CN107798194A - The analogy method and device of engineering construction - Google Patents
The analogy method and device of engineering construction Download PDFInfo
- Publication number
- CN107798194A CN107798194A CN201711030044.9A CN201711030044A CN107798194A CN 107798194 A CN107798194 A CN 107798194A CN 201711030044 A CN201711030044 A CN 201711030044A CN 107798194 A CN107798194 A CN 107798194A
- Authority
- CN
- China
- Prior art keywords
- task
- construction
- collection
- user
- structure collection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Geometry (AREA)
- Theoretical Computer Science (AREA)
- Computer Hardware Design (AREA)
- General Physics & Mathematics (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Computational Mathematics (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention provides a kind of analogy method of engineering construction and device, is related to Construction Technology field.The analogy method of the engineering construction includes:Modeling interface is shown in display interface, the modeling interface comprises at least BIM models;The multiple tasks and the sequence of construction of the multiple task that acquisition user selects in the task list of the engineering construction of the BIM models;Obtain the multiple task that user selects in the BIM models respectively at corresponding structure in the structure collection list of engineering construction to collect, so as to obtain construction simulation model.The analogy method and device of the engineering construction can obtain construction simulation model, to realize simulation to engineering construction, be easy to user to find the problem of there may be during practice of construction according to construction simulation model.
Description
Technical field
The present invention relates to Construction Technology field, in particular to the analogy method and device of a kind of engineering construction.
Background technology
In engineering construction field, traditional Schedule management method, by task decompose with arrangement and method for construction, when segmentum intercalaris
The key elements such as point are associated, the progress situation of management project.What although conventional method can be formulated engineering project preliminary stage
Schedule optimizes, but because itself is there is defect, so optimization of the project administrator to schedule can only stop
Stay on static and word interracial contact, the displaying not directly perceived of actual progress process, imagine by experienced person.Therefore
The problem of there may be in arrangement and method for construction can only be known by artificial prediction, this allows for there may be in schedule some
The problem of not being found, when these problems are showing the construction stage of project, project construction will be quite passive, very
Had a strong impact on to generation.
The content of the invention
In view of this, the embodiments of the invention provide a kind of analogy method of engineering construction and device, to improve existing skill
The problem of there may be in arrangement and method for construction can be known by artificial prediction in art so that there may be and some do not have in schedule
The problem of being found.
To achieve these goals, the technical solution adopted by the present invention is as follows:
A kind of analogy method of engineering construction, methods described include:Modeling interface, simulation circle are shown in display interface
Face comprises at least BIM models;Obtain the multiple tasks that are selected in the task list of the engineering construction of the BIM models of user with
And the sequence of construction of the multiple task;The multiple task that acquisition user selects in the BIM models is respectively at engineering
Corresponding structure collection in the structure collection list of construction, so as to obtain construction simulation model.
As a kind of optional scheme, in the analogy method of above-mentioned engineering construction, the acquisition user is in the BIM models
The multiple task of middle selection obtains construction simulation model respectively at corresponding structure collection in the structure collection list of engineering construction
Afterwards, methods described also includes:When instruction is checked in the simulation for detecting user, the construction simulation model is shown.
It is described to enter the construction simulation model in the analogy method of above-mentioned engineering construction as a kind of optional scheme
Row displaying, including:The three-dimensional building model that structure collection in the BIM models show the construction simulation model is formed;It is aobvious
Show based on the multiple task and the sequence of construction to structure corresponding to multiple tasks described in the three-dimensional building model
The 4D construction simulation processes of collection.
As a kind of optional scheme, in the analogy method of above-mentioned engineering construction, the display is based on the multiple task
And the sequence of construction is to building the 4D construction simulation processes of collection corresponding to multiple tasks described in the three-dimensional building model,
Including:Shown in the multiple task and completed in structure collection, the multiple task corresponding to task with different colors
Structure collection corresponding to structure collection corresponding to the task of not completing and the task of the positive progress in the multiple task, and based on first
Analog rate changes structure concentration corresponding to just carrying out for the task and has completed the color in region and the color in unfinished region.
As a kind of optional scheme, in the analogy method of above-mentioned engineering construction, the display is based on the multiple task
And the sequence of construction is to building the 4D construction simulation processes of collection corresponding to multiple tasks described in the three-dimensional building model,
Including:The Task Progress of each task in the multiple task is shown.
As a kind of optional scheme, in the analogy method of above-mentioned engineering construction, the display is based on the multiple task
And the sequence of construction is to building the 4D construction simulation processes of collection corresponding to multiple tasks described in the three-dimensional building model,
Including:The analog rate for obtaining user chooses instruction;The second analog rate corresponding to instructing is chosen based on the analog rate to show
Show the work progress.
As a kind of optional scheme, in the analogy method of above-mentioned engineering construction, the acquisition user is in the BIM models
The multiple task of middle selection obtains construction simulation model respectively at corresponding structure collection in the structure collection list of engineering construction
Afterwards, methods described also includes:When the detecting user of the task checks instruction, task corresponding to instruction is checked to the task
Details shown.
As a kind of optional scheme, in the analogy method of above-mentioned engineering construction, the acquisition user is in the BIM models
The multiple task of middle selection obtains construction simulation model respectively at corresponding structure collection in the structure collection list of engineering construction
Afterwards, methods described also includes:Simulation of the user to first task in the multiple tasks in the construction simulation model is obtained to select
Instruction fetch;Show based on the first task to building the construction simulation process of collection corresponding to the first task.
A kind of analogue means of engineering construction, described device include:Display module, first choose module and the second selection
Module, wherein, the display module is used to show modeling interface in display interface, and the modeling interface comprises at least BIM models;
The multiple tasks that the first selection module selects in the task list for obtaining engineering construction of the user in the BIM models
And the sequence of construction of the multiple task;The second selection module is used to obtain what user selected in the BIM models
The multiple task is respectively at corresponding structure collection in the structure collection list of engineering construction, so as to obtain construction simulation model.
As a kind of optional scheme, in the analogue means of above-mentioned engineering construction, described device also includes model display mould
Block, the model display module are used for when instruction is checked in the simulation for detecting user, the construction simulation model are opened up
Show.
The analogy method and device of engineering construction provided in an embodiment of the present invention, by showing simulation circle in display interface
Face, modeling interface comprise at least BIM models, and acquisition user selects multiple in the task list of the engineering construction of BIM models
The sequence of construction of task and multiple tasks, the multiple tasks that acquisition user selects in BIM models are respectively at engineering construction
Corresponding structure collection in structure collection list, so as to obtain construction simulation model.It is thus possible to realize the mould of construction simulation model
Intend, in order to which user has found the problem of each task there may be in construction according to construction simulation model.Solves prior art
In can only know the problem of there may be in arrangement and method for construction by artificial prediction so that there may be and some do not have in schedule
The problem of being found, when these problems are showing the construction stage of project, project construction will be quite passive, even
The problem of generation has a strong impact on.
To enable the above objects, features and advantages of the present invention to become apparent, preferred embodiment cited below particularly, and coordinate
Appended accompanying drawing, is described in detail below.
Brief description of the drawings
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention
In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is
Part of the embodiment of the present invention, rather than whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art
The every other embodiment obtained under the premise of creative work is not made, belongs to the scope of protection of the invention.
Fig. 1 shows the block diagram of user terminal provided in an embodiment of the present invention;
Fig. 2 shows a kind of flow chart of the analogy method of engineering construction provided in an embodiment of the present invention;
Fig. 3 shows another flow chart of the analogy method of engineering construction provided in an embodiment of the present invention;
Fig. 4 shows the module map of the analogue means of engineering construction provided in an embodiment of the present invention.
Embodiment
Below in conjunction with accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Ground describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.Generally exist
The component of the embodiment of the present invention described and illustrated in accompanying drawing can be configured to arrange and design with a variety of herein.Cause
This, the detailed description of the embodiments of the invention to providing in the accompanying drawings is not intended to limit claimed invention below
Scope, but it is merely representative of the selected embodiment of the present invention.Based on embodiments of the invention, those skilled in the art are not doing
The every other embodiment obtained on the premise of going out creative work, belongs to the scope of protection of the invention.
It should be noted that:Similar label and letter represents similar terms in following accompanying drawing, therefore, once a certain Xiang Yi
It is defined, then it further need not be defined and explained in subsequent accompanying drawing in individual accompanying drawing.Meanwhile the present invention's
In description, term " first ", " second " etc. are only used for distinguishing description, and it is not intended that instruction or hint relative importance.
Fig. 1 shows a kind of structured flowchart for the user terminal that can be applied in the embodiment of the present invention.As shown in figure 1, with
Family terminal 100 includes memory 102, storage control 104, one or more (one is only shown in figure) processors 106, peripheral hardware
Interface 108, radio-frequency module 110, audio-frequency module 112, display unit 114 etc..These components by one or more communication bus/
Signal wire 116 mutually communicates.
Memory 102 can be used for storage software program and module, such as the simulation of the engineering construction in the embodiment of the present invention
Programmed instruction/module corresponding to method and device, processor 106 by operation be stored in software program in memory 102 with
And module, so as to perform various function application and data processing, such as simulation side of engineering construction provided in an embodiment of the present invention
Method.
Memory 102 may include high speed random access memory, may also include nonvolatile memory, such as one or more magnetic
Property storage device, flash memory or other non-volatile solid state memories.Processor 106 and other possible components are to storage
The access of device 102 can be carried out under the control of storage control 104.
Various input/output devices are coupled to processor 106 and memory 102 by Peripheral Interface 108.In some implementations
In example, Peripheral Interface 108, processor 106 and storage control 104 can be realized in one single chip.In some other reality
In example, they can be realized by independent chip respectively.
Radio-frequency module 110 is used to receiving and sending electromagnetic wave, realizes the mutual conversion of electromagnetic wave and electric signal, so that with
Communication network or other equipment are communicated.
Audio-frequency module 112 provides a user COBBAIF, and it may include one or more microphones, one or more raises
Sound device and voicefrequency circuit.
Display unit 114 provides a display interface between user terminal 100 and user.Specifically, display unit 114
Video frequency output is shown to user, the content of these video frequency outputs may include word, figure, video and its any combination.
It is appreciated that structure shown in Fig. 1 is only to illustrate, user terminal 100 may also include it is more more than shown in Fig. 1 or
Less component, or there is the configuration different from shown in Fig. 1.Each component shown in Fig. 1 can use hardware, software or its
Combination is realized.
First embodiment
The flow chart of the analogy method of engineering construction provided in an embodiment of the present invention as shown in Figure 2.Fig. 2 is referred to, should
The analogy method of engineering construction includes:
Step S110:Modeling interface is shown in display interface, the modeling interface comprises at least BIM models.
Display interface will can be shown for the simulation for carrying out engineering construction, and be comprised at least in modeling interface
BIM models.BIM (Building Information Modeling) is every relevant information data with construction-engineering project
Based on, three-dimensional building model is managed, passes through real information possessed by digital information analogue simulation building.With information
Completeness, information relevance, consistency on messaging, visualization, harmony, simulation, optimization property and the features such as figure can be gone out.
In embodiments of the present invention, task list can be shown in the BIM models in display interface, structure collects list,
And for showing the region of three-dimensional building model.
Further, multiple tasks can be included in task list.Task is the content constructed to some structure collection.
It is understood that task is the construction process write based on the language in BIM prototype softwares.
For example, collect for being built corresponding to one layer of wall, the B area of this layer of wall is brushed when A, the D regions of this layer of wall are brushed when C
Deng.
In embodiments of the present invention, multiple structure collection are included in the list of structure collection.Structure collection is to carry out multiple structures
The set obtained is grouped, i.e., one structure concentration can include multiple structures.Wherein, structure can be some portion in building
Part.
For example, structure collection can be one layer of curtain wall, structure can be the polylith curtain wall in this layer of curtain wall.
In embodiments of the present invention, each task in task list can be collected according to structure when creating
The content that the work progress specifically needed is write.
Step S120:Obtain the multiple tasks that are selected in the task list of the engineering construction of the BIM models of user with
And the sequence of construction of the multiple task.
In embodiments of the present invention, the simulation to engineering construction is, it is necessary to select the task in task list, to obtain specifically
Need the content constructed.
In embodiments of the present invention, user can choose the construction task for needing to simulate from above-mentioned task list, and
It can select or set the sequence of construction of multiple tasks.So that can be suitable according to the construction of multiple tasks in follow-up simulation
Ordered pair task is simulated.
Step S130:Structure of the multiple task that acquisition user selects in the BIM models respectively at engineering construction
Corresponding structure collection in collection list is built, so as to obtain construction simulation model.
After sequence of construction corresponding to the multiple tasks and multiple tasks of user's selection is obtained, it is also necessary to know each
Structure collection, that is, know the structure collection that some task is specifically constructed corresponding to business.
After each self-corresponding structure collection is bound by each task and each task, that is, complete construction simulation model
Structure, so as to obtain construction simulation model.The construction simulation model of acquisition can be used in BIM prototype softwares being constructed
Simulation.
In embodiments of the present invention, due to be with build collection be associated with task, and build collection be can include it is multiple
Structure, task is that the construction process collected for a structure is established, and task and structure collection are carried out so as to reduce user
The number of operations of binding, tied up even if user can not have to the structure of structure concentration successively task corresponding with structure being associated
It is fixed, improve the efficiency of construction simulation, and the Experience Degree of user.
In embodiments of the present invention, after construction simulation model is obtained, construction simulation model can be shown to simulation
The process of construction.Therefore, in embodiments of the present invention, Fig. 3 is referred to, the analogy method of the engineering construction can also include step
S140:When instruction is checked in the simulation for detecting user, the construction simulation model is shown.
It is understood that the operation button for for example " starting to simulate " type can be shown in display interface, when detecting
When user clicks on, that is, represent to detect that instruction is checked in the simulation of user, then can be shown with construction simulation model,
The process of construction simulation is shown.
In embodiments of the present invention, it is described to be shown the construction simulation model, it can include:In the BIM moulds
Type shows the three-dimensional building model that the structure collection in the construction simulation model is formed;Display is based on the multiple task and institute
Sequence of construction is stated to building the 4D construction simulation processes of collection corresponding to multiple tasks described in the three-dimensional building model.
It is understood that can in display interface the three-dimensional building model of BIM models viewing area, obtained above-mentioned
The three-dimensional building model that structure collection in the construction simulation model obtained is formed is shown.Then, further according to construction simulation model
In multiple tasks sequence of construction to corresponding to multiple tasks in three-dimensional building model build collect, according to task carry out 4D simulations
Construction.
In embodiments of the present invention, display is based on the multiple task and the sequence of construction to the three-dimensional building mould
The 4D construction simulation processes of structure collection corresponding to multiple tasks described in type, including:The multiple is shown with different colors
Structure collection corresponding to the unfinished task completed in structure collection, the multiple task corresponding to task in business and described more
Structure collection corresponding to the task of positive progress in individual task, and just carrying out for the task is changed based on the first analog rate and corresponded to
Structure concentrate completed the color in region and the color in unfinished region.
It is understood that for the structure collection in the three-dimensional building model in construction simulation model, can be with different
Color is come represent to have constructed the structure collection of completion, the structure collection of unfinished construction and the structure collection just constructed.And can
With the predetermined analog speed set with user, to change the face that corresponding structure concentration in just carrying out for task has completed region
Color and the color in unfinished region.
In embodiments of the present invention, display is based on the multiple task and the sequence of construction to the three-dimensional building mould
The 4D construction simulation processes of structure collection, can also include corresponding to multiple tasks described in type:To each in the multiple task
The Task Progress of task is shown.
It is understood that the task performance of collection can will be built corresponding to each task, in the form of progress bar
It has been shown that, so that user obtains the performance of the construction of each structure collection.
In embodiments of the present invention, display is based on the multiple task and the sequence of construction to the three-dimensional building mould
The 4D construction simulation processes of structure collection corresponding to multiple tasks described in type, including:The analog rate for obtaining user chooses instruction;
The second analog rate corresponding to instructing is chosen based on the analog rate and shows the work progress.
It is understood that the button for adjusting analog rate can be shown in display interface, speed can limit
At most slow ten times and most fast 30 times, basal rate can be 2 seconds tasks, play can on model direct feel task
Perform the change with every little bit during building.
In embodiments of the present invention, the analogy method of the engineering construction can also include:Looked into the detecting user of the task
When seeing instruction, check that the details of task corresponding to instruction are shown to the task.
It is understood that user can check the details of each task.The details of task can be task
Sequence, task names, director, the project, task type, time started, end time, duration, actual time started, reality
The information such as border end time, actual construction time, the project budget, progress.So that user is recognized that the detailed feelings of each task
Condition.
In embodiments of the present invention, individually the construction task of a structure collection can also be simulated, therefore, the engineering is applied
The analogy method of work can also include:Obtain simulation of the user to first task in the multiple tasks in the construction simulation model
Choose instruction;Show based on the first task to building the construction simulation process of collection corresponding to the first task.Certainly,
It can check that instruction is shown to the details of first task according to the task of user.
The analogy method for the engineering construction that first embodiment of the invention provides, it is possible to achieve the structure of construction simulation model,
To realize the simulation of engineering construction, the process of construction is shown, is easy to user to be found according to construction simulation model and actually applies
Whether the engineering time of the problem of there may be during work and budget is accurate etc..And the structure collection in construction simulation model
Formed for multiple structures, the particular content of the task in construction simulation model is also for structure collection, can make user to appointing
When business is bound with structure collection, user's the step of being associated is reduced, improve simulation precision and the user of engineering construction
Experience Degree.
Second embodiment
Second embodiment of the invention provides a kind of analogue means 200 of engineering construction, please participate in Fig. 4, the engineering construction
Analogue means 200 include:Display module 210, first chooses module 220 and second and chooses module 230.Wherein, it is described aobvious
Show that module 210 is used to show modeling interface in display interface, the modeling interface comprises at least BIM models;Described first chooses
Module 220 is used to obtaining the multiple tasks that are selected in the task list of engineering construction of the user in the BIM models and described
The sequence of construction of multiple tasks;It is described second selection module 230 be used for obtain user selected in the BIM models it is described more
Individual task is respectively at corresponding structure collection in the structure collection list of engineering construction, so as to obtain construction simulation model.
In embodiments of the present invention, the analogue means 200 of the engineering construction can also include model display module.The mould
Type display module is used for when instruction is checked in the simulation for detecting user, and the construction simulation model is shown.
In embodiments of the present invention, the mode that the construction simulation model is shown by model display module, can be wrapped
Include:The three-dimensional building model that structure collection in the BIM models show the construction simulation model is formed;Display is based on described
Multiple tasks and the sequence of construction are simulated to the 4D that collection is built corresponding to multiple tasks described in the three-dimensional building model
Work progress.
In embodiments of the present invention, model display module is shown based on the multiple task and the sequence of construction to institute
Stating the mode of the 4D construction simulation processes of structure collection corresponding to multiple tasks described in three-dimensional building model can include:With difference
Color show the unfinished task pair completed in structure collection, the multiple task corresponding to task in the multiple task
Structure collection corresponding to the structure collection and the task of the positive progress in the multiple task answered, and changed based on the first analog rate
Structure is concentrated and has completed the color in region and the color in unfinished region corresponding to just carrying out for the task.
In embodiments of the present invention, display is based on the multiple task and the sequence of construction to the three-dimensional building mould
The mode of the 4D construction simulation processes of structure collection can include corresponding to multiple tasks described in type:To every in the multiple task
The Task Progress of individual task is shown.
In embodiments of the present invention, display is based on the multiple task and the sequence of construction to the three-dimensional building mould
The mode of the 4D construction simulation processes of structure collection can include corresponding to multiple tasks described in type:Obtain the analog rate of user
Choose instruction;The second analog rate corresponding to instructing is chosen based on the analog rate and shows the work progress.
In embodiments of the present invention, the analogue means 200 of the engineering construction can also include task display module.Task shows
Show that module is used for when the detecting user of the task checks instruction, the details of task corresponding to instruction are checked to the task
Shown.
In embodiments of the present invention, the analogue means 200 of the engineering construction can also include the first instruction acquisition module with
And construction display module.First instruction acquisition module is used to obtain user in the multiple tasks in the construction simulation model the
Instruction is chosen in the simulation of one task;Display module of constructing is used to show based on the first task to corresponding to the first task
Build the construction simulation process of collection.
In summary, the analogy method and device of engineering construction provided in an embodiment of the present invention, by showing in display interface
Show modeling interface, modeling interface comprises at least BIM models, obtains user and is selected in the task list of the engineering construction of BIM models
The multiple tasks and the sequence of construction of multiple tasks selected, the multiple tasks that acquisition user selects in BIM models are respectively at work
Corresponding structure collection in the structure collection list of journey construction, so as to obtain construction simulation model.It is thus possible to realize construction simulation mould
The simulation of type, in order to which user has found the problem of each task there may be in construction according to construction simulation model.Solve existing
The problem of there may be in arrangement and method for construction can only be known by artificial prediction by having in technology so that there may be in schedule
Some the problem of not being found, when these problems are showing the construction stage of project, project construction will suitable quilt
It is dynamic, or even produce the problem of having a strong impact on.
It should be noted that each embodiment in this specification is described by the way of progressive, each embodiment weight
Point explanation is all difference with other embodiment, between each embodiment identical similar part mutually referring to.
For device class embodiment, because it is substantially similar to embodiment of the method, so description is fairly simple, related part is joined
See the part explanation of embodiment of the method.
In several embodiments provided herein, it should be understood that disclosed apparatus and method, it can also be passed through
Its mode is realized.Device embodiment described above is only schematical, for example, the flow chart and block diagram in accompanying drawing show
Device, architectural framework in the cards, the work(of method and computer program product of multiple embodiments according to the present invention are shown
Can and it operate.At this point, each square frame in flow chart or block diagram can represent one of a module, program segment or code
Point, a part for the module, program segment or code includes one or more and is used to realize the executable of defined logic function
Instruction.It should also be noted that at some as in the implementation replaced, the function of being marked in square frame can also be with different from attached
The order marked in figure occurs.For example, two continuous square frames can essentially perform substantially in parallel, they also may be used sometimes
To perform in the opposite order, this is depending on involved function.It is it is also noted that each in block diagram and/or flow chart
The combination of square frame and the square frame in block diagram and/or flow chart, can use function or action as defined in performing it is special based on
The system of hardware is realized, or can be realized with the combination of specialized hardware and computer instruction.
In addition, each functional module in each embodiment of the present invention can integrate to form an independent portion
Point or modules individualism, can also two or more modules be integrated to form an independent part.
If the function is realized in the form of software function module and is used as independent production marketing or in use, can be with
It is stored in a computer read/write memory medium.Based on such understanding, technical scheme is substantially in other words
The part to be contributed to prior art or the part of the technical scheme can be embodied in the form of software product, the meter
Calculation machine software product is stored in a storage medium, including some instructions are causing a computer equipment (can be
People's computer, server, or network equipment etc.) perform all or part of step of each embodiment methods described of the present invention.
And foregoing storage medium includes:USB flash disk, mobile hard disk, read-only storage (ROM, Read-Only Memory), arbitrary access are deposited
Reservoir (RAM, Random Access Memory), magnetic disc or CD etc. are various can be with the medium of store program codes.Need
Illustrate, herein, such as first and second or the like relational terms be used merely to by an entity or operation with
Another entity or operation make a distinction, and not necessarily require or imply between these entities or operation any this reality be present
The relation or order on border.Moreover, term " comprising ", "comprising" or its any other variant are intended to the bag of nonexcludability
Contain, so that process, method, article or equipment including a series of elements not only include those key elements, but also including
The other element being not expressly set out, or also include for this process, method, article or the intrinsic key element of equipment.
In the absence of more restrictions, the key element limited by sentence "including a ...", it is not excluded that including the key element
Process, method, other identical element also be present in article or equipment.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the skill of this area
For art personnel, the present invention can have various modifications and variations.Within the spirit and principles of the invention, that is made any repaiies
Change, equivalent substitution, improvement etc., should be included in the scope of the protection.It should be noted that:Similar label and letter exists
Similar terms is represented in following accompanying drawing, therefore, once being defined in a certain Xiang Yi accompanying drawing, is then not required in subsequent accompanying drawing
It is further defined and explained.
The foregoing is only a specific embodiment of the invention, but protection scope of the present invention is not limited thereto, any
Those familiar with the art the invention discloses technical scope in, change or replacement can be readily occurred in, should all be contained
Cover within protection scope of the present invention.Therefore, protection scope of the present invention described should be defined by scope of the claims.
Claims (10)
1. a kind of analogy method of engineering construction, it is characterised in that methods described includes:
Modeling interface is shown in display interface, the modeling interface comprises at least BIM models;
Obtain multiple tasks and the multiple task that user selects in the task list of the engineering construction of the BIM models
Sequence of construction;
The multiple task that acquisition user selects in the BIM models is respectively at corresponding in the structure collection list of engineering construction
Structure collection, so as to obtain construction simulation model.
2. according to the method for claim 1, it is characterised in that the institute for obtaining user and being selected in the BIM models
Multiple tasks are stated respectively at corresponding structure collection in the structure collection list of engineering construction, it is described after obtaining construction simulation model
Method also includes:
When instruction is checked in the simulation for detecting user, the construction simulation model is shown.
3. according to the method for claim 2, it is characterised in that it is described to be shown the construction simulation model, including:
The three-dimensional building model that structure collection in the BIM models show the construction simulation model is formed;
Display is corresponding to multiple tasks described in the three-dimensional building model based on the multiple task and the sequence of construction
Structure collection 4D construction simulation processes.
4. according to the method for claim 3, it is characterised in that the display is based on the multiple task and the construction
Sequentially to the 4D construction simulation processes that collection is built corresponding to the multiple task, including:
Shown in the multiple task and completed in structure collection, the multiple task corresponding to task not with different colors
Structure collection corresponding to structure collection corresponding to completion task and the task of the positive progress in the multiple task, and it is based on the first mould
Structure corresponding to intending speed change just carrying out for the task, which is concentrated, has completed the color in region and the color in unfinished region.
5. according to the method for claim 3, it is characterised in that the display is based on the multiple task and the construction
Sequentially to the 4D construction simulation processes that collection is built corresponding to multiple tasks described in the three-dimensional building model, including:
The Task Progress of each task in the multiple task is shown.
6. according to the method for claim 3, it is characterised in that the display is based on the multiple task and the construction
Sequentially to the 4D construction simulation processes that collection is built corresponding to multiple tasks described in the three-dimensional building model, including:
The analog rate for obtaining user chooses instruction;
The second analog rate corresponding to instructing is chosen based on the analog rate and shows the work progress.
7. according to the method for claim 1, it is characterised in that the institute for obtaining user and being selected in the BIM models
Multiple tasks are stated respectively at corresponding structure collection in the structure collection list of engineering construction, it is described after obtaining construction simulation model
Method also includes:
When the detecting user of the task checks instruction, check that the details of task corresponding to instruction show to the task
Show.
8. according to the method for claim 1, it is characterised in that the institute for obtaining user and being selected in the BIM models
Multiple tasks are stated respectively at corresponding structure collection in the structure collection list of engineering construction, it is described after obtaining construction simulation model
Method also includes:
Obtain simulation of the user to first task in the multiple tasks in the construction simulation model and choose instruction;
Show based on the first task to building the construction simulation process of collection corresponding to the first task.
9. a kind of analogue means of engineering construction, it is characterised in that described device includes:Display module, first choose module with
And second choose module, wherein,
The display module is used to show modeling interface in display interface, and the modeling interface comprises at least BIM models;
The first selection module selects multiple in the task list for obtaining engineering construction of the user in the BIM models
The sequence of construction of task and the multiple task;
The second selection module is applied for obtaining the multiple task that user selects in the BIM models respectively at engineering
Corresponding structure collection in the structure collection list of work, so as to obtain construction simulation model.
10. device according to claim 9, it is characterised in that described device also includes model display module, the model
Display module is used for when instruction is checked in the simulation for detecting user, and the construction simulation model is shown.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711030044.9A CN107798194A (en) | 2017-10-30 | 2017-10-30 | The analogy method and device of engineering construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711030044.9A CN107798194A (en) | 2017-10-30 | 2017-10-30 | The analogy method and device of engineering construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107798194A true CN107798194A (en) | 2018-03-13 |
Family
ID=61547581
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711030044.9A Pending CN107798194A (en) | 2017-10-30 | 2017-10-30 | The analogy method and device of engineering construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107798194A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117349917A (en) * | 2023-12-05 | 2024-01-05 | 深圳图为技术有限公司 | Construction scheme simulation system, method and storage medium |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104484524A (en) * | 2014-12-09 | 2015-04-01 | 张家驰 | Method and system based on BIM (building information modeling) simulation model and in-site construction interaction |
CN104766182A (en) * | 2015-04-30 | 2015-07-08 | 北京宁晖兴业科技有限公司 | Intelligent monitoring system for building design construction based on BIM |
US9141925B2 (en) * | 2013-01-11 | 2015-09-22 | Myongji University Industry And Academia Cooperation Foundation | System and method for creating building information modeling geometry breakdown structure |
KR101722177B1 (en) * | 2016-07-15 | 2017-04-03 | (주)인트라테크 | Method and apparatus for hybrid displaying of VR(virtual reality) contents |
CN106803150A (en) * | 2017-01-20 | 2017-06-06 | 上海市地下空间设计研究总院有限公司 | Municipal Engineering Construction progress msg management method and system based on BIM |
-
2017
- 2017-10-30 CN CN201711030044.9A patent/CN107798194A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9141925B2 (en) * | 2013-01-11 | 2015-09-22 | Myongji University Industry And Academia Cooperation Foundation | System and method for creating building information modeling geometry breakdown structure |
CN104484524A (en) * | 2014-12-09 | 2015-04-01 | 张家驰 | Method and system based on BIM (building information modeling) simulation model and in-site construction interaction |
CN104766182A (en) * | 2015-04-30 | 2015-07-08 | 北京宁晖兴业科技有限公司 | Intelligent monitoring system for building design construction based on BIM |
KR101722177B1 (en) * | 2016-07-15 | 2017-04-03 | (주)인트라테크 | Method and apparatus for hybrid displaying of VR(virtual reality) contents |
CN106803150A (en) * | 2017-01-20 | 2017-06-06 | 上海市地下空间设计研究总院有限公司 | Municipal Engineering Construction progress msg management method and system based on BIM |
Non-Patent Citations (2)
Title |
---|
张洋等: "国家体育场工程4D施工管理系统", 《第八届全国建设领域信息化与多媒体辅助工程学术交流会》 * |
甘露: "BIM技术在施工项目进度管理中的应用研究", 《中国优秀硕士学位论文全文数据库(工程科技Ⅱ辑)》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117349917A (en) * | 2023-12-05 | 2024-01-05 | 深圳图为技术有限公司 | Construction scheme simulation system, method and storage medium |
CN117349917B (en) * | 2023-12-05 | 2024-04-02 | 深圳图为技术有限公司 | Construction scheme simulation system, method and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110102058A (en) | The generation method of Virtual Building model, device, processor and terminal in game | |
CN108052979A (en) | The method, apparatus and equipment merged to model predication value | |
CN108804704A (en) | A kind of user's depth portrait method and device | |
CN109063829A (en) | Neural network construction method, device, computer equipment and storage medium | |
CN108053410A (en) | Moving Object Segmentation method and device | |
CN110415521A (en) | Prediction technique, device and the computer readable storage medium of traffic data | |
CN102629388B (en) | Mechanical equipment simulation system generating method | |
CN105843873A (en) | System and method for managing data modeling | |
CN105068663A (en) | Object selecting method and device based on electroencephalogram signal | |
CN107454346A (en) | Movie data analytic method, video production template recommend method, apparatus and equipment | |
Wu et al. | Design for sustainable aging: improving design communication through building information modeling and game engine integration | |
CN107481309A (en) | Three-dimensional reflection rendering intent and device | |
CN109344560A (en) | Assembled architecture modeling method and model management system based on BIM technology | |
Hijazi et al. | The Effectiveness of Digital Technologies Used for the Visitor's Experience in Digital Museums. A Systematic Literature Review from the Last Two Decades. | |
CN103838861A (en) | Method and display system for dynamically displaying information based on three-dimensional GIS | |
CN107798194A (en) | The analogy method and device of engineering construction | |
CN107895282A (en) | A kind of tobacco market big data method for visualizing based on space-time grid | |
JP2017059193A (en) | Time series image compensation device, time series image generation method, and program for time series image compensation device | |
CN111177562B (en) | Recommendation ordering processing method and device for target object and server | |
Nourian et al. | Generative design in architecture: From mathematical optimization to grammatical customization | |
CN104133680A (en) | Fast building method of ERP form module | |
CN104463694B (en) | A kind of data circulate the method and system that represent of distribution in information system | |
CN110119565A (en) | A method of quick association and displaying based on BIM model and project programme | |
Becu et al. | How to involve stakeholders in the modeling process | |
CN114494577A (en) | Display method and device, electronic equipment and storage medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180313 |
|
RJ01 | Rejection of invention patent application after publication |