- CN107817750A CN107817750A CN201711130269.1A CN201711130269A CN107817750A CN 107817750 A CN107817750 A CN 107817750A CN 201711130269 A CN201711130269 A CN 201711130269A CN 107817750 A CN107817750 A CN 107817750A
- Authority
- CN
- China
- Prior art keywords
- building
- bim
- monitoring system
- system based
- module
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract description 61
- 238000001514 detection method Methods 0.000 claims abstract description 39
- 238000012545 processing Methods 0.000 claims abstract description 34
- 238000013500 data storage Methods 0.000 claims abstract description 14
- 210000000352 storage cell Anatomy 0.000 claims abstract description 12
- 238000004891 communication Methods 0.000 claims description 17
- 238000004062 sedimentation Methods 0.000 claims description 16
- 238000005516 engineering process Methods 0.000 claims description 15
- 230000005764 inhibitory process Effects 0.000 claims description 13
- DMBHHRLKUKUOEG-UHFFFAOYSA-N diphenylamine Chemical compound C=1C=CC=CC=1NC1=CC=CC=C1 DMBHHRLKUKUOEG-UHFFFAOYSA-N 0.000 claims description 11
- 230000009977 dual effect Effects 0.000 claims description 7
- 230000010354 integration Effects 0.000 claims description 3
- 238000012800 visualization Methods 0.000 abstract description 9
- 238000010276 construction Methods 0.000 description 11
- 238000004088 simulation Methods 0.000 description 9
- 230000000694 effects Effects 0.000 description 6
- 230000004807 localization Effects 0.000 description 6
- 238000005457 optimization Methods 0.000 description 5
- 230000000295 complement effect Effects 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 238000005286 illumination Methods 0.000 description 3
- 230000033001 locomotion Effects 0.000 description 3
- 238000012360 testing method Methods 0.000 description 3
- 241001269238 Data Species 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000003384 imaging method Methods 0.000 description 2
- 238000012546 transfer Methods 0.000 description 2
- 238000012795 verification Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000004806 packaging method and process Methods 0.000 description 1
- 238000007639 printing Methods 0.000 description 1
- 230000002285 radioactive effect Effects 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
- 230000002123 temporal effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/04—Programme control other than numerical control, i.e. in sequence controllers or logic controllers
- G05B19/048—Monitoring; Safety
Abstract
The invention discloses a kind of building monitoring system based on BIM, including for gathering the detection unit of front-end information, being processed into the processing unit of corresponding parameter, for corresponding parameter and BIM model informations to be integrated and sent the main control server of control instruction, the BIM data storage cells for storing BIM model information data, for receiving control instruction and carrying out the controlled plant that power amplifier processing provides the driver element of equipment enabling signal, relevant action is performed for receiving corresponding device control signal for receiving the front-end information and being computed of collection.By precisely being monitored to building various aspects on the basis of BIM BUILDINGS MODELSs are established, the visualization of building integral monitoring is realized, in order to coordinate associated monitoring equipment, when ensureing to monitor building dynamic comprehensively in place.
Description
Technical field
The present invention relates to building automatic field, is a kind of building monitoring system based on BIM specifically.
Background technology
BIM BIMs(Building Information Modeling)It is the items with construction-engineering project
Based on relevant information data, it is established that three-dimensional BUILDINGS MODELS, by possessed by digital information analogue simulation building
Real information.It has information completeness, information relevance, consistency on messaging, visualization, harmony, simulation, optimization property and
Eight big feature of figure can be gone out.By the project participant such as construction unit, designing unit, unit in charge of construction, supervisor in identical platform
On, share same building information model.Beneficial to project visualization, become more meticulous construction.
BIM technology is frequently used to carry out the simulation before construction, is before Construction of Engineering Projects, is put down based on BIM
Platform, arrangement and method for construction is simulated, analyzed and optimized, is pinpointed the problems in advance, Prior Control is carried out, so as to instruct engineering project to apply
Work.This virtual analog can apply the arrangement simulation of the job site before bidding for project program simulation, engineering construction, vertical fortune
Coordination simulation and the simulation of complicated construction technique between defeated simulation, each professional subpackage etc..By shifting to an earlier date construction simulation,
Rework cost and management cost can be substantially reduced.
By developing rapidly for BIM technology in recent years, it has been found that closed according to the information completeness of BIM technology, information
Connection property, consistency on messaging, visualization, harmony, simulation, optimization property, BIM analogue techniques can first-class apply to building
In monitoring system, so as to improve the visualization of building monitoring system, information unified degree, optimize the standard of monitoring system
True property, the security of building is set to have obtained lifting largely.
Therefore it provides a kind of building monitoring system based on BIM technology is extremely important and urgent.
The content of the invention
It is an object of the invention to provide a kind of building monitoring system based on BIM, by establishing BIM BUILDINGS MODELSs
On the basis of building various aspects are precisely monitored, the visualization of building integral monitoring is realized, in order to coordinate associated monitoring
Equipment, when ensureing to monitor building dynamic comprehensively in place.
The present invention is achieved through the following technical solutions:A kind of building monitoring system based on BIM includes being used to gather front end
The detection unit of information, the front-end information for receiving collection are simultaneously computed being processed into the processing unit of corresponding parameter, are used for
Store the BIM data storage cells of BIM model information data, for corresponding parameter and BIM model informations to be integrated and sent out
Go out the main control server of control instruction, for receiving control instruction and carrying out the driving list of power amplifier processing offer equipment enabling signal
Member, the controlled plant for receiving enabling signal execution relevant action;
The main control server is taken with the communication connection of BIM data storage cells, the detection unit by processing unit and master control
The connection of business device, the controlled plant are connected by driver element with main control server;
The detection unit includes building sedimentation monitoring system and building monitored by personnel's system;The building sedimentation monitoring system bag
Include and be arranged on building surface and internal multiple satellite positioning modules and multiple wireless communication modules, the satellite positioning module
Communicated to connect by wireless communication module and processing unit;The building monitored by personnel system includes being arranged at the RFID at gate inhibition
Radio-frequency module and the multiple human detection modules for being arranged at building monitoring region, the human detection module and RFID radio-frequency modules
Equal processing unit is connected.
Its operation principle is:Main control server reads BIM modeling parameters from BIM data storage cells, and then BIM is built
Mould parameter carries out processing generation visualization building structure model image, shows in display of the model image on main control server
Show, for carrying out Real Time Observation monitoring.At the same time, be arranged on detection unit in building to the disengaging personnel situation in building and
Building depression situation is detected, and detection unit carries out checking verification, door by the identity to disengaging personnel in radio-frequency module
The position coordinate parameters of monitoring number information and gate inhibition at taboo can together be transferred to main control server and be registered and combine mould
Type image is shown.When personnel are after gate inhibition enters, detection unit can also carry out human testing to building special area, with
Ensure the safety of special area.
When detection unit is monitored in real time to the sedimentation phenomenon of building, the global position system set in building is to building
The settlement monitoring point for needing to monitor in space is detected, because the generation of sedimentation can cause the position coordinates of monitoring point to occur partially
Move, and the speed ratio that this skew occurs is relatively slow and degrees of offset is also relatively slight, people are difficult to discover to obtain.Here with
The mode combination BIM building structure models of satellite fix are shown, clearly the position coordinates detected can be changed
Shown on the BIM models of foundation, in order to which the sedimentation situation to building is monitored.
Needed during the information data of collection is sent to main control server by detection unit by processing unit
Processing, processing unit receiving front-end collection information simultaneously are computed generating corresponding parameter, so that main control server can be directly sharp
It is combined with the acquisition parameter after processing with BIM modeling datas, generates the monitoring image of BIM models.
Then main control server is according to collecting information data by driver element to controlled plant set in building
It is controlled.When detection unit has detected that personnel enter special area either prohibited area, then audible-visual annunciator is carried out
Sound and light alarm, and control the infrared camera in the region to carry out imaging record and shooting.
In order to preferably realize the present invention, further, BIM4D model dynamic monitorings are provided with the main control server
Platform.By setting BIM4D model dynamic monitoring platforms, the three-dimensional model except establishing out building on three-dimensional, also add
Add temporal parameter, so as to realize the foundation of dynamic model, to reach the real-time building monitoring on BIM models, because
The existing software program in BIM4D model dynamic monitoring platforms position, is not belonging to this programme key protection point, so not repeating excessively herein.
In order to preferably realize the present invention, further, the RFID radio-frequency modules include personnel identity card, RFID label tag
And RFID reader, the RFID label tag are arranged in personnel identity card, the RFID reader is arranged at building inlet and outlet
At gate inhibition.Here identity checks are carried out using RFID technique, is that label one enters magnetic field, plug-in reader because its recognition speed is fast
Can reads information therein immediately, and can handle multiple labels simultaneously, realizes batch identification;Service life is grown, should
It is wide with scope, its radio communication system, it is can apply to the high pollution such as dust, greasy dirt environment and radioactive environment, and
And its closed packaging causes its life-span to substantially exceed the bar code of printing;Label data can be changed dynamically, can using programmable device
To write data to label, so as to assign the function of RFID label tag interactive portable data file, and the write time is compared and beaten
It is less to print bar code;More preferable security, not only it can be embedded in or be attached on the product of different shape, type, and can be with
Cryptoguard is set for the read-write of label data, so as to have higher security;Can dynamic realtime communication, label with it is every
Second, the frequency of 50~100 times was communicated with plug-in reader, as long as so the object accompanying by RFID label tag appears in plug-in reader
In effective identification range, it is possible to its position is carried out dynamically to follow the trail of and monitor.
In order to preferably realize the present invention, further, d GPS locating module is additionally provided with the personnel identity card.This
In by setting d GPS locating module to entering the monitoring of row positional information into personnel, carry out image in conjunction with BIM models and show,
It is clear how the personnel's number situation and situation of regional.
In order to preferably realize the present invention, further, the satellite positioning module is the Big Dipper/GPS dual-mode locating module,
The Big Dipper/GPS dual-mode locating module includes GNSS multimode multi-frequencies receiver, multiple satellite earth antennas.Positioned by the Big Dipper
Module, GPS module, BEI-DOU position system technological orientation is not aided in merely with GPS positioning system technology, strengthen positioning effect
Fruit, complementary localization region, improves setting accuracy, this monitoring and prediction for building deformation to region has very important work
With can compatible a variety of positioning system modules using multimode, it is possible to achieve the seamless switching of various station-keeping modes, in different positioning
The complementation that the region of system covering can be positioned, so as to reach the accurate and complete of positioning.
In order to preferably realize the present invention, further, the satellite earth antenna is arranged at each floor, and each building
Layer is provided with 5 reception antennas, wherein 1 central spot for being arranged at floor, remaining 4 are evenly distributed on the floor surrounding
On surface.By symmetrically setting satellite earth antenna, detection and localization is carried out to the monitoring point of whole building, not only saved
The cost of receiver, and ensure the complete and comprehensive of positioning, it can preferably coordinate BIM to model to obtain monitoring point coordinate offset
Directly perceived show.
In order to preferably realize the present invention, further, the wireless communication module is ZigBee module.Here use
ZigBee module is because it has simple in construction, easy to use, reliable operation, low-cost spy as wireless communication module
Point, in addition, each ZigBee-network node can also be in the range of the coverings of oneself signal, and multiple networks that do not undertake are believed
Cease the isolated child node wireless connection of transfer task.
In order to preferably realize the present invention, further, the human detection module is infrared/microwave dual technology detector.
By using the double mirror detectors of infrared/microwave, detector is the dual technology detector that passive infrared is combined with microwave, is not only had
The reliability of microwave detector, it is unrelated with thermal source the advantages of and also gathered passive infrared detector without illumination and brightness will
The characteristics of asking, can running round the clock, human motion situation can be precisely examined, greatly reduces rate of false alarm.
The present invention compared with prior art, has advantages below and beneficial effect:
(1)The present invention does not aid in Big Dipper positioning system by Big Dipper locating module, GPS module merely with GPS positioning system technology
Unite technological orientation, strengthen locating effect, complementary localization region, improve setting accuracy, this builds deformation to region
Monitoring and prediction has very important effect, can compatible a variety of positioning system modules using multimode, it is possible to achieve various positioning
The seamless switching of pattern, the complementation that can be positioned in the region that different alignment systems cover, so as to reach the accurate of positioning
With it is complete.
(2)The present invention is realized by precisely being monitored to building various aspects on the basis of BIM BUILDINGS MODELSs are established
The visualization of building integral monitoring, in order to coordinate associated monitoring equipment, when ensureing to monitor building dynamic comprehensively in place.
(3)For the present invention by using the double mirror detectors of infrared/microwave, detector is pair that passive infrared is combined with microwave
Reflect detector, not only the reliability with microwave detector, it is unrelated with thermal source the advantages of and also gathered passive infrared detector
Without illumination and brightness requirement, can run round the clock the characteristics of, can precisely examine personnel's situation of movement, greatly reduce rate of false alarm.
Brief description of the drawings
Fig. 1 is the structured flowchart of the embodiment of the present invention 1.
Fig. 2 is the structured flowchart of the embodiment of the present invention 2.
Fig. 3 is workflow diagram of the present invention.
Embodiment
Embodiment 1:
A kind of building monitoring system based on BIM of the present embodiment, as shown in Figure 1:Mainly by detection unit, processing unit, master
Control server, BIM data storage cells, driver element, controlled plant;Wherein, the main control server and BIM data storage lists
Member communication connection, the detection unit is connected by processing unit with main control server, the controlled plant passes through driver element
It is connected with main control server;
The detection unit is used to gather front-end information;The processing unit is used for receiving front-end information and front-end information is handled
Into relevant parameter;The BIM data storage cells are used to provide BIM model information data;The main control server is used to receive
Relevant parameter and BIM model information data, and generate control instruction after they are carried out integration processing;The driver element is used for
Receive control instruction and be processed into enabling signal;The controlled plant, which is used to receive to start information and perform corresponding control, to be moved
Make.
Its operation principle:The disengaging personnel identity information of detection unit collection building front end, building sedimentation information, into people
Member's positional information and the human testing information for being prohibited from entering region.The various information gatherings of front end are sent after completing to processing
Unit, processing unit generate relevant parameter after calculating is handled.Main control server receives relevant parameter and BIM data storage lists
Member provides BIM model information data, and generates control instruction after they are carried out integration processing, and control instruction on the one hand lead by control
Display screen on control server is shown to BIM models, on the basis of BIM models, front end phase that Dynamic Announce collects
Information is closed, and on the other hand, control instruction is sent to driver element, and driver element generates control instruction after power amplifier is handled
The enabling signal that controlled plant can identify, last controlled plant receives enabling signal and performs related action, such as starts report
Alert device, shooting are first-class.
Embodiment 2:
The present embodiment does further optimization on the basis of embodiment 1, as shown in Figure 2:Including the inspection for gathering front-end information
Unit is surveyed, information is gathered for receiving front-end and is computed being processed into the processing unit of corresponding parameter, for collection information
Parameter and BIM model informations be integrated and send the main control server of control instruction, for storing BIM model information data
BIM data storage cells, for receive control instruction and carry out power amplifier processing provide equipment enabling signal driver element, use
In the controlled plant for receiving corresponding device control signal execution relevant action;
The main control server is taken with the communication connection of BIM data storage cells, the detection unit by processing unit and master control
The connection of business device, the controlled plant are connected by driver element with main control server;
The detection unit includes building sedimentation monitoring system and building monitored by personnel's system;The building sedimentation monitoring system bag
Include and be arranged on building surface and internal multiple satellite positioning modules and multiple wireless communication modules, the satellite positioning module
Communicated to connect by wireless communication module and processing unit;The building monitored by personnel system includes being arranged at the RFID at gate inhibition
Radio-frequency module and the multiple human detection modules for being arranged at building monitoring region.
The controlled plant includes being arranged at the audible-visual annunciator of each floor and is arranged at the red of building monitoring region
Outer camera.
During its work:Main control server reads BIM modeling parameters from BIM data storage cells, and then BIM is modeled and joined
Number carries out processing generation visualization building structure model image, and model image is shown in the display on main control server, is supplied
Carry out Real Time Observation monitoring.At the same time, the detection unit in building is arranged on to the disengaging personnel situation and building in building
Depression situation is detected, and detection unit to the identity that passes in and out personnel by carrying out checking verification in radio-frequency module, at gate inhibition
Monitoring number information and the position coordinate parameters of gate inhibition can together be transferred to main control server and register and binding model figure
As being shown.When personnel are after gate inhibition enters, detection unit can also carry out human testing to building special area, to ensure
The safety of special area.
When detection unit is monitored in real time to the sedimentation phenomenon of building, the global position system set in building is to building
The settlement monitoring point for needing to monitor in space is detected, because the generation of sedimentation can cause the position coordinates of monitoring point to occur partially
Move, and the speed ratio that this skew occurs is relatively slow and degrees of offset is also relatively slight, people are difficult to discover to obtain.Here with
The mode combination BIM building structure models of satellite fix are shown, clearly the position coordinates detected can be changed
Shown on the BIM models of foundation, in order to which the sedimentation situation to building is monitored.
Needed during the information data of collection is sent to main control server by detection unit by processing unit
Processing, processing unit receiving front-end collection information simultaneously are computed generating corresponding parameter, so that main control server can be directly sharp
It is combined with the acquisition parameter after processing with BIM modeling datas, generates the monitoring image of BIM models.
Then main control server is according to collecting information data by driver element to controlled plant set in building
It is controlled.When detection unit has detected that personnel enter special area either prohibited area, then audible-visual annunciator is carried out
Sound and light alarm, and control the infrared camera in the region to carry out imaging record and shooting.
The other parts of the present embodiment are same as Example 1, therefore repeat no more.
Embodiment 3:
The present embodiment does further optimization on the basis of embodiment 2, and GPS location mould is additionally provided with the personnel identity card
Block.Here by setting d GPS locating module to enter the monitoring of row positional information to entering personnel, image is carried out in conjunction with BIM models
It has been shown that, it is clear how the personnel's number situation and situation of regional.
The satellite positioning module is the Big Dipper/GPS dual-mode locating module, and the Big Dipper/GPS dual-mode locating module includes
GNSS multimode multi-frequencies receiver, multiple satellite earth antennas.By Big Dipper locating module, GPS module, not merely with GPS location
Systems technology aids in BEI-DOU position system technological orientation, strengthens locating effect, complementary localization region, improves positioning accurate
Exactness, this monitoring and prediction for building deformation to region have very important effect, can compatible a variety of positioning systems using multimode
System module, it is possible to achieve the seamless switching of various station-keeping modes, can be positioned in the region of different alignment systems covering
Complementation, so as to reach the accurate and complete of positioning.
The satellite earth antenna is arranged at each floor, and each storey setting has 5 reception antennas, wherein 1 sets
The central spot of floor is placed in, remaining 4 are evenly distributed on the surface of the floor surrounding.By symmetrically setting satellite to connect
Antenna is received, detection and localization is carried out to the monitoring point of whole building, not only saves the cost of receiver, and ensure the complete of positioning
It is whole and comprehensive, it can preferably coordinate BIM to model to obtain intuitively showing for monitoring point coordinate offset.
Its operation principle, as shown in Figure 3:ID card of the personnel with attachment RFID label tag is passed in and out first, is recorded in ID card
Identity information, job information of the personnel etc. are entered.When the personnel of disengaging enter at gate inhibition, the RFID reader at gate inhibition is automatic
Scanning RFID label tag is searched, carries out authentication, when authentication success, gate inhibition opens permission personnel and entered, and passes through body
The GPS positioning device of part card the inside starts to start real-time positioning, if authentication is unsuccessful, does not then allow access into.
GPS positioning device sends location information to main control server, and at the same time, the sedimentation locating and detecting device of building is real
When sedimentation situation to building examine, it is complementary here by the Big Dipper/GPS dual-mode locating module to strengthening locating effect
Localization region, improves setting accuracy.The personnel positioning information and building sedimentation and deformation location information of collection pass through
BIM 4D models are shown, are shown on the display screen of main control server, on the basis of model, with dynamic point or line
Form is shown, and personnel positions are shown in a model by bright spot, and building settlement monitoring point coordinates moving displacement is in mould
Shown in type by red line, because here using 4D models, in the change of time, its display situation is also all
What state was shown.It is again, can be by bright on display screen when human detection module detects whether that someone enters prohibited area
Point intuitively detects, moreover, moreover, also can be in the human body infrared microwave dual technology detector that prohibited area is set
No personnel have the detection of entrance, if not detected that personnel enter prohibited area, then repeatedly previous step, and cycle detection always
Go down, if hair assigned personnel enter prohibited area, then start acoustic-optic alarm, send sound and light alarm, to remind security protection people
Member is handled, also, calls the infrared camera progress in prohibited area is comprehensive to take pictures and record a video, with saving scene information
Inquired about for the later stage.
The other parts of the present embodiment are same as Example 2, therefore repeat no more
Embodiment 4:
The present embodiment does further optimization on the basis of embodiment 3,
The wireless communication module is ZigBee module.Here it is because of it using ZigBee module as wireless communication module
With simple in construction, easy to use, reliable operation, low-cost feature, in addition, each ZigBee-network node may be used also
In the range of the covering of oneself signal, and multiple isolated child node wireless connections for not undertaking network information transfer task.
The human detection module is infrared/microwave dual technology detector.By using the double mirror detectors of infrared/microwave, visit
It is the dual technology detector that is combined with microwave of passive infrared to survey device, not only the reliability with microwave detector, unrelated with thermal source
The advantages of and gathered passive infrared detector without illumination and brightness requirement, can run round the clock the characteristics of, can precisely examine
Human motion situation, greatly reduces rate of false alarm.
Because ZigBee module and infrared/microwave dual technology detector belong to existing product, and are not belonging to this programme
Key protection point, so it is not described in detail again herein.
The other parts of the present embodiment are same as Example 3, therefore repeat no more.
It is described above, be only presently preferred embodiments of the present invention, any formal limitation not done to the present invention, it is every according to
Any simply modification, the equivalent variations made according to the technical spirit of the present invention to above example, each fall within the protection of the present invention
Within the scope of.
Claims (8)
- A kind of 1. building monitoring system based on BIM, it is characterised in that:Including detection unit, processing unit, main control server, BIM data storage cells, driver element, controlled plant;The main control server and the communication connection of BIM data storage cells, institute State that detection unit is connected by processing unit with main control server, the controlled plant passes through driver element and main control server and connected Connect;The detection unit is used to gather front-end information;The processing unit is used for receiving front-end information and front-end information is handled Into relevant parameter;The BIM data storage cells are used to provide BIM model information data;The main control server is used to receive Relevant parameter and BIM model information data, and generate control instruction after they are carried out integration processing;The driver element is used for Receive control instruction and be processed into enabling signal;The controlled plant, which is used to receive to start information and perform corresponding control, to be moved Make;The detection unit includes building sedimentation monitoring system and building monitored by personnel's system;The building sedimentation monitoring system bag Include and be arranged on building surface and internal multiple satellite positioning modules and multiple wireless communication modules, the satellite positioning module Communicated to connect by wireless communication module and processing unit;The building monitored by personnel system includes being arranged at the RFID at gate inhibition Radio-frequency module and the multiple human detection modules for being arranged at building monitoring region;The human detection module and RFID radio-frequency modules Equal processing unit is connected.The controlled plant includes being arranged at the audible-visual annunciator of each floor and being arranged at the infrared of building monitoring region taking the photograph As head;The audible-visual annunciator and infrared camera are connected with driver element.
- A kind of 2. building monitoring system based on BIM according to claim 1, it is characterised in that:The main control server Built-in BIM4D models dynamic monitoring platform.
- A kind of 3. building monitoring system based on BIM according to claim 1, it is characterised in that:The RFID radio frequencies mould Block includes personnel identity card, RFID label tag and RFID reader, and the RFID label tag is arranged in personnel identity card, the RFID Read write line is arranged at the gate inhibition of building inlet and outlet.
- A kind of 4. building monitoring system based on BIM according to claim 3, it is characterised in that:The personnel identity card Inside it is additionally provided with d GPS locating module.
- A kind of 5. building monitoring system based on BIM according to claim 1, it is characterised in that:The satellite fix mould Block is the Big Dipper/GPS dual-mode locating module, and the Big Dipper/GPS dual-mode locating module includes GNSS multimode multi-frequencies receiver, multiple Satellite earth antenna, GNSS multimode multi-frequencies receiver are connected with multiple satellite earth antennas respectively.
- A kind of 6. building monitoring system based on BIM according to claim 5, it is characterised in that:The satellite reception day Line is arranged at each floor, and each storey setting has 5 satellite earth antennas, wherein 1 central spot for being arranged at floor, Remaining 4 are evenly distributed on the surface of the floor surrounding.
- A kind of 7. building monitoring system based on BIM according to claim any one of 1-6, it is characterised in that:The nothing Line communication module is ZigBee module.
- A kind of 8. building monitoring system based on BIM according to claim any one of 1-6, it is characterised in that:The people Body detection module is infrared/microwave dual technology detector.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711130269.1A CN107817750A (en) | 2017-11-15 | 2017-11-15 | A kind of building monitoring system based on BIM |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711130269.1A CN107817750A (en) | 2017-11-15 | 2017-11-15 | A kind of building monitoring system based on BIM |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107817750A true CN107817750A (en) | 2018-03-20 |
Family
ID=61609093
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711130269.1A Pending CN107817750A (en) | 2017-11-15 | 2017-11-15 | A kind of building monitoring system based on BIM |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107817750A (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108881859A (en) * | 2018-08-06 | 2018-11-23 | 四川君逸数码科技股份有限公司 | Real-time inspection system and method in IBMS building |
CN109325957A (en) * | 2018-08-30 | 2019-02-12 | 盈嘉互联(北京)科技有限公司 | A kind of numerical value imaging BIM building group Outside contour extraction devices, systems, and methods |
CN109856655A (en) * | 2019-02-01 | 2019-06-07 | 南通四建集团有限公司 | A kind of construction time personnel positioning based on Beidou GNSS and BIM, monitoring and managing method |
CN110207656A (en) * | 2019-07-14 | 2019-09-06 | 中核华纬工程设计研究有限公司 | A kind of BIM model based on container and building sedimentation inclination monitoring system and method |
CN110363865A (en) * | 2019-05-31 | 2019-10-22 | 成都科旭电子有限责任公司 | Wisdom bank monitoring system based on BIM and Internet of Things |
CN111145738A (en) * | 2019-12-04 | 2020-05-12 | 广东暨通信息发展有限公司 | AI speech recognition equipment |
CN112773175A (en) * | 2020-12-31 | 2021-05-11 | 广东美的厨房电器制造有限公司 | Cooking control method and device, cooking equipment and storage medium |
CN113340340A (en) * | 2021-04-27 | 2021-09-03 | 常州大连理工大学智能装备研究院 | Building intelligent monitoring system based on thing networking |
CN113377031A (en) * | 2021-05-25 | 2021-09-10 | 哈尔滨轩逸科技有限公司 | Emergent danger guide system that keeps away of wisdom life community |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101866160A (en) * | 2010-06-21 | 2010-10-20 | 昆明理工大学 | Intelligent control system of building safety |
CN105444726A (en) * | 2014-08-28 | 2016-03-30 | 中建四局第六建筑工程有限公司 | Method and system for building structure deformation monitoring based on Beidou satellite |
CN105586995A (en) * | 2016-03-04 | 2016-05-18 | 上海宝冶集团有限公司 | BIM-based deformation monitoring method for deep foundation pit |
CN106228208A (en) * | 2016-07-21 | 2016-12-14 | 重庆工程职业技术学院 | Control system based on BIM and method |
CN106595565A (en) * | 2017-01-17 | 2017-04-26 | 中山大学 | BIM-based intelligent monitoring system |
CN106595537A (en) * | 2016-12-30 | 2017-04-26 | 浙大正呈科技有限公司 | Building safety state monitoring device based on BeiDou satellite and monitoring method thereof |
CN206322049U (en) * | 2016-12-30 | 2017-07-11 | 林同棪国际工程咨询(中国)有限公司 | Hospital ward environmental monitoring system based on BIM O&M devices |
-
2017
- 2017-11-15 CN CN201711130269.1A patent/CN107817750A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101866160A (en) * | 2010-06-21 | 2010-10-20 | 昆明理工大学 | Intelligent control system of building safety |
CN105444726A (en) * | 2014-08-28 | 2016-03-30 | 中建四局第六建筑工程有限公司 | Method and system for building structure deformation monitoring based on Beidou satellite |
CN105586995A (en) * | 2016-03-04 | 2016-05-18 | 上海宝冶集团有限公司 | BIM-based deformation monitoring method for deep foundation pit |
CN106228208A (en) * | 2016-07-21 | 2016-12-14 | 重庆工程职业技术学院 | Control system based on BIM and method |
CN106595537A (en) * | 2016-12-30 | 2017-04-26 | 浙大正呈科技有限公司 | Building safety state monitoring device based on BeiDou satellite and monitoring method thereof |
CN206322049U (en) * | 2016-12-30 | 2017-07-11 | 林同棪国际工程咨询(中国)有限公司 | Hospital ward environmental monitoring system based on BIM O&M devices |
CN106595565A (en) * | 2017-01-17 | 2017-04-26 | 中山大学 | BIM-based intelligent monitoring system |
Non-Patent Citations (2)
Title |
---|
陈林,等: ""互联网+"智慧校园技术与工程实施", 成都:电子科技大学出版社, pages: 44 - 46 * |
韩锐,等: "基于BIM的可视化建筑运维系统构建研究", 《建筑经济》, vol. 37, no. 8, 31 August 2016 (2016-08-31), pages 107 - 111 * |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108881859A (en) * | 2018-08-06 | 2018-11-23 | 四川君逸数码科技股份有限公司 | Real-time inspection system and method in IBMS building |
CN108881859B (en) * | 2018-08-06 | 2021-05-11 | 四川君逸数码科技股份有限公司 | IBMS (information-based multimedia system) in-building real-time inspection system and method |
CN109325957A (en) * | 2018-08-30 | 2019-02-12 | 盈嘉互联(北京)科技有限公司 | A kind of numerical value imaging BIM building group Outside contour extraction devices, systems, and methods |
CN109325957B (en) * | 2018-08-30 | 2022-08-19 | 盈嘉互联(北京)科技有限公司 | Numerical imaging BIM building group outer contour extraction device, system and method |
CN109856655A (en) * | 2019-02-01 | 2019-06-07 | 南通四建集团有限公司 | A kind of construction time personnel positioning based on Beidou GNSS and BIM, monitoring and managing method |
CN110363865A (en) * | 2019-05-31 | 2019-10-22 | 成都科旭电子有限责任公司 | Wisdom bank monitoring system based on BIM and Internet of Things |
CN110207656A (en) * | 2019-07-14 | 2019-09-06 | 中核华纬工程设计研究有限公司 | A kind of BIM model based on container and building sedimentation inclination monitoring system and method |
CN111145738A (en) * | 2019-12-04 | 2020-05-12 | 广东暨通信息发展有限公司 | AI speech recognition equipment |
CN112773175A (en) * | 2020-12-31 | 2021-05-11 | 广东美的厨房电器制造有限公司 | Cooking control method and device, cooking equipment and storage medium |
CN113340340A (en) * | 2021-04-27 | 2021-09-03 | 常州大连理工大学智能装备研究院 | Building intelligent monitoring system based on thing networking |
CN113377031A (en) * | 2021-05-25 | 2021-09-10 | 哈尔滨轩逸科技有限公司 | Emergent danger guide system that keeps away of wisdom life community |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107817750A (en) | A kind of building monitoring system based on BIM | |
US11010501B2 (en) | Monitoring users and conditions in a structure | |
US11042672B2 (en) | Methods and apparatus for healthcare procedure tracking | |
US11481999B2 (en) | Maintenance work support system and maintenance work support method | |
CN105103542B (en) | Handheld portable optical scanner and the method used | |
CN110287519A (en) | A kind of the building engineering construction progress monitoring method and system of integrated BIM | |
US20140095119A1 (en) | System and method for location-based construction project management | |
CN101496074A (en) | Device and method for detecting suspicious activity, program, and recording medium | |
CN110471376A (en) | A kind of industry spot fault detection method and equipment | |
CN107240164A (en) | The data processing of security cruising inspection system and device | |
CN107240166A (en) | Point inspection terminal and its data processing method | |
CN109725632A (en) | Removable smart machine control method, removable smart machine and intelligent sweeping machine | |
CN105794180A (en) | Methods and systems for a universal wireless platform for asset monitoring | |
JPWO2019107420A1 (en) | Equipment management system | |
CN113111144A (en) | Room marking method and device and robot movement method | |
Yang et al. | Automatic detection of falling hazard from surveillance videos based on computer vision and building information modeling | |
US10433112B2 (en) | Methods and apparatus for orienteering | |
Montaser | Automated site data acquisition for effective project control | |
Siddiqui | UWB RTLS for construction equipment localization: experimental performance analysis and fusion with video data | |
CN109702747A (en) | A kind of robot dog system and its implementation | |
CN109766961A (en) | Fire-fighting equipment localization method, device, system and computer readable storage medium | |
JP2009110108A (en) | Management method and management system for mobile body | |
JP6621649B2 (en) | Information terminal and server | |
CN110036406A (en) | Collection system, terminal program and collection method | |
CN114648572A (en) | Virtual positioning method and device and virtual positioning system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |