CN107796949A - Automatic analysing apparatus - Google Patents
Automatic analysing apparatus Download PDFInfo
- Publication number
- CN107796949A CN107796949A CN201710677027.8A CN201710677027A CN107796949A CN 107796949 A CN107796949 A CN 107796949A CN 201710677027 A CN201710677027 A CN 201710677027A CN 107796949 A CN107796949 A CN 107796949A
- Authority
- CN
- China
- Prior art keywords
- mentioned
- significant items
- maintenance
- maintenance significant
- time
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N35/00—Automatic analysis not limited to methods or materials provided for in any single one of groups G01N1/00 - G01N33/00; Handling materials therefor
- G01N35/10—Devices for transferring samples or any liquids to, in, or from, the analysis apparatus, e.g. suction devices, injection devices
- G01N35/1004—Cleaning sample transfer devices
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N35/00—Automatic analysis not limited to methods or materials provided for in any single one of groups G01N1/00 - G01N33/00; Handling materials therefor
- G01N35/00584—Control arrangements for automatic analysers
- G01N35/00594—Quality control, including calibration or testing of components of the analyser
- G01N35/00613—Quality control
- G01N35/00623—Quality control of instruments
Landscapes
- Engineering & Computer Science (AREA)
- Quality & Reliability (AREA)
- Physics & Mathematics (AREA)
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Analytical Chemistry (AREA)
- Biochemistry (AREA)
- General Health & Medical Sciences (AREA)
- General Physics & Mathematics (AREA)
- Immunology (AREA)
- Pathology (AREA)
- Automatic Analysis And Handling Materials Therefor (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention realizes a kind of automatic analysing apparatus, and it can easily be grasped the time necessary to the priority of multiple maintenances and each maintenance, and can implement to consider the display of the maintenance of analysis action.The information for the Maintenance Significant Items that each cycle classified is shown as in picture (1801) is safeguarded.The remaining valid period (%) (202) is shown with percentage for each Maintenance Significant Items.Safeguard that the remaining valid period (%) in picture (1801) is shown using numeral and bar.Due to the remaining time limit of the maintenance of each Maintenance Significant Items of display, therefore the relative importance value (emergency) of maintenance can visually be understood, and due to the time required to also being shown for each Maintenance Significant Items, so user is based on the information, can be according to the operating schedule of automatic analysing apparatus, the schedule planning to maintenance plays a role.
Description
Technical field
The present invention relates to the automatic analysing apparatus for the qualitative and quantitative analysis for carrying out the biological samples such as blood, urine.
Background technology
Mixing is adjusted for each measure object composition in the sample comprising measure object composition reagent and
The automatic analysing apparatus analyzed, there is the reaction vessel of biased sample and reagent, add sample respectively in reaction vessel
Probe is dispensed with sample dispensing probe, the reagent of reagent and is stirred rabbling mechanism of liquid etc..Dress is automatically analyzed this
In putting, reaction vessel is generally used in other analyses after the washing, and dispensing probe is also before different samples, reagent is dispensed
Carry out washer jet.
Automatic analysing apparatus has the cleaning for carrying out this reaction vessel, nozzle cleaning etc. and carried out needed for next analysis
Service action function.Due to that can not carry out analysis action during this service action is carried out, thus in order in accordance with
Analyze schedule, it is necessary to the maintenance of implementation plan.
In patent document 1, as the easy and technology of the resume of the maintenance of recognition detection body analytical equipment at a glance, record
With calendar form show should Maintenance Significant Items that daily, weekly, monthly quasi-periodic is implemented and predetermined, and show each
Safeguard the content for whether implementing to terminate.In addition, on acyclic Maintenance Significant Items, disclose with text importing implement resume with
And predetermined content.
Prior art literature
Patent document
Patent document 1:Japanese Unexamined Patent Publication 2008-51543 publications
However, only it is configured in patent document 1, in the maintenance picture described in patent document 1, if input is implemented
The content safeguarded, then updating maintenance are recorded, and showing for picture is also updated in a manner of as the display for representing to have been carried out
Show, so as to dependently of each other carry out the implementation of the operation and maintenance of device.
Thus, due to being shown with calendar form, therefore user can hold maintenance deadline day approaching situation, still
It is difficult to the priority for easily holding multiple Maintenance Significant Items using picture, and the time implemented needed for each maintenance is failed to understand, it is difficult
Implemented effective with holding with the relation of the duration of runs of automatic analysing apparatus and considering the analysis schedule of automatic analysing apparatus
Safeguard.
The content of the invention
It is an object of the invention to provide a kind of automatic analysing apparatus, its progress can easily hold the preferential suitable of multiple maintenances
Time needed for sequence and each maintenance, and can implement to consider the display of the maintenance of analysis action.
In order to achieve the above object, structure of the invention is as follows.
Have in automatic analysing apparatus:Analysis portion, analysis detection body;Memory, at least store on above-mentioned analysis portion
Multiple Maintenance Significant Items, final implementation time of these each Maintenance Significant Items, each above-mentioned Maintenance Significant Items the recommendation implementation cycle,
And carry out each required time required for above-mentioned Maintenance Significant Items;Calculation control unit, there is remaining time calculating part, the residue
Recommendation implementation cycle and final implementation time of the time calculating part according to each Maintenance Significant Items being stored in above-mentioned memory, meter
Calculate until safeguarding that the remaining time for recommending implementation period and above-mentioned remaining time implement relative to the recommendation of each above-mentioned maintenance
The ratio in cycle;And display part, for each above-mentioned Maintenance Significant Items, show what is calculated using above-mentioned remaining time calculating part
Remaining time, above-mentioned remaining time are relative to the ratio of above-mentioned recommendation implementation cycle and the progress of each above-mentioned Maintenance Significant Items
Required required time.
The effect of the present invention is as follows.
A kind of automatic analysing apparatus can be realized, it can easily be held the priority of multiple maintenances and each dimension
Time needed for shield, and can implement to consider the display of the maintenance of analysis action.
Brief description of the drawings
Fig. 1 is the overall summary construction diagram using the automatic analysing apparatus of one embodiment of the present of invention.
Fig. 2 is to represent the shown figure of one for safeguarding picture.
Fig. 3 is represented Fig. 2 figure for safeguarding picture safeguarded picture and be extended.
Fig. 4 is the addition explanation figure of Fig. 3 display.
Fig. 5 is the figure for the database for representing the information for managing each Maintenance Significant Items.
Fig. 6 is the algorithm of the Maintenance Significant Items shown by selected display field A.
Fig. 7 is the algorithm of the Maintenance Significant Items shown by selected display field B.
Fig. 8 is the figure for representing to safeguard details picture 1803.
Fig. 9 is will to safeguard that details picture is shown in the figure safeguarded on picture 1802 as sprite 1804.
Figure 10 is the figure for representing the schedule setting picture 1805 shown when pressing schedule setting button.
Figure 11 is the figure for the schedule setting picture 1805 for representing the not specified situation for implementing time next time.
Figure 12 is the figure for the algorithm for representing schedule setting.
Figure 13 is the FBD in computer 3.
In figure:1- detection body containers, 2- detection body carrying disks, 3- microcomputers, 4- interfaces, 5- detection body dispensers,
6- reaction vessels, 7- detection body syringe pumps, 8A, 8B- reagent dispensing pipette, 9- reaction baths, 10- constant temperature liquid supply units,
11- reagent syringe pumps, 12- reagent bottles, 13- rabbling mechanisms, 14- multi-wavelength photometer light sources, 15- multiwave length spectro devices, 16-
A/D converter, 17- reaction workbench, 18-CRT, 19- wiper mechanisms, 21- keyboards, 23A, 23B- apparatus for reading of bar code, 24-
CD, 25- storage parts, 26A, 26B- reagent disc, 27- printers, 28- apparatus for reading of bar code, 1801,1802- safeguard picture,
1803- safeguards details picture, 1804- sprites, 1805- schedule setting pictures.
Embodiment
To embodiments of the present invention, it is described in detail referring to the drawings.
Embodiment
Fig. 1 is the overall summary construction diagram using the automatic analysing apparatus of one embodiment of the present of invention.
In Fig. 1, the multiple detection body containers 1 for accommodating detection body are arranged on detection body carrying disk 2.Detect body dispensing
The suction nozzle of mechanism 5 is connected with detection body syringe pump 7.Pump 7 and the action for dispensing mechanism 5, are carried out using via interface 4
The microcomputer (calculation control unit) 3 of the computing of the action control and determination data of each mechanism part controls.Relative to
Multiple reaction vessels 6 are arranged on the reaction workbench 17 that reaction bath 9 is rotatably arranged, so as to form response line.From constant temperature
Liquid supply unit 10 maintains 37 degree Celsius of constant temperature liquid to the reaction supply of bath 9.
Multi-wavelength photometer has light source 14 and multiwave length spectro device 15, and light source 14 is come from so that the row of reaction vessel 6 are crosscutting
Light beam mode rotate transfer reaction workbench 17.The reaction vessel 6 used is cleaned and supplied using wiper mechanism 19
In reusing.Rabbling mechanism 13 mixes detection body and the reagent solution corresponding with its analysis project made an addition in reaction vessel 6.
Measure signal based on the reaction solution obtained by multiwave length spectro device 15, is converted from analog into counting using A/D converter 16
Word signal, and be input into microcomputer 3.
On the reagent disc 26A of the first reagent and the reagent disc 26B of the second reagent, circumferentially respectively set with
The corresponding plurality of reagents bottle 12 of each analysis project.That is, reagent disc 26A, 26B is that the reagent bottle optionally rotated holds
Receive portion.Apparatus for reading of bar code 23A is arranged near disk 26A, apparatus for reading of bar code 23B is arranged near disk 26B.Examination
Agent dispenser includes reagent dispensing pipette 8A, 8B and reagent syringe pump 11.These pipettes 8A, 8B will stop at suction
Reagent solution in the reagent bottle 12 of position sucks scheduled volume and is held in suction nozzle, and these suctions are rotated on reaction vessel row
Nozzle is arranged, the reagent solution kept is discharged in the reaction vessel 6 for stopping at reagent receiving position.The reagent solution now dispensed
It is the reagent solution of the species corresponding with the analysis project being allocated in each reaction vessel.
Disk 2, reaction vessel 6, pump 7, reagent dispensing pipette 8A, 8B, reagent syringe pump 11, dispensing are carried by detection body
Mechanism 5, reaction bath 9, constant temperature liquid supply unit 10, rabbling mechanism 13, light source 14, reaction workbench 17, wiper mechanism 19, bar shaped
The formation detection body such as code reading device 23A, 23B, reagent disc 26A, 26B, multiwave length spectro device 15 and microcomputer 3
Analysis portion.
The reagent bar coded sticker for being printed with bar code is pasted with the outer wall of each reagent bottle 12.As the bar code
And to be, for example, each bottle for being formed by sequence number intrinsic reagent bottle code, the size of this bottle, the reagent solution have the information shown
The effect time limit, represent it is that the first reagent or the reagent dispensing of the second reagent or the 3rd reagent order, the maximum of the reagent solution can be analyzed
Number, the reagent dispensing amount of the dispensing usage amount of expression once and product batch number etc..
The reagent information read from each reagent bottle 12 using apparatus for reading of bar code 23A, 23B, it is stored in storage part (storage
Device) 25 or microcomputer 3 each self-corresponding storage region.As reagent bottle 12 is contained in reagent disc 26A, 26B, profit
With apparatus for reading of bar code 23A, 23B reading reagent information, and now, the rotation being arranged on each reagent disc 26A, 26B is utilized
Angle test section output represents the information of the riding position of each reagent bottle, and is input into via interface 4 in microcomputer 3.Reagent
Information is stored in a corresponding manner with bottle riding position with analysis project.
Operator can input various information using CRT (display part) 18 picture and keyboard 21.The survey of analysis project
Determining result can be shown on printer 27 and CRT18.The information of optical recording medium (CD) 24 is by its reading device
Read, and be stored in the corresponding storage region of storage part 25 or microcomputer 3.It is stored in optical recording medium 24
Information be, for example, following information.That is, it is the analysis project code shown with five-digit number, the ginseng being used in conjunction with the analysis project
Number and the parameter that is stored respectively for each reagent bottle etc..Wherein, as the parameter being used in conjunction with analysis project, be
The abnormal inspection critical value of the wavelength that is used in photometer, sample size, calibration method, concentration of standard solution, titer bottle number, analysis
Deng.It is reagent type, reagent dispensing order, reagent bottle code, reagent solution appearance in addition, as the parameter for each reagent bottle
Amount, reagent dispensing amount, maximum can analysis times and reagent production dates.
In storage part 25 in addition to storing the information read from optical recording medium 24, also storage automatically analyzes dress
The operation condition for each mechanism part put, the analytical parameters of each analysis project, carry out each reagent bottle management decision logic, from examination
The maximum that agent bottle is read can analysis times and analysis result etc..Reagent information is provided by optical recording medium, the optical profile type
Recording medium is to be provided when reagent bottle is delivered goods by manufacturer.In the feelings for not utilizing optical recording medium to prepare reagent information
Under condition, CRT18 picture can also be used as the information on the visual confirmation paper affiliated by operator will be stored in reagent bottle
It is input to keyboard 21 in automatic analysing apparatus.
The detection body bar coded sticker of printed bar code is pasted with the outer wall of detection body container 1.The bar code shows
The information shown is, for example, to uniquely determine the detection body identification number of detection body.The number is read using apparatus for reading of bar code 28,
The angle that disk 2 is carried by detecting body is detected, and detection body position is identified with detection the corresponding of body identification number.The opposing party
Face, due to advancing with keyboard 21 with the corresponding analysis project of detection body identification number and CRT18 is inputted and stored, therefore
When reading bar code before, detection body position and detection body identification number and analysis project are accordingly stored.In addition, according to
The upper number of body identification number is detected, is generally possible to identify that the detection body is standard detection body or control detection body or one
As detect body.
Automatic analysing apparatus it is overall be analyzed as follows it is described, with sampling, reagent dispensing, stirring, light-metering, reaction vessel it is clear
Wash and the order of the data processing such as concentration conversion is implemented.The detection body container 1 for being put into sample is provided with detection body disc 2
It is multiple.Detection body disc 2 is controlled using computer 3 via interface 4.In addition, detection body disc 2 is read with apparatus for reading of bar code 28
The bar code of the outer wall of body container 1 is detected, makes detection body corresponding with analysis project.Afterwards, according to the order for the sample analyzed
And the lower section of the probe in rotary moving to detection body dispensing mechanism 5, the detection body of predetermined detection body container 1 pass through with detecting body
The action for the detection body pump 7 that mechanism 5 connects is dispensed, the detection body of scheduled volume is dispensed among reaction vessel 6.Examined by dispensing
The reaction vessel 6 for surveying body is moved to the first reagent point of addition among bath 9 is reacted.Add in reaction vessel 6 after movement
Add by reagent with the action of pump 11 and the reagent of scheduled volume attracted from reagent container 12, the reagent pump 11 and reagent point
Note the suction nozzle connection of pipette 8.The position that the reaction vessel 6 after the first reagent is moved to rabbling mechanism 13 is with the addition of,
Carry out initial stirring.Laid on reagent disc 26A, 26B until in the case of the 4th reagent, the first~the 4th reagent is entered
Addition-stirring of this reagent of row.
The reaction vessel 6 of stirring content detects this by the light beam sent from light source 14 using multiwave length spectro device 15
When absorbance.The absorbance signal detected is input in computer 3 via A/D converter 16, and via interface 4, conversion
Into the concentration of detection body.The data for being converted into concentration export via interface 4 from the lettering of printer 27, and are shown in CRT18 picture
Face.The reaction vessel 6 for terminating light-metering is moved to the position of wiper mechanism 19, after discharging inside using cleaning container pump, with clear
Washing lotion is cleaned, for the analysis of next time.
In the automatic analysing apparatus so formed, safeguard that picture is shown on CRT (display part) 18.In addition, CRT18 is also
Can be the display devices such as liquid crystal.
Fig. 2 is to represent to be shown in the figure of one for safeguarding picture 1801 on CRT18.In the picture 1801, for every
Individual safeguard recommends the implementation cycle, with guide look show Maintenance Significant Items name 201, each Maintenance Significant Items the remaining valid period (%) 202,
Next time implements predetermined time 203, remaining time limit 204 and required time 205, so as to day of operator's prompting as maintenance
The information of the reference of journey arrangement.
Above-mentioned Maintenance Significant Items and recommendation implementation cycle are prespecified, and are set in following databases.
In the maintenance picture 1801 shown in Fig. 2, the information for the Maintenance Significant Items that display is classified for each cycle.
Day, week are categorized as in Fig. 2 example, the moon, is shown at any time.
These Maintenance Significant Items according to the maintenance that logs in following databases recommend the implementation cycle classified (for example,
Day is shown as if recommending the implementation cycle to be 24h).Recommending the implementation cycle to be not logged in the Maintenance Significant Items in database, (next time ties up
The project of shield period independent of the measure cycle etc.) it is shown as at any time.
In addition, recommend cycle short situation than implementation in the time limit for implementing predetermined time next time that user (operator) specifies
Under, it is shown in predetermined time is implemented the next time that user specifies on the column of " next time implements predetermined time " 203.
In addition, according to the utilization form of automatic analysing apparatus, can also using every two weeks, the cycle such as every two months shows.
In the maintenance picture 1801 shown in Fig. 2, the remaining valid period is shown with percentage for each Maintenance Significant Items
(%) 202.So-called remaining valid period (%) is on to safeguarding key element (elapsed time, analysis that implementation period has an impact
Number, duration of runs etc.), grace period for being permitted relative to key element final implement time to safeguarding that picture shows from safeguarding
When untill variable quantity ratio.For example, in the case of the recommendation implementation cycle that maintenance is set with certain Maintenance Significant Items, the dimension
The maintenance of shield project receives the influence in the elapsed time from being safeguarded final implementation time during implementing.In this case, it is remaining
Valid period (%) is relative to the ratio for safeguarding the remaining time for recommending the implementation cycle.
According to Maintenance Significant Items it is contemplated that the multiple remaining valid periods (%) of setting.Such as Maintenance Significant Items
In the replacing for comparing electrode, the elapsed time is with analysis times on safeguarding that implementation period brings influence.Now, the remaining valid period
The display methods of (%) is contemplated that several.As contemplated display methods, can enumerate:(1) display is on Maintenance Significant Items
All remaining valid periods (%);(2) the remaining valid period (%) of highest (low) is shown;(3) show all the time on one
The remaining valid period (%) of key element, and remaining valid period of the display on remaining key element in pop-up box or other pictures
(%) etc..It is important to consider that Land use systems and select appropriate display methods.In addition, in one embodiment of the invention,
Contemplate following situation:Relative to corresponding Maintenance Significant Items, calculated by computer 3 and determined according to remaining time and analysis times
(2) minimum remaining valid period (%), and be stored in the database of memory 25, and be shown on display part 18.
Fig. 2 remaining valid period (%) safeguarded in picture 1801 is shown using numeral and bar.It is each in simple display
In the case of the remaining time of Maintenance Significant Items, the length of bar has no limits stretching, extension, it is contemplated that can not bring situation in picture etc. into.It is logical
Cross in the picture 1801 is not to show remaining time merely but show the remaining valid period (%) as ratio, Neng Gouzhen
Each Maintenance Significant Items are shown in the region of formed objects.
Due to the remaining time limit of the maintenance that shows each Maintenance Significant Items as described above, therefore it can visually understand maintenance
Relative importance value (emergency), and due to the time required to also showing for each Maintenance Significant Items, so can be based on should by user
Information, according to the operating schedule of automatic analysing apparatus, the schedule planning to maintenance plays a role.In addition, according to Maintenance Significant Items, should
Display can also aid in determining whether the order period of running stores, order number.
In addition, in Fig. 2 maintenance picture 1801, can be according to the value of the remaining valid period (%) of each Maintenance Significant Items
Change display.For example, the use " reaction member replacing " of Maintenance Significant Items shown by the column of Fig. 2 moon, " reactive tank cleaning ", " ISE
The bar of the remaining valid period (%) of dilution trap cleaning " display is shown, according to remaining valid period (%) value, the display of bar
(color) changes respectively.Operator can be visually known the relative importance value or urgent of maintenance by confirming the color of bar
Property.The value of the remaining valid period (%) to change is shown, can be set for each Maintenance Significant Items, if can be by grasping
Author is changed, more preferably.
In addition, in Fig. 2 maintenance picture 1801, it is predetermined that implementation next time that the display of each Maintenance Significant Items is safeguarded can be directed to
Time 203.Next time implementation predetermined time 203 is updated at the time of implementing and safeguarding.
In addition, in Fig. 2 maintenance picture 1801, the remaining time limit 204 that the display of each Maintenance Significant Items is safeguarded can be directed to.
The unit of display in the remaining time limit 204 can suitably Date Of Change, time or analysis times etc..
In addition, in Fig. 2 maintenance picture 1801, it can show and be stored in DB (database) for each Maintenance Significant Items
Maintenance required time 205.The required time 205 can predefine according to each safeguard, can also be according to actual cost
Time calculate after update.In addition, if it is the time required to display and arbitrary, in operator to Land use systems known to maintenance
In, it is possible to as numerous and diverse display, therefore do not show can also.
By confirming Fig. 2 maintenance picture 1801, operator can confirm the Maintenance Significant Items on each cycle at a glance
Various information.Thus, it is contemplated that to the appropriate schedule for determining to safeguard, or reduce the time until needed for determining.
Fig. 3 is to represent the figure for safeguarding picture 1802 safeguarded picture 1801 and be extended to Fig. 2, except with according to every
Outside the viewing area C of the information of the Maintenance Significant Items of individual periodic classification, also with the Maintenance Significant Items that should implement in the same day
Viewing area A, recommend the Maintenance Significant Items implemented in the recent period viewing area B.The maintenance picture 1802 can replace safeguarding picture
1801 and show can arbitrarily select which project shown.
It need not must prepare to safeguard the viewing area A and viewing area B of picture 1802, but by based on the remaining time limit
Or its ratio, the Maintenance Significant Items that estimation and prompting should be implemented on the same day or at no distant date, it can aid in the schedule of maintenance
Planning.
Hereinafter, viewing area A and viewing area B are illustrated.
First, viewing area A is illustrated.
In display area a should be in the Maintenance Significant Items that ought in a few days implement with guide look display.Fig. 6 is to select to be shown in display
The algorithm of Maintenance Significant Items in the A of region.Algorithm shown in Fig. 6 is real to all Maintenance Significant Items being set in automatic analysing apparatus
Apply.Fig. 5 is the figure for the DB300 for representing the information for managing each Maintenance Significant Items, and DB300 is stored in memory 25.Should
DB300 includes:The title 301 respectively safeguarded, recommend the implementation cycle 302, it is final implement time 303, remaining time limit rate threshold value a304,
User specifies implementation time 305, remaining time limit rate threshold value b306, required time 307, same day mark 308, recommendation (to recommend recent
Interior implementation) mark 309.Mark 308,309 utilize the provisional same day 308, recommendation 309 in the case where user is logged in.
In addition, mark 308,309 are by pressing " being appended in the same day ", " being appended in recommendation " for being shown in following pictures 1802
Button, clicked on Maintenance Significant Items can be directed to, it is become effective.For relative importance value, mark 308 is also higher than mark 309.
If in addition, carrying out the Maintenance Significant Items after becoming in mark 308,309 effectively, mark becomes invalid.
At the time of have received Fig. 3 display for safeguarding picture 1802 instruction, Fig. 6 algorithm proceeds by.If start into
The row algorithm, then obtain current time (step S101) first.
Then, the recommendation implementation cycle 302 of Maintenance Significant Items and the final implementation (step of time 303 are obtained from DB300
S102).According to the current time obtained in step S101 and the final implementation time obtained in step s 102, based on following
Formula (1) calculates the elapsed time (step S103) of the Maintenance Significant Items.
Elapsed time=current time-finally implements time ... (1)
Then, according to the elapsed time of above-mentioned formula (1) and the recommendation implementation cycle 302 of Maintenance Significant Items, based on following public affairs
Formula (2) calculates the remaining time (step S104) of Maintenance Significant Items.
Remaining time=recommendation implementation cycle-elapsed time ... (2)
According to the remaining time of above-mentioned formula (2), it is (remaining to judge whether Maintenance Significant Items should be shown in the A of viewing area
Whether the time is less than 24 hours) (step S105).In the case where remaining time is less than 24 hours, Maintenance Significant Items are shown
In the A of viewing area (step S112), end processing.
In step S105, in the case where remaining time is bigger than 24 hours, same day mark 308 (step S106) is obtained,
Judge whether same day mark 308 is effective (step S107).If same day mark 308 is effective, that is, sentenced according to remaining time
It is disconnected whether be should be in the Maintenance Significant Items that ought in a few days implement, and corresponding Maintenance Significant Items are shown in viewing area A and (are formed at aobvious
Show the column (column on the same day) on the same day in portion) in (step S112), end processing.
In step s 107, if same day mark 308 is not effective, judge that user whether has been set in DB300 to be referred to
Surely time (step S108) is implemented.If user specifies implementation time to set, terminate to handle.
In step S108, if user specify implement time set, obtain be set in DB300 " user refers to
Surely time is implemented " (step S109), calculate user and specify remaining time (step S110), judge that user is at specified remaining time
No is less than 24 hours (step S111).
In step S111, if it is less than 24 hours that user, which specifies remaining time, Maintenance Significant Items are shown in viewing area
In the A of domain (step S112), end processing.
In step S111, if it is not less than 24 hours that user, which specifies remaining time, terminate to handle.
In addition, user specifies remaining time to be calculated according to following formula (3).
User specifies remaining time in=user's specified implementation time-current time ... (3)
Hereinafter, viewing area B is illustrated.
Fig. 7 is the algorithm of the selected Maintenance Significant Items being shown in the B of viewing area.
If proceeding by the algorithm, current time (step S201) is obtained first.
Then, the recommendation implementation cycle 302 of Maintenance Significant Items and the final implementation (step of time 303 are obtained from DB300
S202)。
The final implementation time obtained according to the current time obtained in step s 201 and in step S202, based on upper
State the elapsed time (step S203) that formula (1) calculates the Maintenance Significant Items.
Then, according to the elapsed time of above-mentioned formula (1) and the recommendation implementation cycle 302 of Maintenance Significant Items, based on above-mentioned public affairs
Formula (2) calculates the remaining time (step S204) of Maintenance Significant Items.
Then, obtain and be set in recommendation mark (step S205) in DB300, judge acquired recommendation mark whether be
Effectively (step S206).If acquired recommendation is masked as effectively, Maintenance Significant Items being shown in into (step in the B of viewing area
S210), end is handled.
In step S206, if acquired recommendation mark is not effective (invalid), calculated according to following formula (4) surplus
Remaining time limit rate (step S207).
Remaining time limit rate=remaining time/recommendation implementation cycle ... (4)
Then, the remaining time limit rate threshold value a (step S208) being set in DB300 is obtained, judges to fall into a trap in step S207
Whether the remaining time limit rate calculated is remaining more than time limit rate threshold value a (step S209).If remaining time limit rate is remaining time limit rate
More than threshold value a, then terminate to handle.If Maintenance Significant Items are shown in viewing area by the remaining time limit rate threshold value a of remaining time limit rate deficiency
In the B of domain (step S210), end processing.
Hereinafter, viewing area C is illustrated.Viewing area C be show for week, the moon, Maintenance Significant Items at any time area
Domain, it is substantially identical with the display content shown in Fig. 2.Fig. 4 is the addition explanation figure of Fig. 3 display.
In Fig. 4, if clicking on Maintenance Significant Items in the C of viewing area, as clicked on Maintenance Significant Items menu,
Display is converted to maintenance and implements picture, safeguards details picture, the button of schedule setting picture.Example shown in Fig. 4 is to safeguard item
Mesh is the example for the situation that reaction member is changed.Specified Maintenance Significant Items are appended to the same day or recommend (to push away in addition, showing
Recommend the column implemented in the near future) in situation button.
Implement if pressing is safeguarded, show the picture for carrying out specified Maintenance Significant Items.
In addition, if details are safeguarded in pressing, display represents that the details of specified Maintenance Significant Items (state, associate and safeguard item
Mesh, objective for implementation maintenance module, association running stores information) picture.
Fig. 8 is the figure for representing to safeguard details picture 1803.Clicked in fig. 8 it is shown that having in the picture 1802 shown in Fig. 4
Object maintenance project and its state.
In addition, in the display of association Maintenance Significant Items, the display Maintenance Significant Items associated with object maintenance project.For example,
Object maintenance project be " reaction member replacings " in the case of, it is necessary to continue implementation Maintenance Significant Items, " reaction system
Cleaning ", " unit blank determination " show as that must associate Maintenance Significant Items, and, it is not necessary to implement but as being directed to
" cleaning of reactive tank filter " of the Maintenance Significant Items of equal modules etc. is shown as any association Maintenance Significant Items.
In addition, associate the running stores presentation of information detergent associated with object maintenance or change the letter of the running stores such as part
Breath.Now, it can both show it is only running stores information needed for object maintenance project, can also show comprising maintenance must be associated
The running stores of the situation of project.Also, operator can also be made to select these display contents.
In addition, objective for implementation maintenance module visually shows the module of objective for implementation Maintenance Significant Items.In Fig. 8 example
In, " analysis portion " turns into the objective for implementation maintenance module in object maintenance project " reaction member replacing ".
The maintenance details picture 1803 being capable of the reference as the auxiliary information in following schedule settings.In addition, should
Safeguard that details picture 1803 can also be shown in as sprite in the maintenance picture 1802 shown in Fig. 3, Fig. 4.
Fig. 9 is will to safeguard that details picture is shown in the figure safeguarded in picture 1802 as sprite 1804.The sprite
1804 can be moved by dragging, and size can also be changed.
Hereinafter, the situation of the schedule setting button shown in pressing Fig. 4 is illustrated.
Figure 10 is the figure for representing the schedule setting picture 1805 shown when pressing schedule setting button.In Fig. 10,
Object maintenance project shows that the change object of schedule setting is Maintenance Significant Items name.The object maintenance project is to show that schedule is set
The Maintenance Significant Items determined button and clicked on.
Implement to choose whether that setting next time carries out predetermined time during time is specified in next time.In addition, implement time in next time
Middle input next time carries out predetermined time.In the case of have selected " without " in above-mentioned " next time implements time and specified ", preferentially
The display is set to turn into nonactive.Safeguard the setting for recommending to be set for the recommendation on maintenance.Selection is with the process from safeguarding
That condition such as time, the duration of runs, pendulous frequency, surplus is recommended.Set the red in being shown with bar, yellow is come
The remaining period of validity of display.Setting safeguards the cycle implemented (substantially constant more on the column in cycle.In addition, not additional ratio
The low condition of initial value that manufacturer specifies).
In bar is shown, red value is corresponding with the threshold value a being stored in DB300.Red part, which turns into, to be used to make
The display of bar reddens and shows the key of Maintenance Significant Items in recommendation.Yellow is corresponding with the threshold value b being stored in DB300.Into
For the key of its colour changed into yellow for making bar.Red and yellow value can be according to the cycle value or remaining period of validity (%)
To be set.
Figure 11 is the figure for representing the schedule setting picture 1805 in the case where not specifying implement time next time.Such as Figure 11 institutes
Show, in the case where not specifying implement time, the column that next time implements time turns into nonactive display next time.This is in cycle time
Recommend the setting screen example in the case of safeguarding in addition.
Figure 12 is the figure for the algorithm for representing above-mentioned schedule setting.
In fig. 12, selection wants change implementation next time predetermined time or safeguards the Maintenance Significant Items (step for recommending setting
S301).Then, schedule setting button (step S302), display schedule setting picture (step S303) are pressed.Moreover, judgement is
No specified next time implements predetermined time (step S304), in the case where specifying implement predetermined time, when implementing next time next time
Selection " progress " (step S305) in specifying day, input is next to implement time (step S306).
Next, it is determined whether change, which is safeguarded, recommends setting (step S307).In step s 304, do not specifying implement next time
In the case of predetermined time, step S307 is also proceeded to.In step S307, in the case where change safeguards to recommend setting, enter
Step S308 is opened up, change, which is safeguarded, recommends setting.Next, it is determined whether reflection setting (step S309).In step S307,
Do not change maintenance to recommend in the case of setting, also proceed to step S309.In step S309, in the case where reflecting setting,
Confirming button (step S310) is pressed, in the case where not reflecting setting, presses cancel button (step S311).
Figure 13 be for carry out the display control of display picture 1801,1802,1803,1804 and 1805, Fig. 6, Fig. 7 with
And the FBD in the computer (transport control unit) 3 of the implementation of Figure 12 algorithm.
In fig. 13, computer 3 has remaining time calculating part 31, safeguards required time extraction unit 34, schedule changing unit
32nd, safeguard and recommend setting changing unit 33 and judging part 35.Clock pulses generating unit 29 shown in Figure 13 plays the work of clock and watch
With, remaining time calculating part 31 from clock pulses generating unit 29 obtain current at the time of.In addition, remaining time calculating part 31 is from depositing
The DB300 being stored in memory 25 obtains data, carries out Fig. 6 step S101~S104, S109, S110, Fig. 7 step S201
~S204, S207.
In addition, extraction unit 34 extracts the required time for being stored in DB300 in memory 25 out the time required to safeguarding, via sentencing
Disconnected portion 345 is shown on display part 18.Moreover, based on the input from schedule changing unit 32, input unit (keyboard) 21, with judgement
Portion 35 together carries out Figure 12 algorithm.
Setting changing unit 33 is recommended together to carry out Fig. 7's with remaining time calculating part 31 and judging part 35 in addition, safeguarding
Algorithm.Judging part 35 be based on from remaining time calculating part 31, safeguard the time required to extraction unit 34, schedule changing unit 32 and
Safeguard the information for recommending setting changing unit 33 and the display content of display part 18 is controlled.
As described above, according to one embodiment of present invention, by confirming shown in picture 1801 or Fig. 3 shown in Fig. 2
Picture 1802, can at a glance it is confirmed that should in the Maintenance Significant Items that ought in a few days implement, recommend the maintenance item implemented in the near future
The information of mesh, the required time of Maintenance Significant Items and each Maintenance Significant Items classified according to each cycle.Thus, operate
Person, which can easily hold, considers in the Maintenance Significant Items that ought in a few days implement and should obtaining for determining the same day for analysis action
The information of the schedule of later maintenance.
In addition, according to one embodiment of present invention, change maintenance it is predetermined in the case of, also can easily correspond to
Display is changed in the change.
Furthermore it is preferred that in picture 1801,1802 and in the picture in other places the association of each Maintenance Significant Items can be prompted to believe
Breath.So-called related information, information (model, inventory, price, last time order time), the consumption of the part used can be enumerated
The information (model, inventory, price, last time order time) of product, the Maintenance Significant Items (dimension of same module for recommending implementation simultaneously
Shield, adjustment work when changing part etc.) etc..The information considers in the schedule of maintenance mostly, by can be once
Property reference, it will contribute to schedule.
In addition, in the above-described embodiments, the remaining valid period (%) is shown with bar, it is also possible to using instrument board,
Curve map, mark, color show the remaining valid period (%).In the present invention, be referred to as bar, instrument board, curve map, mark,
Color and be defined as figure shows.
Claims (7)
1. a kind of automatic analysing apparatus, it is characterised in that have:
Analysis portion, analysis detection body;
Memory, when at least storing the final implementation of multiple Maintenance Significant Items on above-mentioned analysis portion, these each Maintenance Significant Items
Day, the required time recommended required for implementation cycle and each above-mentioned Maintenance Significant Items of progress of each above-mentioned Maintenance Significant Items;
Calculation control unit, has a remaining time calculating part, and the remaining time calculating part is every in above-mentioned memory according to being stored in
The recommendation implementation cycle of individual Maintenance Significant Items and final implementation time, calculate when the residue untill recommending implementation period is safeguarded
Between and above-mentioned remaining time relative to each above-mentioned maintenance recommendation the implementation cycle ratio;And
Display part, for each above-mentioned Maintenance Significant Items, show calculated using above-mentioned remaining time calculating part remaining time, on
Remaining time is stated relative to needed for required for the ratio of above-mentioned recommendation implementation cycle and the progress of each above-mentioned Maintenance Significant Items
Time.
2. automatic analysing apparatus according to claim 1, it is characterised in that
Above-mentioned calculation control unit is for the predetermined Maintenance Significant Items among above-mentioned multiple Maintenance Significant Items, and computing is by above-mentioned analysis portion
The remaining valid period that analysis times and above-mentioned remaining time determine, the remaining valid period after computing is set to be stored in above-mentioned storage
In device, and above-mentioned display part is shown in as remaining time.
3. automatic analysing apparatus according to claim 1 or 2, it is characterised in that
Above-mentioned display part visually shows above-mentioned remaining time relative to the above-mentioned recommendation implementation cycle by figure shows
Ratio.
4. automatic analysing apparatus according to claim 3, it is characterised in that
Above-mentioned figure shows are bar, instrument board, curve map, mark or color.
5. automatic analysing apparatus according to claim 1 or 2, it is characterised in that
Above-mentioned calculation control unit is judged according to above-mentioned remaining time should be in the Maintenance Significant Items that ought in a few days implement, and will be judged
The Maintenance Significant Items gone out be shown in be formed on above-mentioned display part should be in the viewing area for the Maintenance Significant Items that ought in a few days implement.
6. automatic analysing apparatus according to claim 1 or 2, it is characterised in that
The Maintenance Significant Items that above-mentioned calculation control unit is judged in the near future implement according to above-mentioned remaining time, and will be judged
The Maintenance Significant Items gone out are shown in be formed in the viewing area for the Maintenance Significant Items that the recommendation on above-mentioned display part is implemented in the near future.
7. automatic analysing apparatus according to claim 1, it is characterised in that
In above-mentioned memory, be stored with for each above-mentioned Maintenance Significant Items by the prespecified same day mark of operator and
The specified implementation predetermined time of the Maintenance Significant Items selected among above-mentioned Maintenance Significant Items by aforesaid operations person,
Above-mentioned calculation control unit,
For each Maintenance Significant Items being stored in above-mentioned memory, whether the above-mentioned remaining time for judging to calculate is 24 small
When below, remaining time be less than 24 hours in the case of, the Maintenance Significant Items judged are shown in be formed it is above-mentioned show
Show in portion in the viewing area for the Maintenance Significant Items that ought be in a few days implemented,
In the case of the above-mentioned remaining time calculated is small more than 24, when the Maintenance Significant Items being stored in above-mentioned memory
When same day mark shows effective, be formed at above-mentioned display part in the viewing area for the Maintenance Significant Items that ought be in a few days implemented
Middle display,
When the same day mark for the Maintenance Significant Items being stored in above-mentioned memory does not show effective, judge whether to be stored with above-mentioned finger
Surely predetermined time is implemented,
In the case where being stored with above-mentioned specified implementation predetermined time, calculate from current time to the above-mentioned specified pre- timing of implementation
The remaining time of day, in the case where remaining time is less than 24 hours, the Maintenance Significant Items judged are shown in be formed
Above-mentioned display part in the viewing area for the Maintenance Significant Items that ought be in a few days implemented.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2016173590A JP6815794B2 (en) | 2016-09-06 | 2016-09-06 | Automatic analyzer |
JP2016-173590 | 2016-09-06 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107796949A true CN107796949A (en) | 2018-03-13 |
CN107796949B CN107796949B (en) | 2021-03-16 |
Family
ID=61531606
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710677027.8A Active CN107796949B (en) | 2016-09-06 | 2017-08-09 | Automatic analyzer |
Country Status (2)
Country | Link |
---|---|
JP (1) | JP6815794B2 (en) |
CN (1) | CN107796949B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111108391A (en) * | 2018-03-29 | 2020-05-05 | 株式会社日立高新技术 | Automatic analysis system |
CN111537756A (en) * | 2019-02-07 | 2020-08-14 | 株式会社日立高新技术 | Automatic analysis device and analysis method |
CN113196065A (en) * | 2018-12-19 | 2021-07-30 | 株式会社日立高新技术 | Automatic analysis device and analysis method |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3892999B1 (en) * | 2018-12-06 | 2024-01-10 | Hitachi High-Tech Corporation | Automatic analysis device |
US20230131173A1 (en) | 2020-06-16 | 2023-04-27 | Fanuc Corporation | Robot control device |
WO2022070460A1 (en) * | 2020-09-29 | 2022-04-07 | 株式会社日立ハイテク | Automatic analysis device |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09211003A (en) * | 1996-02-01 | 1997-08-15 | Hitachi Ltd | Automatic analyzer |
JP2002327467A (en) * | 2001-05-02 | 2002-11-15 | Komatsu Ltd | Display device for working machine |
EP1376138A2 (en) * | 2002-06-28 | 2004-01-02 | Hitachi High-Technologies Corporation | Automatic analyzer |
CN101131386A (en) * | 2006-08-22 | 2008-02-27 | 希森美康株式会社 | Sample analyzer |
CN101294973A (en) * | 2007-04-27 | 2008-10-29 | 希森美康株式会社 | Sample analyzing apparatus |
JP2010156649A (en) * | 2009-01-05 | 2010-07-15 | Hitachi High-Technologies Corp | Specimen pretreatment system |
JP2012018103A (en) * | 2010-07-09 | 2012-01-26 | Hitachi High-Technologies Corp | Automatic analyzing device |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6073103A (en) * | 1996-04-25 | 2000-06-06 | International Business Machines Corporation | Display accessory for a record playback system |
JP2004219352A (en) * | 2003-01-17 | 2004-08-05 | Toshiba Corp | Analyzer and management system |
US9978044B2 (en) * | 2011-03-04 | 2018-05-22 | Hitachi High-Technologies Corporation | Analyzing device |
JP5806900B2 (en) * | 2011-09-30 | 2015-11-10 | シスメックス株式会社 | Sample analyzer and computer program |
-
2016
- 2016-09-06 JP JP2016173590A patent/JP6815794B2/en active Active
-
2017
- 2017-08-09 CN CN201710677027.8A patent/CN107796949B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09211003A (en) * | 1996-02-01 | 1997-08-15 | Hitachi Ltd | Automatic analyzer |
JP2002327467A (en) * | 2001-05-02 | 2002-11-15 | Komatsu Ltd | Display device for working machine |
EP1376138A2 (en) * | 2002-06-28 | 2004-01-02 | Hitachi High-Technologies Corporation | Automatic analyzer |
CN101131386A (en) * | 2006-08-22 | 2008-02-27 | 希森美康株式会社 | Sample analyzer |
CN101294973A (en) * | 2007-04-27 | 2008-10-29 | 希森美康株式会社 | Sample analyzing apparatus |
JP2010156649A (en) * | 2009-01-05 | 2010-07-15 | Hitachi High-Technologies Corp | Specimen pretreatment system |
JP5166293B2 (en) * | 2009-01-05 | 2013-03-21 | 株式会社日立ハイテクノロジーズ | Sample pretreatment system |
JP2012018103A (en) * | 2010-07-09 | 2012-01-26 | Hitachi High-Technologies Corp | Automatic analyzing device |
JP5303515B2 (en) * | 2010-07-09 | 2013-10-02 | 株式会社日立ハイテクノロジーズ | Automatic analyzer |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111108391A (en) * | 2018-03-29 | 2020-05-05 | 株式会社日立高新技术 | Automatic analysis system |
US10962559B2 (en) | 2018-03-29 | 2021-03-30 | Hitachi High-Tech Corporation | Automated analysis system |
CN111108391B (en) * | 2018-03-29 | 2021-06-29 | 株式会社日立高新技术 | Automatic analysis system |
CN113196065A (en) * | 2018-12-19 | 2021-07-30 | 株式会社日立高新技术 | Automatic analysis device and analysis method |
CN113196065B (en) * | 2018-12-19 | 2023-09-29 | 株式会社日立高新技术 | Automatic analysis device and analysis method |
CN111537756A (en) * | 2019-02-07 | 2020-08-14 | 株式会社日立高新技术 | Automatic analysis device and analysis method |
CN111537756B (en) * | 2019-02-07 | 2023-12-22 | 株式会社日立高新技术 | Automatic analysis device and analysis method |
Also Published As
Publication number | Publication date |
---|---|
JP2018040621A (en) | 2018-03-15 |
CN107796949B (en) | 2021-03-16 |
JP6815794B2 (en) | 2021-01-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107796949A (en) | Automatic analysing apparatus | |
CN101275963B (en) | Sample analyzer | |
JP3156550B2 (en) | Reagent management method and apparatus | |
JP5123111B2 (en) | Automatic analyzer | |
CN100523817C (en) | Automatic analyzer | |
CN104246510B (en) | Automatic analysing apparatus | |
CN107407686B (en) | Automatic analyzer | |
US8040757B2 (en) | Sample analyzing apparatus | |
CN101452005A (en) | Automatic analyzer | |
CN101393225A (en) | Sample analyzer and sample analyzing method | |
JP5806900B2 (en) | Sample analyzer and computer program | |
CN103308701B (en) | Sample processing apparatus | |
JP5331056B2 (en) | Automatic analyzer | |
CN102539797A (en) | Analyzer and method of analyzing | |
CN102023222A (en) | Sample processing apparatus and sample rack transporting method | |
JP5535047B2 (en) | Automatic analyzer | |
EP2116850A1 (en) | Analyzer | |
EP1260818A1 (en) | Method of management of analytical data and system for management of analytical data | |
JP7038734B2 (en) | Automatic analyzer | |
JP2007315784A (en) | Automatic analyzer, reagent inventory control method for automatic analyzer, and reagent inventory control program for automatic analyzer | |
JP4068772B2 (en) | Automatic analyzer | |
JP2010164332A (en) | Automatic analysis device and method of managing reagent for the same | |
JP5260156B2 (en) | Automatic analyzer management system | |
CN102221621A (en) | Checked body analyzing device and analyzing control method | |
CN109690322B (en) | Automatic analyzer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |