CN202323916U - Splayed sand cage sand-protecting barrier of weedtree fence net and sand-checking construction structure of splayed sand cage sand-protecting barrier - Google Patents

Splayed sand cage sand-protecting barrier of weedtree fence net and sand-checking construction structure of splayed sand cage sand-protecting barrier Download PDF

Info

Publication number
CN202323916U
CN202323916U CN2011202831139U CN201120283113U CN202323916U CN 202323916 U CN202323916 U CN 202323916U CN 2011202831139 U CN2011202831139 U CN 2011202831139U CN 201120283113 U CN201120283113 U CN 201120283113U CN 202323916 U CN202323916 U CN 202323916U
Authority
CN
China
Prior art keywords
sand
splayed
weedtree
barrier
cage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011202831139U
Other languages
Chinese (zh)
Inventor
娄志平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xishi Eco Polytron Technologies Inc
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011202831139U priority Critical patent/CN202323916U/en
Application granted granted Critical
Publication of CN202323916U publication Critical patent/CN202323916U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The utility model aims at providing a splayed sand cage sand-protecting barrier of a weedtree fence net and a construction structure of the splayed sand cage sand-protecting barrier, belonging to the technical field of desertification control engineering. The splayed sand cage sand-protecting barrier of the weedtree fence net comprises two crossly and alternatively mixed weedtree fence net sheets with lengths being 10m, widths being 25cm-45cm and porosity being 30 percent to 60 percent, and top edges of the weedtree fence net sheets are connected by using nylon wires, and bottom edges of the weedtree fence net sheets can be opened for an angle of 60 degrees to 70 degrees to form the splayed sand cage sand-protecting barrier. On the top of a travelling dune, sand on the top of a sand ridge line is moved for 60cm-150cm towards a windward slope so that a sand ridge platform with the width being above 60cm is obtained through flattening, the splayed sand cage sand-protecting barrier of the weedtree fence net is embedded on the sand ridge platform, and the top of the splayed sand cage sand-protecting barrier, with the height being less than 15cm, is only exposed; and when a desert drift sand pile is embedded until being higher than the top of a sand cage by 30cm or the sand ridge line is forwards pushed for 150cm, the structure construction is repeated, and the traveling dune can be changed into a sediment storage dam stacking upwards from the mode of moving forwards.

Description

Weedtree boom net splayed net cage sand barrier and sediment trapping constructing structure thereof
Technical field
The utility model relates to the sand control engineering technical field, is specially a kind of weedtree boom net splayed net cage sand barrier and sediment trapping constructing structure thereof.
Background technology
At present in desert treatment; Fix the sand back plantation psammophytes with construction straw checkerboard barrier and plastic wire grid, ecological recovery is produced effect very much, but to fixing very dry unbroken moving dunes that should not plant growing; Said method not only construction cost is high, also can and lose efficacy by the drift sand covering very soon.Scattered seeds by airplane for afforestation seed on the moving sand dune of extremely arid sand is difficult to germinate; More difficult one-tenth is lived; Therefore invent a kind of low preparation cost, easy construction, can fix moving dunes fast; Weedtree boom net splayed net cage sand barrier that does not pollute the environment again and sediment trapping constructing structure thereof have been the needs of desert treatment.
Summary of the invention
The utility model aims to provide a kind of weedtree boom net splayed net cage sand barrier and sediment trapping constructing structure thereof; Weedtree boom net splayed net cage sand barrier; Construction just can be fixed moving dunes on the dune ridge line of moving dunes, purpose is to become useful check dam to harmful moving dunes.The utility model is to be 201120219428.7 to application number, and the utility model name is called dividing an application of " fixing the sand boom net with what weedtree, bamboo, reed were made ".
The described weedtree boom net of the utility model comprises the boom net that fixes the sand with regular shrub branches such as the salix monogolica making of cutting down of needs on the desert.
The utility model splayed net cage sand barrier selects for use wide cut between 25cm to 45cm; Degree of porosity intersects the weedtree boom net that mixes between 30% to 60% makes; Cut out the net sheet that is cut into 10 meters length to the weedtree boom net, netting length is unrestricted, can cut out according to the construction needs and cut.Two overlapping back four limits alignment of sheet of throwing the net; Get the top margin of a long limit as splayed net cage sand barrier; With nylon wire two throw the net sheet top margin link up, make two throw the net sheet top margin both fixed, can open ° angle, 60 ° of angles to 70 to net sheet base again and constitute splayed net cage sand barrier.When dispatching from the factory close up finished product splayed net cage sand barrier base, be rolled into cylindric packing.
When on moving dunes, constructing, move 60cm to 150cm to the sand at dune ridge line top to the windward slope direction, smoothly go out the above dune ridge platform of a wide 60cm; On the dune ridge platform, dig 20cm at interval, the Liang Tiaogou of dark 15cm to 20cm opens tension with weedtree boom net splayed net cage sand barrier; The base separately down; Place Liang Tiaogou to two bases respectively, fill and lead up Liang Tiaogou to the sand that digs again then, be embedded in the Lower Half of splayed net cage sand barrier in the sand; First half heap to the cylinder mould sand-protecting barrier buries desert sand simultaneously, makes the cylinder mould sand-protecting barrier expose its top less than 15cm.On the dune ridge line, be stitched together splayed net cage sand barrier one by one by said structure, the jointing positions of two cylinder mould sand-protecting barriers is tied up fixing with iron wire, and these moving dunes have just been fixed by splayed net cage sand barrier.When the desert drift sand flows to top of sand dune under the blowing of wind and since splayed net cage sand barrier stop that a part of drift sand is blocked in cylinder mould sand-protecting barrier windward slope one side; Part drift sand climbs over splayed net cage sand barrier and falls on the leeward slope on sand dune, and a part of drift sand is piled up at the leeward slope top of cylinder mould sand-protecting barrier after climbing over the cylinder mould sand-protecting barrier, is buried by sand drift up to cylinder mould sand-protecting barrier top and cannot see; At this moment; The cylinder mould sand-protecting barrier just become the sand dune internal fixation the splayed kernel because the resistance of kernel, drift sand still continues at the top of sand dune heap high; Bury up to sand drift and to be higher than more than the cylinder mould sand-protecting barrier top 30cm; Perhaps pass 150cm before the dune ridge alignment, just move 100cm to 150cm to the sand at dune ridge line top to the windward slope direction again, press said structure construction splayed net cage sand barrier again.So repeat construction, splayed net cage sand barrier just changes over upwards heap height to the moving dunes that move forward.Splayed net cage sand barrier is the height that utilizes moving dunes, tackles the desert of flowing, and moving dunes are high more; The sediment trapping effect of splayed net cage sand barrier is good more, and this phenomenon is not introduced on textbook, and the personage among the people of indivedual sand controls has noticed that moving dunes can be transformed into check dam; And there is related article to deliver on the internet; But because the product of its sediment trapping involves great expense, can't on the desert, do the engineering demonstration with its product economically, also can't promote.And splayed net cage sand barrier is cheap, easy construction, and changing over check dam to moving dunes becomes cheap engineering.Applicant's sample project has been demonstrated in the Inner Mongol, Ningxia, Gansu, Qinghai; The applicant has delivered " the fixing and utilizations of moving dunes " in 2009; In article, illustrated the sediment trapping principle and the sediment trapping effect of splayed net cage sand barrier, and the sediment trapping effect formula V=4.5H on the textbook 2Sina (formula 1) is modified as V=4.5 [H+ (H 1+ H 2)/2] 2Sina (formula 2), in (formula 1), V is the husky amount of resistance, and H is the height of mechanical sand barrier, and a is the angle of cut, and V is the husky amount of resistance in (formula 2), H is the height of mechanical sand barrier, H 1Be sand dune windward slope height, H 2Be sand dune leeward slope height, a is the angle of cut.Because splayed net cage sand barrier exposes top of sand dune less than 15cm, if apply mechanically (formula 1) on the textbook, the husky amount of the resistance of splayed net cage sand barrier, available slightly do not disregard explain, in other words, this splayed net cage sand barrier sediment trapping is useless.But in fact expose the splayed net cage sand barrier of top of sand dune less than 15cm; Because being arranged, the sand dune under the cylinder mould sand-protecting barrier makes liner; Its sediment trapping effect is higher than far away and places the moving dunes waist, and height is greater than the high vertical sediment trapping net of 150cm, therefore; (formula 1) is inapplicable to the sediment trapping effect of the splayed net cage sand barrier that is arranged at the moving dunes top, must just can say something with (formula 2).
The applicant sends the Chinese Academy of Sciences paper of " the fixing and utilizations of moving dunes " in December, 2009; Under the vice-president's who is responsible for desert treatment bothering about; Desert analytical test portion of Institute of Analysis of Lanzhou Branch of the Chinese Academy of Sciences, Chinese Academy of Sciences desert and desertification key lab; In May, 2010 " splayed net cage sand barrier lifting check dam " project of applicant has freely been done the wind tunnel experiment detection, it is successful that experiment and detection proof splayed net cage sand barrier promote check dam, construction and experiment indoor construction on the desert; The principle of constructing check dam is identical, and effect is identical; Can directly observe the dynamic process that splayed net cage sand barrier is constructed check dam at wind tunnel laboratory.
Description of drawings
Fig. 1 looks sketch map for the utility model weedtree boom net splayed net cage sand barrier master.
Fig. 2 looks sketch map for the utility model weedtree boom net splayed net cage sand barrier left side.
Fig. 3 is the utility model weedtree boom net splayed net cage sand barrier sediment trapping constructing structure sketch map.
Fig. 4 repeats the sketch map of constructing for the utility model weedtree boom net splayed net cage sand barrier on the sand dune.
In the accompanying drawing, 1 is weedtree boom net splayed net cage sand barrier, and 2 is the weedtree boom net, and 3 is nylon wire, and 4 is moving dunes, and 5 for becoming the splayed net cage sand barrier of the inner kernel in sand dune.
The specific embodiment
Weedtree boom net splayed net cage sand barrier 1 by two wide cuts between the 25cm to 45cm; Degree of porosity intersects the weedtree boom net 2 that mixes and combines between 30% to 60%; The top margin of two boom nets connects with nylon wire 3, and ° angle, 60 ° of angles to 70 of base expansible constitutes splayed net cage sand barrier.
The constructing structure that fixes the sand of weedtree boom net splayed net cage sand barrier is; Move 60cm to 150cm to the sand on moving dunes dune ridge line pinnacle to the windward slope direction, smoothly go out the above dune ridge platform of a wide 60cm, on platform, dig 20cm at interval; The Liang Tiaogou of dark 15cm to 25cm; Weedtree boom net splayed net cage sand barrier 1 is opened tension, and two bases separately place Liang Tiaogou down respectively, then excavating two ditches of husky landfill of coming out; Bury desert sand to the first half of cylinder mould sand-protecting barrier heap again, weedtree boom net splayed net cage sand barrier potting on the dune ridge platform.Make 1 of cylinder mould sand-protecting barrier expose the top of height less than 15cm.
Desert, strong wind sky drift sand flows to the top, slope from windward slope under wind, when moving 150cm more than the desert sand drift buries the top 30cm that is higher than cylinder mould sand-protecting barrier 1 or before the dune ridge alignment; Move 60cm to 150cm to the sand on the dune ridge line pinnacle to the windward slope direction; Smoothly go out the above dune ridge platform of a wide 60cm, on the dune ridge platform, so repeat above-mentioned constructing structure to new weedtree boom net splayed net cage sand barrier potting; Moving dunes just stop to move forward; Change over upwards rising, mobile desert is just lived by the sand dune interception that splayed net cage sand barrier stops under fixing, and moving dunes have just become check dam.
The utility model weedtree boom net splayed net cage sand barrier can be produced in enormous quantities in factory, and available mechanization is construction sediment trapping engineering at the moving dunes top.

Claims (2)

1. weedtree boom net splayed net cage sand barrier; It is characterized in that; Weedtree boom net splayed net cage sand barrier (1) by two wide cuts between the 25cm to 45cm; Degree of porosity intersects the weedtree aperture plate (2) that mixes and combines between 30% to 60%, the top margin of two boom nets connects with nylon wire (3), and ° angle, 60 ° of angles to 70 of base expansible constitutes splayed net cage sand barrier.
2. the sediment trapping constructing structure of weedtree boom net splayed net cage sand barrier; It is characterized in that: move 60cm to 150cm to the sand at moving dunes dune ridge line top to the windward slope direction; Smoothly go out the above dune ridge platform of a wide 60cm; Weedtree boom net splayed net cage sand barrier potting is on the dune ridge platform, and cylinder mould sand-protecting barrier (1) only exposes the top of height less than 15cm.
CN2011202831139U 2011-06-16 2011-06-16 Splayed sand cage sand-protecting barrier of weedtree fence net and sand-checking construction structure of splayed sand cage sand-protecting barrier Expired - Fee Related CN202323916U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202831139U CN202323916U (en) 2011-06-16 2011-06-16 Splayed sand cage sand-protecting barrier of weedtree fence net and sand-checking construction structure of splayed sand cage sand-protecting barrier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202831139U CN202323916U (en) 2011-06-16 2011-06-16 Splayed sand cage sand-protecting barrier of weedtree fence net and sand-checking construction structure of splayed sand cage sand-protecting barrier

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN2011202194287U Division CN202247836U (en) 2011-06-16 2011-06-16 Sand-stabilizing rail fence mesh made of miscellaneous trees, bamboos and reeds

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN2011203272832U Division CN202323917U (en) 2011-06-16 2011-06-16 Cotton straw boom net splayed mesh cage sand barrier and sand blocking construction structure

Publications (1)

Publication Number Publication Date
CN202323916U true CN202323916U (en) 2012-07-11

Family

ID=46435899

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202831139U Expired - Fee Related CN202323916U (en) 2011-06-16 2011-06-16 Splayed sand cage sand-protecting barrier of weedtree fence net and sand-checking construction structure of splayed sand cage sand-protecting barrier

Country Status (1)

Country Link
CN (1) CN202323916U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104047239A (en) * 2014-07-01 2014-09-17 甘肃省治沙研究所 Movable sand deposition sand barrier and application method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104047239A (en) * 2014-07-01 2014-09-17 甘肃省治沙研究所 Movable sand deposition sand barrier and application method thereof
CN104047239B (en) * 2014-07-01 2017-03-22 甘肃省治沙研究所 Movable sand deposition sand barrier and application method thereof

Similar Documents

Publication Publication Date Title
CN100532728C (en) Method for sand-prevention, sand-fixation and planting in desert area
CN103174125A (en) Structure method of biological fertilizer island sand-stabilizing sand-protecting barrier
CN205369274U (en) Civil engineering structure of complete domatic afforestation worker method in rock matter abrupt slope
CN105544567B (en) A kind of civil engineering structure of the full slope greening engineering method of steep rocky slope
CN101680202A (en) Soil-baffling structure with interlocking component
CN204199304U (en) Ecological revetment
RU49011U1 (en) DEVICE FOR STRENGTHENING SLOPE OF EARTH STRUCTURE
CN205369297U (en) Hollow building block formula barricade with prop up and keep off and afforest function
CN202323916U (en) Splayed sand cage sand-protecting barrier of weedtree fence net and sand-checking construction structure of splayed sand cage sand-protecting barrier
CN107604928A (en) A kind of anti-runoff anti-erosion ecological protection blanket complex structure body and its construction method
CN202989859U (en) Ecological type flexible bank protection structure
CN110725277A (en) Anti-scouring ecological treatment method for river bank hydro-fluctuation belt
CN202323917U (en) Cotton straw boom net splayed mesh cage sand barrier and sand blocking construction structure
CN102359097A (en) Splayed cylinder mould sand barrier of weed-tree fence net and sand trapping construction method thereof
CN207109721U (en) A kind of river channel ecology Afforestation Landscape structure
CN202509482U (en) Sand stop grid and sandbox grid embankment wall
CN202202316U (en) Splayed cylinder mould sand barrier of miscellaneous tree fence net
CN204645061U (en) Dam and block sand ship shape traverse furrow in hillside fields
CN207553123U (en) A kind of high-speed railway rock matter cut slope green safeguard structure
CN102409658A (en) Splayed cage sand barrier with cotton stalk fence nets and sand-blocking construction method
CN203602980U (en) Flake rubble stack reinforced soil composite embankment structure
CN216134938U (en) Underground lodging-resistant structure for arbor transplantation
CN201671094U (en) Sand-fixing intestine-shaped sand barrier
CN204212141U (en) Sandstone matter building waste gravel sand stabilization structure
CN208293605U (en) A kind of complex ecological slope protection barricade of friction pile in conjunction with reinforced earth

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: YIYANG XISHI ECOLOGICAL TECHNOLOGY CO., LTD.

Free format text: FORMER OWNER: LOU ZHIPING

Effective date: 20131024

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 312451 SHAOXING, ZHEJIANG PROVINCE TO: 413001 YIYANG, HUNAN PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20131024

Address after: 413001 Xishi garden, kiln town, Changchun Town, Ziyang District, Hunan, Yiyang

Patentee after: Yiyang Xishi Ecology Technology Co., Ltd.

Address before: 312451 Sinpo Road, Pukou street, Zhejiang, No. 40, No.

Patentee before: Lou Zhiping

C56 Change in the name or address of the patentee

Owner name: HUNAN XISI ECOLOGY TECHNOLOGY CO., LTD.

Free format text: FORMER NAME: YIYANG XISHI ECOLOGICAL TECHNOLOGY CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 413001 Xishi garden, kiln town, Changchun Town, Ziyang District, Hunan, Yiyang

Patentee after: Hunan Xishi ecological Polytron Technologies Inc

Address before: 413001 Xishi garden, kiln town, Changchun Town, Ziyang District, Hunan, Yiyang

Patentee before: Yiyang Xishi Ecology Technology Co., Ltd.

CP03 Change of name, title or address

Address after: 413001 Ziyang Yiyang district (319 National Road), Hunan Spring Festival Road, Xishi ecological garden

Patentee after: Xishi eco Polytron Technologies Inc

Address before: 413001 Xishi garden, kiln town, Changchun Town, Ziyang District, Hunan, Yiyang

Patentee before: Hunan Xishi ecological Polytron Technologies Inc

CP03 Change of name, title or address
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120711

Termination date: 20180616

CF01 Termination of patent right due to non-payment of annual fee