CN107803667A - A kind of steel plate docking production line and its control method - Google Patents

A kind of steel plate docking production line and its control method Download PDF

Info

Publication number
CN107803667A
CN107803667A CN201711085274.5A CN201711085274A CN107803667A CN 107803667 A CN107803667 A CN 107803667A CN 201711085274 A CN201711085274 A CN 201711085274A CN 107803667 A CN107803667 A CN 107803667A
Authority
CN
China
Prior art keywords
way
steel plate
roller
tipper
welder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711085274.5A
Other languages
Chinese (zh)
Inventor
赵加亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bao Du International New Material Co ltd
Baodu International Engineering Technology Co ltd
Original Assignee
BEIJING BAODU STEEL STRUCTURE ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING BAODU STEEL STRUCTURE ENGINEERING Co Ltd filed Critical BEIJING BAODU STEEL STRUCTURE ENGINEERING Co Ltd
Priority to CN201711085274.5A priority Critical patent/CN107803667A/en
Publication of CN107803667A publication Critical patent/CN107803667A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P23/00Machines or arrangements of machines for performing specified combinations of different metal-working operations not covered by a single other subclass
    • B23P23/06Metal-working plant comprising a number of associated machines or apparatus

Landscapes

  • Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Arc Welding In General (AREA)
  • Laser Beam Processing (AREA)

Abstract

The invention discloses a kind of steel plate docking production line and its control method, belongs to automatic producing technology field, and the steel plate docking production line includes:Multiple hydraulic control devices, welder, tipper, plane Grinder, cutting machine and a plurality of roller-way, approach table, docking roller-way, the first welder, the first translation roller-way, the first tipper, the second translation roller-way, plane Grinder, the 3rd translation roller-way, the second welder, the 4th translation roller-way, cutting machine, the 5th translation roller-way, the second tipper and runout table are installed successively from left to right.The present invention solves the problems, such as that existing steel plate docking technique low production efficiency, production cost are high.

Description

A kind of steel plate docking production line and its control method
Technical field
The present invention relates to technical field of automatic control, and in particular to a kind of steel plate docking production line and its control method.
Background technology
The steel plate docking mode of domestic each steel construction manufacturer is manual operation at present, and in general operator scheme is: Steel plate plays groove, carbon dioxide bottoming, back chipping polishing, submerged-arc welding, back gouging polishing, submerged-arc welding, and the mode of manufacture efficiency is low, Production task requirement can not be met, and cost of labor is high, easy production development accident, and high material consumption, uncertainty is very Greatly.Domestic market economic situation is very pessimistic, and labour cost is but also very tight in very fast growth, the personnel of each enterprise Again, many enterprises are all worried in the thing for recruitment drop sheet.
In order to solve the above problems, the present invention provides a kind of steel plate docking production line and its control method, present invention operation It is convenient, productivity can be increased substantially, reduces spillage of material, realizes the automation of steel plate docking production.
The content of the invention
It is an object of the invention to provide a kind of steel plate docking production line and its control method, to solve existing steel plate pair Connection technology low production efficiency, the problem of production cost is high.
To achieve the above object, the technical scheme is that:Steel plate docking described in a kind of steel plate docking production line is provided Production line includes:Multiple hydraulic control devices, welder, tipper, plane Grinder, cutting machine and a plurality of roller-way, often Bar roller-way bottom is respectively connected with a hydraulic control device, and the welder includes the first welder and the second welding dress Put, the tipper includes the first tipper and the second tipper, and a plurality of roller-way includes approach table, docking roller-way, the One translation roller-way, the second translation roller-way, the 3rd translation roller-way, the 4th translation roller-way, the 5th translation roller-way and runout table, it is described Approach table, docking roller-way, the first welder, the first translation roller-way, the first tipper, the second translation roller-way, plane milling Device, the 3rd translation roller-way, the second welder, the 4th translation roller-way, cutting machine, the 5th translation roller-way, the second tipper and Runout table is installed successively from left to right.
As a kind of optimal technical scheme, the welder uses submerged arc welding machine.
As a kind of optimal technical scheme, the cutting machine uses CUT.
As a kind of optimal technical scheme, first welder, the second welder, the first tipper, second turn over Favourable turn, plane Grinder and cutting machine are mounted on laser inductor.
As a kind of optimal technical scheme, the end of the runout table is connected with joining machine.
As a kind of optimal technical scheme, a kind of control method of steel plate docking production line includes:
Submerged arc welding:Plurality of steel plates is successively placed in approach table with crane, with the rotation of roller-way, steel plate is transported To the first welder, when first block of steel plate passes through the laser sensor on the first welder, laser sensor is sent Line signals are to hydraulic control device, and hydraulic control device is according to line signals control docking roller-way action, by adjacent first Point-blank, then docking roller-way is out of service, and the first welder is carried out automatically for block steel plate and the adjustment of Article 2 steel plate Submerged arc welding;Turnover translation moving:After welding, steel plate is pushed to the first translation by hydraulic control device control docking roller-way running Steel plate is transported to the first tipper position by roller-way, the first translation roller-way again, and the laser sensor on the first tipper detects After steel plate, steel plate is overturn;Plane milling:After upset, hydraulic control device control the second translation roller-way running will Steel plate is transported to the position of plane Grinder, and the laser inductor on plane mill device senses to welding bead, simultaneously Aligned signal is sent to hydraulic control device, the welding bead of steel plate is aligned flat by hydraulic control device control the second translation roller-way action The cutter head of facing cut cutting apparatus, then plane Grinder butt welding road progress milling;Submerged arc welding again:After milling, hydraulic pressure The translation roller-way operation of control device control the 3rd, is transported to the second welder, the laser sense on the second welder by steel plate Device is answered to sense automatic progress submerged arc welding after welding bead;Plasma cut:Again after submerged arc welding, hydraulic control device control the Steel plate is transported at CUT by four translation roller-way operations, length of the laser inductor on CUT to steel plate Degree is sensed and then cut;Turnover translation moving again:After cutting, the translation roller-way fortune of hydraulic control device control the 5th OK, the steel plate after cutting is transported to the second tipper, the laser inductor on the second tipper detect steel plate completely into After second tipper, the second tipper is overturn to steel plate, is finally exported by runout table.
As a kind of optimal technical scheme, during the submerged arc welding, laser inductor is according to the steel plate sensed Thickness sends gap signal to hydraulic control device, and hydraulic control device controls docking roller-way to make to leave use between two blocks of steel plates again In the gap of welding, steel plate thickness is bigger, and the gap between two blocks of steel plates is bigger.
As a kind of optimal technical scheme, during the plasma cut, first by length value in plasma cut Set in machine, recycle CUT to be cut.
As a kind of optimal technical scheme, after the step of turnover translation moving again terminates, remaining steel plate is output roller-way It is transported on joining machine and is transported to again at approach table, or approach table is transported to by crane and carries out secondary use.
The inventive method has the following advantages that:
(1) position of fixing steel plate can be accurately sensed using laser inductor, reduces product error, improves steel plate matter Amount;
(2) according to the position of a variety of machines of technological process reasonable arrangement, the production automation is realized, improves production efficiency;
(3) full-automatic flow reduces manpower, reduces production cost.
Brief description of the drawings
Fig. 1 is that a kind of steel plate of embodiment 1 docks the top view of production line.
Fig. 2 is that a kind of steel plate of embodiment 1 docks the front view of production line.
Fig. 3 is that a kind of steel plate of embodiment 2 docks the top view of production line.
Fig. 4 is that a kind of steel plate of embodiment 2 docks the front view of production line.
In figure:Approach table 01, docking roller-way 02, the first welder 03, first translation roller-way 04, the first tipper 05th, the second translation roller-way 06, plane Grinder the 07, the 3rd translate roller-way 08, the second welder the 09, the 4th translation roller-way 10th, cutting machine the 11, the 5th translate roller-way 12, the second tipper 13, runout table 14, joining machine 15, hydraulic control device 16, swash Optical inductor 17.
Embodiment
Following examples are used to illustrate the present invention, but are not limited to the scope of the present invention.
Embodiment 1
With reference to figure 1, the invention provides a kind of steel plate to dock production line, including:Hydraulic control device 16, welder, Tipper, plane Grinder 07, cutting machine 11 and a plurality of roller-way, the hydraulic means are connected with a plurality of roller-way, the weldering Connection device includes the first welder 03 and the second welder 09, and the tipper includes the first tipper 05 and the second upset Machine 13, a plurality of roller-way includes approach table 01, docking roller-way 02, first translates roller-way 04, second and translates roller-way 06, the Three translation roller-ways the 08, the 4th translate roller-way the 10, the 5th and translate roller-way 12 and runout table 14, the approach table 01, docking roller Road 02, the first welder 03, first translation roller-way 04, the first tipper 05, second translation roller-way 06, plane Grinder 07th, the 3rd translation roller-way 08, the second welder the 09, the 4th translation roller-way 10, cutting machine the 11, the 5th translate roller-way 12, second Tipper 13 and runout table 14 are installed successively from left to right.Welder, tipper, plane Grinder 07 and cutting machine 11 The laser inductor 17 being connected with control system is mounted on, ensure that the fluency of steel plate docking production and full-automatic journey Degree.
Welder uses submerged arc welding machine, the input voltage of submerged arc welding machine:AC three-phases 380V
Specified input capacity:74KVA, rated output voltage:44V, output current adjustable range:150-1500A, it is specified Load factor:80%, wire feed rate scope:0.2-1.5m/min.
Cutting machine 11 uses CUT, the nominal input voltage of CUT:3~380V 50Hz, volume Determine input power:76KVA, output-current rating:190A, cyclic duration factor:80%, operating voltage:190V, maximum cutting are thick Degree:70mm, air pressure:1MPa.
The control method of steel plate docking production line includes:
Submerged arc welding:Plurality of steel plates is successively placed in approach table 01 with crane, with the rotation of roller-way, steel plate is transported Deliver at the first welder 03, when first block of steel plate passes through the laser inductor 17 on the first welder 03, laser sense Answer device 17 to send line signals to hydraulic control device 16, hydraulic control device 16 controls docking roller-way 02 dynamic according to line signals Make, first block of steel plate and Article 2 steel plate are adjusted point-blank, then docking roller-way 02 is out of service, the first welding dress Set to 03 automatic progress submerged arc weldings;
Turnover translation moving:After welding, the control docking roller-way 02 of hydraulic control device 16 operates pushes to first by steel plate Roller-way 04 is translated, steel plate is transported to the position of the first tipper 05 by the first translation roller-way 04 again, the laser on the first tipper 05 After inductor 17 detects steel plate, steel plate is overturn;
Plane milling:After upset, the control of hydraulic control device 16 second translation roller-way 06, which operates, is transported to steel plate The position of plane Grinder 07, the laser inductor 17 on plane mill device senses to welding bead, while gives hydraulic pressure Control device 16 sends aligned signal, and the control of hydraulic control device 16 second translation roller-way 06 acts the welding bead alignment of steel plate is flat The cutter head of facing cut cutting apparatus 07, then plane Grinder 07 is to welding bead progress milling;
Submerged arc welding again:After milling, the translation roller-way 08 of the control of hydraulic control device 16 the 3rd is run, by steel plate It is transported to the second welder 09, the laser inductor 17 on the second welder 09, which senses, automatic after welding bead carries out submerged arc Welding;
Plasma cut:Again after submerged arc welding, the translation roller-way 10 of the control of hydraulic control device 16 the 4th is run steel plate It is transported at CUT, is first set length value in CUT, recycles CUT Steel plate is cut;
Turnover translation moving again:After cutting, the translation roller-way 12 of the control of hydraulic control device 16 the 5th is run, and will be cut Steel plate afterwards is transported at the second tipper 13 and overturn, and is finally exported by runout table 14.Turnover translation moving step knot again Shu Hou, remaining steel plate is transported at approach table 01 with crane and carries out secondary use.
Further, during submerged arc welding, laser inductor 17 is according to the steel plate thickness sensed to hydraulic control Device 16 sends gap signal, and hydraulic control device 16 controls docking roller-way 02 to make to leave for welding between two blocks of steel plates again Gap, steel plate thickness is bigger, and the gap between two blocks of steel plates is bigger.
Embodiment 2
The invention provides a kind of steel plate docking production line and its control method, its structure and embodiment one are essentially identical, Its difference is, on the basis of embodiment one, adds following characteristics again, is made that further improvement, improves this hair Bright performance.
The end of runout table 14 is connected with joining machine 15, and steel plate is transported to joining machine with the operation of runout table 14 On 15, the bottom of joining machine 15 is provided with roller, and worker can be promoted at joining machine 15 to approach table 01, saves manpower and thing Power, improve operating efficiency.
Although above with general explanation and specific embodiment, the present invention is described in detail, at this On the basis of invention, it can be made some modifications or improvements, this will be apparent to those skilled in the art.Therefore, These modifications or improvements without departing from theon the basis of the spirit of the present invention, belong to the scope of protection of present invention.

Claims (9)

1. a kind of steel plate docks production line, it is characterised in that the steel plate docking production line includes:Multiple hydraulic control devices (16), welder, tipper, plane Grinder (07), cutting machine (11) and a plurality of roller-way, every roller-way bottom are all connected with There is a hydraulic control device (16), the welder includes the first welder (03) and the second welder (09), institute Stating tipper includes the first tipper (05) and the second tipper (13), and a plurality of roller-way includes approach table (01), docking Roller-way (02), first translation roller-way (04), second translation roller-way (06), the 3rd translation roller-way (08), the 4th translation roller-way (10), 5th translation roller-way (12) and runout table (14), the approach table (01), docking roller-way (02), the first welder (03), the first translation roller-way (04), the first tipper (05), the second translation roller-way (06), plane Grinder (07), the 3rd flat Move roller-way (08), the second welder (09), the 4th translation roller-way (10), cutting machine (11), the 5th translation roller-way (12), second Tipper (13) and runout table (14) are installed successively from left to right.
2. a kind of steel plate docking production line as claimed in claim 1, it is characterised in that the welder uses submerged arc welding Machine.
3. a kind of steel plate docking production line as claimed in claim 1, it is characterised in that the cutting machine (11) uses plasma Cutting machine.
4. a kind of steel plate docking production line as claimed in claim 1, it is characterised in that first welder (03), the Two welders (09), the first tipper (05), the second tipper (13), plane Grinder (07) and cutting machine (11) are pacified Equipped with the laser inductor (17) being connected with control system.
5. a kind of steel plate docking production line as claimed in claim 1, it is characterised in that the end of the runout table (14) connects It is connected to joining machine (15).
A kind of 6. control method of steel plate docking production line as described in claim 1-5 is any, it is characterised in that the control Method includes:
Submerged arc welding:Plurality of steel plates is successively placed in approach table (01) with crane, with the rotation of roller-way, steel plate is transported To the first welder (03) place, when first block of steel plate passes through laser inductor (17) on the first welder (03), swash Optical inductor (17) sends line signals to hydraulic control device (16), and hydraulic control device (16) is according to line signals control pair Roller-way (02) action is connect, first block of adjacent steel plate and second block of steel plate are adjusted point-blank, then dock roller-way (02) out of service, the first welder (03) carries out submerged arc welding automatically;
Turnover translation moving:After welding, steel plate is pushed to first by hydraulic control device (16) control docking roller-way (02) running Roller-way (04) is translated, steel plate is transported to the first tipper (05) position, the first tipper (05) by the first translation roller-way (04) again On laser inductor (17) detect steel plate completely into the first tipper (05) after, the first tipper (05) to steel plate carry out Upset;
Plane milling:After upset, steel plate is transported to by hydraulic control device (16) control the second translation roller-way (06) running Plane Grinder (07), the laser inductor (17) on plane mill device senses to welding bead, while gives hydraulic pressure control Device (16) processed sends aligned signal, and the translation roller-way (06) of hydraulic control device (16) control second is acted the welding bead pair of steel plate The cutter head of directrix plane Grinder (07), then plane Grinder (07) is to welding bead progress milling;
Submerged arc welding again:After milling, translation roller-way (08) operation of hydraulic control device (16) control the 3rd, steel plate is transported Deliver to the second welder (09), the laser inductor (17) on the second welder (09) is buried automatically after sensing welding bead Arc welding;
Plasma cut:Again after submerged arc welding, the translation roller-way (10) of hydraulic control device (16) control the 4th is run steel plate It is transported at CUT, the laser inductor (17) on CUT is sensed and then entered to the length of steel plate Row cutting;
Turnover translation moving again:After cutting, translation roller-way (12) operation of hydraulic control device (16) control the 5th, after cutting Steel plate be transported to the second tipper (13), the laser inductor (17) on the second tipper (13) detect steel plate completely into After second tipper (13), the second tipper (13) is overturn to steel plate, is finally exported by runout table (14).
7. the control method of a kind of steel plate docking production line as claimed in claim 6, it is characterised in that the submerged arc welding During, laser inductor (17) sends gap signal, hydraulic pressure according to the steel plate thickness sensed to hydraulic control device (16) Control device (16) controls docking roller-way (02) to make to leave the gap for welding between two blocks of steel plates again, and steel plate thickness is bigger, Gap between two blocks of steel plates is bigger.
A kind of 8. control method of steel plate docking production line as claimed in claim 6, it is characterised in that the plasma cut During, first length value is set in CUT, recycles CUT to be cut.
9. the control method of a kind of steel plate docking production line as claimed in claim 6, it is characterised in that the upset again is flat After walk terminates suddenly, remaining steel plate is output roller-way (14) and is transported on joining machine (15) is transported to approach table (01) place again, Or approach table (01) is transported to by crane and carries out secondary use.
CN201711085274.5A 2017-11-07 2017-11-07 A kind of steel plate docking production line and its control method Pending CN107803667A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711085274.5A CN107803667A (en) 2017-11-07 2017-11-07 A kind of steel plate docking production line and its control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711085274.5A CN107803667A (en) 2017-11-07 2017-11-07 A kind of steel plate docking production line and its control method

Publications (1)

Publication Number Publication Date
CN107803667A true CN107803667A (en) 2018-03-16

Family

ID=61591705

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711085274.5A Pending CN107803667A (en) 2017-11-07 2017-11-07 A kind of steel plate docking production line and its control method

Country Status (1)

Country Link
CN (1) CN107803667A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111687557A (en) * 2020-06-09 2020-09-22 浙江东南网架股份有限公司 Automatic manufacturing method of linear steel plate shear wall
CN113351960A (en) * 2021-06-18 2021-09-07 广东韶钢松山股份有限公司 Online intelligent cutting device and method for plates
CN114425698A (en) * 2022-04-06 2022-05-03 江苏巨弘捆带制造有限公司 Butt welding device for steel strip production

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0655391A (en) * 1992-08-04 1994-03-01 I N R Kenkyusho:Kk Composite machining device for medical material
CN2925684Y (en) * 2006-05-09 2007-07-25 蔡昌益 Automatic steel-plate feeder
CN102335822A (en) * 2011-10-17 2012-02-01 无锡市南方电器制造有限公司 H-shaped steel heavy welding production line
CN202317673U (en) * 2011-11-14 2012-07-11 山东力丰自动化成套设备有限公司 Automatic production line of container
CN103639706A (en) * 2013-11-22 2014-03-19 无锡三虹重工机械设备有限公司 Steel plate extension production line
CN104647050A (en) * 2014-12-24 2015-05-27 东莞市锐嘉精密机械制造有限公司 Efficient metal plate forming method and flexible production line for forming metal plates
CN204771571U (en) * 2015-06-05 2015-11-18 内蒙古九强机械有限公司 A small section system of processing for steel construction
CN205771395U (en) * 2016-06-01 2016-12-07 佛山市陆锋金属建材有限公司 A kind of control system for aluminum curtain walls production line

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0655391A (en) * 1992-08-04 1994-03-01 I N R Kenkyusho:Kk Composite machining device for medical material
CN2925684Y (en) * 2006-05-09 2007-07-25 蔡昌益 Automatic steel-plate feeder
CN102335822A (en) * 2011-10-17 2012-02-01 无锡市南方电器制造有限公司 H-shaped steel heavy welding production line
CN202317673U (en) * 2011-11-14 2012-07-11 山东力丰自动化成套设备有限公司 Automatic production line of container
CN103639706A (en) * 2013-11-22 2014-03-19 无锡三虹重工机械设备有限公司 Steel plate extension production line
CN104647050A (en) * 2014-12-24 2015-05-27 东莞市锐嘉精密机械制造有限公司 Efficient metal plate forming method and flexible production line for forming metal plates
CN204771571U (en) * 2015-06-05 2015-11-18 内蒙古九强机械有限公司 A small section system of processing for steel construction
CN205771395U (en) * 2016-06-01 2016-12-07 佛山市陆锋金属建材有限公司 A kind of control system for aluminum curtain walls production line

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111687557A (en) * 2020-06-09 2020-09-22 浙江东南网架股份有限公司 Automatic manufacturing method of linear steel plate shear wall
CN111687557B (en) * 2020-06-09 2021-09-17 浙江东南网架股份有限公司 Automatic manufacturing method of linear steel plate shear wall
CN113351960A (en) * 2021-06-18 2021-09-07 广东韶钢松山股份有限公司 Online intelligent cutting device and method for plates
CN114425698A (en) * 2022-04-06 2022-05-03 江苏巨弘捆带制造有限公司 Butt welding device for steel strip production
CN114425698B (en) * 2022-04-06 2022-07-26 江苏巨弘捆带制造有限公司 Butt welding device for steel strip production

Similar Documents

Publication Publication Date Title
CN107803667A (en) A kind of steel plate docking production line and its control method
CN201002178Y (en) Automatic welding device
KR101554683B1 (en) Coil continuous supply system for press process
CN108247257B (en) Full-automatic electronic detonator ignition element welding test production line
CN203765298U (en) Elevator door processing assembly line
CN104959709B (en) Superimposed sheet reinforced mesh automatic moulding machine
CN103433408A (en) Full-automatic single-wheel numerical control circling welding machine and circling welding method thereof
CN103406668A (en) Automatic laser cutter
CN107695736B (en) Milling groove positioning device
CN102430581B (en) Deviation-rectification-free uncoiling method of cold continuous rolling unit
CN105728886A (en) Flame cutting technology
CN203459600U (en) Full-automatic single-wheel numerical control swirling welding machine
US20130239642A1 (en) Production line of large diameter longitudinal welded pipe
CN204584560U (en) A kind of aluminium flake feeding device of Full-automatic laser welding machine
CN108788647A (en) The technique and equipment led to using channel steel splicing side
CN104588894A (en) Fire prevention cabinet robot automatic welding and carrying system
CN108687521A (en) A kind of full-automatic welded pipe product line
CN110666320A (en) 300-series stainless steel Taylor double-welding-wheel resistance seam welding process
CN104925575A (en) Canvas core conveying belt production device and method
CN206795238U (en) A kind of full-automatic welded pipe product line
CN201799783U (en) Run-on plate and run-off plate for welding of fire-resisting non-metal material body
CN205996206U (en) A kind of processing unit (plant) of winch LeBus grooving
CN206029038U (en) Eu standard plywood automation line
CN205130057U (en) Woodwork is with automatic circular milling circular knitting machine of sawing
KR101633494B1 (en) Girder and the automatic welding unit for flat welding

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 102600 11 floor, 6 building, JIAYE Plaza, 9 Hongye Road, Xihongmen, Daxing District, Beijing.

Applicant after: BAODU INTERNATIONAL ENGINEERING TECHNOLOGY Co.,Ltd.

Address before: 102600 11 floor, 6 building, JIAYE Plaza, 9 Hongye Road, Xihongmen, Daxing District, Beijing.

Applicant before: BEIJING BAODU STEEL STRUCTURE PROJECT LTD.

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180929

Address after: 100162 11 floor, 6 building, JIAYE Plaza, 9 Hongye Road, Xihongmen, Daxing District, Beijing.

Applicant after: BAODU INTERNATIONAL ENGINEERING TECHNOLOGY Co.,Ltd.

Applicant after: BAO DU INTERNATIONAL NEW MATERIAL Co.,Ltd.

Address before: 102600 11 floor, 6 building, JIAYE Plaza, 9 Hongye Road, Xihongmen, Daxing District, Beijing.

Applicant before: BAODU INTERNATIONAL ENGINEERING TECHNOLOGY Co.,Ltd.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180316