CN107824997A - The installation method of asymmetric equatorial zone coverboard - Google Patents

The installation method of asymmetric equatorial zone coverboard Download PDF

Info

Publication number
CN107824997A
CN107824997A CN201711049789.XA CN201711049789A CN107824997A CN 107824997 A CN107824997 A CN 107824997A CN 201711049789 A CN201711049789 A CN 201711049789A CN 107824997 A CN107824997 A CN 107824997A
Authority
CN
China
Prior art keywords
equatorial
plate
supporting column
coverboard
upper supporting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711049789.XA
Other languages
Chinese (zh)
Other versions
CN107824997B (en
Inventor
黄金祥
吴梦先
潘伍覃
李�浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Wuhan Yiye Steel Structure Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Wuhan Yiye Steel Structure Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd, Wuhan Yiye Steel Structure Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN201711049789.XA priority Critical patent/CN107824997B/en
Publication of CN107824997A publication Critical patent/CN107824997A/en
Application granted granted Critical
Publication of CN107824997B publication Critical patent/CN107824997B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K31/00Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups
    • B23K31/02Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups relating to soldering or welding
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P21/00Machines for assembling a multiplicity of different parts to compose units, with or without preceding or subsequent working of such parts, e.g. with programme control

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The invention discloses a kind of installation method of asymmetric equatorial zone coverboard, comprise the following steps:Equatorial plate is placed in into group to be placed on levelling bench on platform, marking upper supporting column anchor point, equatorial plate lower end on plate under the line, equatorial plate upper end is placed on the crossbeam of elevation and subsidence regulating device;The crossbeam of elevation and subsidence regulating device is held into equatorial plate upper end, adjusts the setting height(from bottom) of crossbeam, when the upper supporting column anchor point of equatorial plate reaches theoretical level apart from group to podium level, fixed cross beam, welds upper supporting column and equatorial plate at the upper supporting column anchor point of plate under the line;Lower supporting rod and pull bar annex are installed on the basis of, after lifting equatorial plate and fixed upper supporting column and lower supporting rod, other installations with coverboard are carried out after completing the installation of equatorial plate.The installation method of asymmetric equatorial zone coverboard proposed by the present invention, facilitates and equatorial plate is installed.

Description

The installation method of asymmetric equatorial zone coverboard
Technical field
The present invention relates to installation of spheroidal tank technical field, more particularly to a kind of installation method of asymmetric equatorial zone coverboard.
Background technology
Construction of spherical tank is divided into workshop making and in-site installation, the part directly mutually welded with Spherical Tank Shell Plates, such as upper supporting column and equator The workshop that is welded between plate completes, and spherical shell boards half-finished product, which is transported to job site, to carry out welding after lifting is combined into entirety again Connect.It is equatorial zone that traditional three employ one of symmetrical splitted structure form, its feature with spherical tanks, five band spherical tanks, seven with spherical tanks In broadwise and through being all upwards symmetrical, the broadwise center of equatorial plate is just on the central horizontal line of spherical tank Spherical Tank Shell Plates.Cause This, when equatorial plate is with spherical tank support column group pair, as long as the outside center position welding upper supporting column of plate under the line, you can ensure pillar During installation just with spherical tank tangent.Due to equator harden structure be it is full symmetric, therefore, very convenient group of symmetrical expression equatorial plate Weldering, such as Fig. 1.
With the constantly big volume of spherical tank, largest domestic Propylene Spherical Tanks have accomplished 40003, the maximization of spherical tank volume, make Obtain Spherical Tank Shell Plates divides valve typesetting form also diversified.In the case that spherical tank volume is certain, the block number of Spherical Tank Shell Plates is reduced as far as possible, it is real Existing spherical tank divides the optimization of valve, realizes the purpose for improving Spherical Tank Shell Plates stock utilization.Four-zone spherical tank is in the band spherical tank base of tradition three A kind of new point lobed formula to grow up on plinth, the equatorial zone of traditional spherical tank is divided into two in broadwise, that is, is divided into equator Band and upper temperature zone.The equator zone plate of four-zone spherical tank only has warp-wise symmetrically and broadwise is asymmetric, such as Fig. 2, referred to as asymmetric equatorial plate. If using conventional methods group asymmetric equatorial plate of weldering and a pillar, upper supporting column at an angle, is difficult to control with levelling bench Precision, installation effectiveness are low.In addition, method needs to build applying for the equatorial plate field assembly for lower supporting rod and with upper supporting column now Work platform, there are area requirements to job site place.
The content of the invention
It is a primary object of the present invention to provide a kind of installation method of asymmetric equatorial zone coverboard, it is intended to convenient to non-right Equatorial zone coverboard is claimed to be installed.
To achieve the above object, the present invention provides a kind of installation method of asymmetric equatorial zone coverboard, comprises the following steps:
Equatorial plate is placed in group and is placed in levelling bench on platform, marking upper supporting column anchor point, equatorial plate lower end on plate under the line On, equatorial plate upper end is placed on the crossbeam of elevation and subsidence regulating device;
The crossbeam of elevation and subsidence regulating device is held into equatorial plate upper end, adjusts the setting height(from bottom) of crossbeam, when the upper supporting column of equatorial plate is determined Site apart from group to podium level reach theoretical level when, fixed cross beam, under the line at the upper supporting column anchor point of plate welding on prop up Post;
Lower supporting rod and pull bar annex are installed on the basis of, after lifting equatorial plate and fixed upper supporting column and lower supporting rod, complete equatorial plate Installation after carry out other installations with coverboard.
Preferably, the upper supporting column anchor point on the equatorial plate is the intersection point of spherical tank central horizontal line and warp-wise line of symmetry.
Preferably, the two adjacent equatorial plates with upper supporting column are first lifted when lifting equatorial plate, successively, and fixed upper supporting column and Corresponding lower supporting rod, the equatorial plate without upper supporting column between two equatorial plates is then lifted, lifts other equatorial plates according to this.
Preferably, coordinated between upper supporting column and lower supporting rod using circumferential weld fixture and fixed block and fixed.
Preferably, when welding upper supporting column, ensure that it is relatively parallel to platform with group.
Preferably, after completing the lifting of all equatorial plates, physical dimension is to allowing to miss between integrally-regulated equatorial zone and pillar After in poor scope, then carry out other liftings with coverboard.
The installation method of asymmetric equatorial zone coverboard proposed by the present invention, has the advantages that:
1st, when workshop manufactures, by elevation and subsidence regulating device, asymmetric equatorial plate horizontal centre line position is transferred to virtual symmetrical high H is spent, is easy to measure the levelness of pillar and pillar during equatorial plate group pair.As long as ensure that pillar is horizontal, you can ensure pillar with it is red Guidance tape is tangent, facilitates the installation for carrying out equatorial plate;
2nd, during on-site consolidation, lower supporting rod is first installed(Include the annexes such as pull bar), when plate lifts under the line, upper supporting column and lower supporting rod it Between the connection of circumferential weld carry out in the air(Conventional method is that the welding between lower supporting rod is completed on ground construction platform, then is entered Row lifting), using circumferential weld fixture and fixed block mating connection group to lower supporting rod and the circumferential weld of upper supporting column, equatorial zone one is enclosed assembled complete Afterwards, then the integrally-regulated of physical dimension between equatorial zone and pillar is carried out, advantageously reduces assembling stress.Meanwhile this method is not Need to set up the construction platform of the equatorial plate field assembly for lower supporting rod and with upper supporting column, greatly reduce to job site place Area requirements.Meanwhile lifting machine-team can be saved, improve spherical tank lifting efficiency.
Brief description of the drawings
Fig. 1 is the structural representation of symmetrical expression equatorial plate;
Fig. 2 is the structural representation of asymmetric equatorial plate;
Fig. 3 is the installation method of this asymmetric equatorial zone coverboard in installation equatorial plate and the structural representation before upper supporting column;
Fig. 4 is the installation method of this asymmetric equatorial zone coverboard in installation equatorial plate and the structural representation after upper supporting column;
Fig. 5 be this asymmetric equatorial zone coverboard installation method in elevation and subsidence regulating device structural representation;
Fig. 6 is structural representation of the installation method of this asymmetric equatorial zone coverboard when installing lower supporting rod and its annex;
Fig. 7 is structural representation of the installation method of this asymmetric equatorial zone coverboard when installing first piece of equatorial plate;
Fig. 8 is structural representation of the installation method of this asymmetric equatorial zone coverboard when installing the 3rd piece of equatorial plate;
Fig. 9 be this asymmetric equatorial zone coverboard installation method under the line plate rigging out when structural representation.
In figure, 1- equatorial plates, 2- upper supporting columns, 3- lower supporting rods, 4- equatorial zones, 5- poles side plate, 6- poles side plate, the extremely middle plates of 7-, The upper pole bands of 8-, pole under 9-, 10- groups are horizontal to platform, 11- upper supporting column anchor points, 12- elevation and subsidence regulating devices, 13- jack, 14- Beam, 15- columns.
The realization, functional characteristics and advantage of the object of the invention will be described further referring to the drawings in conjunction with the embodiments.
Embodiment
It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not intended to limit the present invention.
It should be noted that in the description of the invention, term " transverse direction ", " longitudinal direction ", " on ", " under ", "front", "rear", The orientation or position relationship of the instruction such as "left", "right", " vertical ", " level ", " top ", " bottom ", " interior ", " outer " is based on accompanying drawing institutes The orientation or position relationship shown, it is for only for ease of the description present invention and simplifies description, is not instruction or implies signified dress Put or element there must be specific orientation, with specific azimuth configuration and operation, therefore it is not intended that to limit of the invention System.
Referring to figs. 1 to Fig. 9, in this preferred embodiment, a kind of installation method of asymmetric equatorial zone coverboard, including following step Suddenly:
Step S10, equatorial plate 1 is placed in group on platform 10, marking upper supporting column anchor point 11 on plate 1 under the line, under equatorial plate 1 End is placed on levelling bench, and the upper end of equatorial plate 1 is placed on the crossbeam 14 of elevation and subsidence regulating device 12;
Step S20, the crossbeam 14 of elevation and subsidence regulating device 12 is held into the upper end of equatorial plate 1, the setting height(from bottom) of crossbeam 14 is adjusted, when red The upper supporting column anchor point 11 of guidance tape 1 apart from group highly reach theoretical level to platform 10 when, fixed cross beam 14, plate 1 under the line Upper supporting column 2 is welded at upper supporting column anchor point 11;
Step S30, lower supporting rod 3 and pull bar annex are installed on the basis of, lift equatorial plate 1 and fixed upper supporting column 2 and lower supporting rod 3 Afterwards, other installations with coverboard are carried out after completing the installation of equatorial plate 1.
In step S10, the upper supporting column anchor point 11 on equatorial plate 1 is the friendship of spherical tank central horizontal line and warp-wise line of symmetry Point.When welding upper supporting column 2, ensure that it is relatively parallel to platform 10 with group.Elevation and subsidence regulating device 12 includes two columns 15, is located at Crossbeam 14 between two columns 15 and the jack 13 positioned at the lower section of crossbeam 14.Jack 13 drives crossbeam 14 to move up and down, The both sides progress that column 15 is used for equatorial plate 1 is spacing.
In step S30, when lifting equatorial plate 1, the two adjacent equatorial plates 1 with upper supporting column 2 are first lifted successively, and fix Pillar 2 and corresponding lower supporting rod 3, the equatorial plate 1 without upper supporting column 2 between two equatorial plates 1 is then lifted, is lifted according to this other Equatorial plate 1.Coordinated between upper supporting column 2 and lower supporting rod 3 using circumferential weld fixture and fixed block and fixed(Circumferential weld fixture and fixed block use Existing conventional equipment).
Complete after all equatorial plates 1 lift, physical dimension is to allowable error scope between integrally-regulated equatorial zone and pillar After interior(By adjusting installation site of the fixed block on circumferential weld fixture, to adjust distance between upper supporting column 2 and lower supporting rod 3), Other liftings with coverboard are carried out again.
It is specifically described below by taking a certain spherical tank as an example, spherical tank parameter is as follows:Spherical tank is by asymmetric equatorial zone, upper temperature Band, upper pole band, lower pole band composition, wherein 12 pieces of the asymmetric equator zone plate with upper supporting column 2, without the asymmetric equatorial zone of pillar 12 pieces of plate, 24 pieces of equatorial plates 1 altogether, pillar is made up of 3 two sections of upper supporting column 2 and lower supporting rod, such as Fig. 2.Its installation process is as follows.
(1)When workshop manufactures, equatorial plate 1 is placed in group on platform 10, marking spherical tank central horizontal line on plate 1 under the line With warp-wise line of symmetry, intersection point a is upper supporting column anchor point 11.The lower end of equatorial plate 1 is placed on levelling bench, and upper end is placed in rising-falling tone On the crossbeam 14 of regulating device 12, such as Fig. 4.
(2)Theoretical level h is calculated, by elevation and subsidence regulating device 12, crossbeam 14 holds the upper end of equatorial plate 1.When a points When highly reaching anomaly platform theoretical level h, fixed cross beam 14, such as Fig. 5.
(3)During on-site hoisting, lower supporting rod 3 and pull bar annex, such as Fig. 6 are first installed on the basis of.
(4)First piece of asymmetric equatorial plate 1 with upper supporting column 2 is lifted, such as Fig. 7.Group is to adopting between upper supporting column 2, lower supporting rod 3 Coordinated with circumferential weld fixture and fixed block and fixed, equatorial plate 1 is fixed using wind rope temporarily if necessary.
(5)Using the same method of previous step, lift with second piece of step 4 adjacent struts with the asymmetric of upper supporting column 2 Equatorial plate 1, the equatorial plate 1 without upper supporting column 2 of two intercolumniations is then lifted, such as Fig. 8.
(6)Step is used successively(4)And step(5), complete the lifting of asymmetric equatorial plate 1.Such as Fig. 9.It is integrally-regulated red Physical dimension is to after in the range of allowable error between road band and pillar, then carries out other liftings with coverboard.
Above method step(1)To step(2)Also it is applied to one-part form pillar(It is not divided to upper and lower two sections of corbeling shape Formula).Step(3)To step(6)Also it is applied to the on-site consolidation of symmetrical expression equatorial zone spherical tank.
The installation method of asymmetric equatorial zone coverboard proposed by the present invention, has the advantages that:
1st, when workshop manufactures, by elevation and subsidence regulating device 12, it is virtual right that the horizontal centre line position of asymmetric equatorial plate is transferred to Claim height h, be easy to measure the levelness of pillar and pillar during equatorial plate group pair.As long as ensure that pillar is horizontal, you can ensure pillar It is tangent with equatorial plate, facilitate the installation for carrying out equatorial plate;
2nd, during on-site consolidation, lower supporting rod 3 is first installed(Include the annexes such as pull bar), when plate lifts under the line, upper supporting column 2 and lower supporting rod The connection of circumferential weld is carried out in the air between 3(Conventional method is that the welding between lower supporting rod 3 is completed on ground construction platform, Lifted again), using circumferential weld fixture and fixed block mating connection group to lower supporting rod 3 and the circumferential weld of upper supporting column 2, equatorial zone one is enclosed It is assembled it is complete after, then carry out the integrally-regulated of physical dimension between equatorial zone and pillar, advantageously reduce assembling stress.Meanwhile should Method need not set up the construction platform of the equatorial plate field assembly for lower supporting rod 3 and with upper supporting column 2, greatly reduce to construction Live site area requirement.Meanwhile lifting machine-team can be saved, improve spherical tank lifting efficiency.
The preferred embodiments of the present invention are these are only, are not intended to limit the scope of the invention, it is every to utilize this hair The equivalent structure transformation that bright specification and accompanying drawing content are made, or other related technical areas are directly or indirectly used in, Similarly it is included within the scope of the present invention.

Claims (6)

1. a kind of installation method of asymmetric equatorial zone coverboard, it is characterised in that comprise the following steps:
Equatorial plate is placed in group and is placed in levelling bench on platform, marking upper supporting column anchor point, equatorial plate lower end on plate under the line On, equatorial plate upper end is placed on the crossbeam of elevation and subsidence regulating device;
The crossbeam of elevation and subsidence regulating device is held into equatorial plate upper end, adjusts the setting height(from bottom) of crossbeam, when the upper supporting column of equatorial plate is determined Site apart from group to podium level reach theoretical level when, fixed cross beam, under the line at the upper supporting column anchor point of plate welding on prop up Post;
Lower supporting rod and pull bar annex are installed on the basis of, after lifting equatorial plate and fixed upper supporting column and lower supporting rod, complete equatorial plate Installation after carry out other installations with coverboard.
2. the installation method of asymmetric equatorial zone coverboard as claimed in claim 1, it is characterised in that upper on the equatorial plate Pillar anchor point is the intersection point of spherical tank central horizontal line and warp-wise line of symmetry.
3. the installation method of asymmetric equatorial zone coverboard as claimed in claim 1, it is characterised in that during lifting equatorial plate, first The two adjacent equatorial plates with upper supporting column, and fixed upper supporting column and corresponding lower supporting rod are lifted successively, then lift two equatorial plates Between the equatorial plate without upper supporting column, lift other equatorial plates according to this.
4. the installation method of asymmetric equatorial zone coverboard as claimed in claim 1, it is characterised in that upper supporting column and lower supporting rod it Between coordinated using circumferential weld fixture and fixed block and fix.
5. the installation method of asymmetric equatorial zone coverboard as claimed in claim 1, it is characterised in that when welding upper supporting column, Ensure that it is relatively parallel to platform with group.
6. the installation method of the asymmetric equatorial zone coverboard as described in any one in claim 1 to 5, it is characterised in that complete After being lifted into all equatorial plates, physical dimension is to after in the range of allowable error between integrally-regulated equatorial zone and pillar, then enters The other liftings with coverboard of row.
CN201711049789.XA 2017-10-31 2017-10-31 Method for mounting asymmetric equatorial belt shell plate Active CN107824997B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711049789.XA CN107824997B (en) 2017-10-31 2017-10-31 Method for mounting asymmetric equatorial belt shell plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711049789.XA CN107824997B (en) 2017-10-31 2017-10-31 Method for mounting asymmetric equatorial belt shell plate

Publications (2)

Publication Number Publication Date
CN107824997A true CN107824997A (en) 2018-03-23
CN107824997B CN107824997B (en) 2020-10-16

Family

ID=61651215

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711049789.XA Active CN107824997B (en) 2017-10-31 2017-10-31 Method for mounting asymmetric equatorial belt shell plate

Country Status (1)

Country Link
CN (1) CN107824997B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115537483A (en) * 2022-10-24 2022-12-30 中国十九冶集团有限公司 Blast furnace five-way ball dehydrogenation treatment method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2709773Y (en) * 2003-12-30 2005-07-13 刘福录 Ball-shape storage tank
CN103343875A (en) * 2013-06-17 2013-10-09 武汉一冶钢结构有限责任公司 Double-layer spherical tank and hoisting method thereof
CN103883132A (en) * 2014-04-11 2014-06-25 沈阳工业安装工程股份有限公司 Method for assembling upper and lower seal heads of nuclear power containment and jig frame structure
CN104002079A (en) * 2014-05-12 2014-08-27 上海市安装工程集团有限公司 Welding-deforming-preventing stainless steel spherical tank spherical shell part assembling tool and method
CN105113776A (en) * 2015-09-18 2015-12-02 武汉一冶钢结构有限责任公司 Supporting device and construction method for top platform in upper pole of spherical tank
JP6139957B2 (en) * 2013-04-19 2017-05-31 三井造船株式会社 Sphere support structure for liquefied gas carrier

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2709773Y (en) * 2003-12-30 2005-07-13 刘福录 Ball-shape storage tank
JP6139957B2 (en) * 2013-04-19 2017-05-31 三井造船株式会社 Sphere support structure for liquefied gas carrier
CN103343875A (en) * 2013-06-17 2013-10-09 武汉一冶钢结构有限责任公司 Double-layer spherical tank and hoisting method thereof
CN103883132A (en) * 2014-04-11 2014-06-25 沈阳工业安装工程股份有限公司 Method for assembling upper and lower seal heads of nuclear power containment and jig frame structure
CN104002079A (en) * 2014-05-12 2014-08-27 上海市安装工程集团有限公司 Welding-deforming-preventing stainless steel spherical tank spherical shell part assembling tool and method
CN105113776A (en) * 2015-09-18 2015-12-02 武汉一冶钢结构有限责任公司 Supporting device and construction method for top platform in upper pole of spherical tank

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115537483A (en) * 2022-10-24 2022-12-30 中国十九冶集团有限公司 Blast furnace five-way ball dehydrogenation treatment method

Also Published As

Publication number Publication date
CN107824997B (en) 2020-10-16

Similar Documents

Publication Publication Date Title
CN106120559B (en) A kind of bridge limited bracket construction method and bridge
CN109779269B (en) Large-span truss sectional hoisting high-altitude folding measure device and construction method
CN106141476B (en) A kind of assemble method of super-large diameter without ribbed stiffener thin-wall semi top seal closure
CN109236012B (en) Method for hoisting power transmission line T-shaped guyed tower
CN103556836A (en) Method for assembling and constructing spherical reticulated shell under limited spatial condition
CN102235092A (en) Layered hoisting construction process for suspended steel structure
CN109025286A (en) A kind of construction method of large span high-altitude three-dimensional canopy of the heavens steel construction
CN106544959B (en) The construction method of king-tower lifting segment and bridge main tower saddle containing saddle
CN107491619A (en) A kind of old project steel construction that changes based on BIM technology positions construction method for hanging
CN108590322A (en) A kind of method of free-standing steel chimney upside-down method of hull-section construction assembling segmental hoisting
CN111395623B (en) Steel arch-shaped roof structure of nuclear power station and assembling construction method thereof
CN107083853A (en) Modularization multi-storied garage and its installation method
CN107824997A (en) The installation method of asymmetric equatorial zone coverboard
CN102496771A (en) Method and device for installing large-sized steel structural antenna
CN111827483B (en) Construction method for roof curved surface # -shaped combined steel truss girder
CN109179222A (en) A kind of pre-buried section gradient of derrick crane and levelness control construction method
CN108221702A (en) A kind of integral lifting apparatus of introversion formula steel case arch rib
CN104882267B (en) Method for adding angle ring to transformer coil assembly
CN107695961A (en) A kind of integrated form adjusting detection platform of side wall skeleton
CN109295858B (en) Integral assembly jig frame for steel shell sections of double-wall combined bridge tower and working method thereof
CN107143144A (en) Round multi-storied garage steel construction unit integrated installation method
CN114086594A (en) Support welding frock of offshore wind power jacket
CN206667213U (en) A kind of embedded parts structure of ship lift main equipment room steel lattice column
CN105817883B (en) Hydraulic press frame group is carried out to method using mold
CN207534763U (en) A kind of integrated form adjusting detection platform of side wall skeleton

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant