CN107798184A - A kind of determination method of the critical big inbreak span in goaf - Google Patents

A kind of determination method of the critical big inbreak span in goaf Download PDF

Info

Publication number
CN107798184A
CN107798184A CN201710978992.9A CN201710978992A CN107798184A CN 107798184 A CN107798184 A CN 107798184A CN 201710978992 A CN201710978992 A CN 201710978992A CN 107798184 A CN107798184 A CN 107798184A
Authority
CN
China
Prior art keywords
goaf
inbreak
span
big
critical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710978992.9A
Other languages
Chinese (zh)
Other versions
CN107798184B (en
Inventor
李海英
任凤玉
赵云峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northeastern University China
Original Assignee
Wuhan University of Science and Engineering WUSE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan University of Science and Engineering WUSE filed Critical Wuhan University of Science and Engineering WUSE
Priority to CN201710978992.9A priority Critical patent/CN107798184B/en
Publication of CN107798184A publication Critical patent/CN107798184A/en
Application granted granted Critical
Publication of CN107798184B publication Critical patent/CN107798184B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation

Abstract

The invention discloses a kind of determination method of the critical big inbreak span in goaf, determines the critical big inbreak span in goaf as the following formula:The present invention weakens thickness degree and gob floor buried depth to determine the critical big inbreak span in goaf according to earth's surface;According to critical big inbreak span control underground back production scope, to control the inbreak process in goaf, or reach the time of critical big inbreak span according to Goaf Area, predict that big inbreak and surface subsidence are cheated the time to be formed, prevent and treat the harmful of mined out area safety economy.The present invention is applied to tilt Slowly inclined large and thick ore body underground Mining by caving method mine or the mine of such ore body open stope afterwards filling; the former is applied to erecting dense individual props hazard prediction and preventing and treating; the latter is applied to protect earth's surface not to be destroyed, and can obtain safe, economic and efficient prevention effect.

Description

A kind of determination method of the critical big inbreak span in goaf
Technical field
The present invention relates to metalliferous deposit underground mining technical field, specifically a kind of critical big inbreak span in goaf is really Determine method.
Background technology
Blast impact, gushing water and earth's surface caused by the big inbreak in goaf the disaster such as subside into current production mine most terrible disaster One of evil, until in recent years, this disaster still frequently occurs, and is although people know increasing with mined-out area span after all Big height increase, but cannot know when that big inbreak occurs, i.e., big inbreak time of origin not can determine that some mines count in advance The year even surface subsidence of more than ten years prevention in advance, result is not collapse for several years, and personnel enter the plantation as usual of Jing Xie areas, and the plantation several years does not have Problem, once earth's surface is emitted suddenly, it is easy to cause disaster.It is also equally several years that working face in the pit, which reserves the protection of ore granular media, Do not work, worker just inclines to believe in " experience " controlled oneself, and protection bed course is no longer conscientiously reserved, as a result by high-volume inbreak Or even the blast impact of big inbreak.It should say, the decline in alertness of people is the main reason for causing this kind of disaster frequently to occur.Du The generation of exhausted such disaster, best bet is to determine out the time that big inbreak occurs, implements prophylactico-therapeutic measures accordingly, so easy Ensure prophylactico-therapeutic measures in place, realize the effect effectively prevented and treated, but there has been no practicable determination side of big inbreak time at present Method and inbreak course control method, this has just buried potential safety hazard for relevant staff.
The content of the invention
It is an object of the invention to provide a kind of determination method of the critical big inbreak span in goaf, to solve above-mentioned background The problem of being proposed in technology.
To achieve the above object, the present invention provides following technical scheme:
A kind of determination method of the critical big inbreak span in goaf, is comprised the following steps that:
Step 1, determine that earth's surface weakens the thickness of layer (including overlying Quaternary Period rock stratum and weathered layer) according to geologic information hf, protolith compression strength TcWith the volume-weighted average γ of goaf top covering rockmass, on the section along vertical range direction, from upper The gob floor buried depth H of the segment level and mined out sector width L of each segmentation is measured by segmentation downwardsi
Step 2, the critical big inbreak span in goaf is determined as the following formula:(H is to adopt in formula Dead zone bottom plate buried depth, m;hfDepth of stratum, m are weakened for earth's surface;TcFor protolith compression strength, t/m2;D is caving arch load level The effective range of stress, m;General d=1.0~2.0m;γ be goaf top covering rockmass volume-weighted average, t/m3;LjFor goaf Critical big inbreak span, m.);
Step 3, since head adopts segmentation, the stopping area of each segmentation is drawn a circle to approve, by segmented projection a to plane, Measure equivalent circular diameter on that plane, depth H where listing each segmentation and the corresponding goaf equivalent circular diameter L that adds up, with by Formula in step 2 presses the L that H values calculatejContrast, as L≤LjWhen, corresponding segmentation will cause big inbreak to occur, and be big inbreak It is segmented;
Step 4, it is segmented in big inbreak, by substoping schedule, determines that back production scope reaches critical and emitted greatly Fall the time of span, the predicted time occurred as big inbreak.
As the further scheme of the present invention:When emitting earth's surface for predicting and forming the Collapse Pit time in earth's surface, Tc Calculated by the mean compressive strength of the non-weathered rock formation of goaf overlying;When for protecting earth's surface not collapse, Tc is by goaf The lower value for covering the compression strength of non-weathered rock formation calculates.
As the further scheme of the present invention:Tc is the product of compressive strength of rock and Rock-mass integrity index.
As the further scheme of the present invention:Under the conditions of uniformly the back production of mined-out area span is expanded, in mined-out area span Before reaching critical big inbreak span, general roof rock presses fragmentary inbreak form inbreak, reach critical big inbreak span it Afterwards, usually high-volume inbreak and impact wave is formed, now needs closure working face in advance and the port in goaf, prevent and emit Fall blast impact.
Compared with prior art, the beneficial effects of the invention are as follows:The present invention weakens thickness degree and goaf bottom according to earth's surface Plate buried depth determines the critical big inbreak span in goaf;According to critical big inbreak span control underground back production scope, adopted with control The inbreak process of dead zone, or reach according to Goaf Area the time of critical big inbreak span, predict big inbreak and surface subsidence The time formed is cheated, prevents and treats the big inbreak harm in goaf safety economy;The present invention is applied to tilting Slowly inclined large and thick ore body Lower Mining by caving method mine or the mine of such ore body open stope afterwards filling, the former is applied to erecting dense individual props hazard prediction with preventing Control, the latter is applied to protect earth's surface not to be destroyed, and can obtain safe, economic and efficient prevention effect.
Brief description of the drawings
Fig. 1 is the schematic diagram of the determination method of the critical big inbreak span in goaf.
Embodiment
The technical scheme of this patent is described in more detail with reference to embodiment.
Referring to Fig. 1, a kind of determination method of the critical big inbreak span in goaf, is comprised the following steps that:Geology is pressed first Data determines that earth's surface weakens layer (including overlying Quaternary Period rock stratum and weathered layer) thickness hf;In the section along vertical range direction On, measure the gob floor buried depth H of segment level by segmentation from the top downi, and the mined out sector width L of each segmentationi, In continuous extension goaf, goaf is represented using equivalent circular diameter (the maximum diameter of a circle that can be accommodated in the perspective plane of dead zone) Effective span, time of critical big inbreak span is reached by equivalent circular diameter, predicts the time that big inbreak occurs;Similarly, control Equivalent circular diameter processed, it is less than the time of critical big inbreak span, the big inbreak time can be put off.When earth's surface landform is uneven When, gob floor buried depth H is measured by goaf center when reaching critical big inbreak span, it is corresponding that H is calculated as follows Critical big inbreak span value:The L that will be calculatedjValue and mined out sector width LiValue is carried out pair Than working as Li≧LjWhen, it is corresponding to be segmented into big inbreak and be segmented, when the segmentation goaf communicates completely with large empty area, Ji Jiangfa Raw big inbreak activity.By substoping schedule, determine that back production scope all connects (goaf equivalence with existing goaf Circular diameter is not less than critical big inbreak span) time, as big inbreak occur predicted time.Reach big inbreak in goaf Before predicted time, all ports of the closely knit closure working face of underground granular media and dead zone, prevent that inbreak blast impacts;Meanwhile Earth's surface sets alert tool line in the range of inbreak, prevents and subsides harm.
In conventional research, people have revealed that out erecting dense individual props undergo initial inbreak, continue inbreak, big inbreak with In the lateral avalanche stage, Collapse Pit finally is formed in earth's surface, but the determination method of lasting inbreak and big inbreak span could not be provided.Hair A person of good sense has found to continue inbreak and big inbreak is often indivisible, continue inbreak by the actual inbreak process in research mine for many years It is the prelude for emitting earth's surface, under gravity field action, when caving arch enters, earth's surface weakens rock stratum while goaf height can be held Receive inbreak rock mass broken bulk when, the big inbreak of sensible earth's surface just quickly occurs, thus proposes critical big inbreak span calculating formula. According to the formation time of critical big inbreak span, determine the time that the big inbreak harm in goaf occurs, to implement prophylactico-therapeutic measures accordingly, Safe, economic, efficient prevention effect can be obtained.The present invention is especially suitable for inclination Slowly inclined large and thick ore body, using oper cylinler Sublevel caving method exploitation, earth's surface allow the metal mine of inbreak, for formulate safety production program and production safety management provide according to According to according to this method control inbreak process, it can also be used to which filling administers goaf and protects earth's surface not to be damaged.
It is obvious to a person skilled in the art that the invention is not restricted to the details of above-mentioned one exemplary embodiment, Er Qie In the case of without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, embodiment all should be regarded as exemplary, and be nonrestrictive, the scope of the present invention is by appended power Profit requires rather than described above limits, it is intended that all in the implication and scope of the equivalency of claim by falling Change is included in the present invention.
Moreover, it will be appreciated that although the present specification is described in terms of embodiments, not each embodiment is only wrapped Containing an independent technical scheme, this narrating mode of specification is only that those skilled in the art should for clarity Using specification as an entirety, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art It is appreciated that other embodiment.

Claims (4)

  1. A kind of 1. determination method of the critical big inbreak span in goaf, it is characterised in that comprise the following steps that;
    Step 1, determine that earth's surface weakens the thickness h of layer (including overlying Quaternary Period rock stratum and weathered layer) according to geologic informationf, it is former The compression strength T of rockcWith the volume-weighted average γ of goaf top covering rockmass;
    Step 2, the critical big inbreak span in goaf is determined as the following formula:(H is goaf bottom in formula Plate buried depth, m;hfDepth of stratum, m are weakened for earth's surface;TcFor protolith compression strength, t/m2;D is caving arch load level stress Effective range, m;General d=1.0~2.0m;γ be goaf top covering rockmass volume-weighted average, t/m3;LmIt is critical big for goaf Inbreak span, m.);
    Step 3, since head adopts segmentation, the stopping area of each segmentation is drawn a circle to approve, by segmented projection a to plane, herein Equivalent circular diameter is measured in plane, depth H and corresponding cumulative goaf equivalent circular diameter L where listing each segmentationi, and by step Formula in rapid two presses the L that H values calculatejContrast, works as Li≧LjWhen, corresponding segmentation will cause big inbreak to occur, and be shaved one's head for big emit Estranged section;
    Step 4, it is segmented in big inbreak, by substoping schedule, determines that back production scope joins with existing goaf The time led to, make whole goaf reach critical big inbreak span, the predicted time occurred as big inbreak.
  2. 2. the determination method of the critical big inbreak span in goaf according to claim 1, it is characterised in that described this method Earth's surface is emitted for predicting and when earth's surface forms the Collapse Pit time, and Tc is strong by the Mean Crush of the non-weathered rock formation of goaf overlying Degree calculates;When for protecting earth's surface not collapse, Tc is calculated by the lower value of the compression strength of the non-weathered rock formation of goaf overlying.
  3. 3. the determination method of the critical big inbreak span in goaf according to claim 1 or 2, it is characterised in that the Tc For the product of compressive strength of rock and Rock-mass integrity index.
  4. 4. the determination method of the critical big inbreak span in goaf according to claim 1, it is characterised in that described uniform Under the conditions of the back production for expanding mined-out area span, before mined-out area span reaches critical big inbreak span, general roof rock is pressed Fragmentary inbreak form inbreak, after critical big inbreak span is reached, usually high-volume inbreak and impact wave is formed, this When need to block working face and the port in goaf in advance.
CN201710978992.9A 2017-10-19 2017-10-19 Method for determining critical large caving span and time of goaf Active CN107798184B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710978992.9A CN107798184B (en) 2017-10-19 2017-10-19 Method for determining critical large caving span and time of goaf

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710978992.9A CN107798184B (en) 2017-10-19 2017-10-19 Method for determining critical large caving span and time of goaf

Publications (2)

Publication Number Publication Date
CN107798184A true CN107798184A (en) 2018-03-13
CN107798184B CN107798184B (en) 2021-04-02

Family

ID=61533592

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710978992.9A Active CN107798184B (en) 2017-10-19 2017-10-19 Method for determining critical large caving span and time of goaf

Country Status (1)

Country Link
CN (1) CN107798184B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109162712A (en) * 2018-08-30 2019-01-08 北京矿冶科技集团有限公司 A method of control avalanche goaf above rock differential settlement
CN110221357A (en) * 2019-05-20 2019-09-10 深圳市勘察研究院有限公司 A kind of long-span and shallowly buried limestone goaf integrated survey method
CN113338924A (en) * 2021-05-11 2021-09-03 紫金矿业集团股份有限公司 Control method for surface subsidence range by natural caving method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101363824A (en) * 2008-05-12 2009-02-11 西安西科测控设备有限责任公司 Device for real time monitoring mine roof rock formation or concrete structure stability
US7596242B2 (en) * 1995-06-07 2009-09-29 Automotive Technologies International, Inc. Image processing for vehicular applications
EP2621057A2 (en) * 2010-08-20 2013-07-31 Fujikura Ltd. Electric wire, coil, apparatus for designing electric wire, and electric motor
CN103528563A (en) * 2013-10-22 2014-01-22 安徽理工大学 Goaf subsidence region sinkage monitoring system and method
CN104806243A (en) * 2015-03-09 2015-07-29 东北大学 Wedge transferring transition method for transferring from open-pit mining to underground mining
CN106709123A (en) * 2016-08-26 2017-05-24 西安工业大学 Design method for bolting of abscission roof of roadway
CN106968713A (en) * 2017-04-21 2017-07-21 东北大学 A kind of whole audience quick Real-time Feedback recognition methods of coal mine roof plate stress field and caving zone

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7596242B2 (en) * 1995-06-07 2009-09-29 Automotive Technologies International, Inc. Image processing for vehicular applications
CN101363824A (en) * 2008-05-12 2009-02-11 西安西科测控设备有限责任公司 Device for real time monitoring mine roof rock formation or concrete structure stability
EP2621057A2 (en) * 2010-08-20 2013-07-31 Fujikura Ltd. Electric wire, coil, apparatus for designing electric wire, and electric motor
CN103528563A (en) * 2013-10-22 2014-01-22 安徽理工大学 Goaf subsidence region sinkage monitoring system and method
CN104806243A (en) * 2015-03-09 2015-07-29 东北大学 Wedge transferring transition method for transferring from open-pit mining to underground mining
CN106709123A (en) * 2016-08-26 2017-05-24 西安工业大学 Design method for bolting of abscission roof of roadway
CN106968713A (en) * 2017-04-21 2017-07-21 东北大学 A kind of whole audience quick Real-time Feedback recognition methods of coal mine roof plate stress field and caving zone

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李海英: "露天转地下过渡期协同开采方法与应用研究", 《中国博士学位论文全文数据库 工程科技Ⅰ辑》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109162712A (en) * 2018-08-30 2019-01-08 北京矿冶科技集团有限公司 A method of control avalanche goaf above rock differential settlement
CN110221357A (en) * 2019-05-20 2019-09-10 深圳市勘察研究院有限公司 A kind of long-span and shallowly buried limestone goaf integrated survey method
CN110221357B (en) * 2019-05-20 2020-10-09 深圳市勘察研究院有限公司 Large-span shallow-buried limestone goaf comprehensive exploration method
CN113338924A (en) * 2021-05-11 2021-09-03 紫金矿业集团股份有限公司 Control method for surface subsidence range by natural caving method
CN113338924B (en) * 2021-05-11 2023-02-10 紫金矿业集团股份有限公司 Control method for surface subsidence range by natural caving method

Also Published As

Publication number Publication date
CN107798184B (en) 2021-04-02

Similar Documents

Publication Publication Date Title
CN110939442B (en) Method for treating rock burst by pressure relief source in ground fracturing area
CN103397883B (en) Mutil-coal seam mining Rock Burst method for integrated control
CN113404535B (en) Method for preventing rock burst by hydraulic fracturing of coal mine underground
CN106150546B (en) A kind of method that the filling of goaf part is carried out according to earth's surface subsidence
CN107798184A (en) A kind of determination method of the critical big inbreak span in goaf
CN107609299A (en) A kind of optimization method of inclined substrate internal dumping side slope form
CN111854667B (en) Overburden water guide fracture zone height prediction method based on geomechanics
Zhu et al. Mechanisms of support failure and prevention measures under double-layer room mining gobs–a case study: Shigetai coal mine
Ghasemi et al. A new method for risk assessment of pillar recovery operation
CN106677781B (en) A kind of ultra-thin coal seam drilling release anti-reflection method
CN113961999A (en) Demonstration method for safe setting of isolation coal pillars
CN112031772B (en) Method for inducing overall damage of overlying residual coal pillars by using high-pressure water jet
CN108150171A (en) A kind of great burying thin bedrock area high seam longwall top coal caving pressure rack water-inrush prevention method
CN116049964B (en) Anti-impact method for artificial liberation layer of newly-built mine
CN116050171B (en) Anti-impact method for artificial liberation layer of tunneling roadway
CN116167223B (en) Method for determining artificial liberation layer
CN111046595A (en) Typical and atypical rock burst mine type dividing method
CN116258000A (en) Anti-impact method for artificial liberation layer
Liu et al. Mechanism and integrated control of “rib spalling: Roof collapse—Support instability” hazard chains in steeply dipping soft coal seams
CN114329922B (en) Method for determining height of water flowing fractured zone based on structural overlying strata
CN112855123B (en) Method for determining depth of pressure relief drilling hole
CN112901169B (en) Impact instability judging and anti-impact mining method for asymmetrical island working surface
CN109162712B (en) Method for controlling uneven settlement of overlying surrounding rock in caving goaf
Luo Gateroad design in overlying multi-seam mines
Glazer et al. Crown pillar failure mechanism–case study based on seismic data from Palabora Mine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210331

Address after: 110001 No.11, Lane 3, Wenhua Road, Heping District, Shenyang City, Liaoning Province

Patentee after: Northeastern University

Address before: No. 947, Qingshan District, Wuhan City, Hubei Province 430080

Patentee before: WUHAN University OF SCIENCE AND TECHNOLOGY

TR01 Transfer of patent right