CN107816032A - A kind of building cell compartment of Breathable ponding-proof - Google Patents

A kind of building cell compartment of Breathable ponding-proof Download PDF

Info

Publication number
CN107816032A
CN107816032A CN201711128408.7A CN201711128408A CN107816032A CN 107816032 A CN107816032 A CN 107816032A CN 201711128408 A CN201711128408 A CN 201711128408A CN 107816032 A CN107816032 A CN 107816032A
Authority
CN
China
Prior art keywords
cell compartment
band
ponding
buckle
breathable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711128408.7A
Other languages
Chinese (zh)
Inventor
武全福
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei Huafu Geotextile Material Co Ltd
Original Assignee
Hefei Huafu Geotextile Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei Huafu Geotextile Material Co Ltd filed Critical Hefei Huafu Geotextile Material Co Ltd
Priority to CN201711128408.7A priority Critical patent/CN107816032A/en
Publication of CN107816032A publication Critical patent/CN107816032A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/04Foundations produced by soil stabilisation
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
    • E02D3/103Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains by installing wick drains or sand bags
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0084Geogrids

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Agronomy & Crop Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention belongs to the building cell compartment that Geosynthetics Technology domain variability discloses a kind of Breathable ponding-proof;Including cell compartment band, buckle, connecting pole;The adjacent part of described two cell compartment bands is bonded to form connecting node, and profit is stuck with buckle at connecting node, and every cell compartment band bottom is connected with several connecting poles;About some water-supply-pipes be arrangeding in parallel are provided with the cell compartment band, water-supply-pipe is provided with an opening along cell compartment band at interval of certain distance;The connecting pole is made up of affixed above and below cylinder and cone, and several handstand frustum cone structures being arranged above and below also are connected with the outside of cylinder;The buckle is stuck on two cell compartment bands from top to bottom, and a row several convex bodys are respectively provided with cell compartment band both sides contact portion.The present invention using simple in construction, easy to assembly, breathe freely, anti-ponding effect it is good, be connected firmly with roadbed.

Description

A kind of building cell compartment of Breathable ponding-proof
Technical field
The present invention relates to Geosynthetics Technology field, more specifically, more particularly to a kind of soil of Breathable ponding-proof Wooden cell compartment.
Background technology
Existing geotechnical grid is usually by strengthening HDPE sheet materials, welds and is formed a kind of three-dimensional netted through high-tenacity Cell compartment structure is welded to be formed, and because of requirement of engineering, some is punched on diaphragm.Its material is light, wear-resistant, and chemical property is steady Fixed, resistance to photooxidation resistance, acid and alkali-resistance, suitable for the soil condition such as different soils and desert, with capable of expansion and contraction, transport can contract it is folded, During construction can tensioning reticulate, insert the bulk materials such as soil, rubble, concrete, form have it is powerful laterally limiting and it is big just The characteristic of the structure of degree.
Geotechnical grid extensive use in traffic engineering.Bed course can be used as, soft ground treatment increases the carrying of ground Ability, domatic upper composition slope protection structure can be also laid on, can also be used to build retaining structure etc..Running into subgrade When, construction labor intensity can be mitigated significantly using geotechnical grid, reduction roadbed thickness speed of application is fast, and performance is good, greatly drops Low construction costs.
Geotechnical grid is a kind of reinforcing cell compartment array for being similar to " honeycomb " shape structure, and filler can be filled with cell compartment, The filler can be the aggregate of cohesiveless soil, sand, gravel, ballast aggregate or any other type.Constraint is provided in all directions, and And internal force vector is acted in each cell compartment in all wall portions.
As number of patent application is:201580009986.1 Chinese invention patent disclose a kind of geotechnical grid, the geotechnique Cell compartment is formed by multiple polymeric tapes, and adjacent tapes are combined together along sealing wire, to be hung down along the surface with the band Multiple cell compartments with cell compartment wall portion are formed when straight direction is stretched.Due to passing through welding between the adjacent tapes of above-mentioned geotechnical grid Knot is combined so that the connection between band is insecure, so as to influence the stability of cell compartment structure, and work as in roadbed to have ponding When, this kind of building cell compartment is unable to reach ventilative the effect of arranging ponding, the risk that roadbed can be caused softening to be present, collapse.So such as What provides a kind of ventilative, anti-ponding and solid and reliable building cell compartment, is those skilled in the art's technical issues that need to address.
The content of the invention
The present invention is unable to reach the difficult point of ventilative, anti-ponding for building cell compartment in the prior art, there is provided one kind is ventilative anti- The building cell compartment of ponding.
The present invention using following technical scheme in order to solve the above technical problems, realized:Design a kind of Breathable ponding-proof Building cell compartment, it is characterised in that including cell compartment band, buckle, connecting pole;The adjacent part of described two cell compartment bands is bonded the company of being formed Node is connect, profit is stuck with buckle at connecting node, and every cell compartment band bottom is connected with several connecting poles;Set in the cell compartment band There are about some water-supply-pipes be arrangeding in parallel, water-supply-pipe is provided with an opening along cell compartment band at interval of certain distance;The company Connect post to be made up of affixed above and below cylinder and cone, several handstand round platform knots being arranged above and below also are connected with the outside of cylinder Structure;The buckle is stuck on two cell compartment bands from top to bottom, and a row several convex bodys are respectively provided with cell compartment band both sides contact portion.
This building cell compartment is stuck with buckle by several cell compartment band profits, has the advantages of shape, size are arbitrarily spliced.Together When, cell compartment band is interior to be provided with some water-supply-pipes, and water-supply-pipe has many openings on the surface of cell compartment band, plays ventilative well and row The effect of ponding is let out, avoids roadbed because ponding causes the danger caved in.In addition, cell compartment band bottom is provided with connecting pole, connect Post is provided with the round estrade of several barb structures, when connecting pole is inserted into ground, plays more preferable fixation.
Preferably, water-supply-pipe is provided with four in described cell compartment band, and each cell compartment band possesses four water-supply-pipes can be more preferable Play a part of ventilative and anti-ponding.
Preferably, described each connecting pole is provided with three handstand frustum cone structures, and each connecting pole, which is provided with three and stood upside down, to be justified Platform structure can preferably play fixation.
Preferably, each column is provided with the opening on four convex bodys and each convex body one-to-one corresponding cell compartment band altogether on described buckle Central part, the convex body on buckle clasp one by one with the opening on cell compartment band, can be square by the use of the opening on cell compartment band as neck Just the cell compartment band for blocking two jingle bells.
Preferably, described convex body is the corner wimble structure of upper end horizontal structure, and downside is designed as italic, upper horizontal, During firmly blocking downwards, oblique skew back body structure design is easy to block;Because upside sets for level after blocking It is just difficult to be extracted in split shed in the opening to count and plug.
After the present invention uses said structure, beneficial effect is:Present invention use is simple in construction, easy to assembly, breathes freely, be anti- Ponding effect is good, is connected firmly with roadbed.
Brief description of the drawings
The present invention is described in further detail for embodiment in below in conjunction with the accompanying drawings, but does not form to the present invention's Any restrictions.
Fig. 1 is the connection diagram of the present invention;
Fig. 2 is the buckle structure schematic diagram of the present invention;
Fig. 3 is the schematic side view of the single cell compartment band of the present invention;
Fig. 4 is the schematic front view of the single cell compartment band of this present invention.
In figure:Cell compartment band 1, buckle 2, connecting pole 3, water-supply-pipe 4, opening 5, convex body 6.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.
Refering to shown in Fig. 1-Fig. 4, a kind of building cell compartment of Breathable ponding-proof of the invention, including cell compartment band 1, buckle 2, even Connect post 3;Two adjacent parts of cell compartment band 1 are bonded to form connecting node, are blocked at connecting node using buckle 2, every cell compartment The bottom of band 1 is connected with several connecting poles 3;It is provided with about four water-supply-pipes 4 be arrangeding in parallel in cell compartment band 1, water-supply-pipe is along lattice Room band 1 is provided with an opening 5 at interval of certain distance;Connecting pole 3 is made up of affixed above and below cylinder and cone, outside cylinder Side is also connected with three handstand being arranged above and below frustum cone structures;Buckle 2 is stuck on two cell compartment bands 1 from top to bottom, with cell compartment band 1 Both sides contact portion is respectively provided with the central part of opening 5 on four convex bodys 6 of a row and each one-to-one corresponding cell compartment of convex body 6 band 1, convex Body 6 is the corner wimble structure of upper end horizontal structure.
This building cell compartment is blocked by several cell compartment bands 1 using buckle 2, has the advantages of shape, size are arbitrarily spliced.Together When, cell compartment band 1 is interior to be provided with some water-supply-pipes 4, and water-supply-pipe 4 has many openings 5 on the surface of cell compartment band 1, plays well thoroughly The effect of gas and excretion ponding, roadbed is avoided because ponding causes the danger caved in.In addition, the bottom of cell compartment band 1 is provided with connection Post 3, connecting pole 3 is provided with the round estrade of several barb structures, when connecting pole is inserted into ground, plays preferably fixed make With.
The foregoing is only a preferred embodiment of the present invention, but protection scope of the present invention be not limited thereto, Any one skilled in the art the invention discloses technical scope in, technique according to the invention scheme and its Inventive concept is subject to equivalent substitution or change, should all be included within the scope of the present invention.

Claims (5)

1. the building cell compartment of a kind of Breathable ponding-proof, it is characterised in that including cell compartment band (1), buckle (2), connecting pole (3);Institute State two adjacent parts of cell compartment band (1) to be bonded to form connecting node, blocked at connecting node using buckle (2), every cell compartment Band (1) bottom is connected with several connecting poles (3);About some water-supply-pipes be arrangeding in parallel are provided with the cell compartment band (1) (4), water-supply-pipe is provided with an opening (5) along cell compartment band (1) at interval of certain distance;The connecting pole (3) is by cylinder and circle Affixed composition above and below cone, cylinder outside are also connected with several handstand frustum cone structures being arranged above and below;The buckle (2) by On be stuck in downwards on two cell compartment bands (1), be respectively provided with a row several convex bodys (6) with cell compartment band (1) both sides contact portion.
A kind of 2. building cell compartment of Breathable ponding-proof according to claim 1, it is characterised in that described cell compartment band (1) Middle water-supply-pipe (4) is provided with four.
A kind of 3. building cell compartment of Breathable ponding-proof according to claim 1, it is characterised in that described each connecting pole (3) three handstand frustum cone structures are provided with.
4. the building cell compartment of a kind of Breathable ponding-proof according to claim 1, it is characterised in that on described buckle (2) Each column is provided with opening (5) central part on four convex bodys (6) and each convex body (6) one-to-one corresponding cell compartment band (1) altogether.
5. the building cell compartment of a kind of Breathable ponding-proof according to claim 1, it is characterised in that described convex body (6) is The corner wimble structure of upper end horizontal structure.
CN201711128408.7A 2017-11-15 2017-11-15 A kind of building cell compartment of Breathable ponding-proof Pending CN107816032A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711128408.7A CN107816032A (en) 2017-11-15 2017-11-15 A kind of building cell compartment of Breathable ponding-proof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711128408.7A CN107816032A (en) 2017-11-15 2017-11-15 A kind of building cell compartment of Breathable ponding-proof

Publications (1)

Publication Number Publication Date
CN107816032A true CN107816032A (en) 2018-03-20

Family

ID=61609172

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711128408.7A Pending CN107816032A (en) 2017-11-15 2017-11-15 A kind of building cell compartment of Breathable ponding-proof

Country Status (1)

Country Link
CN (1) CN107816032A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109853513A (en) * 2019-03-19 2019-06-07 温州大学 A kind of preparation method of geotechnical grid and the geotechnical grid
CN112726309A (en) * 2020-12-30 2021-04-30 重庆广播电视大学重庆工商职业学院 Assembly type soft foundation pavement reinforcing structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109853513A (en) * 2019-03-19 2019-06-07 温州大学 A kind of preparation method of geotechnical grid and the geotechnical grid
CN112726309A (en) * 2020-12-30 2021-04-30 重庆广播电视大学重庆工商职业学院 Assembly type soft foundation pavement reinforcing structure

Similar Documents

Publication Publication Date Title
CN106320194B (en) A kind of anti-sand fence device and sand prevention system
US20080202073A1 (en) Sandbag Wall Ststem with Multi-Compartment Sandbag
CN107816032A (en) A kind of building cell compartment of Breathable ponding-proof
JP2006342648A (en) Facility for evacuation from tsunami etc. and its construction method
CN209144836U (en) A kind of bedrock side slope grass planting structure
CN205576885U (en) Geotechnical cell
ES2692836T3 (en) Barrier for water, in particular, a dike
CN205399388U (en) High wind district moving dunes fix sand structure
RU2006111919A (en) SEMI-DAM OF COMBINED DESIGN
US20040068925A1 (en) Modular plant support system
CN206237929U (en) A kind of Anti-Typhoon single shed
CN206768634U (en) Shed hole structure for Unevenly-pressured shallow tunnel
CN107916659A (en) A kind of geotechnical grid that can quickly splice
KR20140123350A (en) Soil bag for vegetation and the fence building method which uses
JP2006249659A (en) Ground reinforcing frame and its manufacturing method
CN209277101U (en) A kind of river channel ecology protective slope structure
CN105475039B (en) Plant daylighting greenhouse air film drag-line web frame
CN105155468A (en) Vertical column with fixing positions
CN204919575U (en) Road bed side slope protection U type net skeleton
CN207228052U (en) A kind of Ecological Retaining Wall structure and Ecological Retaining Wall
CN213978409U (en) Assembly type high strength geotechnique's check room connecting piece with anchor function
CN202323916U (en) Splayed sand cage sand-protecting barrier of weedtree fence net and sand-checking construction structure of splayed sand cage sand-protecting barrier
CN203755112U (en) Support body for pavement
KR102581619B1 (en) a functional gabion block
CN203890955U (en) Ecological bank-protection vegetation structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180320

WD01 Invention patent application deemed withdrawn after publication