CN206483008U - Integral type shaft tower rescue tool - Google Patents

Integral type shaft tower rescue tool Download PDF

Info

Publication number
CN206483008U
CN206483008U CN201720055775.8U CN201720055775U CN206483008U CN 206483008 U CN206483008 U CN 206483008U CN 201720055775 U CN201720055775 U CN 201720055775U CN 206483008 U CN206483008 U CN 206483008U
Authority
CN
China
Prior art keywords
shaft tower
integral type
ring
rescue
type shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720055775.8U
Other languages
Chinese (zh)
Inventor
辛平野
楚烺
郭润凯
王鑫
关宇斌
张锴
蔡铭杰
王颖新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Guangzhou Power Supply Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Power Supply Bureau Co Ltd filed Critical Guangzhou Power Supply Bureau Co Ltd
Priority to CN201720055775.8U priority Critical patent/CN206483008U/en
Application granted granted Critical
Publication of CN206483008U publication Critical patent/CN206483008U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model discloses a kind of integral type shaft tower rescue tool, including fixing band and lifting rope, the fixing band is included with body and positioned at first clasp and connection ring with body two ends, the band body is set around on shaft tower and first clasp is buckled on the band body, described lifting rope one end is used to be connected with personnel to be rescued, and the other end is used to be pulled by rescue personnel through the connection ring.The utility model provides a kind of simple and assembles efficiently rescue tool, can greatly shorten rescue time, improve electric shock first aid efficiency, its aerial suspension Quick rescue that can be used under various operating environments, with preferable practicality and versatility.The utility model is simple in construction, takes small volume, is easy to carry, cost of manufacture is relatively low.

Description

Integral type shaft tower rescue tool
Technical field
The utility model is related to electrician tool technical field, more particularly, to a kind of integral type shaft tower rescue tool.
Background technology
In ultra-high-tension power transmission line maintenance repair operation, because human users are improper, equipment operation condition is not good, external environment condition The reasons such as influence, easily cause operating personnel's electric shock injury accident.Existing high-altitude, which is got an electric shock, hangs rescue means deficiency, electric shock people Member's rescue time is universal longer, it is necessary to take hours, and rescue difficulty is high, and the death rate is high.It occur frequently that because of rescue time Electric shock personnel CPR or suspension can not be carried out more long to be caused to be choked to death.
Utility model content
Based on this, the utility model is that the defect for overcoming prior art, there is provided a kind of integral type shaft tower rescue tool, is used In the aerial suspension Quick rescue under various operating environments, greatly shorten effective rescue time, improve electric shock first aid efficiency.
Its technical scheme is as follows:
A kind of integral type shaft tower rescue tool, including fixing band and lifting rope, the fixing band include band body and are fixedly connected In first clasp and connection ring with body two ends, the band body is set around on shaft tower and first clasp is buckled in the band On body, described lifting rope one end is used to be connected with personnel to be rescued, and the other end is used to be pulled by rescue personnel through the connection ring.
In one of the embodiments, the connection ring is including the first ring body arranged up and down, the second ring body and is located at Connecting portion between first ring body and second ring body, the lifting rope bypasses the connecting portion, and its two ends is towards same One direction passes second ring body, and first ring body is connected with the band body.
In one of the embodiments, the lifting rope is included positioned at the first rope body in the left side of the connecting portion and positioned at institute State the second rope body on the right side of connecting portion, the first rope body stretches out from the left side of second ring body, the second rope body from The right side of second ring body is stretched out.
In one of the embodiments, the internal diameter of second ring body is more than the internal diameter of first ring body.
In one of the embodiments, the lifting rope is provided be used for fastening with the once safety band of personnel to be rescued second and buckled Ring.
In one of the embodiments, the outer surface with body is provided with nonskid coating.
In one of the embodiments, the material of the connection ring is that aluminium alloy is zinc-plated.
In one of the embodiments, it is described to bear gravity more than or equal to 300kg with body.
In one of the embodiments, the lifting rope is climbing rope.
In one of the embodiments, in addition to for the cutter for the secondary safety belt for cutting off personnel to be rescued.
The advantage or principle to preceding solution are illustrated below:
Integral type shaft tower rescue tool described in the utility model, including fixing band and lifting rope, fixing band and lifting rope assembling Integrally.When specifically used, fixing band colligation is fixed on shaft tower, and then reaches the effect for fixing connection ring, for creating Make interim point of suspension;The supporting body that connection ring is then slided as lifting rope, it is ensured that the personnel to be rescued of lifting rope one end are in the other end Slowly decline under the control of rescue personnel, so that personnel to be rescued are transferred to Ground-Holding first aid.The utility model provides one Plant simple and assemble efficiently rescue tool and rescue mode, can greatly shorten rescue time, improve electric shock first aid efficiency, Its aerial suspension Quick rescue that can be used under various operating environments, with preferable practicality and versatility.The utility model It is simple in construction, small volume is taken, is easy to carry, cost of manufacture is relatively low.
Connection ring described in the utility model is the word ring of class 8, and lifting rope may pass through the second ring body on the downside of connection ring again from upside The first ring body set under, be finally locked on connecting portion, can so increase the frictional force between lifting rope and connection ring, it is ensured that wait to rescue Personnel delay drop in the state of controllable.
First rope body of the lifting rope both sides and the second rope body stretch out from the both sides of the second ring body respectively, to ensure first Restricting body and the second rope body will not cross, it is ensured that personnel to be rescued can stablize and decline, and will not shake.
The internal diameter of second ring body is larger, prevents the first rope body and the second rope body phase mutual connection from touching wiping, rope is put in influence.
The lifting rope is additionally provided with the second clasp, the quick connection to realize lifting rope and personnel to be rescued.
The outer surface of the fixing band is additionally provided with nonskid coating, to increase with the frictional force between body and shaft tower, it is ensured that Fixing band is fixed, and can increase the crocking resistance with body.
The material of the connection ring is that aluminium alloy is zinc-plated, to improve the frictional force needed for slow drop.
The gravity that bears of the fixing band is more than or equal to 300kg, it is ensured that the intensity of fixing band, so as to ensure whole rescue Instrument is safe and reliable.
The lifting rope is climbing rope, with larger stretching resistance, it is ensured that rescue tool is firm.
Brief description of the drawings
Fig. 1 is the structural representation of the integral type shaft tower rescue tool described in the utility model embodiment;
Fig. 2 is the operating diagram of the integral type shaft tower rescue tool described in the utility model embodiment.
Description of reference numerals:
10th, shaft tower, 20, personnel to be rescued, 30, once safety band, 40, secondary safety belt, 100, fixing band, 110, band body, 111st, clamping ring, 112, suture zone, the 120, first clasp, 130, connection ring, the 131, first ring body, the 132, second ring body, 133, Connecting portion, the 200, lifting rope, 210, first rope body, the 211, second clasp, the 220, second rope body.
Embodiment
It is below in conjunction with accompanying drawing and specifically real for the purpose of this utility model, technical scheme and advantage is more clearly understood Mode is applied, the utility model is described in further detail.It should be appreciated that embodiment described herein Only to explain the utility model, protection domain of the present utility model is not limited.
It should be noted that when element is referred to as " being located at " or " being fixed on " another element, it can be directly arranged in Or be fixed on another element or can also be located at by element placed in the middle or be fixed on another element.When an element It is known as " connection " another element, it can be directly to another element or can also be by member placed in the middle Part and be connected to another element.
In addition, unless otherwise indicated, the description such as term " first " otherwise in specification and " second " is used only for distinguishing Each component, element, step in specification etc., without the logical relation being intended to indicate that between each component, element, step Or ordinal relation etc..
As depicted in figs. 1 and 2, integral type shaft tower rescue tool described in the utility model, including fixing band 100 and lifting rope 200.The fixing band 100 includes with body 110 and is fixedly connected on first clasp 120 and connection ring with the two ends of body 110 130.When specifically used, the band body 110 is set around on shaft tower 10, and the hook mouthful of its first clasp 120 is buckled in the band upward On body 110, the connection ring 130 is then set (i.e. positioned at the outside of the first clasp 120) through first clasp 120.Now Should by be connected with body 110 connection ring one end tense and by a side compression from the first clasp 120 to shaft tower 10 so that will be with body 110 are securely fixed on shaft tower 10.Described one end of lifting rope 200 is used for the once peace with personnel 20 to be rescued (electric shock stupor person etc.) Full band 30 is connected, and the other end, which bypasses the connection ring 130, to be used to be pulled by rescue personnel.It should be noted that described in this area Once safety band 30 is to tie up the safety belt with staff, and secondary safety belt 40 is then connection once safety band 30 and shaft tower 10 safety belt.
The operation principle of the integral type shaft tower rescue tool is as follows:Band body 110 of the fixing band 100 including Integral design, First clasp 120 and connection ring 130, lifting rope 200 is further around in connection ring 130, being integrally formed integral type shaft tower rescue tool. When specifically used, the colligation of fixing band 100 is fixed on shaft tower 10, and then reaches the effect for fixing connection ring 130, for creating Make interim point of suspension;The supporting body that connection ring 130 is then slided as lifting rope 200, it is ensured that the personnel to be rescued 20 of the one end of lifting rope 200 Slowly decline under the control of the rescue personnel of the other end, so that personnel 20 to be rescued are transferred to Ground-Holding first aid.This practicality It is new to provide a kind of simple and assemble efficiently rescue tool and rescue mode, it can greatly shorten rescue time, improve Electric shock first aid efficiency, its aerial suspension Quick rescue that can be used under various operating environments, with preferable practicality and general Property.The utility model is simple in construction, takes small volume, is easy to carry, cost of manufacture is relatively low.
In the present embodiment, the connection ring 130 includes the first ring body 131, the second ring body 132 and the position arranged up and down Connecting portion 133 between first ring body 131 and second ring body 132.The individual pen of lifting rope 200 is set around the company In socket part 133, and its two ends is passed through out of described second ring body 132 in the same direction, as can be from second ring body 132 Front side is worn to rear side, or is worn from rear side to front side.First ring body 131 is then connected with band body 110.From the foregoing, it will be observed that this practicality The new connection ring 130 is the word ring of class 8, and lifting rope 200 may pass through the second ring body 132 of the downside of connection ring 130 again from upside Under first 131 sets of ring body, finally it is locked on connecting portion 133, can so increases the friction between lifting rope 200 and connection ring 130 Power, it is ensured that personnel 20 to be rescued delay drop in the state of controllable.Winding of the lifting rope 200 in connection ring 130 be not unique, can Selected according to actual conditions.
Preferably, the lifting rope 200 is included positioned at the first rope body 210 in the left side of the connecting portion 133 and positioned at described The right side of connecting portion 133 the second rope body 220 (in addition on connecting portion 133, the relative with connecting portion 133 the 3rd restrict Body).The first rope body 210 stretches out from the left side of second ring body 132, and the second rope body 220 is from second ring body 132 right side is stretched out.It follows that the lifting rope 200 of both sides stretches out from the both sides of the second ring body 132 respectively, to ensure first Restricting the rope body 220 of body 210 and second will not cross, it is ensured that personnel 20 to be rescued can stablize and decline, and will not shake.Need It is bright, term as used herein " on ", " under " "front", "rear", "left", "right" and similar statement simply to illustrate that Purpose, it is unique embodiment to be not offered as.
In the present embodiment, the internal diameter of second ring body 132 is more than the internal diameter of first ring body 131, prevents first The rope rope body 220 of body 210 and second contacts with each other friction in the second ring body 132, influences to put rope.It should be noted that described The internal diameter of two ring bodies 220 also may be less than or equal to the internal diameter of first ring body 210.
Preferably, the lifting rope 200 is provided with the second clasp for being used for fastening with the once safety band 30 of personnel 20 to be rescued 211, the quick connection to realize lifting rope 200 and the once safety band 30 of personnel 20 to be rescued.The utility model also can be according to reality (accompanying drawing is not in the 3rd clasp that the other end setting of the lifting rope 200 and the once safety band 30 of rescue personnel are fastened for border needs Show), now, rescue personnel can pull any position on the second rope body 220.
The utility model also include be used for cut off personnel 2020 to be rescued secondary safety belt 40 cutter, lifting rope 200 with After the once safety band 30 of personnel 20 to be rescued is connected, the secondary safety belt 40 on personnel 20 to be rescued can be cut by cutter It is disconnected so that personnel 20 to be rescued depart from the constraint of shaft tower 10.
In the present embodiment, the band body 110 be nylon tape, polyester belt or other similar materials, length be 90~ 150cm, the preferably girth with hanging position match, such as 100cm;Its load-bearing is not less than 300kg T, it is ensured that with the strong of body 110 Degree, so as to ensure that whole rescue tool is safe and reliable;In addition, the band body 110 is single belt or bilayer zone, outer surface is provided with anti- Sliding coating, to increase with the frictional force between body 110 and shaft tower 10, it is ensured that fixing band 100 is fixed, and can increase band body 110 crocking resistance;Finally, (shade show termination to clamping ring 111 of the two ends with body 110 provided with suture in figure Suture zone 112), to the first clasp of the company of circle 120 and connection ring 130.The material of the connection ring 130 be aluminium alloy it is zinc-plated or its His metal material, to improve the frictional force needed for slow drop.The lifting rope 200 is climbing rope, with larger stretching resistance, it is ensured that Rescue tool is solid and reliable, and the utility model also can be used as lifting rope 300 using the rope made of hemp according to actual needs.The cutter can be general Logical electrician's knife.
Using the rescue mode of above-mentioned shaft tower rescue tool, following steps are specifically included:
Step 1: rescue personnel fastens the once safety band 30 of itself, and carry integral type shaft tower rescue tool and step on bar;
Step 2: rescue personnel completes inherently safe measure on shaft tower 10, itself two are such as fixed on shaft tower 10 Secondary safety belt 40;
Step 3: the good fixing band 100 of rescue personnel's colligation on shaft tower 10, fixing band 100 need to be fixedly secured in shaft tower 10 On, specifically, fixing band 100 with body 110 from the side of shaft tower 10 around to opposite side, the first clasp positioned at the side of shaft tower 10 120 clasp the band body 110 of the opposite side of shaft tower 10, and now the hook of the first clasp 120 mouthful should be set upward, and anti-stop-band body 110 takes off Fall, now connection ring 130 is set through the first clasp 120;
Step 4: one end of lifting rope 200 is connected with the once safety band 30 of personnel 20 to be rescued, the other end is wound on rescue people On hand, rescue personnel can use around elbow method that lifting rope 200 is pre-fixed member;
Step 5: the secondary safety belt 40 of personnel 20 to be rescued is cut off using cutter;
Personnel 20 to be rescued are made to transfer to ground Step 6: rescue personnel slowly puts rope.
The emergency relief measure such as CPR can be carried out putting to ground wait the personnel that rescue 20.It should be noted that this reality Do not limited with the new sequencing to above-mentioned steps one to step 6, those skilled in the art can be according to actual needs to phase The priority execution sequence answered is adjusted, to reduce rescue time, realizes most fast rescue.
In summary, the utility model provides a kind of integral type shaft tower rescue tool, when greatly can shorten rescue Between (can be completed in 3 minutes shaft tower 10 get an electric shock suspension Quick rescue), improve electric shock first aid efficiency, can greatly reduce high-altitude The death by suffocation probability of electric shock suspension personnel;Its aerial suspension Quick rescue that can be used under various operating environments, such as can be used for In the case of the personnel rescuing of fault rod climbing tower 10, electric operating personnel step on the slow drop such as uncomfortable after bar, high altitude firefighting can not succour A variety of scenes such as landing, with preferable versatility and practicality;In addition, its is simple in construction, lighter in weight takes small volume, It is easy to carry about with one and steps on bar, it operates also easy, achievable one man relief, with preferable promotion prospect.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality Apply all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, the scope of this specification record is all considered to be.
Embodiment described above only expresses several embodiments of the present utility model, and it describes more specific and detailed, But therefore it can not be interpreted as the limitation to utility model patent scope.It should be pointed out that for the common skill of this area For art personnel, without departing from the concept of the premise utility, several modification and improvement can also be made, these belong to this The protection domain of utility model.

Claims (10)

1. a kind of integral type shaft tower rescue tool, it is characterised in that including fixing band and lifting rope, the fixing band include band body and First clasp and connection ring with body two ends are fixedly connected on, the band body is set around on shaft tower and first clasp is buckled On the band body, described lifting rope one end is used to be connected with personnel to be rescued, and the other end is used for by rescue people through the connection ring Member pulls.
2. integral type shaft tower rescue tool according to claim 1, it is characterised in that the connection ring includes arranging up and down The first ring body, the second ring body and the connecting portion between first ring body and second ring body, the lifting rope around The connecting portion is crossed, and its two ends passes second ring body in the same direction, first ring body is connected with the band body.
3. integral type shaft tower rescue tool according to claim 2, it is characterised in that the lifting rope includes being located at the company The first rope body in the left side of socket part and restricted body positioned at the second of the right side of the connecting portion, the first rope body is from second ring The left side of body is stretched out, and the second rope body stretches out from the right side of second ring body.
4. integral type shaft tower rescue tool according to claim 3, it is characterised in that the internal diameter of second ring body is more than The internal diameter of first ring body.
5. integral type shaft tower rescue tool according to claim 1, it is characterised in that the lifting rope, which is provided with, to be used for waiting to rescue The second clasp that the once safety band of personnel is fastened.
6. integral type shaft tower rescue tool according to any one of claim 1 to 5, it is characterised in that described with body Outer surface is provided with nonskid coating.
7. integral type shaft tower rescue tool according to any one of claim 1 to 5, it is characterised in that the connection ring Material for aluminium alloy it is zinc-plated.
8. integral type shaft tower rescue tool according to any one of claim 1 to 5, it is characterised in that described with body Gravity is born more than or equal to 300kg.
9. integral type shaft tower rescue tool according to any one of claim 1 to 5, it is characterised in that the lifting rope is Climbing rope.
10. integral type shaft tower rescue tool according to any one of claim 1 to 5, it is characterised in that also including for Cut off the cutter of the secondary safety belt of personnel to be rescued.
CN201720055775.8U 2017-01-16 2017-01-16 Integral type shaft tower rescue tool Active CN206483008U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720055775.8U CN206483008U (en) 2017-01-16 2017-01-16 Integral type shaft tower rescue tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720055775.8U CN206483008U (en) 2017-01-16 2017-01-16 Integral type shaft tower rescue tool

Publications (1)

Publication Number Publication Date
CN206483008U true CN206483008U (en) 2017-09-12

Family

ID=59766540

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720055775.8U Active CN206483008U (en) 2017-01-16 2017-01-16 Integral type shaft tower rescue tool

Country Status (1)

Country Link
CN (1) CN206483008U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107742851A (en) * 2017-11-14 2018-02-27 国网四川省电力公司攀枝花供电公司 A kind of disconnecting switch insulation operation platform
CN107834431A (en) * 2017-11-24 2018-03-23 国家电网公司 A kind of downward Evacuation method of transmission line of electricity under power-off condition
CN112921494A (en) * 2021-01-27 2021-06-08 鲁普耐特集团有限公司 Flat belt for high-voltage impact-resistant power distribution live working and manufacturing method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107742851A (en) * 2017-11-14 2018-02-27 国网四川省电力公司攀枝花供电公司 A kind of disconnecting switch insulation operation platform
CN107834431A (en) * 2017-11-24 2018-03-23 国家电网公司 A kind of downward Evacuation method of transmission line of electricity under power-off condition
CN112921494A (en) * 2021-01-27 2021-06-08 鲁普耐特集团有限公司 Flat belt for high-voltage impact-resistant power distribution live working and manufacturing method thereof

Similar Documents

Publication Publication Date Title
CN206483008U (en) Integral type shaft tower rescue tool
CN202590203U (en) Anti-falling pole-winding assistant belt and anti-falling safety belt
CN201775876U (en) High-rise fire rescue device for climbing to top along rope
US20210000192A1 (en) Safety Garment System
CN200988579Y (en) Automatic opener for parachute
CN104383648A (en) Low-attitude emergency lifesaving parachute
CN205586372U (en) Outdoor climbing and flee and use knapsack
US9694220B2 (en) Rescue strap
CN105003194A (en) Folding multifunctional fire fighting and rescue ladder
CN206483009U (en) Shaft tower rescue tool
CN202179825U (en) Climbing rope and climbing device
US10603528B1 (en) Rapid extraction system
CN205699207U (en) A kind of steel tube tower anti-falling climbing auxiliary equipment
CN106823184A (en) Shaft tower rescue tool and method
CN201775878U (en) Cross-roof anchorage cable edge rope type fire fighting and rescuing device for tall buildings
CN204619202U (en) Low latitude escape parachute
CN204877248U (en) Foldable multi -functional rescue ladder of putting out a fire
CN207856108U (en) Safety belt for building construction and supervision
CN203898984U (en) Safety belt for overhead operation
CN207412531U (en) A kind of electric power High Altitude Emergency succours kit
CN207225669U (en) Security system is hung in a kind of helicopter air rescue
CN201775877U (en) Building-crossing sliding roof along-rope tall-building fire rescue device
CN203750034U (en) Low-attitude emergency escape umbrella
CN207323855U (en) Building escape device fixed frame
CN205268851U (en) High -altitude emergency escape device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200928

Address after: 510620 Tianhe District, Guangzhou, Tianhe South Road, No. two, No. 2, No.

Patentee after: Guangzhou Power Supply Bureau of Guangdong Power Grid Co.,Ltd.

Address before: 510620 Tianhe District, Guangzhou, Tianhe South Road, No. two, No. 2, No.

Patentee before: GUANGZHOU POWER SUPPLY Co.,Ltd.