CN107818524A - Building industrialization system based on BIM technology - Google Patents
Building industrialization system based on BIM technology Download PDFInfo
- Publication number
- CN107818524A CN107818524A CN201710995580.6A CN201710995580A CN107818524A CN 107818524 A CN107818524 A CN 107818524A CN 201710995580 A CN201710995580 A CN 201710995580A CN 107818524 A CN107818524 A CN 107818524A
- Authority
- CN
- China
- Prior art keywords
- information
- bim
- building
- management module
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000005516 engineering process Methods 0.000 title claims abstract description 15
- 238000010276 construction Methods 0.000 claims abstract description 36
- 238000004519 manufacturing process Methods 0.000 claims abstract description 27
- 238000006243 chemical reaction Methods 0.000 claims abstract description 13
- 238000012544 monitoring process Methods 0.000 claims abstract description 5
- 238000007726 management method Methods 0.000 claims description 20
- 238000009430 construction management Methods 0.000 claims description 4
- 230000008859 change Effects 0.000 claims description 3
- 230000005611 electricity Effects 0.000 claims description 2
- 230000010354 integration Effects 0.000 abstract description 4
- 238000013461 design Methods 0.000 description 21
- 238000000034 method Methods 0.000 description 8
- 238000009434 installation Methods 0.000 description 7
- 238000012423 maintenance Methods 0.000 description 4
- 230000008569 process Effects 0.000 description 4
- 238000001514 detection method Methods 0.000 description 3
- 238000004088 simulation Methods 0.000 description 3
- 230000008901 benefit Effects 0.000 description 2
- 238000011156 evaluation Methods 0.000 description 2
- 238000005259 measurement Methods 0.000 description 2
- 230000002265 prevention Effects 0.000 description 2
- 238000003672 processing method Methods 0.000 description 2
- 230000004044 response Effects 0.000 description 2
- 241000208340 Araliaceae Species 0.000 description 1
- 241001269238 Data Species 0.000 description 1
- 241000196324 Embryophyta Species 0.000 description 1
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 description 1
- 235000003140 Panax quinquefolius Nutrition 0.000 description 1
- 238000004458 analytical method Methods 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000012790 confirmation Methods 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000004134 energy conservation Methods 0.000 description 1
- 238000005265 energy consumption Methods 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 238000005194 fractionation Methods 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 230000004927 fusion Effects 0.000 description 1
- 235000008434 ginseng Nutrition 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000010297 mechanical methods and process Methods 0.000 description 1
- 230000005226 mechanical processes and functions Effects 0.000 description 1
- 230000008520 organization Effects 0.000 description 1
- 238000005192 partition Methods 0.000 description 1
- 230000036314 physical performance Effects 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- GOLXNESZZPUPJE-UHFFFAOYSA-N spiromesifen Chemical compound CC1=CC(C)=CC(C)=C1C(C(O1)=O)=C(OC(=O)CC(C)(C)C)C11CCCC1 GOLXNESZZPUPJE-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Health & Medical Sciences (AREA)
- Economics (AREA)
- General Health & Medical Sciences (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- General Factory Administration (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention is a kind of building industrialization system based on BIM technology.It includes BIM memory modules, information conversion module, manufactures system, logistics system, management module;BIM memory modules:For storing BIM all information;Information conversion module:BIM information is carried out decomposing classification and numbered according to the component being related in building;Manufacturing system:The information transmitted according to information conversion module, to different component produce simultaneously label;Logistics system:The product for manufacturing module generation is enclosed into radio frequency identification electronic label, while above- mentioned information is inputted in project component base;Management module:To construction, the building monitoring of O&M and feedback information.The present invention is through building life cycle management application;Realize to designing, manufacturing, the integration of carry out technology of constructing and standard;Ensure the seamless connection of Information barrier-free and each session information, realize value maximization of the information in building life cycle management application.
Description
Technical field
Building industrialization system of the present invention, particularly a kind of building industrialization system based on BIM technology.
Background technology
Traditional architecture mode, all it is to be integrated with using plane drawing and construction, in actual mechanical process, easily
It is improper to there is linking, causes construction speed to be delayed.
The content of the invention
It is an object of the invention to provide the building industrialization system based on BIM technology.
The purpose of the present invention is achieved through the following technical solutions:
A kind of building industrialization system based on BIM technology, BIM memory modules, information conversion module, life
Produce manufacturing system, logistics system, management module;
BIM memory modules:For storing BIM all information;
Information conversion module:BIM information is carried out decomposing classification and numbered according to the component being related in building;
Manufacturing system:The information transmitted according to information conversion module, to different component produce simultaneously label;
Logistics system:The product for manufacturing module generation is enclosed into radio frequency identification electronic label, less radio-frequency is known
Lifting comprising component and transit information, the order of classes or grades at school and route information that dispatch from the factory with delivery information, transport in other electronic tag;Simultaneously
Above- mentioned information is inputted in project component base, to meet that factory delivers and construction speed requirement;
Management module:To construction, the building monitoring of O&M and feedback information.
For prior art, the advantage of the invention is that:
1st, building industrialization implementation process preferably uses BIM technology, through building life cycle management application.Bag
Stage containing preconsolidation stress, design phase, fabrication stage, haulage stage, construction stage, completion of works delivery, operation maintenance management
Etc. overall process.
2nd, the application of BIM technology should embody the theory of shared, integrated collaboration.In implementation process, project ginseng
It should be fitted close, be realized to designing, manufacturing, the integration of carry out technology of constructing and standard with each side, each specialty.Realize Information barrier-free
The seamless connection with each session information is transmitted, value maximization of the information in building life cycle management application is realized, reaches green
Energy-conservation, the purpose saved.
3 BIM technology applications answer integrated structure main element, inside fitting component and line equipment to integrate, shape
Into satisfaction standardization, information-based, industrialization, fabricated technological system.Realize Project design componentization, the reality of component information
Apply pattern.
Brief description of the drawings
The connection relationship diagram of Fig. 1 systems patent of the present invention;
Embodiment
Present invention is described in detail with reference to Figure of description and embodiment:
BIM memory modules, information conversion module, manufacture system, logistics system, management module;
BIM memory modules:For storing BIM all information;
Information conversion module:BIM information is carried out decomposing classification and numbered according to the component being related in building;
Manufacturing system:The information transmitted according to information conversion module, to different component produce simultaneously label;
Logistics system:The product for manufacturing module generation is enclosed into radio frequency identification electronic label, less radio-frequency is known
Lifting comprising component and transit information, the order of classes or grades at school and route information that dispatch from the factory with delivery information, transport in other electronic tag;Simultaneously
Above- mentioned information is inputted in project component base, to meet that factory delivers and construction speed requirement;
Management module:To construction, the building monitoring of O&M and feedback information.
In BIM memory modules, the information that BIM designs each stage is stored;It is actual comprising preconsolidation stress stage, scheme
Stage, construction documents design phase;
The preconsolidation stress design phase:The performance evaluation of building should be carried out using BIM, comprising saving, adopt
Light, noise, wind environment etc. are analyzed.Meet the sunykatuib analysis requirement of green building.
Schematic design phase:Should according to building the characteristics of with architecture construction pattern carry out performance evaluation, optimizing design scheme,
Standardized components system is divided.Using existing versatile component as Basic Design unit, form project structure and (match somebody with somebody) part and mark
Standardization storehouse.
Construction documents design phase:Integrate preconsolidation stress and schematic design phase information, in-depth model structure (matches somebody with somebody) part, component
Exploitativeness.By pipeline collision detection and each specialty collaboration, form drawing quality and self close, meet setting for construction criteria
Count file.
Design phase should carry out construction simulation, i.e., (match somebody with somebody) part to structure, component carries out preassembling, check design accuracy and can be real
Shi Xing.
Design phase should carry out pipeline, structure (matches somebody with somebody) part collision detection, pipeline layout design document inside and outside forming chamber.Its achievement
Each specialty specification requirement and manufacture, construction requirement should be met.And it should meet to build the requirements such as clear height.
Information conversion module:BIM information is carried out decomposing classification and numbered according to the component being related in building;
The BIM models of component have unique mark, the file designation rule of component:(specialty)+classification+model is numbered, in
Between use (-) Symbolic Links, numbering is corresponding with specialty.Designing unit also can voluntarily formulate component name, classification and encoding scheme, preferably
Classified using face point-score, but unified component management rule should be established, establish the component resource storehouse of our unit or project, it is real
The establishment of existing component, collection, editor, storage, use, abolishments etc. effectively manage.
Designing unit should be provided to prefabricated components manufacturer and unit in charge of construction component installation steps, Node Processing Method,
The association index information of component and threedimensional model.
Manufacturing system:The information transmitted according to information conversion module, to different component produce simultaneously label;
This stage should be deepened according to design phase model, according to the member unit of design partition, with reference to plant produced
Equipment and site operation situation carry out the production fractionation that structure (matches somebody with somebody) part component.Form fabrication stage special purpose model, Combined design letter
Breath and manufacture information.
Prefabricated components manufacturer should have carries out streamline, the technique of e-manufacturing based on BIM
Flow.Meet the requirement of industrialized production, meet the accuracy of manufacture, shipping mass control, the requirement of installation accuracy.
All prefabricated structures (match somebody with somebody) part, component answers additional two-dimensional information code or less radio-frequency core before transport and installation is delivered
Piece, following information should be included:
Designing unit:The geometric properties and non-geometry information (including location dimension and coordinate) of component and fitting, installation position.Structure
Part forms and constructed substantially way.Manufacture, transport, construction precautions.
Production information:Production information (including the information such as material information, produce order, producers), quality information, transport
And construction precautions.
Transit information:Transit information and the points for attention of transport.Join information.
Construction information:Join information, measurement and mount message, completion information, quality information.
Supervisory information:Whether satisfaction design and code requirement and quality information.
Operation maintenance information:Reminded comprising above- mentioned information, and to main attention item.
Component manufacturer should provide component installation steps, Node Processing Method, component and threedimensional model to unit in charge of construction
Association index information.
Logistics system:The product for manufacturing module generation is enclosed into Quick Response Code or RFID technique (radio frequency identification electricity
Subtab), form the BIM technology application system based on RFID technique.Quick Response Code or RFID technique include component
Lifting and transit information, the order of classes or grades at school and route information that dispatch from the factory with delivery information, transport.And in project structure (matches somebody with somebody) part storehouse in input
Information is stated, meets that factory delivers and construction speed requirement.The process (matches somebody with somebody) the whole transportation of part, component through structure.
Management module:To construction, the building monitoring of O&M and feedback information.It has been divided into construction management module and O&M
Management module:
Construction management module
Unit in charge of construction should be deepened according to the BIM of design, fabrication stage, with reference to Design of Construction Organization, shape
Into construction model.
Before formal construction, component information confirmation should be carried out, and uses construction simulation, determines assembling, the transport order of component.
The risk prevention system document of component installation is formed, is loaded into construction simulation information.
Site operation should use measurement and the construction equipment of the compatible BIM of energy, it is ensured that the accuracy of information is with applying
Work precision
Preferably according to practice of construction quality and progress and Virtual Construction quality and the contrasting detection of progress, construction information is carried out
Management and control.
Construction information should be added in construction in RFID card, and is entered information into BIM.Correlation is believed
Breath is detected and checked.
In work progress, all mount messages all should be loaded into completion model, and formation can correctly reflect real equipment shape
The related data of state, installation situation, O&M.Integration architecture object space information and facility information and construction information, and merge quality inspection
Information forms completion model.
Operation management module
This stage based on the model that is completed, Integration Design information, manufactures information, transit information and the letter of construction stage
Breath.Fabric structure facility is provided《Wall, beam, plate, post, roof etc.》, facility information (details such as unit type), fully
The advantage of BIM space orientation and data fusion is played, accurate judgement is made to the applicable state of equipment and building,
Physical performance is built to improve, energy consumption and maintenance cost are reduced, to reduce maintenance cost.
Completion BIM model datas information should be associated with operation management platform, and information inquiry, figure are provided for operation management
The functions such as paper tube reason, repair prompt, risk prevention system, issue handling.
Forbid entering the agent structure of building in the operation management stage row information change, actual conditions can be directed to, to machine
The relevant information of electric equipment carries out improving change.
Claims (2)
- A kind of 1. building industrialization system based on BIM technology, it is characterised in that:BIM memory modules, information turn Change module, manufacture system, logistics system, management module;BIM memory modules:For storing BIM all information;Information conversion module:BIM information is carried out decomposing classification and numbered according to the component being related in building;Manufacturing system:The information transmitted according to information conversion module, to different component produce simultaneously label;Logistics system:The product for manufacturing module generation is enclosed into radio frequency identification electronic label, radio frequency identification electricity Lifting comprising component and transit information, the order of classes or grades at school and route information that dispatch from the factory with delivery information, transport in subtab;Simultaneously in item Above- mentioned information is inputted in mesh component base, to meet that factory delivers and construction speed requirement;Management module:To construction, the building monitoring of O&M and feedback information.
- 2. the building industrialization system according to claim 1 based on BIM technology, it is characterised in that:It is described Management module include construction management module, operation management module;Construction management module, operation management module include information read device and information storage equipment.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610938815 | 2016-10-25 | ||
CN2016109388153 | 2016-10-25 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107818524A true CN107818524A (en) | 2018-03-20 |
Family
ID=61608423
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710995580.6A Pending CN107818524A (en) | 2016-10-25 | 2017-10-23 | Building industrialization system based on BIM technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107818524A (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108647753A (en) * | 2018-05-04 | 2018-10-12 | 桂林电子科技大学 | A kind of construction site method for prewarning risk based on BIM and RFID technique |
CN109033654A (en) * | 2018-08-02 | 2018-12-18 | 南京东南建筑机电抗震研究院有限公司 | A kind of science of bridge building component classification and coding method based on IFD |
CN109543209A (en) * | 2018-09-19 | 2019-03-29 | 中建科技有限公司深圳分公司 | A kind of management method and device of component database |
CN109886643A (en) * | 2019-01-29 | 2019-06-14 | 杭州凌望建筑科技有限公司 | BIM multidimensional mould based on IOS examines platform |
CN110543530A (en) * | 2019-09-06 | 2019-12-06 | 中国电建集团昆明勘测设计研究院有限公司 | Method for realizing rapid coding of pumped storage power station model component by utilizing Dynamo |
CN110909972A (en) * | 2019-09-17 | 2020-03-24 | 金陵科技学院 | BIM-based steel structure life cycle management system and method |
CN112184180A (en) * | 2020-10-16 | 2021-01-05 | 沈阳城市学院 | Building life cycle management equipment based on BIM |
CN112434123A (en) * | 2020-11-25 | 2021-03-02 | 马鞍山学院 | Rail transit life-cycle management data storage method based on BIM and RFID |
CN116629555A (en) * | 2023-05-29 | 2023-08-22 | 龚黎 | Intelligent building integrated management system based on BIM and Internet of things technology |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103268576A (en) * | 2013-05-29 | 2013-08-28 | 上海大学 | System and method for checking and accepting quality of precast concrete component |
CN103530827A (en) * | 2013-09-26 | 2014-01-22 | 中铁建设集团有限公司 | Assembly type building component intelligent management system based on BIM (building information modeling) |
CN103544556A (en) * | 2013-09-06 | 2014-01-29 | 上海大学 | Life-cycle management system and method for tunnels |
KR101595243B1 (en) * | 2015-05-04 | 2016-02-19 | 주식회사 두올테크 | Automatic modeling system for facility in field based building information modeling and method thereof |
CN105956310A (en) * | 2016-05-16 | 2016-09-21 | 中建安装工程有限公司 | Technology for electromechanical modularized design and combined installation |
-
2017
- 2017-10-23 CN CN201710995580.6A patent/CN107818524A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103268576A (en) * | 2013-05-29 | 2013-08-28 | 上海大学 | System and method for checking and accepting quality of precast concrete component |
CN103544556A (en) * | 2013-09-06 | 2014-01-29 | 上海大学 | Life-cycle management system and method for tunnels |
CN103530827A (en) * | 2013-09-26 | 2014-01-22 | 中铁建设集团有限公司 | Assembly type building component intelligent management system based on BIM (building information modeling) |
KR101595243B1 (en) * | 2015-05-04 | 2016-02-19 | 주식회사 두올테크 | Automatic modeling system for facility in field based building information modeling and method thereof |
CN105956310A (en) * | 2016-05-16 | 2016-09-21 | 中建安装工程有限公司 | Technology for electromechanical modularized design and combined installation |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108647753A (en) * | 2018-05-04 | 2018-10-12 | 桂林电子科技大学 | A kind of construction site method for prewarning risk based on BIM and RFID technique |
CN109033654A (en) * | 2018-08-02 | 2018-12-18 | 南京东南建筑机电抗震研究院有限公司 | A kind of science of bridge building component classification and coding method based on IFD |
CN109543209A (en) * | 2018-09-19 | 2019-03-29 | 中建科技有限公司深圳分公司 | A kind of management method and device of component database |
CN109543209B (en) * | 2018-09-19 | 2023-06-09 | 中建科技有限公司深圳分公司 | Management method and device for component database |
CN109886643A (en) * | 2019-01-29 | 2019-06-14 | 杭州凌望建筑科技有限公司 | BIM multidimensional mould based on IOS examines platform |
CN110543530A (en) * | 2019-09-06 | 2019-12-06 | 中国电建集团昆明勘测设计研究院有限公司 | Method for realizing rapid coding of pumped storage power station model component by utilizing Dynamo |
CN110909972A (en) * | 2019-09-17 | 2020-03-24 | 金陵科技学院 | BIM-based steel structure life cycle management system and method |
CN110909972B (en) * | 2019-09-17 | 2023-09-26 | 金陵科技学院 | BIM-based steel structure full life cycle management system and method |
CN112184180A (en) * | 2020-10-16 | 2021-01-05 | 沈阳城市学院 | Building life cycle management equipment based on BIM |
CN112434123A (en) * | 2020-11-25 | 2021-03-02 | 马鞍山学院 | Rail transit life-cycle management data storage method based on BIM and RFID |
CN116629555A (en) * | 2023-05-29 | 2023-08-22 | 龚黎 | Intelligent building integrated management system based on BIM and Internet of things technology |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107818524A (en) | Building industrialization system based on BIM technology | |
Qi et al. | A systematic review of emerging technologies in industrialized construction | |
Darko et al. | Building information modeling (BIM)-based modular integrated construction risk management–Critical survey and future needs | |
CN107967399B (en) | Assembly type building deepening design method based on BIM software | |
Kosse et al. | Digital twin framework for enabling serial construction | |
Fengque et al. | Research on design of the smart factory for forging enterprise in the industry 4.0 environment | |
Ma et al. | Visualization of component status information of prefabricated concrete building based on building information modeling and radio frequency identification: a case study in China | |
CN109544084A (en) | A kind of assembled architecture systematic difference method, system and terminal device | |
CN103996102A (en) | Container body inspection method | |
Dias et al. | Layout and process optimisation: using computer-aided design (CAD) and simulation through an integrated systems design tool | |
CN116303819B (en) | Data processing method and device based on digital twin implementation under warehousing system | |
CN104574021A (en) | In-stock spare part inventory management system and transportation route generating algorithm thereof | |
Marchuk et al. | World trends in warehousing logistics | |
CN103530664A (en) | Production management system of tunnel segment | |
CN115345987A (en) | Rice supply chain digital twin model construction method based on identification analysis system | |
CN107341598A (en) | Semantic and geometry calculations incorporated complex building specification accordance detection means and method | |
Han et al. | A novel IoT-Cloud-BIM based intelligent information management system in building industrialization | |
Liu et al. | Research on the framework of internet of things in manufacturing for aircraft large components assembly site | |
CN118350593A (en) | Intelligent construction method, system, equipment and medium for modularized integrated building | |
CN111321902A (en) | System and method for hoisting components on assembly building construction site | |
Feng et al. | An intelligent logistics management model in prefabricated construction | |
KR20110075983A (en) | System and method for building parts assembly line | |
CN107832951A (en) | Application processes and system of the BIM in precast concrete supply chain | |
CN116186840A (en) | Digital construction prefabrication processing method for large-scale high-tech engineering project air pipes | |
Zhu et al. | Vision-based precast concrete management plan in off-site construction site: Using PC member quality grades |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |