CN107816014A - 人工干预条件下珊瑚礁快速成岛方法 - Google Patents
人工干预条件下珊瑚礁快速成岛方法 Download PDFInfo
- Publication number
- CN107816014A CN107816014A CN201711120885.9A CN201711120885A CN107816014A CN 107816014 A CN107816014 A CN 107816014A CN 201711120885 A CN201711120885 A CN 201711120885A CN 107816014 A CN107816014 A CN 107816014A
- Authority
- CN
- China
- Prior art keywords
- wing
- husky
- coral reef
- rapid
- conditions
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/18—Reclamation of land from water or marshes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B2017/0039—Methods for placing the offshore structure
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Artificial Fish Reefs (AREA)
Abstract
本发明公开了一种人工干预条件下的珊瑚礁快速成岛技术,通过在珊瑚礁外侧设置一组集沙翅,将洋流挟带的巨大珊瑚砂、有机物等物质在集沙翅前形成堆积,形成一定堆积量后,继续重复在外侧设置一组集沙翅,再形成一定量堆积,工程继续,直至形成一定规模的岛屿。本发明的技术方案工程造价低、施工方便、不污染海洋。
Description
技术领域
本发明涉及岛屿施工技术领域。
背景技术
珊瑚礁的主体是由珊瑚虫组成的,珊瑚虫在生长过程中能吸收海水中的钙和二氧化碳,然后分泌出石灰石,这些石灰石经过以后的压实、石化,形成岛屿和礁石,也就是所谓的珊瑚礁。由于在洋流的作用下,会将一些珊瑚砂、贝壳、有机物质等推到礁盘上形成堆积。堆积得多了,就会形成小沙洲,小沙洲继续堆积,就会形成大沙洲。再继续堆积,慢慢的,岛礁表面就会形成土壤,之后慢慢地,岛屿就形成了。但是这个自然过程是需要漫长时间的。然而目前珊瑚礁成岛的工程,经常采用的是高科技驳船和挖泥船在从海底一直抽取沙子,然后将之堆积到珊瑚礁上,这种方法成本极高,而且抽取海底沙子,也会改变海洋洋流的方向,影响海洋气候。
发明内容
本发明所解决的技术问题是提供一种利用珊瑚礁快速形成岛屿的人工干预条件下珊瑚礁快速成岛方法。
本发明采用的技术方案是人工干预条件下珊瑚礁快速成岛方法,步骤一:通过海域地质勘查,选择有洋流经过并且海底表面下有泥沙层的珊瑚礁区域;步骤二:在珊瑚礁外侧设置一组集沙翅,集沙翅横截面呈弧形结构,集沙翅的凹面迎向洋流,集沙翅下端插入海底泥沙层;步骤三:洋流受到集沙翅的阻挡形成涡流和涡积,洋流挟带的固体物质在集沙翅前堆积成岛体;步骤四:在步骤三形成的岛体外侧再次设置集沙翅,重复步骤一至步骤三,直至形成岛屿。
集沙翅的两侧在海底表面层上堆叠有碎石加固体。
集沙翅上端在高潮期高于水面。
集沙翅由U型钢板桩组拼而成。
每个钢板桩末端向外弯折形成锁扣,相邻钢板桩开口方向相反通过锁扣相互插接相连,在锁扣内填充防水混合料。
所述集沙翅横截面为1/4圆的弧状。
本发明的有益效果是成岛速度快、结构简单、工程造价低、施工方便、不污染海洋。
附图说明
图1为本发明平面示意图。
图2为本发明的立体剖面图。
图3为集沙翅结构图。
图4为集沙翅的侧视图。
图中标记为:1-集沙翅;2-钢板桩;3-珊瑚礁;4-锁扣;5-海底表面;6-泥沙层;7-基岩层;8-碎石加固体。
具体实施方式
下面结合附图对本发明作进一步说明。
本发明所述的人工干预条件下珊瑚礁快速成岛技术,通过在珊瑚礁外侧设置一组集沙翅,将洋流挟带的巨大珊瑚砂、有机物等物质在集沙翅前形成堆积,形成一定堆积量后,继续重复在外侧设置一组集沙翅,再形成一定量堆积,工程继续,直至形成一定规模的岛屿。
首先,通过海域地质勘查,选取含有足够深度泥沙,可满足集沙翅稳定的珊瑚礁区域,同时也要满足有流向稳定的洋流经过的区域作为施工场地。
其次,集沙翅整体最好呈1/4圆的弧形结构,弧形的凹面迎向洋流的方向。集沙翅的两端并不平齐,这样洋流可以被弧形的集沙翅横向引导,在集沙翅处形成涡流和涡积,可以有效沉积泥沙等固体物质,根据工程所需的集沙量和洋流方向,确定集沙翅两端的具体位置。根据海洋最高潮的高度和工程所需集沙量来确定集沙翅的高度和长度。
集沙翅由经防腐处理的高强度钢板桩互相组拼构成,施工方便,可重复利用,不污染海洋。钢板桩为热轧U型,强度高,钢板桩组拼时,在锁扣内填充防水混合料,加固集沙翅。根据工程地的实际情况确定钢板桩的厚度。
为确保集沙翅的稳定性,集沙翅一端固定在珊瑚礁上,根据海洋洋流大小和海浪冲击力来确定集沙翅下埋深度,并在集沙翅两侧放置若干碎石加固体,保障集沙翅的稳定性。
本发明,结构简单、工程造价低、施工方便、不污染海洋。
Claims (6)
1.人工干预条件下珊瑚礁快速成岛方法,步骤一:通过海域地质勘查,选择有洋流经过并且海底表面下有泥沙层的珊瑚礁区域;步骤二:在珊瑚礁外侧设置一组集沙翅,集沙翅横截面呈弧形结构,集沙翅的凹面迎向洋流,集沙翅下端插入海底泥沙层;步骤三:洋流受到集沙翅的阻挡形成涡流和涡积,洋流挟带的固体物质在集沙翅前堆积成岛体;步骤四:在步骤三形成的岛体外侧再次设置集沙翅,重复步骤一至步骤三,直至形成岛屿。
2.如权利要求1所述的人工干预条件下珊瑚礁快速成岛方法,其特征在于:集沙翅的两侧在海底表面层上堆叠有碎石加固体。
3.如权利要求1所述的人工干预条件下珊瑚礁快速成岛方法,其特征在于:集沙翅上端在高潮期高于水面。
4.如权利要求1所述的人工干预条件下珊瑚礁快速成岛方法,其特征在于:集沙翅由U型钢板桩组拼而成。
5.如权利要求4所述的人工干预条件下珊瑚礁快速成岛方法,其特征在于:每个钢板桩末端向外弯折形成锁扣,相邻钢板桩开口方向相反通过锁扣相互插接相连,在锁扣内填充防水混合料。
6.如权利要求1所述的人工干预条件下珊瑚礁快速成岛方法,其特征在于:所述集沙翅横截面为1/4圆的弧状。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711120885.9A CN107816014B (zh) | 2017-11-14 | 2017-11-14 | 人工干预条件下珊瑚礁快速成岛方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711120885.9A CN107816014B (zh) | 2017-11-14 | 2017-11-14 | 人工干预条件下珊瑚礁快速成岛方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107816014A true CN107816014A (zh) | 2018-03-20 |
CN107816014B CN107816014B (zh) | 2019-11-22 |
Family
ID=61609231
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711120885.9A Active CN107816014B (zh) | 2017-11-14 | 2017-11-14 | 人工干预条件下珊瑚礁快速成岛方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107816014B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110205986A (zh) * | 2019-05-07 | 2019-09-06 | 上海克络蒂材料科技发展有限公司 | 一种复合材料漂浮板桩围海造岛的方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006291648A (ja) * | 2005-04-14 | 2006-10-26 | Kajima Corp | 堆積土砂の搬送方法 |
JP2012241320A (ja) * | 2011-05-16 | 2012-12-10 | Masaki Chigira | 津波防波堤 |
CN103882831A (zh) * | 2014-01-27 | 2014-06-25 | 王晓进 | 一种利用城市建筑垃圾建造礁盘人工岛的方法 |
CN105350493A (zh) * | 2015-11-16 | 2016-02-24 | 广州驭蓝驿站工程技术有限公司 | 快速扩充岛礁面积的方法及结构 |
CN205348095U (zh) * | 2015-11-09 | 2016-06-29 | 上海勘测设计研究院有限公司 | 一种拦沙促淤装置 |
CN105970875A (zh) * | 2016-05-02 | 2016-09-28 | 浙江科技学院 | 利用自然能量在海滩促淤固砂的方法 |
CN106759291A (zh) * | 2016-11-30 | 2017-05-31 | 国家海洋局第二海洋研究所 | 人工生态岛礁建设的施工方法 |
-
2017
- 2017-11-14 CN CN201711120885.9A patent/CN107816014B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006291648A (ja) * | 2005-04-14 | 2006-10-26 | Kajima Corp | 堆積土砂の搬送方法 |
JP2012241320A (ja) * | 2011-05-16 | 2012-12-10 | Masaki Chigira | 津波防波堤 |
CN103882831A (zh) * | 2014-01-27 | 2014-06-25 | 王晓进 | 一种利用城市建筑垃圾建造礁盘人工岛的方法 |
CN205348095U (zh) * | 2015-11-09 | 2016-06-29 | 上海勘测设计研究院有限公司 | 一种拦沙促淤装置 |
CN105350493A (zh) * | 2015-11-16 | 2016-02-24 | 广州驭蓝驿站工程技术有限公司 | 快速扩充岛礁面积的方法及结构 |
CN105970875A (zh) * | 2016-05-02 | 2016-09-28 | 浙江科技学院 | 利用自然能量在海滩促淤固砂的方法 |
CN106759291A (zh) * | 2016-11-30 | 2017-05-31 | 国家海洋局第二海洋研究所 | 人工生态岛礁建设的施工方法 |
Non-Patent Citations (1)
Title |
---|
郑家麟: "《厦门市海岛调查研究论文集》", 30 April 1996, 海洋出版社 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110205986A (zh) * | 2019-05-07 | 2019-09-06 | 上海克络蒂材料科技发展有限公司 | 一种复合材料漂浮板桩围海造岛的方法 |
Also Published As
Publication number | Publication date |
---|---|
CN107816014B (zh) | 2019-11-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106638542B (zh) | 吹填土固结排水系统及吹填土快速加固方法 | |
Xiao | Geotechnical engineering design | |
Mollard | Regional landslide types in Canada | |
CN106400776A (zh) | 凹地吹填土排水系统及底部抽真空预压方法 | |
Kujansuu et al. | Glaciofluvial deposits in Finland | |
CN103215945B (zh) | 非均质场地软土地基立体式组合动力排水固结系统和方法 | |
Meijs et al. | Geomorphologic context and proposed chronostratigraphic position of Lower Palaeolithic artefacts from the Op de Schans pit near Kesselt (Belgium) to the west of Maastricht | |
CN106284321B (zh) | 一种复合桩基的施工方法 | |
CN105442491A (zh) | 一种河湖底泥就地处理与生态护坡方法 | |
CN107816014B (zh) | 人工干预条件下珊瑚礁快速成岛方法 | |
CN108277794A (zh) | 一种吹填软土地基真空动力固结复合排水系统 | |
CN214832575U (zh) | 一种高填方软基施工综合立体排水固结系统 | |
CN101003973A (zh) | 一种人工岛准预压地基处理方法 | |
CN108442356A (zh) | 吹填软土地基真空动力固结复合排水系统的施工工艺 | |
CN203846479U (zh) | 一种饱和松砂密实系统 | |
CN101713164B (zh) | 湿软土地基处理方法 | |
Wong | Ground improvement case studies chemical lime piles and dynamic replacement | |
Losco et al. | Periglacial features and landforms of the Delmarva Peninsula | |
CN201797771U (zh) | 绿化生态布加固结构 | |
CN104612013B (zh) | 一种条带状路基的帷幕握裹预压排水结构及其施工方法 | |
Xin et al. | Application of Vacuum Preloading in Foundation Treatment of River | |
Aven | The effect of maintenance on the performance of tube drains | |
Saroglou et al. | Ground improvement of clayey soil formations using stone columns: a case study from Greece | |
Oblogov et al. | Quaternary deposits and geocryological conditions of Gydan Bay Coast of the Kara Sea | |
CN108708371A (zh) | 一种防渗帷幕混凝土复合桩及其施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |