11-24 2017-11-24 A kind of downward Evacuation method of transmission line of electricity under power-off condition Pending CN107834431A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711193226.8A CN107834431A (en) 2017-11-24 2017-11-24 A kind of downward Evacuation method of transmission line of electricity under power-off condition

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711193226.8A CN107834431A (en) 2017-11-24 2017-11-24 A kind of downward Evacuation method of transmission line of electricity under power-off condition

Publications (1)

Publication Number Publication Date
CN107834431A true CN107834431A (en) 2018-03-23

Family

ID=61652589

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711193226.8A Pending CN107834431A (en) 2017-11-24 2017-11-24 A kind of downward Evacuation method of transmission line of electricity under power-off condition

Country Status (1)

Country Link
CN (1) CN107834431A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4934277A (en) * 1987-07-02 1990-06-19 Evacuation Systems, Inc. Mobile aerial rapid rescue system
CN203507341U (en) * 2013-09-27 2014-04-02 国家电网公司 Handheld rotary type slow descent control device
CN103933677A (en) * 2014-04-10 2014-07-23 东北林业大学 Sitting slow descent device for fire disaster
CN107126646A (en) * 2017-06-28 2017-09-05 山东博步安防科技有限公司 A kind of power worker's falling from high altitude suspends system and method for saving oneself in midair
CN206483008U (en) * 2017-01-16 2017-09-12 广州供电局有限公司 Integral type shaft tower rescue tool

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4934277A (en) * 1987-07-02 1990-06-19 Evacuation Systems, Inc. Mobile aerial rapid rescue system
CN203507341U (en) * 2013-09-27 2014-04-02 国家电网公司 Handheld rotary type slow descent control device
CN103933677A (en) * 2014-04-10 2014-07-23 东北林业大学 Sitting slow descent device for fire disaster
CN206483008U (en) * 2017-01-16 2017-09-12 广州供电局有限公司 Integral type shaft tower rescue tool
CN107126646A (en) * 2017-06-28 2017-09-05 山东博步安防科技有限公司 A kind of power worker's falling from high altitude suspends system and method for saving oneself in midair

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
中国石油企业会编: "《石油企业管理现代化创新成果选编 第16集》", 30 June 2009 *
全国企业管理现代化创新成果审定委员会: "《国家级企业管理创新成果 第十六届》", 31 March 2010 *
宫梓超等: "绳索技术在电力应急救援中的应用", 《农村电气化》 *

Similar Documents

Publication Publication Date Title
Lee Electrical safety in industrial plants
CN108031019A (en) Transmission line of electricity, which is accompanied, under a kind of power-off condition declines Evacuation method
CN107929972A (en) A kind of transmission line high-altitude operating personnel shaft tower fall after rescue mode
CN107899143A (en) Transmission line of electricity is without release rescue mode above accompanying in the case of one kind is powered
CN107913479A (en) The rescue mode of the oblique rope bridge-type of high-voltage power line conductive line bar tower trapped person
CN107834431A (en) A kind of downward Evacuation method of transmission line of electricity under power-off condition
CN107910808A (en) The downward Evacuation method of transmission line of electricity in the case of one kind is powered
CN206483008U (en) Integral type shaft tower rescue tool
CN205508427U (en) Fire -retardant flexible cable is used to super fire -resistant communication power supply of environment -friendly
CN107802974A (en) A kind of transmission line high-altitude operating personnel wire fall after rescue mode
CN107769080A (en) A kind of transmission line wire pulley crosses rescue mode
CN206949588U (en) A kind of communication iron tower overhaul protective device
CN107968354A (en) Transmission line of electricity, which is accompanied, in the case of one kind is powered declines Evacuation method
CN107982819A (en) Transmission line of electricity is without release rescue mode above accompanying under a kind of power-off condition
CN107731414A (en) A kind of heat resistance silicon rubber insulating control cable
CN205704021U (en) The falling proof device of transmission line high-altitude operation Work tool
CN209045189U (en) A kind of insulated fireproof power cable
CN203787851U (en) Maintenance device used for power supply and power transmission lines
CN109473905A (en) Distribution uninterrupted operation " 3+1 " insulating bar working system
CN109390088A (en) A kind of insulated fireproof power cable
CN210039723U (en) Tensile flame-retardant cable
CN116260073B (en) Operation method for live replacement of 35kV linear insulator string
CN104051986A (en) Tower minimum space operating method based on insulated isolation umbrella
CN216169466U (en) Pole climbing protection device for electric power construction
CN215505212U (en) Safety belt for electric power engineering

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180323

RJ01 Rejection of invention patent application after publication