CN107808197A - Upkeep operation management system and upkeep operation managing device - Google Patents

Upkeep operation management system and upkeep operation managing device Download PDF

Info

Publication number
CN107808197A
CN107808197A CN201710731163.0A CN201710731163A CN107808197A CN 107808197 A CN107808197 A CN 107808197A CN 201710731163 A CN201710731163 A CN 201710731163A CN 107808197 A CN107808197 A CN 107808197A
Authority
CN
China
Prior art keywords
label
video data
upkeep operation
shape
addition
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710731163.0A
Other languages
Chinese (zh)
Other versions
CN107808197B (en
Inventor
高桥才明
稻田圭介
藤田雄介
栗原恒弥
佐野谕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Building Systems Co Ltd
Original Assignee
Hitachi Building Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Building Systems Co Ltd filed Critical Hitachi Building Systems Co Ltd
Publication of CN107808197A publication Critical patent/CN107808197A/en
Application granted granted Critical
Publication of CN107808197B publication Critical patent/CN107808197B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance

Abstract

The problem of present invention provides a kind of upkeep operation management system and upkeep operation managing device, and its upkeep operation for being used to solve regeneration Video data to retrieve as target needs to spend time and time, therefore upkeep operation manager is difficult to management service operation.The association portion that upkeep operation managing device possesses in advance associates specific names and given shape, when addition of the timing of name label and shape label in Video data within the scheduled period, based on the position additional association label that addition of name label or shape label.Extraction unit is based on the regeneration request that addition of the name label position consistent with the timing of shape label sent from first terminal, the position that addition of correlation tag is extracted out from Video data, to make first terminal proceed by starting regeneration from the position that addition of correlation tag.

Description

Upkeep operation management system and upkeep operation managing device
Technical field
The present invention relates to a kind of upkeep operation management system of upkeep operation such as supporting lift and dimension Protect job managing apparatus.
Background technology
As the lift being arranged in building, such as there is elevator.Elevator is by the overall control device of control, Cheng Kejin The car of row boarding, the counterweight being connected by hawser with car, grasp driving hawser come make car lift carrying means into. The operator of maintenance lifting machine is by carrying out the inspection corresponding with each device of composition lift, decomposing cleaning, adjustment so Upkeep operation prevent the failure of lift.In conventional upkeep operation, knot is checked by being charged in papery checklist Fruit etc. manages the status of implementation of operation.In recent years, seek to be retained so as to substitute using the content of upkeep operation as data Papery checklist.
In the upkeep operation of lift, each qualification for possessing for operator determines that the model for safeguarding work can be carried out Enclose.Therefore, in upkeep operation, the work that receives instruction one by one and can also be needed is not waited from manager even if operator Industry.But in order to keep the stable needs such as upkeep operation quality, manager suitably to confirm job content.
Due to setting lift in each building, therefore operator rushes towards target structures thing to carry out upkeep operation. The place of the managers such as remote expert or practician that must be in the distance carries out upkeep operation.At present it is known that in patent document 1 In disclose it is a kind of efficiently manage the upkeep operation in a distant place in order to which manager waits, the technology of the situation of operator can be shared.
At this Patent Document 1 discloses following technology, job step is retrieved according to search condition or operation indicates, and is incited somebody to action The job step retrieved or operation instruction are sent to operator's terminal, and operator's terminal receives the job step retrieved or work Industry indicates, and is shown in operator's terminal display part.
In the method disclosed in patent document 1, operator can input according to by the image or sound of record Keyword, retrieve the Video data as charge book as target.But if in the picture without record and input The corresponding lift of keyword, then can not confirm upkeep operation.In addition, same keyword is entered when several times in upkeep operation During row sounding, the position of the keyword sounding is completely drawn out.Therefore, job management person retrieves and shown the work for wanting confirmation Industry record position needs to spend time and time.
Patent document 1:Japanese Unexamined Patent Publication 2004-102727 publications
The content of the invention
The present invention be in view of such situation and make, its object is to easily manage the upkeep operation of lift.
The upkeep operation management system of the present invention possesses filming apparatus, upkeep operation managing device, first terminal.
Filming apparatus shoots the upkeep operation of lift, and generates comprising the image and sound related to upkeep operation Video data.
The Video data that operator's terminal regeneration obtains from upkeep operation managing device.
Upkeep operation managing device is connected by communication line with filming apparatus, and obtains Video data from filming apparatus. The upkeep operation managing device possesses:Title test section, SHAPE DETECTION portion, association portion, extraction unit.Title test section is to number of recording a video Text transform is carried out to detect the specific title in upkeep operation, and to detecting the spy of Video data according to the sound of middle record The position of fixed title adds name label.The image detection lift that SHAPE DETECTION portion records from Video data it is specific Shape, and the position additional shape label of the specific shape to detecting Video data.Association portion is in advance by specific title Get up with specific shape correlation, when addition of the timing of name label and shape label in Video data in the scheduled period When interior, based on addition of the position of name label or shape label come additional association label.The storage of Video data storage part is additional The Video data of name label, shape label and correlation tag.Extraction unit addition of name based on what is sent from first terminal Claim the regeneration request at the label position consistent with the timing of shape label, in the Video data stored from Video data storage part Extract the position of additional association label out, first terminal is proceeded by starting regeneration from the position that addition of correlation tag.
By the present invention, since in Video data addition of the name label position consistent with the timing of shape label Enter start of line regeneration, therefore can efficiently carry out the management of upkeep operation.
In addition, above-mentioned upkeep operation management system is the mode of the present invention, one for reflecting the present invention The upkeep operation managing device of side, there is the upkeep operation management system identical knot with reflecting the side of the present invention Structure.
By the following description of the embodiments so that problem other than the above, structure and effect become clear and definite.
Brief description of the drawings
Fig. 1 is the explanation figure for representing to retrieve the configuration example of the upkeep operation management system at sounding position.
Fig. 2 is the explanation figure of the configuration example for the upkeep operation management system for representing searching part shape.
Fig. 3 is the explanation figure of the configuration example for the upkeep operation management system for representing one embodiment of the present of invention.
Fig. 4 is the block diagram of the internal structure example for the upkeep operation management system for representing one embodiment of the present of invention.
Fig. 5 is the block diagram for the hardware structure of computer example for representing one embodiment of the present of invention.
Fig. 6 be in the Video data for represent one embodiment of the present of invention add name of parts label, component shape label, The explanation figure of the example of correlation tag.
Fig. 7 is the explanation figure of the display example for the extraction condition setting screen for representing one embodiment of the present of invention.
Fig. 8 is the explanation figure of the running-active status for the upkeep operation management system for representing one embodiment of the present of invention.
Fig. 9 is the place for the upkeep operation management system additional label in Video data for representing one embodiment of the present of invention The flow chart of the example of reason.
Figure 10 is the flow chart of the example of the operating method for the office's terminal for representing one embodiment of the present of invention.
Figure 11 is to represent the situation in the operation of the operator carried out in operation field of one embodiment of the present of invention Illustrate figure.
Figure 12 is the explanation figure of the transfer example for the picture shot by camera for representing one embodiment of the present of invention.
Figure 13 is the explanation figure of the show example for the report display picture for representing one embodiment of the present of invention.
Embodiment
Hereinafter, explanation is sent out as the retrieval of the premise of the upkeep operation management system of one embodiment of the present of invention in order The configuration example of the configuration example of the upkeep operation management system of part position, the upkeep operation management system of searching part shape.For Structural element with substantially identical function or structure, assign identical symbol and the repetitive description thereof will be omitted.
(configuration example of the upkeep operation management system at retrieval sounding position)
Illustrated firstly for the upkeep operation management system at retrieval sounding position.
Fig. 1 is the explanation figure for representing to retrieve the configuration example of the upkeep operation management system 100 at sounding position.
Upkeep operation management system 100 possesses:Camera 3, upkeep operation managing device 101, manager terminal 9.Photograph Machine 3 is connected with upkeep operation managing device 101 via communication line 6, can be sent to upkeep operation managing device 101 from photograph The extraction result 104 extracted out in the Video data 102 that camera 3 photographs.
The lifts such as elevator between floors are accommodated in addition to traction machine 1, also by control device (not shown), sedan-chair Railway carriage or compartment, hawser, counterweight etc. are formed.Also, operator 2 carries out the upkeep operation of each device.
Operator 2 for example puts on the safety cap progress operation for being provided with camera 3.Camera 3 is by the sight 4 of operator 2 Direction as shooting direction, the maintenance of the lift for being carried out in the range of being substantially the same with the visual field of operator 2 is made Industry is shot, and the sounding 10 of operator 2 is recorded by microphone (not shown).Therefore, camera 3 can give birth to Into the Video data 102 for including the image and sound related to upkeep operation.Operator 2 is schemed sight direction by a dotted line In traction machine 1 when camera 3 shoot Range Representation be coverage R1~R3.The expression sounding of operator 2 of sounding 10 is simultaneously true The name of parts for the lift recognized, confirm content etc..For example, the content of the sounding of operator 2 and the sounding 10 confirmed is " components A ".” Components A " for example represents the brake lining 11 for braking.
Operator 2 carries out the sounding of " components A " when the order according to coverage R1, R2, R3 moves sight 4 every time 10.Have recorded in the Video data 102 that camera 3 photographs the sounding 10 of operator 2, traction machine 1 coverage R1~ R3.In figure, camera 3 represents that operator 2 is carried out in video process, for coverage R1~R3 by dialog box The timing of the sounding 10 of " components A ".
Upkeep operation managing device 101 stores the Video data 102 obtained by communication line 6 from camera 3.Manager 8 operational administrative person terminals 9, are shown in the Video data 102 stored in upkeep operation managing device 101 in manager terminal 9. Thus, manager 8 can confirm the operation of operator 2 from a distant place.
, can be from video recording number when manager 8 regenerates Video data 102 to confirm the upkeep operation carried out by operator 2 Start to be watched untill video recording terminates according to 102 video recording, but if video time is grown, then in target job of appearing before one's eyes out To spend the time before.Therefore, upkeep operation managing device 101 is the timing that the sounding 10 of " components A " has been carried out in operator 2 The name of parts label that can be originated is recorded in Video data 102 as initial signal.Inputted in manager 8 to manager terminal 9 When " components A " is used as search key 103, upkeep operation managing device 101 sent from Video data to manager terminal 9 102 have extracted the extraction result 104 of the image for the position that addition of name of parts label out.In the extraction knot that manager terminal 9 is shown Fruit 104 is that coverage R1~R3 of the BR for the sounding 10 that " components A " has been carried out in operator 2 in sequence enters Gone starting regeneration image.
But the timing that the sounding 10 of " components A " has been carried out in operator 2 not necessarily shoots components A.Therefore, although pipe Reason person 8 merely desires to the coverage R2 for components A of appearing before one's eyes being shown as retrieval result, but even if the coverage for components A of not appearing before one's eyes R1, R3 are also extracted out and shown, need time and time to find out target image.
[configuration example of the upkeep operation management system of searching part shape]
Then, illustrated for the upkeep operation management system of searching part shape.
Fig. 2 is the explanation figure of the configuration example for the upkeep operation management system 110 for representing searching part shape.
Upkeep operation management system 110 possesses camera 3, upkeep operation managing device 111, manager terminal 9.Camera 3 are connected with upkeep operation managing device 111 via communication line 6, can be sent to upkeep operation managing device 111 from photograph The extraction result 114 extracted out in the Video data 112 that machine 3 photographs.
Upkeep operation managing device 111 detects specific component shape, example in the image included from Video data 112 Position such as the component shape 7 of brake lining 11 records the component shape label as initial signal.In manager 8 to manager When the input block shape 7 of terminal 9 is used as search key 113, upkeep operation managing device 111 is sent to manager terminal 9 From the extraction result 114 of the image for the position that addition of component shape label that Video data 112 is extracted out.Manager terminal 9 is aobvious The extraction result 114 shown is that the image of starting regeneration has been carried out to the coverage R2 of the component shape 7 for components A of appearing before one's eyes.In addition, Detecting the action of specific component shape can be carried out in all images that Video data 112 is included, it is also contemplated that place Load is managed, at predetermined intervals or ratio is carried out.For example, it is 30fps (frames per second, frames per second in camera Number) when, an image can regularly be extracted out with every 120 frame (4 seconds).Furthermore it is possible to extract the image selected from 120 frame out Degree of jitter, other images are reselected from 120 frame when shaking big.As described below, by making the predetermined interval short The scheduled period (such as 5 seconds) used when in additional association label, name of parts label and part shape can be carried out exhaustive Association between shape label.In addition, when determining multiple component shapes from same image, multiple name of parts labels can be added.
Herein, sight 4 is moved sometimes through operator 2, in Video data 112 with the sight 4 of operator 2 synchronously Order according to coverage R1, R2, R3, R2 is recorded a video.Now, the extraction result 114 shown in manager terminal 9 In, repeatedly comprising the coverage R2 of the components A with component shape 7 of appearing before one's eyes.Part of appearing before one's eyes has been regenerated in repeatedly starting During the coverage R2 of shape 7, the image that manager 8 finds out the position for wanting confirmation needs to spend time and time.
[one embodiment]
In this way, in upkeep operation management system 100,110, manager 8 is difficult to rapidly retrieve and confirm target job. Therefore, it is explained with reference to improve the upkeep operation management system of the one embodiment of the invention of retrieval performance.The maintenance Job management system is used for the upkeep operation of elevator, can be used for the upkeep operation for lifts such as staircases.
Fig. 3 is the explanation figure for the configuration example for representing upkeep operation management system 30.
Upkeep operation management system 30 possesses camera 3 (example of filming apparatus), upkeep operation managing device 50, Manager terminal 9 (example of first terminal), operator's terminal 20 (example of second terminal).Upkeep operation management Device 50 is connected by communication line 6 with camera 3, and Video data 5 is obtained from camera 3.Manager terminal 9 can regenerate The Video data 5 obtained from upkeep operation managing device 50.
Control panel 21 is provided near the traction machine 1 shot by camera 3.The traction machine 1 possesses brake lining 11st, main brake arm 12, brake drum 13, tripping spring 14.In the following description, brake lining is referred to as " components A ", by main system Swing arm 12 is referred to as " part B ", and brake drum 13 is referred to as " part C ", tripping spring to be referred to as into " part D ".
Operator 2, which moves sight 4, makes coverage R1, R2, R3 enter the visual field in order, and camera 3 is recorded a video bat in order Take the photograph scope R1, R2, R3.With the Video data 5 that coverage R1, R2, R3 sequential shoot arrive by communication line 6 from camera 3 are sent to upkeep operation managing device 50.Operator's terminal 20 that operator 2 holds is connected with camera 3, can show photograph Coverage R1~R3 that machine 3 is recorded a video.In addition, operator's terminal 20 can obtain Video data 5 by communication line 6, carry out The starting regeneration of Video data 5, or the report of display or printing upkeep operation.
Upkeep operation managing device 50 possesses name of parts database D 1, component shape data storehouse D2, linked database D3, record As data storage database D4, job step database D 5.
" components A "~" part D " portion has been logged in name of parts database D 1 (example of name of parts storage part) Part name D11~D14.As the name of parts of each part, name of parts D11 is logged on as into " brake lining ", name of parts D12 is logged on as " main brake arm ", name of parts D13 is logged on as into " brake drum ", name of parts D14 is logged on as " tripping spring ".In the present embodiment In, it is that the specific title of the part of traction machine 1 is referred to as " name of parts " by the lift for forming progress upkeep operation.
Logged in component shape data storehouse in D2 (example of component shape storage part) " components A "~" part D's " Component shape D21~D24.Component shape D21~D24 is logged on as to represent " components A "~" shape of part D " characteristic Image.In the present embodiment, the specific shape of part is referred to as " component shape ".
Storage associates name of parts with component shape in linked database D3 (example in associated storage portion) Result.Such as represent to associate with component shape D21 by using the association D31 connection member name D11 of two arrows.Equally Ground, by using two arrows association D32~D34 for name of parts D12~D14 and component shape D22~D24 be attached come Represent association.
The storage Video data in Video data data storage storehouse D4 (example of Video data storage part).Pass through dimension Shield job managing apparatus 50 addition of name of parts label (example of name label), component shape mark in Video data 5 Sign (example of shape label) and correlation tag.
The upkeep operation of lift is stored in job step database D 5 (example of job step storage part) Required job step.Extraction unit 54 described later is in the job step from Video data data storage storehouse D4 retrieval upkeep operations When with reference to job step.
Manager terminal 9 is associated come from video recording number by specified parts name, component shape or name of parts and component shape According to the Video data 5 of the coverage of 5 display targets.For example, manager 8 have input name of parts D11 as search key During with component shape D21, the sounding 10 of starting regeneration progress " components A " in manager terminal 9, and the part for components A of appearing before one's eyes Shape D21 coverage R2, which is used as, extracts result 26 out.Therefore, manager 8 can quickly be selected as the maintenance work of target Industry, and the upkeep operation for confirming operator 2 can be watched from a distant place.
Fig. 4 is the block diagram for the internal structure example for representing upkeep operation managing device 50.
Upkeep operation managing device 50 is except title test section 51, SHAPE DETECTION portion 52, association portion 53, extraction unit 54, report Accuse beyond book generating unit 55, be also equipped with above-mentioned 1~D5 of database D.
Name of parts D11~D14 of the part of the reference of store name test section 51 in name of parts database D 1.In part shape Component shape D21~D24 of the part of the reference of SHAPE DETECTION portion 52 is stored in shape database D 2.Stored in linked database D3 Name of parts D11~the D14 and component shape D21~D24 of the reference of association portion 53 association D31~D34.Stored in Video data Storage addition of the Video data 5 of name of parts label, component shape label, correlation tag as initial signal in database D 4. Also, the job step of storage system maintenance operation in job step database D 5.The job step is for example by upkeep operation Order of name of parts when image obtained from situation is shot and operator 2 carry out sounding 10 etc. is formed.
The sound recorded in the Video data 5 inputted by communication line 6 from camera 3 is entered style of writing by title test section 51 Reference cell name database D1 after this conversion, detect the name of parts when sounding of operator 2 is confirmed in upkeep operation.So Afterwards, title test section 51 is when the name of parts detected is consistent with the name of parts logged in name of parts database D 1, to number of recording a video According to the 5 position additional component name label for detecting name of parts.The specific title that title test section 51 detects is except name of parts Can also be job title etc. in addition.
The reference cell shape database D2 of SHAPE DETECTION portion 52, the detection composition conduct from the image of the record of Video data 5 The component shape of the part of the lift of upkeep operation object.Then, SHAPE DETECTION portion 52 is in the component shape and portion detected When the component shape logged in part shape database D2 is consistent, to the position appendix for detecting component shape of Video data 5 Part shape label.
In the present embodiment, title test section shown in Fig. 9 51 and SHAPE DETECTION portion 52 are handled parallel as be described hereinafter, also may be used Handled, can also be detected according to SHAPE DETECTION portion 52, title with the order according to title test section 51, SHAPE DETECTION portion 52 The order in portion 51 is handled.
Association portion 53 in advance associates name of parts and component shape, when addition of part identifier in Video data 5 When (for example, within 5 seconds), name is addition of based on Video data 5 within the scheduled period for the timing of label and component shape label Claim the position additional association label of label or shape label.Represent the corresponding relation quilt associated between name of parts and component shape It is stored in linked database D3.For example, when the name of parts label added within the scheduled period in Video data 5 is name of parts D11, when component shape label is component shape D21, due to being associated with name of parts D11 and component shape D21 by associating D31 Get up, therefore the additional association label in Video data 5.
Extraction unit 54 addition of the name label portion consistent with the timing of shape label based on what is sent from manager terminal 9 The regeneration request of position, extract the position that addition of correlation tag out from Video data data storage storehouse D4 Video data 5.Now, Extraction unit 54 is extracted out according to the regeneration request received from manager terminal 9 and addition of name of parts label, component shape label or pass Join the position of label.Then, extraction unit 54 can make manager terminal 9 from addition of name of parts label, component shape label or The position of correlation tag proceeds by starting regeneration.
For example, shown in Figure 10 as be described hereinafter, extraction unit 54 from manager terminal 9 receive comprising " only title ", " only shape ", The regeneration request of any one in " title or shape " and " title and shape are consistent ".Then, extraction unit 54 is according to connecing The regeneration request received, sent to manager terminal 9 and represent to addition of name label, shape label from what Video data 5 was extracted out Or the information at the position of correlation tag.As the information sent to manager terminal 9, such as comprising addition of and extraction condition one The image at the position of the label of cause, at the beginning of the Video data 5 between elapsed time as information.It is whole in manager Show that the information is used as in end 9 and extract result 26 out.Manager 8 selects to extract result 26 out by operational administrative person terminal 9, takes out The Video data 5 of starting can be extracted out from the extraction result 26 selected by going out portion 54, manager terminal 9 is entered the start of line again It is raw.In addition, the extraction result 26 on being sent to manager terminal 9, can show in operator's terminal 20, can also pass through Operator's terminal 20 enters start of line regeneration.
In addition, image that extraction unit 54 can record with reference to job step database D 5 in combined picture-recording data 5 and maintenance The change of the related information of operation judges what kind of job step is job step be.As the change of the image, such as comprising Operator 2 from car upper take into when situation, disengaging hoistway when situation etc..In addition, the related information as upkeep operation, Comprising representing operator 2 by the power-off of elevator, the change of electrical control information such as timing connected etc..With such image Change with the related information of upkeep operation together, confirms to add title in Video data 5 by carrying out sounding by operator 2 Label, shape label or correlation tag.Therefore, extraction unit 54 is with reference to the job step stored in job step database D 5, Judge to need in upkeep operation according to the order that addition of name label, shape label or correlation tag in Video data 5 The job step to be confirmed.Then, extraction unit 54 can be in the manager terminal 9 preferentially to needing most the job step of confirmation Image enters start of line regeneration.
Report generating unit 55 generates report, and this report school bag, which contains, passes through extraction unit 54 from Video data data storage storehouse The image at the position extracted out in the Video data 5 of D4 storages.Additional image is not only to addition of correlation tag in report Position image, can also be addition of name label, shape label position image.This report book passes through communication line 6 are sent to operator's terminal 20, and operator's terminal 20 shows report, or can be by belonging to operator's terminal 20 not The Portable printer of diagram is printed.In addition, manager terminal 9 can show this report book.
Then, the hardware configuration for forming the computer C of upkeep operation managing device 50 is illustrated.
Fig. 5 is the block diagram for the hardware configuration for representing computer C.
Computer C is the hardware used as usually said computer.Computer C possesses to be connected with bus C4 respectively CPU (Central Processing Unit, central processing unit) C1, ROM (Read Only Memory, read-only storage Device) C2, RAM (Random Access Memory, random access memory) C3, nonvolatile memory C5, network interface C6.
CPU C1 read from ROM C2 and perform the program code of the software of each function for realizing the present embodiment. In RAM C3, caused variable and parameter etc. during calculation process are temporarily written.
As nonvolatile memory C5, such as use HDD (Hard Disk Drive, hard disk drive), SSD (Solid State Drive, solid state hard disc), floppy disk, CD, photomagneto disk, CD-ROM, CD-R, tape, Nonvolatile memory Deng.In nonvolatile memory C5, beyond record OS (Operating System, operating system), various parameters, Also record the program for making computer C play function.ROM C2, nonvolatile memory C5 are used as have recorded CPU C1 progress Program and data required for action etc., and store by the computer-readable non-transitory of the computer C programs performed One example of recording medium.Therefore, the program is for good and all stored in ROM C2, nonvolatile memory C5.
In network interface C6 such as using NIC (Network Interface Card NICs), Neng Goujing Sent between the devices by the grade of communication line 6 for being connected to terminal and receive various data.Therefore, the energy of upkeep operation managing device 50 Enough by network interface C6, Video data 5 is received from camera 3, and record is sent for manager terminal 9 or operator's terminal 20 As data 5 or extract result 26 out.
Fig. 6 is the name of parts label, component shape label, the example of correlation tag for representing to add in Video data 5 Illustrate figure.
Video data 5 shown in Fig. 6 represents that one hour of experience of camera 3 counts obtained from being recorded a video to upkeep operation According to.Matchingly camera 3 starts to record a video for beginning with upkeep operation, the matchingly knot of camera 3 of the end with upkeep operation Beam is recorded a video.Therefore, it is possible to determine to addition of part in Video data 5 by the elapsed time t on the basis of by operation starting Name label, component shape label, the position of correlation tag.
Make operator 2 by sight 4 towards upkeep operation object when additional component shape label timing earlier than Operator 2 has carried out the timing of additional component name label when sounding confirms.The timing of component shape label be addition of with addition of If within the scheduled period that the difference between the timing of name of parts label is represented with the quadrangle of dotted line in figure (for example, 5 seconds with It is interior), then by association portion 53 in Video data 5 additional association label.The position that addition of the correlation tag is set to originate Regeneration site 61.Manager 8 can arbitrarily change the scheduled period by operational administrative terminal 9.In addition, in figure 6, pre- A component shape label is merely illustrated in periodically, it is pre- at this when including multiple component shape labels within the scheduled period A correlation tag is at least added in periodically.In addition, when containing multiple component shape labels in same image, If the component shape label consistent with the name of parts label added in the scheduled period in multiple component shape labels is one, Then can be with additional association label.In addition, the determining method on the scheduled period, can divide animation in each scheduled time, will Each section is set to a scheduled period, at the time of can also making addition of name of parts label with addition of component shape label when Difference (absolute value) between quarter for predetermined value (for example, 5 seconds) below.The method of the latter can neatly tackle additional component shape The deviation of the timing of shape label and name of parts label.
It is same earlier than in the case of the timing that addition of component shape label in the timing that addition of component names label. That is, if it addition of the timing of component shape label and addition of difference between the timing of name of parts label in figure with dotted line Quadrangle represent scheduled period within (for example, within 5 seconds), then by association portion 53 in Video data 5 additional association mark Label.The position that addition of the correlation tag is set to originate regeneration site 62.
Here, addition of the consistent position of timing of the timing of name of parts label with addition of component shape label is to record It is predetermined as addition of the timing of name of parts label in data 5 and addition of the Differential time between the timing of component shape label Position in period.For example, operator 2 sight 4 towards the sounding that name of parts is carried out within 5 seconds after brake lining 11, or When the sight 4 of operator 2 is towards brake lining 11 within 5 seconds after carrying out the sounding of name of parts, as addition of component shape The timing of label is with the timing that addition of name of parts label consistent to be handled.Then, matchingly add and close with following position Join label, the position is the early position of the timing than addition of component shape label or name of parts label.It is furthermore, it is not necessary that certain Some timing additional association label in the timing that addition of component shape label or name of parts label, such as even in additional Position additional association label before the several seconds of the timing of some label can also play the effect of the present invention.
Therefore, when addition of timing of the timing of component shape label with addition of name of parts label in Video data 5 Between difference when having exceeded the scheduled period, the not additional association label in Video data 5.For example, it formerly addition of component shape After label, if the non-additional component name label within the scheduled period, an additional component shape label in Video data 5. The position that addition of the component shape label is set to originate regeneration site 63.Similarly, after formerly addition of name of parts label, If the non-additional component shape label within the scheduled period, an additional component name label in Video data 5.It will addition of The position of the name of parts label is set to originate regeneration site 64.
Fig. 7 is the explanation figure for the example for representing extraction condition setting screen W1.
Possess job step selection region W11, name of parts choosing in the extraction condition setting screen W1 that manager terminal 9 is shown Select region W12, shape selection region W13, operation elapsed time input area W14, extraction condition selection region W15.
Job step selection region W11 can select job step by pull-down menu.
Name of parts selection region W12 can be by pull-down menu come alternative pack name.
Shape selection region W13 can be by representing the icon of each component shape come alternative pack shape.
Operation elapsed time input area W14 can input since Video data 5 video recording the time started it is any when Between be used as the operation elapsed time.
Extraction condition selection region W15 can select only name of parts, only component shape, name of parts or component shape, consistent Each button shown in extraction condition.In addition, in order to select extraction condition selection region W15, it is necessary to selection region W11~W14 In some region.If in addition, have selected job step by job step selection region W11, extract out and originate regeneration In the upkeep operation recorded a video in Video data 5 specific name of parts has been carried out in the job step selected sounding or It has taken the part of component shape.If not selecting job step, extracted out from whole Video datas 5 and originate regeneration to specific Name of parts carried out sounding or have taken the part of component shape.In addition, if in operation elapsed time input area W14 The operation elapsed time is have input, then extracts and originate the operation that regeneration is carried out after the operation elapsed time out.
When having pressed executive button W16, according to by extracting extraction condition that condition selection region W15 selects out from record As data 5 extract image out.
When having pressed " only name of parts " button from extraction condition selection region W15, extraction addition of to be selected in name of parts The position for the name of parts label that region W12 is selected.In figure 6, starting regeneration site 61,62,64 is extracted out.
When having pressed " only component shape " button, the part shape that addition of and selected in shape selection region W13 is extracted out The position of shape label.In figure 6, starting regeneration site 61,62,63 is extracted out.
When having pressed " name of parts or component shape " button, extraction addition of to be selected in name of parts selection region W12 Name of parts label position and addition of at the position of the shape selection region W13 component shape labels selected.In Fig. 6 In, extract starting regeneration site 61,62,63,64 out.
When having pressed " consistent " button, the pass that addition of and associate name of parts label with component shape label is extracted out Join the position of label.In figure 6, starting regeneration site 61,62 is extracted out.
Extract results display area domain W17 out and show taking out for the image that extraction unit 54 is extracted out according to extraction condition from Video data 5 Go out result 26.In this example embodiment, show that operator 2 carries out sounding, the component shape D21 for components A of appearing before one's eyes shooting to " components A " Scope R2 image.Have a case that to show multiple images in results display area domain W17 is extracted out.Manager 8 is existed by selection Extract the image shown in the W17 of results display area domain out, lighted from the time for showing selected image and proceed by video recording number Regenerated according to 5 starting.
Fig. 8 is the explanation figure for the running-active status for representing upkeep operation management system 30.
During upkeep operation is carried out, camera 3 is shot operator 2 to coverage R1~R3.Then, operation Person has carried out the sounding 10 of " components A " in switching coverage R1~R3 every time, but is actually appeared before one's eyes in Video data 5 The simply coverage R2 of components A.
The operational administrative person terminal 9 of manager 8, it is crucial that the name of parts D11 of components A and component shape D21 are appointed as retrieval Word 25, and press the consistent button shown in Fig. 7.Now, show to extract out from Video data 5 in manager terminal 9 and carry out The extraction result of the sounding 10 of " components A " and coverage R2 comprising component shape D21.Then, manager 8 can pass through choosing Select and extract result 26 out to carry out the starting of Video data 5 regeneration.
In addition, when having carried out starting regeneration at the position to addition of name of parts label, can show in manager terminal 9 Show name of parts.In addition, when starting regeneration has been carried out at the position to addition of component shape label or correlation tag, can be in pipe Component shape is highlighted in reason person's terminal 9.For example, it is also possible to by flashing component shape, or use and ambient color Different colors carrys out display unit shape so that manager 8 can easily grasp the component shape of part.
Then, reference picture 9 and Figure 10 illustrate the processing example of upkeep operation management system 30.
Fig. 9 is the flow chart for representing the additional example of label in Video data 5 of upkeep operation management system 30.
First, when operator 2 opens the power knob of camera 3, camera 3 starts to shoot (S1), hereafter, operator 2 start upkeep operation (S2).Then, camera 3 sends to upkeep operation managing device 50 and is set to clap by the sight 4 of operator 2 Take the photograph the Video data 5 (S3) of scope.
Title test section 51 retrieves the sounding 10 recorded from Video data 5 from name of parts database D 1 and carries out text transform And the name of parts detected, carry out detection part name (S4).Then, the additional part identifier in Video data 5 of title test section 51 Sign (S5).
The part shape that the image that SHAPE DETECTION portion 52 records from component shape data storehouse D2 retrievals from Video data 5 is extracted out Shape, carry out detection part shape (S6).Then, the additional component shape label (S7) in Video data 5 of SHAPE DETECTION portion 52.
Then, association portion 53 judge to have added the timing of name of parts label with added component shape label timing whether Unanimously (S8).As described above, " consistent " refer to the component shape label that is associated as shown in Figure 6 by linked database D3 and Name of parts label is attached in Video data 5 in a manner of additional timing is within the scheduled period.
In the timing of additional name of parts label and the inconsistent timing of additional component shape label (S8, no), do not recording Processing is moved to step S10 as additional correlation tag in data 5.The timing of name of parts label is being added with having added portion When the timing of part shape label is consistent (S8, yes), the additional correlation tag (S9) in Video data 5 of association portion 53.Then, associate Portion 53 stores Video data 5 (S10) in Video data data storage storehouse D4, and terminates present treatment.
Figure 10 is the flow chart of the example for the operating method for representing manager terminal 9.
First, manager 8 operational administrative person terminal 9 starts to watch Video data 5 (S11).Now, in manager terminal The extraction condition setting screen W1 shown in Fig. 7 is shown in 9.Then, manager 8 is extracting condition setting screen W1 region W11 out Input retrieval object (S12) in~W14.Hereafter, by retrieving object from extraction condition selection region W15 selections, and press and hold Row button W16, regeneration request is sent from manager terminal 9 to upkeep operation managing device 50.Extraction unit 54 is according to regeneration request The Video data 5 stored from Video data data storage storehouse D4 retrieves the position consistent with regeneration request.
Herein, extraction unit 54 judges whether from the extraction condition that extraction condition selection region W15 is selected be " only part Name " (S13).When extraction condition is " only name of parts " (S13, yes), extraction unit 54 only pulls out has carried out sounding to name of parts Position, and all shown (S14) using extraction result 26 as starting in manager terminal 9.
When extraction condition is not " only name of parts " (S13, no), extraction unit 54 is judged from extraction condition selection region W15 Whether the extraction condition selected is " only component shape " (S15).When being " only component shape " (S15, yes), extraction unit 54 is only Extract the position for component shape of appearing before one's eyes out, and all shown using extraction result 26 as starting in manager terminal 9 (S16)。
When extraction condition is not " only component shape " (S15, no), extraction unit 54 is judged from extraction condition selection region Whether the extraction condition that W15 is selected is " name of parts or component shape " (S17).When being " name of parts or component shape " (S17, yes), extraction unit 54 extracts the position that sounding has been carried out to name of parts out and this both sides of the position of component shape that appear before one's eyes, in pipe All shown (S18) using extraction result 26 as starting in reason person's terminal 9.
When extraction condition is not " name of parts or component shape " (S17, no), extraction unit 54 from extract out condition selection region The extraction condition that W15 is selected is the situation (S19) of " name of parts is consistent with component shape ".In this case, extract out to portion Part name has carried out the position position (position of additional association label) consistent with the position for component shape of appearing before one's eyes of sounding, and in pipe All shown (S20) using extraction result 26 as starting in reason person's terminal 9.
Then, reference picture 11 and Figure 12 illustrate the flow of actual upkeep operation.In Figure 11 and Figure 12, add common Expression job step (1)~(7) numbering.Herein, represent that operator 2 decomposes the feelings for the brake 22 for cleaning traction machine 1 Condition.
Figure 11 is the explanation figure for the situation for representing the operation that operator 2 is carried out in operation field.
Figure 12 is the explanation figure of the migration example of picture for representing to shoot by camera 3.
(1) initially, operator 2 by sight 4 towards control panel 21, the main power source of cutting-off controlling disk 21.Now, in shooting model Enclose in R11, the operator that appears before one's eyes cuts off the situation of main power source.
(2) then, operator 2 and visually inspects brake 22 by sight 4 towards brake 22.Now, in coverage Appeared before one's eyes in R12 brake 22.
(3) then, operator 2 by sight 4 towards brake lining 11, main brake arm 12 come visually inspect brake lining 11, Main brake arm 12.Now, appeared before one's eyes in coverage R13 brake lining 11, main brake arm 12, brake drum 13, tripping spring 14 Component shape.
(4) then, operator 2 takes out tripping spring 14 by sight 4 towards tripping spring 14 from main brake arm 12.Now, Appeared before one's eyes in coverage R14 the tripping spring 14 of taking-up, brake lining 11, the component shape of main brake arm 12.
(5) then, operator 2 fell main brake arm 12, and by sight 4 towards brake lining 11.Now, in coverage In R15, the component shape of brake lining of appearing before one's eyes 11 and main brake arm 12.
(6) then, operator 2 takes out brake lining 11, and the brake lining by sight 4 towards taking-up from main brake arm 12 11, visually inspect brake lining 11.Meanwhile operator 2 is indicated the sounding 10 of inspection result.Now, in Video data 5 Record has carried out the situation that the sounding of " components A confirmation " confirms.In addition, in coverage R16, the brake lining for taking-up of appearing before one's eyes 11st, the component shape of main brake arm 12.
(7) then, operator 2 terminates the visual inspection of brake lining 11, and is transferred to next step.Now, clapping Take the photograph in scope R17 to appear before one's eyes and be moved to the situation of next step.
In this way, the situation for continuous job step (1)~(7) of being appeared before one's eyes in a Video data 5.For the Video data 5, additional name of parts label, component shape label, correlation tag.For example, in the timing additional brake liner 11 of job step (6) Name of parts label.In addition, the component shape label of the timing additional brake liner 11 in job step (3)~(6).Then, In the correlation tag of the timing additional brake liner 11 of job step (6).
Figure 13 is the explanation figure for the display example for representing report display picture W2.
Report display picture W2 with possessing mansion photo W21, the Objective of Report details column W22, operator's photo W23, report source details column W24, operation photo W25.
The photo of mansion is shown in mansion photo W21, the lift for having carried out upkeep operation is arranged in the mansion.
In details column W22, show proposition destination, mansion name and the device name of report in the Objective of Report The details on such Objective of Report ground.
The facial photo of operator 2 is shown in operator's photo W23.
In source details column W24 is reported, display report source exabyte, telephone number, the date of report, operator's name, Telephone number etc..
The photo for the part changed in upkeep operation etc. is shown in operation photo W25.The photo is, for example, Represent addition of the image of the situation before and after the replacing of the image or part at the position of correlation tag.In the example shown in Figure 13 In, represent to take out old brake lining 11 from main brake arm 12 by serial-gram, and new braking is installed in main brake arm 12 The situation of liner 11.
Report generating unit 55 can show report display picture W2 in manager terminal 9 or operator's terminal 20. In addition, operator's terminal 20 can print report by pocket printer according to report display picture W2 identicals form Accuse book.In this case, the report printed is submitted from operator 2 to mansion owner etc..In addition, report generating unit 55 email addresses that can also be possessed by the mail Deng Xiang mansion owners are sent in what is shown in report display picture W2 Content.
In the upkeep operation management system 30 of one embodiment described above, retrieved by manager 8 and made with safeguarding The related name of parts label of the industry position consistent with component shape label, starting is proceeded by from the position that addition of correlation tag Regeneration.Therefore, manager 8 can find out the position for wishing to read rapidly.Wherein, name of parts label is consistent with component shape label Position there is the enough and to spare of scheduled period, thus can easily additional association label.Therefore, manager 8 can further improve Want the precision at the position of reading.
In this way, the content of the easy management service operation of manager 8.In addition, lead in the report for giving the mansion owner Serial-gram is crossed to represent job step, therefore the mansion owner easily confirms job result.
[variation]
In addition, the specific job step module in upkeep operation can be turned to what manager 8 should manage by extraction unit 54 Most important operation.For example, a series of job step (3)~(6) shown in Figure 11 and Figure 12 are collected for " a components A Apportioned effort ".The situation for so collecting a series of job step is referred to as " modularization ".Extraction unit 54 can be in job step A series of job step in rapid database D 5 after memory module.Then, extraction unit 54 is to the sending module of manager terminal 9 The position of the beginning and end of a series of operation after change.Therefore, the operation that manager 8 quickly can confirm to manage is opened The situation for beginning and terminating.
Here, when operator 2 has carried out operation by the step different from the job step after modularization, according to leading to The order different for the component shape label that the job step after modularization is added in Video data 5 is crossed, in video recording number According to additional component shape label in 5.Therefore, extraction unit 54 is with reference to the dimension after the modularization stored in job step database D 5 The job step of operation is protected, shows that attention is aroused in operator's terminal 20, the attention arouses what is carried out for representing operator 2 The job step of upkeep operation is different from the job step of the upkeep operation after modularization.Thus, operator 2 is it can be noted that pass through The job step of mistake carries out the situation of operation, and re-starts operation by correct job step.
In addition, the present invention is not limited to the above embodiments, can naturally not depart from described in claim Other various application examples, variations are obtained in the range of spirit of the invention.
For example, the above embodiments are in order to understandable to illustrate of the invention and detailed and specifically understand device and be The structure of system, but be not restricted to that must possess the entire infrastructure of explanation.In addition, can be by the structure of embodiment described herein A part replace with the structure of other embodiment, and the knot of other embodiment can be added in the structure of some embodiment Structure.In addition, the addition, elimination, replacement of other structures for a part for each example structure, can be carried out.
In addition, control line and information wire are considered as to be needed to illustrate, but be not restricted to that on product Whole control line and information wire must be represented.It can essentially think that almost all of structure is connected with each other.
The explanation of symbol
1:Traction machine, 3:Camera, 5:Video data, 9:Manager terminal, 20:Job-oriented terminal, 25:Search key, 26:Extract result, 30 out:Upkeep operation management system, 50:Upkeep operation managing device, 51:Title test section, 52:SHAPE DETECTION Portion, 53:Association portion, 54:Extraction unit, 55:Report generating unit, D1:Part name database, D2:Component shape data storehouse, D3: Linked database, D4:Video data data storage storehouse, D5:Job step database.

Claims (7)

1. a kind of upkeep operation management system, it is characterised in that possess:
Filming apparatus, it shoots the upkeep operation of lift, and generation includes the image and sound related to the upkeep operation Video data;
Upkeep operation managing device, it is connected by communication line with the filming apparatus, and obtains institute from the filming apparatus State Video data;And
First terminal, it regenerates the Video data obtained from the upkeep operation managing device,
The upkeep operation managing device possesses:
Title test section, the sound recorded in the Video data is carried out text transform to detect the upkeep operation by it In specific names, and the position for detecting the specific names of the Video data add name label;
SHAPE DETECTION portion, the given shape of its described image recorded from the Video data detection lift, and The position additional shape label for detecting the given shape of the Video data;
Association portion, it in advance associates the specific names and the given shape, when additional in the Video data When the timing of the name label and the shape label is within the scheduled period, based on addition of the name label or institute State the position additional association label of shape label;
Video data storage part, it stores the institute that addition of the name label, the shape label and the correlation tag State Video data;And
Extraction unit, it is based on the timing one that addition of the name label and the shape label sent from the first terminal The regeneration request at the position of cause, extract out in the Video data stored from the Video data storage part and addition of the pass Join the position of label, to make the first terminal proceed by starting regeneration from the position that addition of the correlation tag.
2. the upkeep operation management system according to entitlement requests 1, it is characterised in that
The extraction unit is according to including only described specific names, only described given shape, the specific names or the specific shape The regeneration request of any one during shape and the specific names and the given shape are consistent, it will represent from institute The information for stating the position that addition of the name label, the shape label or the correlation tag of Video data extraction is sent To the first terminal, the Video data of starting is extracted out based on the described information selected by the first terminal, and The first terminal is set to enter start of line regeneration.
3. the upkeep operation management system according to entitlement requests 2, it is characterised in that
Job step storage part is also equipped with, it stores the job step of the upkeep operation,
The extraction unit is with reference to the job step stored in the job step storage part, according in the Video data In addition of the order of the name label, the shape label or the correlation tag to judge to need in the upkeep operation The job step to be confirmed, and the first terminal is proceeded by from the position for the job step for representing to determine Starting regeneration.
4. the upkeep operation management system according to entitlement requests 3, it is characterised in that
Second terminal is also equipped with, it obtains the Video data by the communication line, carries out the starting of the Video data Regeneration, and the report of the upkeep operation is shown or prints,
The upkeep operation managing device possesses report generating unit, and it is generated comprising the position extracted out by the extraction unit The report of described image.
5. the upkeep operation management system according to entitlement requests 4, it is characterised in that
The extraction unit is by the job step modularization of the upkeep operation before and after adding the correlation tag, and by mould The job step of the upkeep operation after block is stored in the job step storage part, outside the upkeep operation When the job step of the upkeep operation of progress and the job step difference of the upkeep operation after modularization, to institute Second terminal output attention is stated to arouse.
6. the upkeep operation management system described in any one in entitlement requests 1 to 5, it is characterised in that
Addition of the name label position consistent with the timing of the shape label is addition of in the Video data Portion of the time difference within the scheduled period between the timing of the name label and the timing that addition of the shape label Position.
7. a kind of upkeep operation managing device, it is characterised in that possess:
Title test section, it is by communication line and the upkeep operation for shooting lift, and generation includes and the upkeep operation Related image and the filming apparatus of the Video data of sound are connected, the video recording number that will be obtained from the filming apparatus Text transform is carried out to detect the specific names in the upkeep operation, and in the Video data according to the sound of middle record The position for detecting the specific names add name label;
SHAPE DETECTION portion, the given shape of its described image recorded from the Video data detection lift, and The position additional shape label for detecting the given shape of the Video data;
Association portion, it in advance associates the specific names and the given shape, when additional in the Video data When the timing of the name label and the shape label is within the scheduled period, based on addition of the name label or institute State the position additional association label of shape label;
Video data storage part, it stores the institute that addition of the name label, the shape label and the correlation tag State Video data;And
Extraction unit, it addition of the name label and the shape based on what is sent from the first terminal for regenerating the Video data The regeneration request at the consistent position of the timing of shape label, take out in the Video data stored from the Video data storage part Go out the position that addition of the correlation tag, to make the first terminal be proceeded by from the position that addition of the correlation tag Starting regeneration.
CN201710731163.0A 2016-09-06 2017-08-23 Maintenance work management system and maintenance work management device Active CN107808197B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2016-173327 2016-09-06
JP2016173327A JP6530357B2 (en) 2016-09-06 2016-09-06 Maintenance work management system and maintenance work management device

Publications (2)

Publication Number Publication Date
CN107808197A true CN107808197A (en) 2018-03-16
CN107808197B CN107808197B (en) 2021-07-30

Family

ID=61569791

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710731163.0A Active CN107808197B (en) 2016-09-06 2017-08-23 Maintenance work management system and maintenance work management device

Country Status (2)

Country Link
JP (1) JP6530357B2 (en)
CN (1) CN107808197B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7064952B2 (en) * 2018-05-17 2022-05-11 オリンパス株式会社 Information processing equipment, information processing methods and programs

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002288185A (en) * 2001-03-23 2002-10-04 Hitachi Ltd Image retrieval system and image accumulation method
CN1476246A (en) * 2002-07-12 2004-02-18 ���µ�����ҵ��ʽ���� Sound image data recording regenerating apparatus
JP2005100087A (en) * 2003-09-25 2005-04-14 Toshiba Corp Field monitoring system and method
CN1615644A (en) * 2001-12-07 2005-05-11 日本先锋公司 Information recording apparatus and method, information reproducing apparatus and method, information recording program, information reproducing program, recording medium, and information recording me
CN1663249A (en) * 2002-06-24 2005-08-31 松下电器产业株式会社 Metadata preparing device, preparing method therefor and retrieving device
CN1903688A (en) * 2005-07-25 2007-01-31 株式会社日立建筑系统 Work report forming device for edifice equipment
CN101069421A (en) * 2004-11-30 2007-11-07 松下电器产业株式会社 Program list reproduction method and display method
US20080005076A1 (en) * 2006-06-28 2008-01-03 Microsoft Corporation Entity-specific search model
JP2008003781A (en) * 2006-06-21 2008-01-10 Konica Minolta Holdings Inc Operation monitoring system
CN101160962A (en) * 2005-04-18 2008-04-09 松下电器产业株式会社 Recording device
CN102103718A (en) * 2009-12-18 2011-06-22 兄弟工业株式会社 Operation management system and operation management method
JP2014241016A (en) * 2013-06-11 2014-12-25 株式会社東芝 Index creation device, index creation system, index creation method and index creation program
CN104914989A (en) * 2014-03-12 2015-09-16 欧姆龙株式会社 Gesture recognition apparatus and control method of gesture recognition apparatus
CN105103068A (en) * 2013-04-18 2015-11-25 欧姆龙株式会社 Work management system and work management method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007034822A (en) * 2005-07-28 2007-02-08 Hitachi Building Systems Co Ltd Preparation device for maintenance and inspection work report

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002288185A (en) * 2001-03-23 2002-10-04 Hitachi Ltd Image retrieval system and image accumulation method
CN1615644A (en) * 2001-12-07 2005-05-11 日本先锋公司 Information recording apparatus and method, information reproducing apparatus and method, information recording program, information reproducing program, recording medium, and information recording me
CN1663249A (en) * 2002-06-24 2005-08-31 松下电器产业株式会社 Metadata preparing device, preparing method therefor and retrieving device
CN1476246A (en) * 2002-07-12 2004-02-18 ���µ�����ҵ��ʽ���� Sound image data recording regenerating apparatus
JP2005100087A (en) * 2003-09-25 2005-04-14 Toshiba Corp Field monitoring system and method
CN101069421A (en) * 2004-11-30 2007-11-07 松下电器产业株式会社 Program list reproduction method and display method
CN101160962A (en) * 2005-04-18 2008-04-09 松下电器产业株式会社 Recording device
CN1903688A (en) * 2005-07-25 2007-01-31 株式会社日立建筑系统 Work report forming device for edifice equipment
JP2008003781A (en) * 2006-06-21 2008-01-10 Konica Minolta Holdings Inc Operation monitoring system
US20080005076A1 (en) * 2006-06-28 2008-01-03 Microsoft Corporation Entity-specific search model
CN102103718A (en) * 2009-12-18 2011-06-22 兄弟工业株式会社 Operation management system and operation management method
CN105103068A (en) * 2013-04-18 2015-11-25 欧姆龙株式会社 Work management system and work management method
JP2014241016A (en) * 2013-06-11 2014-12-25 株式会社東芝 Index creation device, index creation system, index creation method and index creation program
CN104914989A (en) * 2014-03-12 2015-09-16 欧姆龙株式会社 Gesture recognition apparatus and control method of gesture recognition apparatus

Also Published As

Publication number Publication date
CN107808197B (en) 2021-07-30
JP2018041183A (en) 2018-03-15
JP6530357B2 (en) 2019-06-12

Similar Documents

Publication Publication Date Title
EP1742471B1 (en) Imaging device and imaging system
CN101729691B (en) Agent screen recording system and realizing method thereof, agent screen recording quality detection system and implementation method thereof
CN108985530A (en) Vehicle risk behavior management method and device
CN106202157A (en) Video method for quickly retrieving based on time stream
US20100262605A1 (en) Image management apparatus, control method thereof and storage medium storing program
KR960706252A (en) Still image system
JP5962898B2 (en) Driving evaluation system, driving evaluation method, and driving evaluation program
CN107808197A (en) Upkeep operation management system and upkeep operation managing device
CN107862868A (en) A kind of method that track of vehicle prediction is carried out based on big data
CN101207672A (en) Image processing apparatus, and image processing method
JP2008154228A (en) Monitoring video recording controller
JP6336618B2 (en) FAT file system, vehicle multimedia data storage device using the same, and method therefor
JP5868358B2 (en) Image processing method
US7802190B2 (en) Application display apparatus and application display system
JP2007233259A (en) Driving instruction system
KR20070007732A (en) Printing apparatus, recording apparatus, information processing apparatus, control method therefor, and storage medium
JP2007213183A (en) Device, method, and program for classifying digital image data
CN109147338A (en) A kind of recognition methods of illegal parking, device and server
JP6135180B2 (en) Image processing program, image processing apparatus, and image processing method
JP2010205090A (en) Driving recorder
JPH10214195A (en) Device for generating job control sentence for executing plural job steps in parallel and method therefore, and recording medium for recording program for generating job control sentence
JP2008097106A (en) Order processing system
JP4404247B2 (en) Video program production support system, processing apparatus, video program processing method and program
JP2003085528A (en) Image filing device
EP1689665A1 (en) A system and method for forming information pertaining to a transportation device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant