CN107831078A - A kind of electric wire curved detection experimental rig - Google Patents

A kind of electric wire curved detection experimental rig Download PDF

Info

Publication number
CN107831078A
CN107831078A CN201711128300.8A CN201711128300A CN107831078A CN 107831078 A CN107831078 A CN 107831078A CN 201711128300 A CN201711128300 A CN 201711128300A CN 107831078 A CN107831078 A CN 107831078A
Authority
CN
China
Prior art keywords
electric wire
gear
experimental rig
pipeline installation
action bars
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711128300.8A
Other languages
Chinese (zh)
Inventor
武全福
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei Huafu Geotextile Material Co Ltd
Original Assignee
Hefei Huafu Geotextile Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei Huafu Geotextile Material Co Ltd filed Critical Hefei Huafu Geotextile Material Co Ltd
Priority to CN201711128300.8A priority Critical patent/CN107831078A/en
Publication of CN107831078A publication Critical patent/CN107831078A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N3/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N3/20Investigating strength properties of solid materials by application of mechanical stress by applying steady bending forces
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2203/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N2203/0014Type of force applied
    • G01N2203/0023Bending
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2203/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N2203/02Details not specific for a particular testing method
    • G01N2203/026Specifications of the specimen
    • G01N2203/0262Shape of the specimen
    • G01N2203/0278Thin specimens
    • G01N2203/028One dimensional, e.g. filaments, wires, ropes or cables

Landscapes

  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Testing Or Calibration Of Command Recording Devices (AREA)

Abstract

The present invention relates to pipe testing apparatus technical field,In particular a kind of electric wire curved detection experimental rig,Including base,Two symmetrical support frames are installed on the base,Rotating shaft is equipped with two support frames as described above,One end of the rotating shaft is provided with rotating disk,The other end and the second motor are connected with each other,Second motor is installed on support frame,The present invention installs rotating disk in the rotating shaft between support frame,Transverse slat is installed between two rotating disks,Detection analysis instrument is installed on transverse slat,Pass through the electric expansion bar being installed on detection analysis instrument,Moving horizontally back and forth for detection analysis instrument can be achieved,And pass through the rotation of motor driven rotating shaft,Realize rotation of the detection analysis instrument on rotating disk,By this while realize the horizontal reciprocating movement of detection analysis instrument and the rotation in solid space,It can reach comprehensive detection and analysis of the detection analysis instrument to part to be detected,Detection analysis efficiency and the accuracy of analysis can be effectively improved.

Description

A kind of electric wire curved detection experimental rig
Technical field
The present invention relates to pipe testing apparatus technical field, specially a kind of electric wire curved detection experimental rig.
Background technology
Electric wire is most common electric power facility, is the important medium of power Transmission, and the quality of electric wire quality is straight Connect and be related to social normal activity and can be normally carried out, be typically necessary before electric wire dispatches from the factory and electric wire is entered Row curved detection, traditional detection analysis instrument can only typically detect to some regions of electric wire, and typically by Mechanical mobile detection analysis instrument can be only achieved wider detection range, can not realize and carry out comprehensive detection automatically, cause Detection and analysis efficiency is low and the accuracy error of detection and analysis is big, in consideration of it, a kind of it is proposed that electric wire curved detection Experimental rig.
The content of the invention
It is an object of the invention to provide a kind of electric wire curved detection experimental rig, to solve in above-mentioned background technology The problem of proposition.
To achieve the above object, the present invention provides following technical scheme:
A kind of electric wire curved detection experimental rig, including base, be provided with the base two it is symmetrical Support frame, rotating shaft is equipped with two support frames as described above, one end of the rotating shaft is provided with rotating disk, the other end and the second motor phase Connect, second motor is installed on support frame, and transverse slat, the transverse slat are fixedly connected between the rotating disk of left and right two Inside is provided with chute, and is movably installed with detection analysis instrument by fixed block on transverse slat, the fixed block on the detection analysis instrument Nesting is slided in chute, and electric expansion bar is fixedly connected with fixed block, the electric expansion bar and the first motor phase Connect, first motor is installed on rotating disk, and the side of each rotating disk is equipped with pipeline installation rack, the pipeline installation rack Through the center of rotating disk, and its one end is fixed on support frame, and body peace is installed with two pipeline installation racks Piece installing, and part to be detected is provided between two pipeline installation racks, the body installed part is corresponding nested located at the two of part to be detected The intraoral portion of end pipe, two portable plates in left and right are provided with the hollow area inside body installed part, are provided between two portable plates Middle montant, the middle montant are fixed on inside body installed part, and are provided with middle montant by movable axis telescopic Connector, it is to be flexibly connected between the telescopic connection and two portable plates, and two portable plates are away from middle montant Side be installed with multiple pressure rams, each pressure ram, which is located on the body of rod outside body installed part, to be surrounded with First spring, the top of one of portable plate are fixedly connected with the first action bars, and first action bars is movably arranged at pipeline In chute inside mounting bracket, one end of the first action bars is installed with docking block, the side of the chute inside pipeline installation rack The position of wall face docking block is provided with docking groove, and the cell wall up and down of the docking groove is equipped with chute, is respectively mounted in upper gliding groove There is the first Saw blade, the side of each first Saw blade is equipped with the first gear being engaged with, the first gear Side is provided with second gear, and sprocket wheel is respectively and fixedly provided with the second gear and first gear, passes through chain between two sprocket wheels Bar is connected with each other, and the side of second gear is engaged with the second Saw blade, and the is provided between upper and lower two second Saw blades Two action bars, connecting rod, the interposition of the connecting rod are respectively connected between second action bars and upper and lower two the second Saw blades Put through there is rotary shaft, the both ends of rotary shaft are installed between the both sides cell wall of pipeline installation rack interior grooves, and Pipe installing The cell wall that frame interior grooves are located at the second action bars periphery is provided with tongue, is fixed on the body of rod of the second action bars face convex channel portion There is bulge loop, and second spring is surrounded with this section of body of rod, the both ends of the second spring are connected to the side wall of tongue and convex On ring.
Preferably, the pipeline installation rack is L-shaped.
Preferably, the rotating shaft inner hollow, the part of horizontal support body of the pipeline installation rack of L-type run through the hollow bulb of rotating shaft Point, and be fixedly connected with support frame.
Preferably, the telescopic connection is intersected by two straight-bars and formed, and the centre of two straight-bars is run through jointly There is movable axis, the upper and lower ends of two straight-bars are respectively to be flexibly connected between two portable plates.
Preferably, for the pressure ram at least provided with three on each portable plate, in the vertical direction is linearly equidistant From arrangement.
Preferably, the one end of the pressure ram away from body installed part is fixed with arc pressuring plate, the table of each arc pressuring plate Face is equipped with the taper protrusion in matrix arrangement.
Preferably, described to state docking block and the section of docking groove is rectangular, and the width of the two is mutually matched, and docks block The position of each first Saw blade of upper and lower side face be equipped with mutual of the size of neck, the neck and the first Saw blade Match somebody with somebody.
Preferably, it is connected with each other between the sprocket wheel and first gear by welding manner, between sprocket wheel and second gear It is connected with each other by welding manner.
Compared with prior art, the beneficial effects of the invention are as follows:The present invention installs rotating disk in the rotating shaft between support frame, Transverse slat is installed between two rotating disks, detection analysis instrument is installed on transverse slat, electronic is stretched by be installed on detection analysis instrument Contracting bar, moving horizontally back and forth for detection analysis instrument can be achieved, and by the rotation of motor driven rotating shaft, realize that detection analysis instrument exists Rotation on rotating disk, can by this while realize the horizontal reciprocating movement of detection analysis instrument and the rotation in solid space Reach comprehensive detection and analysis of the detection analysis instrument to part to be detected, detection analysis efficiency and analysis can be effectively improved Accuracy.
Brief description of the drawings
Fig. 1 is schematic structural view of the invention;
Fig. 2 is enlarged drawing at A in Fig. 1 of the present invention;
Fig. 3 is enlarged drawing at B in Fig. 2 of the present invention.
In figure:Support frame 1, rotating shaft 2, rotating disk 3, transverse slat 4, detection analysis instrument 5, electric expansion bar 6, pipeline installation rack 7, treat Detection piece 8, body installed part 9, portable plate 10, middle montant 11, telescopic connection 12, pressure ram 13, the first spring 14, One action bars 15, docking block 16, docking groove 17, the first Saw blade 18, first gear 19, second gear 20, sprocket wheel 21, second are sawed Rack 22, the second action bars 23, connecting rod 24, tongue 25, bulge loop 26, second spring 27, the first motor 28, the second motor 29.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made Embodiment, belong to the scope of protection of the invention.
Fig. 1-3 are referred to, the present invention provides a kind of technical scheme:
A kind of electric wire curved detection experimental rig, including base, two symmetrical supports are installed on base Frame 1, rotating shaft 2 is equipped with two support frames 1, and one end of rotating shaft 2 is provided with rotating disk 3, the other end and the interconnection of the phase of the second motor 29 Connect, the second motor 29 is installed on support frame 1, and transverse slat 4 is fixedly connected between the rotating disk 3 of left and right two, and the inside of transverse slat 4, which is provided with, to be slided Groove, and detection analysis instrument 5 is movably installed with by fixed block on transverse slat 4, the fixed block on detection analysis instrument 5 slides nesting and is located at Electric expansion bar 6 is fixedly connected with chute, and on fixed block, the motor 28 of electric expansion bar 6 and first is connected with each other, the first electricity Machine 28 is installed on rotating disk 3, and the side of each rotating disk 3 is equipped with pipeline installation rack 7, and pipeline installation rack 7 is L-shaped, inside rotating shaft 2 Hollow, the part of horizontal support body of the pipeline installation rack 7 of L-type runs through the hollow space of rotating shaft 2, and is fixedly connected with support frame 1, manages Road mounting bracket 7 runs through the center of rotating disk 3, and its one end is fixed on support frame 1, is fixedly mounted on two pipeline installation racks 7 There is body installed part 9, and part 8 to be detected is provided between two pipeline installation racks 7, body installed part 9 is corresponding nested located to be checked Survey inside the both ends mouth of pipe of part 8, two portable plates 10 in left and right, two portable plates are provided with the hollow area inside body installed part 9 Middle montant 11 is provided between 10, middle montant 11 is fixed on inside body installed part 9, and passes through movable axis on middle montant 11 Telescopic connection 12 is installed, telescopic connection 12 is intersected by two straight-bars and formed, and the centre of two straight-bars is common Through there is movable axis, the upper and lower ends of two straight-bars are respectively to be flexibly connected between two portable plates 10, telescopic connection It is to be flexibly connected between part 12 and two portable plates 10, and the fixed peace in side of two portable plates 10 away from middle montant 11 Equipped with multiple pressure rams 13, pressure ram 13 is at least provided with three on each portable plate 10, and in the vertical direction is linear etc. Distance arrangement, the one end of pressure ram 13 away from body installed part 9 are fixed with arc pressuring plate, and the surface of each arc pressuring plate is equipped with Protruded in the taper of matrix arrangement, each pressure ram 13, which is located on the body of rod outside body installed part 9, is surrounded with the first bullet Spring 14, the top of one of portable plate 10 are fixedly connected with the first action bars 15, and the first action bars 15 is movably arranged at pipeline peace Shelve in the chute inside 7, one end of the first action bars 15, which is installed with, docks block 16, the chute inside pipeline installation rack 7 The position of side wall face docking block 16 be provided with docking groove 17, the section of docking block 16 and docking groove 17 is rectangular, and the two Width be mutually matched, the position for docking each first Saw blade 18 of upper and lower side face of block 16 is equipped with neck, neck and The size of first Saw blade 18 is mutually matched, and the cell wall up and down of docking groove 17 is equipped with chute, and is mounted in upper gliding groove One Saw blade 18, the side of each first Saw blade 18 are equipped with the first gear 19 being engaged with, the side of first gear 19 Provided with second gear 20, sprocket wheel 21 is respectively and fixedly provided with second gear 20 and first gear 19, between sprocket wheel 21 and first gear 19 Be connected with each other by welding manner, be connected with each other between sprocket wheel 21 and second gear 20 by welding manner, two sprocket wheels 21 it Between be connected with each other by chain, and the side of second gear 20 is engaged with the second Saw blade 22, upper and lower two the second Saw blades 22 Between be provided with the second action bars 23, be respectively connected with connecting rod 24 between the second action bars 23 and upper and lower two the second Saw blades 22, even The centre position of bar 24 through there is a rotary shaft, the both ends of rotary shaft be installed on the interior grooves of pipeline installation rack 7 both sides cell wall it Between, and the interior grooves of pipeline installation rack 7 are located at the peripheral cell wall of the second action bars 23 and are provided with tongue 25, the face of the second action bars 23 Bulge loop 26 is fixed with the body of rod of the part of tongue 25, and second spring 27 is surrounded with this section of body of rod, the both ends of second spring 27 It is connected in the side wall and bulge loop 26 of tongue 25.
Two body installed parts 9 are corresponded to and are fit into the both ends mouth of pipe of part 8 to be detected, inwardly extrude the first action bars 15, drive one of portable plate 10 to be moved to close to the direction of the tube wall of part 8 to be detected, then in the effect of telescopic connection 12 Under, another portable plate 10 moves in the opposite direction, to two portable plates 10 on multiple pressure rams 13 be tightly squeezed in it is to be detected On the tube wall of part 8, realize that the extruding for treating detection piece 8 is fixed, now docking block 16 is corresponding is inserted into inside docking groove 17, herein The second action bars 23 is inwardly extruded before, drives upper and lower two the second Saw blades 22 to move round about by connecting rod 24, from And driving second gear 20 to rotate, the rotation of second gear 20 drives first gear 19 by the mutual linkage of two sprocket wheels 21 Rotate, the rotation of first gear 19 drives the first Saw blade 18 to be moved towards inside grooves, when docking block 16 enters in docking groove 17 Inside portion and docking block about 16 the neck of two sides and the first Saw blade 18 mutually to it is corresponding when unclamp the second action bars 23, Under the elastic force effect of second spring 27, the self-return of the second action bars 23, and then realize that two the first Saw blades 18 are automatic up and down Docking block is inserted into about 16 in the neck of two sides, realizes the fixation to docking the action bars 15 of block 16 and first, that is, realizes and manages Body installed part 9 lifts to the fixed of part to be detected 8 to be detected, and the second motor 29 drives rotating shaft 2 and rotating disk 3 thereon to rotate, The detection analysis instrument 5 being installed on transverse slat 4 is driven to be rotated around part 8 to be detected, while the driving electric expansion link 6 of the first motor 28 is stretched Contracting, back and forth reciprocal horizontal movement of the detection analysis instrument 5 on transverse slat 4 is realized, it is right to can reach detection analysis instrument 5 in this way The comprehensive detection and analysis of whole part 8 to be detected, reach higher detection and analysis efficiency and precision.
Although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of changes, modification can be carried out to these embodiments, replace without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (8)

1. a kind of electric wire curved detection experimental rig, including base, two symmetrical branch are installed on the base Support (1), rotating shaft (2) is equipped with two support frames as described above (1), one end of the rotating shaft (2) is provided with rotating disk (3), another End and the second motor (29) are connected with each other, and second motor (29) is installed on support frame (1), the rotating disk of left and right two (3) transverse slat (4) is fixedly connected between, chute is provided with inside the transverse slat (4), and pacify on transverse slat (4) by fixed block activity Equipped with detection analysis instrument (5), the fixed block on the detection analysis instrument (5) slides nested in chute and solid on fixed block Surely electric expansion bar (6) is connected with, the electric expansion bar (6) and the first motor (28) are connected with each other, first motor (28) it is installed on rotating disk (3), the side of each rotating disk (3) is equipped with pipeline installation rack (7), and the pipeline installation rack (7) is passed through The center of rotating disk (3) is worn, and its one end is fixed on support frame (1), is installed with two pipeline installation racks (7) Body installed part (9), and part to be detected (8) is provided between two pipeline installation racks (7), it is characterised in that:The body installation Part (9) is corresponding nested inside the both ends mouth of pipe of part to be detected (8), and body installed part (9) is provided with a left side in internal hollow area Right two portable plates (10), be provided with middle montant (11), middle montant (11) fixation between two portable plates (10) It is internal in body installed part (9), and telescopic connection (12) is provided with by movable axis on middle montant (11), it is described flexible It is to be flexibly connected between formula connector (12) and two portable plates (10), and two portable plates (10) are away from middle montant (11) Side be installed with multiple pressure rams (13), each pressure ram (13) be located at the bar outside body installed part (9) The first spring (14) is surrounded with body, the top of one of portable plate (10) is fixedly connected with the first action bars (15), institute State the first action bars (15) to be movably arranged in the internal chute of pipeline installation rack (7), peace is fixed in one end of the first action bars (15) Equipped with docking block (16), the position of the side wall face docking block (16) of the internal chute of pipeline installation rack (7) is provided with docking groove (17), the cell wall up and down of the docking groove (17) is equipped with chute, the first Saw blade (18) is mounted in upper gliding groove, each The side of first Saw blade (18) is equipped with the first gear (19) being engaged with, and the side of the first gear (19) is set There is second gear (20), sprocket wheel (21), two sprocket wheels are respectively and fixedly provided with the second gear (20) and first gear (19) (21) it is connected with each other between by chain, and the side of second gear (20) is engaged with the second Saw blade (22), upper and lower two institutes State and the second action bars (23) is provided between the second Saw blade (22), second action bars (23) and upper and lower two the second Saw blades (22) connecting rod (24) is respectively connected between, through there is rotary shaft, the both ends of rotary shaft are installed in the centre position of the connecting rod (24) Between the both sides cell wall of pipeline installation rack (7) interior grooves, and pipeline installation rack (7) interior grooves are located at the second action bars (23) peripheral cell wall is provided with tongue (25), and bulge loop is fixed with the body of rod of the second action bars (23) face tongue (25) part (26) second spring (27), and on this section of body of rod is surrounded with, the both ends of the second spring (27) are connected to tongue (25) Side wall and bulge loop (26) on.
A kind of 2. electric wire curved detection experimental rig according to claim 1, it is characterised in that:The Pipe installing Frame (7) is L-shaped.
A kind of 3. electric wire curved detection experimental rig according to claim 1, it is characterised in that:The rotating shaft (2) Inner hollow, the part of horizontal support body of the pipeline installation rack (7) of L-type run through the hollow space of rotating shaft (2), and with support frame (1) It is fixedly connected.
A kind of 4. electric wire curved detection experimental rig according to claim 1, it is characterised in that:The telescopic company Fitting (12) is intersected by two straight-bars and formed, the centres of two straight-bars jointly through there is a movable axis, two straight-bars up and down Both ends are respectively to be flexibly connected between two portable plates (10).
A kind of 5. electric wire curved detection experimental rig according to claim 1, it is characterised in that:The pressure ram (13) at least provided with three on each portable plate (10), in the vertical direction is linearly spaced substantially equidistant.
A kind of 6. electric wire curved detection experimental rig according to claim 1, it is characterised in that:The pressure ram (13) one end away from body installed part (9) is fixed with arc pressuring plate, and the surface of each arc pressuring plate is equipped with arranges in matrix form The taper protrusion of row.
A kind of 7. electric wire curved detection experimental rig according to claim 1, it is characterised in that:The docking block (16) and docking groove (17) section it is rectangular, and the width of the two is mutually matched, the upper and lower side face of docking block (16) The position of each first Saw blade (18) is equipped with neck, and the size of the neck and the first Saw blade (18) is mutually matched.
A kind of 8. electric wire curved detection experimental rig according to claim 1, it is characterised in that:The sprocket wheel (21) It is connected with each other between first gear (19) by welding manner, passes through welding manner between sprocket wheel (21) and second gear (20) It is connected with each other.
CN201711128300.8A 2017-11-15 2017-11-15 A kind of electric wire curved detection experimental rig Pending CN107831078A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711128300.8A CN107831078A (en) 2017-11-15 2017-11-15 A kind of electric wire curved detection experimental rig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711128300.8A CN107831078A (en) 2017-11-15 2017-11-15 A kind of electric wire curved detection experimental rig

Publications (1)

Publication Number Publication Date
CN107831078A true CN107831078A (en) 2018-03-23

Family

ID=61655447

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711128300.8A Pending CN107831078A (en) 2017-11-15 2017-11-15 A kind of electric wire curved detection experimental rig

Country Status (1)

Country Link
CN (1) CN107831078A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108896410A (en) * 2018-07-25 2018-11-27 赣州蓉江新区车来养汽车养护店 A kind of automobile buffer beam bending test apparatus
CN109580382A (en) * 2018-11-12 2019-04-05 芜湖顺成电子有限公司 A kind of test device of wire and plug bending property
CN109752151A (en) * 2018-12-30 2019-05-14 珠海市广源信科技有限公司 A kind of muffler measuring device
CN110595912A (en) * 2019-09-17 2019-12-20 金杯电工电磁线有限公司 Enameled wire narrow-edge bending test device and enameled wire narrow-edge bending test method
CN112595505A (en) * 2020-12-09 2021-04-02 湖南震宇天然生物科技有限责任公司 Electron cigarette rotary cover life-span test equipment
CN112945290A (en) * 2021-02-06 2021-06-11 全通电缆股份有限公司 Cable detection device
CN117783418A (en) * 2024-02-28 2024-03-29 河南新鹰塑业有限公司 Detection device and detection method for cable material

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108896410A (en) * 2018-07-25 2018-11-27 赣州蓉江新区车来养汽车养护店 A kind of automobile buffer beam bending test apparatus
CN108896410B (en) * 2018-07-25 2020-09-29 温州鸿伟新能源有限公司 Automobile anti-collision beam bending test device
CN109580382A (en) * 2018-11-12 2019-04-05 芜湖顺成电子有限公司 A kind of test device of wire and plug bending property
CN109580382B (en) * 2018-11-12 2021-12-10 芜湖顺成电子有限公司 Testing arrangement of electric wire plug bending property
CN109752151A (en) * 2018-12-30 2019-05-14 珠海市广源信科技有限公司 A kind of muffler measuring device
CN110595912A (en) * 2019-09-17 2019-12-20 金杯电工电磁线有限公司 Enameled wire narrow-edge bending test device and enameled wire narrow-edge bending test method
CN110595912B (en) * 2019-09-17 2024-05-28 金杯电工电磁线有限公司 Enameled wire narrow-edge bending test device and enameled wire narrow-edge bending test method
CN112595505A (en) * 2020-12-09 2021-04-02 湖南震宇天然生物科技有限责任公司 Electron cigarette rotary cover life-span test equipment
CN112945290A (en) * 2021-02-06 2021-06-11 全通电缆股份有限公司 Cable detection device
CN112945290B (en) * 2021-02-06 2022-02-18 全通电缆股份有限公司 Cable detection device
CN117783418A (en) * 2024-02-28 2024-03-29 河南新鹰塑业有限公司 Detection device and detection method for cable material
CN117783418B (en) * 2024-02-28 2024-05-03 河南新鹰塑业有限公司 Detection device and detection method for cable material

Similar Documents

Publication Publication Date Title
CN107831078A (en) A kind of electric wire curved detection experimental rig
CN103418849B (en) Hub burr removing machine
CN111055072A (en) Jacking rotary mechanism and welding equipment
CN205463741U (en) High -efficient high accuracy screw rod straightener
CN109968047A (en) A kind of flexible linear motor is double to drive gantry platform
CN117549566A (en) Hot press with double platforms alternately switched
CN110576230B (en) Automatic welding device for manhole door of wind power generation tower cylinder
CN209061992U (en) A kind of equipment with plate and adjustable plate discharge position function is helped
CN217056935U (en) Detachable structure of sucker type mounting equipment
CN116160243A (en) Horizontal assembly structure of direct-buried gate sealing valve and use method thereof
CN216881190U (en) Stainless steel pipe push-in type numerical control bending equipment
CN109277807A (en) Automatic device for disassembling
CN210910039U (en) Stacking robot for refractory material production
CN113732737A (en) Method and device for processing heat-resistant steel high-alloy grid plate
CN208584251U (en) A kind of high-precision automobile fixture positioning mechanism
CN209080908U (en) Material sucking mechanism
CN208868931U (en) A kind of movable mechanical hand feeding platform
CN215146523U (en) Output shaft installation and oil dripping mechanism
CN104577181B (en) Metal shell battery overhead welding clamping device
CN105171419A (en) Cable fixing terminal manufacturing system
CN213915609U (en) Shaping device of precision stainless steel tube for special instrument
CN215880869U (en) Clamp for producing automobile parts
CN111070541B (en) Dual locking and positioning mechanism for foaming clamp
CN221676339U (en) Automatic assembly and disassembly device for outer rod of drilling tool
CN217020638U (en) Propelling device for cutting rubber tube

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180323