CN107806181A - A kind of mammoth structure of building - Google Patents

A kind of mammoth structure of building Download PDF

Info

Publication number
CN107806181A
CN107806181A CN201711063500.XA CN201711063500A CN107806181A CN 107806181 A CN107806181 A CN 107806181A CN 201711063500 A CN201711063500 A CN 201711063500A CN 107806181 A CN107806181 A CN 107806181A
Authority
CN
China
Prior art keywords
huge
building
mammoth
horizontal member
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711063500.XA
Other languages
Chinese (zh)
Inventor
杨洪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711063500.XA priority Critical patent/CN107806181A/en
Publication of CN107806181A publication Critical patent/CN107806181A/en
Priority to PCT/CN2018/110350 priority patent/WO2019085733A1/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/34Extraordinary structures, e.g. with suspended or cantilever parts supported by masts or tower-like structures enclosing elevators or stairs; Features relating to the elastic stability

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)
  • Wind Motors (AREA)

Abstract

The invention discloses a kind of mammoth structure of building, including main structure and first time structure, main structure includes the first huge vertical member, the first huge horizontal member, encorbelmented on first huge vertical member and stretch out the first huge horizontal member, first time structure is connected with the described first huge horizontal member and the first huge vertical member respectively.The present invention may be such that super high rise building realizes that ordinary residence is vertically coordinated to arrange with public building composite module, be easy to use, and can solve the problems, such as high building fire fighting, vertical traffic, save cost.In mammoth structure, secondary structure can be arranged near huge horizontal member and huge vertical member, and main structure stress is clear and definite.Mammoth structure building is provided with huge hole, reduces wind load.

Description

A kind of mammoth structure of building
Technical field
The present invention relates to tall and super tall R.C. buidings technical field, more particularly to a kind of mammoth structure of building.
Background technology
In recent years, as the development of urbanization and the aggregation of population, executive information systems are built as large size city The preferred building type of thing.Executive information systems are very sensitive to wind load and seismic side force, therefore, it is high-rise and Requirement of the super high rise building to building structure is at a relatively high, and building structure needs to bear to draw from the huge the earth's core of skyscraper Power, it is also desirable to possess certain anti-side rigidity, so as to effectively offset side force caused by wind-force or earthquake.
At present, structure more advanced in high-level structure is mammoth structure, and the structure is by the huge frame as main structure Frame or huge truss and the floor framework composition as time structure, main structure include huge vertical member (such as colossal column, core Cylinder) and huge horizontal member (such as Huge Beam that more colossal columns and Core Walls Structure link together), huge basis;Secondary structure Including small-sized vertical member (such as small-sized post or small-sized suspension rod), the small-sized horizontal member being arranged on huge horizontal member. In existing skyscraper, all secondary structures are all disposed on huge horizontal member, vertical direction, water suffered by secondary structure Square to power be transferred to the huge horizontal member being connected with time structure, on huge vertical member, finally pass to huge basis And ground.But the secondary structure of traditional architecture thing is built on huge horizontal member, it is desirable to every on huge vertical member Every one section of floor distance, one layer of huge horizontal member for being used to support upper hierarchical structure be just set, whole high-rise from lower and It is upper, from inner and be provided with floor building time structure outside, primary and secondary structure force path is indefinite.In addition, existing skyscraper Structure is in enclosed construction on the whole, or portion is unidirectionally open, and causes building integrally directly to bear wind load larger.So It is indefinite Earthquake response power transmission to be present in existing mammoth structure, bears the problem of wind load is larger.
The skyscraper that existing skyscraper includes mammoth structure there is problems:1st, the higher fire-fighting of building is asked The more bad solution of topic;2nd, higher building, depth-width ratio is bigger, is unfavorable for wind resistance, antidetonation.5th, ordinary residence can not be with public building Coordination is arranged in Super High, and Working Life is inconvenient, and mobility of people is big, and vertical traffic demand is big.Vertical traffic occupies greatly Quantity space is effectively few using space.6th, large-scale hanging garden can not be arranged.7th, because the stress of mammoth structure is indefinite, it is counted Analysis model is calculated not solve also.
The content of the invention
It is existing to solve it is an object of the invention to a kind of mammoth structure of building for overcome the deficiencies in the prior art There is the weak point of technology.
The purpose of the present invention adopts the following technical scheme that realization:
A kind of mammoth structure of building, including main structure and first time structure, it is huge perpendicular that the main structure includes first To component, the first huge horizontal member, encorbelmented on the first huge vertical member and stretch out the first huge horizontal member, institute First time structure is stated to be connected with the described first huge horizontal member and the first huge vertical member respectively.
Further, including giant frame structure, the main structure are giant frame structures.
Further, including huge truss structure and huge inclined member, the main structure is huge truss structure, huge Truss structure contains the first huge inclined member.
Further, including the second huge horizontal member and second of structure, second of structure is by first, second huge water Flat component support, and close to first, second huge horizontal member arrangement, left and right adjacent first time structure and upper and lower adjacent second Secondary structure surrounds huge hole.
Further, the described first huge inclined member is pull bar.
Further, the device of compensation linkage length is installed on the pull bar.
Further, the first time structure can surround the described first huge vertical member rotation.
Further, the second huge inclined member is additionally provided between huge vertical member and the second huge horizontal member.
Compared with prior art, the beneficial effects of the present invention are:
(1) present invention is by the upward arranged superposed of residential quarters module with public building.Each module be by first, Second huge vertical member and first, second huge horizontal member being connected with its bottom are added and above-mentioned huge vertical member First, second structure composition connected with huge horizontal member.First time structure arranges residential housing, second of structure arrangement Public building, form a residential quarters module with public building and (it is below to refer here to public building, residential housing exists A cell is combined as above).Realize that ordinary residence is coordinated to arrange with public building.
(2) due to swimming pool (and fire cistern) can be provided with the top of each second of structure public building of module cell, above, Under have for the accessibility fire extinguishing of fireman, rescue work face, and disaster affected people can evacuate up and down, have a good transport service, fire fighting problem Preferably solve;
(3) because the building mammoth structure of the present invention is hollow building, so the spacing of huge vertical member can To increase, according to the hight coordinate of building arrangement (cost increases little) so that the height of building and the ratio of width are not Greatly, building wind resistance, antidetonation are advantageous to.
(4) because the building mammoth structure of the present invention forms cell module, ordinary residence is coordinated to arrange with public building In Super High, it is convenient that person works live, and mobility is small, and vertical traffic demand is small.Living in module cell first time structure Residence building only needs to arrange the vertical traffic of this residential usage, and the public building in second of structure arranges the vertical of this public building Means of transportation and fire-fighting stairway.Vertical traffic take up space it is small, effectively using area it is big.In the huge vertical member position cloth in middle part Put the high speed multi-level elevator between each module cell up and down, solve the problems, such as between cell and cell to ground vertical transportation. Because each cell is provided with public building, mobile personnel is few between cell.Alleviate the pressure of vertical transportation.Because vertical traffic is set Back-up work is clear and definite, so it is small to take up space, building is effectively big using space, and saves vertical traffic cost.
(5) the public building roof of each module cell of building mammoth structure of the invention can be arranged large-scale aerial Garden, can also arrange swimming pool, and large-scale outdoor sports ground uses for school.School, big can be arranged in public building Type business, office building, administrative building, hotel and public place of entertainment etc..
(6) building mammoth structure of the invention is provided with huge hole, and each module cell is hollow, building wind-engaging lotus Carry small.Building safety degree is high, and saves cost.
(7) can slowly be rotated around huge vertical member in each mammoth structure cell module, first time structure so that Each residential customer obtains preferable direction and landscape at times;
(8) it is marine can be disposed adjacent to the rivers on bank, lake as needed for building mammoth structure of the invention.Solve Soil problem in short supply.
Brief description of the drawings
Fig. 1 is the elevation of the mammoth structure of super high rise building of the present invention;
Fig. 2 is the sectional view of the line A-A along Fig. 1;
Fig. 3 is the main structure of one embodiment of the present invention and the elevation of secondary structure;
Fig. 4 is the sectional view of the line B-B along Fig. 3;
Fig. 5 is the elevation of the main structure provided with the first huge inclined member;
Fig. 6 is the elevation of the main structure provided with the second huge inclined member.
In figure:1st, huge vertical member;11st, the first huge vertical member;12nd, the second huge vertical member;2nd, first is huge Type horizontal member;3rd, huge basis;30th, ground;4th, the second huge horizontal member;5th, first time structure;6th, second of structure; 61st, building block;7th, swivel plate;71st, the first small-sized vertical member;81st, the first huge inclined member;82nd, second is huge oblique Component.
Embodiment
Below, with reference to accompanying drawing and embodiment, the present invention is described further, it is necessary to which explanation is, not Under the premise of afoul, new implementation can be formed between various embodiments described below or between each technical characteristic in any combination Example.
Fig. 1 is a kind of main structure schematic diagram of the mammoth structure of super high rise building of the present invention, the height of monolithic architecture thing For 1000m, Fig. 2 is the sectional view of the line A-A along Fig. 1.Such as Fig. 3, the present invention is by the residential quarters module with public building 61 upward arranged superposeds.Each module 61 be by first, second huge vertical member 11,12 and be connected with its bottom first, Second huge horizontal member 2,4 adds first, second knot being connected with above-mentioned huge vertical member and huge horizontal member Structure 5,6 forms.First time structure arranges residential housing, and second of structure arranges public building, forms one with public building Residential quarters module 61 (it is below to refer here to public building, residential housing is combined as a cell above).Realize general Logical house is coordinated to arrange with public building.
1st, as shown in Figure 1,2,3, 4, the mammoth structure of the super high rise building includes main structure and first time structure 5, main Structure is also known as mega-frame, is made up of huge vertical member (colossal column) and huge horizontal member (Huge Beam), bears overall knot The vertical and horizontal active force of structure;First time structure 5 also known as time framework or house framework, generally common skeleton, subject Premises is vertical and horizontal applied force, and passes to main structure.Main structure includes huge the 1, first huge horizontal structure of vertical member Part 2, encorbelment on the first huge vertical member 11 and stretch out the first huge horizontal member 2, first time structure 5 is huge perpendicular with first respectively Connected to 11 and first huge horizontal member 2 of component.Huge vertical member 1 includes being arranged on the second huge of building center Type vertical member 12 and the first huge vertical member 11 that architecture enclosing is arranged on around the second huge vertical member 12, second The huge huge bottom of vertical member 11 of vertical member 12 and first is also associated with huge basic 3, huge basic 3 by 30, ground Support.First huge horizontal member 2 arranges that its peripheral horizontal zone arranges the second huge water around the first huge vertical member 11 (in other embodiments, the first huge horizontal member 2 can also be located on the second huge horizontal member 4 and with first for flat component 4 Huge vertical member 11 is connected, and the first huge 2 and second huge horizontal member 4 of horizontal member is not on same horizontal plane), Thus the second huge horizontal member 4 exists together on a horizontal plane and is connected with each other with the first huge horizontal member 2, and second is huge Type horizontal member 4 is connected by the first huge horizontal member 2 with the first huge vertical member 11.And the second huge horizontal member 4 It is connected with the second huge vertical member 12.First time structure 5 (i.e. house framework) is arranged on the first huge horizontal member 2.By This, the first time structure 5 being arranged on each first huge horizontal member 2 is not connected with each other, during super high rise building is presented Hollow out state is entreated, air-flow can be from passing through building between peripheral first time structure 5 so that the wind load that monolithic architecture thing is subject to is big Amount reduces, and reduces the horizontal force suffered by building.In addition, in the mammoth structure of super high rise building of the present invention, first time structure 5 Being set for sub-module, the first time structure 5 of each module passes to its vertical force the first huge horizontal member 2 of its bottom, And then the first huge vertical member 11 is passed to, side force is directly passed to the first huge vertical member 11, and it is huge to be achieved in first The sub-module of type vertical member is set, sub-module stress, and the first huge vertical member force path is clear and definite.
2nd, as preferred embodiment, such as Fig. 1, main structure can be giant frame structure, and this construction profile is attractive in appearance.
3rd, as preferred embodiment, such as Fig. 5, main structure can be huge truss structure, and this structure vertical rigidity is big, Wind resistance, anti-seismic performance are good.This structure contains the first huge inclined member 81.
4th, as preferred embodiment, as shown in figure 3, on first and second huge horizontal member 2,4 of each module 61 Second of structure 6 can also be built, can be designed as public place in second of structure 6 herein, such as can be school, doctor Institute, office building, administration building, large supermarket, body-building center, hanging garden etc., stay in the first time of each module 61 Resident family in structure 5 can i.e. operable, life, motion, study etc. in following to second structure 6, arrived without under The bottom of whole super high rise building, avoid the inconvenience downstairs brought, thus greatly save vertical traffic facility with Fire-fighting stairway, vertical traffic take up space it is small, effectively using area it is big.Save vertical traffic cost.In the house of module 61, Elevator needed for this house is only arranged in the position of the first huge vertical member 11, vertical traffic takes up space small.Each cell the The public building of secondary structure 6 arranges the vertical traffic facility and fire-fighting stairway of this public building.Vertical traffic take up space it is small, It is effectively big using area.High speed multi-level elevator between the huge location arrangements of vertical member 4 in middle part second up and down each cell, solution Certainly between cell and cell to ground vertical transportation.Because each residential quarters are provided with public building, flowed between cell Personnel are few.Alleviate the pressure of vertical transportation.Because the division of labor of vertical traffic equipment is clear and definite, so it is small to take up space.In the present embodiment In, according to the house staffing public building of this module 61, because the public building area of plane is big, building number of floor levels typically only needs Several layers.So the secondary structure 6 of public building is pressed close to huge horizontal member 11,12 and set so that huge horizontal member 11,12 stress Clearly, clear and definite plus foregoing huge vertical member 2,4 stress so that whole mammoth structure stress is clear and definite, solves The indefinite problem of mammoth structure stress at present.Further, since first and second structure 5,6 is close to huge vertical member and huge Horizontal member is arranged, is surrounded huge hole between adjacent first and second structure 5,6, be ensure that the center of super high rise building In hollow out state, facilitate air-flow to pass through the super high rise building, largely reduce the wind load that super high rise building is born.
Swimming pool or storage tank can also be set in second of structure 6, when there is fire incident in super high rise building, energy The enough water drawn in time in natatorium or storage tank is used to put out a fire, and the personnel that first time structure house occurs during fire in house can With rapid toward escaping in upper and lower second of structure public building, fireman can be used as Succor plain stage by the use of second of structural plane Put out a fire and rescued.When fire occurs for second of structure public building, wherein personnel can be escaped with upper and lower run quickly toward residential housing It is raw.Solves the problems, such as high building fire-proof.Add the security of super-high storied building.Usually, it can also utilize swimming pool body-building or pass through Storage tank water storage, supply water, facilitate super-high storied building resident family to live.
5th, as preferred embodiment, such as Fig. 5, the first huge inclined member 81 can be pull bar.Due to mammoth structure Size is big, and cost can be saved using pull bar.
6th, as preferred embodiment, the device of compensation linkage length is set on pull bar.When after the earthquake, if pull bar It is plastically deformed, scantling can be recovered by the length of this device adjusting yoke.
7th, as preferred embodiment, as shown in figure 4, being additionally provided with circular rotating plate on the first huge horizontal member 2 7, the top of circular rotating plate 7 is fixedly connected with first time structure 5, and the bottom of circular rotating plate 7 is provided with motor-driven carriage, So as to realize that circular rotating plate 7 drives first time structure 5 to be rotated relative to the first huge horizontal member 2.Thus, first time structure 5 can slowly rotate around the first huge vertical member 11 so that inhabit each residential customer in first time structure 5 at times Obtain preferable direction and landscape.In a particular embodiment, circular rotating plate 7 supports the first small-sized vertical member 71, the One small-sized horizontal member is connected with horizontal ring beam and is connected with the first small-sized vertical member 71 or both ends are small-sized vertical with first Component 71 connects, and horizontal ring beam is slidably connected with the first huge vertical member 11, can both transmit horizontally and vertically power, again can be with Slide, ensure that time structure 5 can slowly rotate around the first huge vertical member 11.Here the first small-sized vertical member 71 and One small-sized horizontal member and horizontal ring beam construct first time structure 5 jointly.
8th, as preferred embodiment, as shown in fig. 6, the mammoth structure can also include the second huge inclined member 82, in any building block 61, one end and the second huge level in the building block 61 of the second huge inclined member 82 Component 4 connects, the other end of the second huge inclined member 82 and the second huge vertical member 12 in the building block 61 Connection.Thus, the second huge horizontal member 2 is further supported by the second huge inclined member 82, reduces the second huge level The span of component 2, save cost.
9th, it is marine can be disposed adjacent to the rivers on bank, lake as needed for the mammoth structure of building of the present invention, with solution The problem of certainly soil is in short supply.
Above-mentioned embodiment is only the preferred embodiment of the present invention, it is impossible to the scope of protection of the invention is limited with this, The change and replacement for any unsubstantiality that those skilled in the art is done on the basis of the present invention belong to institute of the present invention Claimed scope.

Claims (8)

1. a kind of mammoth structure of building, including main structure and first time structure, it is huge vertical that the main structure includes first Component, the first huge horizontal member, it is characterised in that:Encorbelmented on the first huge vertical member and stretch out the first huge water Flat component, the first time structure are connected with the described first huge horizontal member and the first huge vertical member respectively.
A kind of 2. mammoth structure of building according to claim 1, it is characterised in that:Including giant frame structure, institute It is giant frame structure to state main structure.
A kind of 3. mammoth structure of building according to claim 1, it is characterised in that:Including huge truss structure and huge Type inclined member, the main structure are huge truss structures, and huge truss structure contains the first huge inclined member.
A kind of 4. mammoth structure of building according to claim 1, it is characterised in that:Including the second huge horizontal member It is simultaneously huge close to first by the first huge horizontal member, the second huge horizontal member support with second of structure, second of structure Horizontal member, the second huge horizontal member arrangement, left and right adjacent first time structure and upper and lower adjacent second of structure surround huge Type hole.
A kind of 5. mammoth structure of building according to claim 3, it is characterised in that:The first huge inclined member For pull bar.
A kind of 6. mammoth structure of building according to claim 5, it is characterised in that:It is provided with the pull bar adjustable Save the device of pull bar length.
A kind of 7. mammoth structure of building according to claim 1, it is characterised in that:The first time structure can surround The first huge vertical member rotation.
A kind of 8. mammoth structure of building according to claim 1,3,4, it is characterised in that:Huge vertical member with The second huge inclined member is additionally provided between second huge horizontal member.
CN201711063500.XA 2017-11-02 2017-11-02 A kind of mammoth structure of building Pending CN107806181A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201711063500.XA CN107806181A (en) 2017-11-02 2017-11-02 A kind of mammoth structure of building
PCT/CN2018/110350 WO2019085733A1 (en) 2017-11-02 2018-10-16 Mega structure of building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711063500.XA CN107806181A (en) 2017-11-02 2017-11-02 A kind of mammoth structure of building

Publications (1)

Publication Number Publication Date
CN107806181A true CN107806181A (en) 2018-03-16

Family

ID=61582384

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711063500.XA Pending CN107806181A (en) 2017-11-02 2017-11-02 A kind of mammoth structure of building

Country Status (2)

Country Link
CN (1) CN107806181A (en)
WO (1) WO2019085733A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108266001A (en) * 2018-04-03 2018-07-10 中南林业科技大学 A kind of aerial villa of timber structure
WO2019085733A1 (en) * 2017-11-02 2019-05-09 杨洪 Mega structure of building

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000142930A (en) * 1998-11-06 2000-05-23 Nkk Corp Automatic high-rise warehouse
CN201981802U (en) * 2011-03-17 2011-09-21 中国建筑设计研究院 Combined tower structure building system
CN102535672A (en) * 2012-02-15 2012-07-04 姚攀峰 Novel hybrid huge anti-seismic structure and construction method thereof
CN106996153A (en) * 2017-05-16 2017-08-01 东南大学 A kind of integral tension suspension
CN207959517U (en) * 2017-11-02 2018-10-12 杨洪 A kind of mammoth structure building

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107806181A (en) * 2017-11-02 2018-03-16 杨洪 A kind of mammoth structure of building

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000142930A (en) * 1998-11-06 2000-05-23 Nkk Corp Automatic high-rise warehouse
CN201981802U (en) * 2011-03-17 2011-09-21 中国建筑设计研究院 Combined tower structure building system
CN102535672A (en) * 2012-02-15 2012-07-04 姚攀峰 Novel hybrid huge anti-seismic structure and construction method thereof
CN106996153A (en) * 2017-05-16 2017-08-01 东南大学 A kind of integral tension suspension
CN207959517U (en) * 2017-11-02 2018-10-12 杨洪 A kind of mammoth structure building

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019085733A1 (en) * 2017-11-02 2019-05-09 杨洪 Mega structure of building
CN108266001A (en) * 2018-04-03 2018-07-10 中南林业科技大学 A kind of aerial villa of timber structure

Also Published As

Publication number Publication date
WO2019085733A1 (en) 2019-05-09

Similar Documents

Publication Publication Date Title
Al-Kodmany Guidelines for tall buildings development
CN107806181A (en) A kind of mammoth structure of building
CN207959517U (en) A kind of mammoth structure building
CN115434428B (en) Annular cross-woven cable net structure, stereoscopic city dome and large-span building dome
CN104652853B (en) Quick lifting installation building structure
CN108266001A (en) A kind of aerial villa of timber structure
CN103556843B (en) Outdoor platform evacuation system for vertical transportation trunk and branch conversion of high-rise building
CN213654150U (en) Convenient bridge pile foundation construction operation platform
CN204551731U (en) A kind of full steel structure building
CN205329517U (en) Take shelter bridge in fire control lane
CN107514175A (en) The antiseismic wave building structure of oval shell framework rocking type
CN112298473A (en) Tourism leisure platform that wind resistance can be strong and be applicable to marine vacation fishing
CN211375302U (en) Ball curtain supporting structure
CN209211935U (en) A kind of installation interlayer of workshop
CN203594244U (en) Outdoor platform evacuation system for switching of vertical transportation trunk road and branch roads of high-rise building
Tamboli et al. Tall buildings: sustainable design opportunities
CN206220645U (en) A kind of tents
CN105804469A (en) Disaster-preventing danger-avoiding safety house
CN206245830U (en) A kind of hybrid energy dissipation vibration-damp steel support frame Core Walls Structure
CN115492243A (en) Three-dimensional urban super high-rise building and construction method thereof
CN211473593U (en) Four-column angle steel comprehensive observation tower for forest ecological system positioning observation research station
CN215331739U (en) Hotel covering or awning on a car, boat, etc. room with a plurality of interior spaces
CN215341504U (en) Fire-fighting training tower for theme park
CN217489640U (en) Emergency rescue comprehensive training field
von Klemperer Lotte World Tower: Seoul’s First Supertall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180316