CN107818524A - Building industrialization system based on BIM technology - Google Patents

Building industrialization system based on BIM technology Download PDF

Info

Publication number
CN107818524A
CN107818524A CN201710995580.6A CN201710995580A CN107818524A CN 107818524 A CN107818524 A CN 107818524A CN 201710995580 A CN201710995580 A CN 201710995580A CN 107818524 A CN107818524 A CN 107818524A
Authority
CN
China
Prior art keywords
information
bim
building
management module
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710995580.6A
Other languages
Chinese (zh)
Inventor
黄晓冬
戴鸣
戴一鸣
张大镇
张月燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Architectural Design Research Institute Co Ltd
Original Assignee
Fujian Architectural Design Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Architectural Design Research Institute Co Ltd filed Critical Fujian Architectural Design Research Institute Co Ltd
Publication of CN107818524A publication Critical patent/CN107818524A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention is a kind of building industrialization system based on BIM technology.It includes BIM memory modules, information conversion module, manufactures system, logistics system, management module;BIM memory modules:For storing BIM all information;Information conversion module:BIM information is carried out decomposing classification and numbered according to the component being related in building;Manufacturing system:The information transmitted according to information conversion module, to different component produce simultaneously label;Logistics system:The product for manufacturing module generation is enclosed into radio frequency identification electronic label, while above- mentioned information is inputted in project component base;Management module:To construction, the building monitoring of O&M and feedback information.The present invention is through building life cycle management application;Realize to designing, manufacturing, the integration of carry out technology of constructing and standard;Ensure the seamless connection of Information barrier-free and each session information, realize value maximization of the information in building life cycle management application.

Description

Building industrialization system based on BIM technology
Technical field
Building industrialization system of the present invention, particularly a kind of building industrialization system based on BIM technology.
Background technology
Traditional architecture mode, all it is to be integrated with using plane drawing and construction, in actual mechanical process, easily It is improper to there is linking, causes construction speed to be delayed.
The content of the invention
It is an object of the invention to provide the building industrialization system based on BIM technology.
The purpose of the present invention is achieved through the following technical solutions:
A kind of building industrialization system based on BIM technology, BIM memory modules, information conversion module, life Produce manufacturing system, logistics system, management module;
BIM memory modules:For storing BIM all information;
Information conversion module:BIM information is carried out decomposing classification and numbered according to the component being related in building;
Manufacturing system:The information transmitted according to information conversion module, to different component produce simultaneously label;
Logistics system:The product for manufacturing module generation is enclosed into radio frequency identification electronic label, less radio-frequency is known Lifting comprising component and transit information, the order of classes or grades at school and route information that dispatch from the factory with delivery information, transport in other electronic tag;Simultaneously Above- mentioned information is inputted in project component base, to meet that factory delivers and construction speed requirement;
Management module:To construction, the building monitoring of O&M and feedback information.
For prior art, the advantage of the invention is that:
1st, building industrialization implementation process preferably uses BIM technology, through building life cycle management application.Bag Stage containing preconsolidation stress, design phase, fabrication stage, haulage stage, construction stage, completion of works delivery, operation maintenance management Etc. overall process.
2nd, the application of BIM technology should embody the theory of shared, integrated collaboration.In implementation process, project ginseng It should be fitted close, be realized to designing, manufacturing, the integration of carry out technology of constructing and standard with each side, each specialty.Realize Information barrier-free The seamless connection with each session information is transmitted, value maximization of the information in building life cycle management application is realized, reaches green Energy-conservation, the purpose saved.
3 BIM technology applications answer integrated structure main element, inside fitting component and line equipment to integrate, shape Into satisfaction standardization, information-based, industrialization, fabricated technological system.Realize Project design componentization, the reality of component information Apply pattern.
Brief description of the drawings
The connection relationship diagram of Fig. 1 systems patent of the present invention;
Embodiment
Present invention is described in detail with reference to Figure of description and embodiment:
BIM memory modules, information conversion module, manufacture system, logistics system, management module;
BIM memory modules:For storing BIM all information;
Information conversion module:BIM information is carried out decomposing classification and numbered according to the component being related in building;
Manufacturing system:The information transmitted according to information conversion module, to different component produce simultaneously label;
Logistics system:The product for manufacturing module generation is enclosed into radio frequency identification electronic label, less radio-frequency is known Lifting comprising component and transit information, the order of classes or grades at school and route information that dispatch from the factory with delivery information, transport in other electronic tag;Simultaneously Above- mentioned information is inputted in project component base, to meet that factory delivers and construction speed requirement;
Management module:To construction, the building monitoring of O&M and feedback information.
In BIM memory modules, the information that BIM designs each stage is stored;It is actual comprising preconsolidation stress stage, scheme Stage, construction documents design phase;
The preconsolidation stress design phase:The performance evaluation of building should be carried out using BIM, comprising saving, adopt Light, noise, wind environment etc. are analyzed.Meet the sunykatuib analysis requirement of green building.
Schematic design phase:Should according to building the characteristics of with architecture construction pattern carry out performance evaluation, optimizing design scheme, Standardized components system is divided.Using existing versatile component as Basic Design unit, form project structure and (match somebody with somebody) part and mark Standardization storehouse.
Construction documents design phase:Integrate preconsolidation stress and schematic design phase information, in-depth model structure (matches somebody with somebody) part, component Exploitativeness.By pipeline collision detection and each specialty collaboration, form drawing quality and self close, meet setting for construction criteria Count file.
Design phase should carry out construction simulation, i.e., (match somebody with somebody) part to structure, component carries out preassembling, check design accuracy and can be real Shi Xing.
Design phase should carry out pipeline, structure (matches somebody with somebody) part collision detection, pipeline layout design document inside and outside forming chamber.Its achievement Each specialty specification requirement and manufacture, construction requirement should be met.And it should meet to build the requirements such as clear height.
Information conversion module:BIM information is carried out decomposing classification and numbered according to the component being related in building;
The BIM models of component have unique mark, the file designation rule of component:(specialty)+classification+model is numbered, in Between use (-) Symbolic Links, numbering is corresponding with specialty.Designing unit also can voluntarily formulate component name, classification and encoding scheme, preferably Classified using face point-score, but unified component management rule should be established, establish the component resource storehouse of our unit or project, it is real The establishment of existing component, collection, editor, storage, use, abolishments etc. effectively manage.
Designing unit should be provided to prefabricated components manufacturer and unit in charge of construction component installation steps, Node Processing Method, The association index information of component and threedimensional model.
Manufacturing system:The information transmitted according to information conversion module, to different component produce simultaneously label;
This stage should be deepened according to design phase model, according to the member unit of design partition, with reference to plant produced Equipment and site operation situation carry out the production fractionation that structure (matches somebody with somebody) part component.Form fabrication stage special purpose model, Combined design letter Breath and manufacture information.
Prefabricated components manufacturer should have carries out streamline, the technique of e-manufacturing based on BIM Flow.Meet the requirement of industrialized production, meet the accuracy of manufacture, shipping mass control, the requirement of installation accuracy.
All prefabricated structures (match somebody with somebody) part, component answers additional two-dimensional information code or less radio-frequency core before transport and installation is delivered Piece, following information should be included:
Designing unit:The geometric properties and non-geometry information (including location dimension and coordinate) of component and fitting, installation position.Structure Part forms and constructed substantially way.Manufacture, transport, construction precautions.
Production information:Production information (including the information such as material information, produce order, producers), quality information, transport And construction precautions.
Transit information:Transit information and the points for attention of transport.Join information.
Construction information:Join information, measurement and mount message, completion information, quality information.
Supervisory information:Whether satisfaction design and code requirement and quality information.
Operation maintenance information:Reminded comprising above- mentioned information, and to main attention item.
Component manufacturer should provide component installation steps, Node Processing Method, component and threedimensional model to unit in charge of construction Association index information.
Logistics system:The product for manufacturing module generation is enclosed into Quick Response Code or RFID technique (radio frequency identification electricity Subtab), form the BIM technology application system based on RFID technique.Quick Response Code or RFID technique include component Lifting and transit information, the order of classes or grades at school and route information that dispatch from the factory with delivery information, transport.And in project structure (matches somebody with somebody) part storehouse in input Information is stated, meets that factory delivers and construction speed requirement.The process (matches somebody with somebody) the whole transportation of part, component through structure.
Management module:To construction, the building monitoring of O&M and feedback information.It has been divided into construction management module and O&M Management module:
Construction management module
Unit in charge of construction should be deepened according to the BIM of design, fabrication stage, with reference to Design of Construction Organization, shape Into construction model.
Before formal construction, component information confirmation should be carried out, and uses construction simulation, determines assembling, the transport order of component. The risk prevention system document of component installation is formed, is loaded into construction simulation information.
Site operation should use measurement and the construction equipment of the compatible BIM of energy, it is ensured that the accuracy of information is with applying Work precision
Preferably according to practice of construction quality and progress and Virtual Construction quality and the contrasting detection of progress, construction information is carried out Management and control.
Construction information should be added in construction in RFID card, and is entered information into BIM.Correlation is believed Breath is detected and checked.
In work progress, all mount messages all should be loaded into completion model, and formation can correctly reflect real equipment shape The related data of state, installation situation, O&M.Integration architecture object space information and facility information and construction information, and merge quality inspection Information forms completion model.
Operation management module
This stage based on the model that is completed, Integration Design information, manufactures information, transit information and the letter of construction stage Breath.Fabric structure facility is provided《Wall, beam, plate, post, roof etc.》, facility information (details such as unit type), fully The advantage of BIM space orientation and data fusion is played, accurate judgement is made to the applicable state of equipment and building, Physical performance is built to improve, energy consumption and maintenance cost are reduced, to reduce maintenance cost.
Completion BIM model datas information should be associated with operation management platform, and information inquiry, figure are provided for operation management The functions such as paper tube reason, repair prompt, risk prevention system, issue handling.
Forbid entering the agent structure of building in the operation management stage row information change, actual conditions can be directed to, to machine The relevant information of electric equipment carries out improving change.

Claims (2)

  1. A kind of 1. building industrialization system based on BIM technology, it is characterised in that:BIM memory modules, information turn Change module, manufacture system, logistics system, management module;
    BIM memory modules:For storing BIM all information;
    Information conversion module:BIM information is carried out decomposing classification and numbered according to the component being related in building;
    Manufacturing system:The information transmitted according to information conversion module, to different component produce simultaneously label;
    Logistics system:The product for manufacturing module generation is enclosed into radio frequency identification electronic label, radio frequency identification electricity Lifting comprising component and transit information, the order of classes or grades at school and route information that dispatch from the factory with delivery information, transport in subtab;Simultaneously in item Above- mentioned information is inputted in mesh component base, to meet that factory delivers and construction speed requirement;
    Management module:To construction, the building monitoring of O&M and feedback information.
  2. 2. the building industrialization system according to claim 1 based on BIM technology, it is characterised in that:It is described Management module include construction management module, operation management module;
    Construction management module, operation management module include information read device and information storage equipment.
CN201710995580.6A 2016-10-25 2017-10-23 Building industrialization system based on BIM technology Pending CN107818524A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201610938815 2016-10-25
CN2016109388153 2016-10-25

Publications (1)

Publication Number Publication Date
CN107818524A true CN107818524A (en) 2018-03-20

Family

ID=61608423

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710995580.6A Pending CN107818524A (en) 2016-10-25 2017-10-23 Building industrialization system based on BIM technology

Country Status (1)

Country Link
CN (1) CN107818524A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108647753A (en) * 2018-05-04 2018-10-12 桂林电子科技大学 A kind of construction site method for prewarning risk based on BIM and RFID technique
CN109033654A (en) * 2018-08-02 2018-12-18 南京东南建筑机电抗震研究院有限公司 A kind of science of bridge building component classification and coding method based on IFD
CN109543209A (en) * 2018-09-19 2019-03-29 中建科技有限公司深圳分公司 A kind of management method and device of component database
CN109886643A (en) * 2019-01-29 2019-06-14 杭州凌望建筑科技有限公司 BIM multidimensional mould based on IOS examines platform
CN110543530A (en) * 2019-09-06 2019-12-06 中国电建集团昆明勘测设计研究院有限公司 Method for realizing rapid coding of pumped storage power station model component by utilizing Dynamo
CN110909972A (en) * 2019-09-17 2020-03-24 金陵科技学院 BIM-based steel structure life cycle management system and method
CN112184180A (en) * 2020-10-16 2021-01-05 沈阳城市学院 Building life cycle management equipment based on BIM
CN112434123A (en) * 2020-11-25 2021-03-02 马鞍山学院 Rail transit life-cycle management data storage method based on BIM and RFID
CN116629555A (en) * 2023-05-29 2023-08-22 龚黎 Intelligent building integrated management system based on BIM and Internet of things technology

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103268576A (en) * 2013-05-29 2013-08-28 上海大学 System and method for checking and accepting quality of precast concrete component
CN103530827A (en) * 2013-09-26 2014-01-22 中铁建设集团有限公司 Assembly type building component intelligent management system based on BIM (building information modeling)
CN103544556A (en) * 2013-09-06 2014-01-29 上海大学 Life-cycle management system and method for tunnels
KR101595243B1 (en) * 2015-05-04 2016-02-19 주식회사 두올테크 Automatic modeling system for facility in field based building information modeling and method thereof
CN105956310A (en) * 2016-05-16 2016-09-21 中建安装工程有限公司 Technology for electromechanical modularized design and combined installation

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103268576A (en) * 2013-05-29 2013-08-28 上海大学 System and method for checking and accepting quality of precast concrete component
CN103544556A (en) * 2013-09-06 2014-01-29 上海大学 Life-cycle management system and method for tunnels
CN103530827A (en) * 2013-09-26 2014-01-22 中铁建设集团有限公司 Assembly type building component intelligent management system based on BIM (building information modeling)
KR101595243B1 (en) * 2015-05-04 2016-02-19 주식회사 두올테크 Automatic modeling system for facility in field based building information modeling and method thereof
CN105956310A (en) * 2016-05-16 2016-09-21 中建安装工程有限公司 Technology for electromechanical modularized design and combined installation

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108647753A (en) * 2018-05-04 2018-10-12 桂林电子科技大学 A kind of construction site method for prewarning risk based on BIM and RFID technique
CN109033654A (en) * 2018-08-02 2018-12-18 南京东南建筑机电抗震研究院有限公司 A kind of science of bridge building component classification and coding method based on IFD
CN109543209A (en) * 2018-09-19 2019-03-29 中建科技有限公司深圳分公司 A kind of management method and device of component database
CN109543209B (en) * 2018-09-19 2023-06-09 中建科技有限公司深圳分公司 Management method and device for component database
CN109886643A (en) * 2019-01-29 2019-06-14 杭州凌望建筑科技有限公司 BIM multidimensional mould based on IOS examines platform
CN110543530A (en) * 2019-09-06 2019-12-06 中国电建集团昆明勘测设计研究院有限公司 Method for realizing rapid coding of pumped storage power station model component by utilizing Dynamo
CN110909972A (en) * 2019-09-17 2020-03-24 金陵科技学院 BIM-based steel structure life cycle management system and method
CN110909972B (en) * 2019-09-17 2023-09-26 金陵科技学院 BIM-based steel structure full life cycle management system and method
CN112184180A (en) * 2020-10-16 2021-01-05 沈阳城市学院 Building life cycle management equipment based on BIM
CN112434123A (en) * 2020-11-25 2021-03-02 马鞍山学院 Rail transit life-cycle management data storage method based on BIM and RFID
CN116629555A (en) * 2023-05-29 2023-08-22 龚黎 Intelligent building integrated management system based on BIM and Internet of things technology

Similar Documents

Publication Publication Date Title
CN107818524A (en) Building industrialization system based on BIM technology
Qi et al. A systematic review of emerging technologies in industrialized construction
Darko et al. Building information modeling (BIM)-based modular integrated construction risk management–Critical survey and future needs
CN107967399B (en) Assembly type building deepening design method based on BIM software
Kosse et al. Digital twin framework for enabling serial construction
Fengque et al. Research on design of the smart factory for forging enterprise in the industry 4.0 environment
Ma et al. Visualization of component status information of prefabricated concrete building based on building information modeling and radio frequency identification: a case study in China
CN109544084A (en) A kind of assembled architecture systematic difference method, system and terminal device
CN103996102A (en) Container body inspection method
Dias et al. Layout and process optimisation: using computer-aided design (CAD) and simulation through an integrated systems design tool
CN116303819B (en) Data processing method and device based on digital twin implementation under warehousing system
CN104574021A (en) In-stock spare part inventory management system and transportation route generating algorithm thereof
Marchuk et al. World trends in warehousing logistics
CN103530664A (en) Production management system of tunnel segment
CN115345987A (en) Rice supply chain digital twin model construction method based on identification analysis system
CN107341598A (en) Semantic and geometry calculations incorporated complex building specification accordance detection means and method
Han et al. A novel IoT-Cloud-BIM based intelligent information management system in building industrialization
Liu et al. Research on the framework of internet of things in manufacturing for aircraft large components assembly site
CN118350593A (en) Intelligent construction method, system, equipment and medium for modularized integrated building
CN111321902A (en) System and method for hoisting components on assembly building construction site
Feng et al. An intelligent logistics management model in prefabricated construction
KR20110075983A (en) System and method for building parts assembly line
CN107832951A (en) Application processes and system of the BIM in precast concrete supply chain
CN116186840A (en) Digital construction prefabrication processing method for large-scale high-tech engineering project air pipes
Zhu et al. Vision-based precast concrete management plan in off-site construction site: Using PC member quality grades

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination