CN107796949A - Automatic analysing apparatus - Google Patents

Automatic analysing apparatus Download PDF

Info

Publication number
CN107796949A
CN107796949A CN201710677027.8A CN201710677027A CN107796949A CN 107796949 A CN107796949 A CN 107796949A CN 201710677027 A CN201710677027 A CN 201710677027A CN 107796949 A CN107796949 A CN 107796949A
Authority
CN
China
Prior art keywords
mentioned
significant items
maintenance
maintenance significant
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710677027.8A
Other languages
Chinese (zh)
Other versions
CN107796949B (en
Inventor
稻木大
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Hitachi High Tech Corp
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Publication of CN107796949A publication Critical patent/CN107796949A/en
Application granted granted Critical
Publication of CN107796949B publication Critical patent/CN107796949B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N35/00Automatic analysis not limited to methods or materials provided for in any single one of groups G01N1/00 - G01N33/00; Handling materials therefor
    • G01N35/10Devices for transferring samples or any liquids to, in, or from, the analysis apparatus, e.g. suction devices, injection devices
    • G01N35/1004Cleaning sample transfer devices
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N35/00Automatic analysis not limited to methods or materials provided for in any single one of groups G01N1/00 - G01N33/00; Handling materials therefor
    • G01N35/00584Control arrangements for automatic analysers
    • G01N35/00594Quality control, including calibration or testing of components of the analyser
    • G01N35/00613Quality control
    • G01N35/00623Quality control of instruments

Landscapes

  • Engineering & Computer Science (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Automatic Analysis And Handling Materials Therefor (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention realizes a kind of automatic analysing apparatus, and it can easily be grasped the time necessary to the priority of multiple maintenances and each maintenance, and can implement to consider the display of the maintenance of analysis action.The information for the Maintenance Significant Items that each cycle classified is shown as in picture (1801) is safeguarded.The remaining valid period (%) (202) is shown with percentage for each Maintenance Significant Items.Safeguard that the remaining valid period (%) in picture (1801) is shown using numeral and bar.Due to the remaining time limit of the maintenance of each Maintenance Significant Items of display, therefore the relative importance value (emergency) of maintenance can visually be understood, and due to the time required to also being shown for each Maintenance Significant Items, so user is based on the information, can be according to the operating schedule of automatic analysing apparatus, the schedule planning to maintenance plays a role.

Description

Automatic analysing apparatus
Technical field
The present invention relates to the automatic analysing apparatus for the qualitative and quantitative analysis for carrying out the biological samples such as blood, urine.
Background technology
Mixing is adjusted for each measure object composition in the sample comprising measure object composition reagent and The automatic analysing apparatus analyzed, there is the reaction vessel of biased sample and reagent, add sample respectively in reaction vessel Probe is dispensed with sample dispensing probe, the reagent of reagent and is stirred rabbling mechanism of liquid etc..Dress is automatically analyzed this In putting, reaction vessel is generally used in other analyses after the washing, and dispensing probe is also before different samples, reagent is dispensed Carry out washer jet.
Automatic analysing apparatus has the cleaning for carrying out this reaction vessel, nozzle cleaning etc. and carried out needed for next analysis Service action function.Due to that can not carry out analysis action during this service action is carried out, thus in order in accordance with Analyze schedule, it is necessary to the maintenance of implementation plan.
In patent document 1, as the easy and technology of the resume of the maintenance of recognition detection body analytical equipment at a glance, record With calendar form show should Maintenance Significant Items that daily, weekly, monthly quasi-periodic is implemented and predetermined, and show each Safeguard the content for whether implementing to terminate.In addition, on acyclic Maintenance Significant Items, disclose with text importing implement resume with And predetermined content.
Prior art literature
Patent document
Patent document 1:Japanese Unexamined Patent Publication 2008-51543 publications
However, only it is configured in patent document 1, in the maintenance picture described in patent document 1, if input is implemented The content safeguarded, then updating maintenance are recorded, and showing for picture is also updated in a manner of as the display for representing to have been carried out Show, so as to dependently of each other carry out the implementation of the operation and maintenance of device.
Thus, due to being shown with calendar form, therefore user can hold maintenance deadline day approaching situation, still It is difficult to the priority for easily holding multiple Maintenance Significant Items using picture, and the time implemented needed for each maintenance is failed to understand, it is difficult Implemented effective with holding with the relation of the duration of runs of automatic analysing apparatus and considering the analysis schedule of automatic analysing apparatus Safeguard.
The content of the invention
It is an object of the invention to provide a kind of automatic analysing apparatus, its progress can easily hold the preferential suitable of multiple maintenances Time needed for sequence and each maintenance, and can implement to consider the display of the maintenance of analysis action.
In order to achieve the above object, structure of the invention is as follows.
Have in automatic analysing apparatus:Analysis portion, analysis detection body;Memory, at least store on above-mentioned analysis portion Multiple Maintenance Significant Items, final implementation time of these each Maintenance Significant Items, each above-mentioned Maintenance Significant Items the recommendation implementation cycle, And carry out each required time required for above-mentioned Maintenance Significant Items;Calculation control unit, there is remaining time calculating part, the residue Recommendation implementation cycle and final implementation time of the time calculating part according to each Maintenance Significant Items being stored in above-mentioned memory, meter Calculate until safeguarding that the remaining time for recommending implementation period and above-mentioned remaining time implement relative to the recommendation of each above-mentioned maintenance The ratio in cycle;And display part, for each above-mentioned Maintenance Significant Items, show what is calculated using above-mentioned remaining time calculating part Remaining time, above-mentioned remaining time are relative to the ratio of above-mentioned recommendation implementation cycle and the progress of each above-mentioned Maintenance Significant Items Required required time.
The effect of the present invention is as follows.
A kind of automatic analysing apparatus can be realized, it can easily be held the priority of multiple maintenances and each dimension Time needed for shield, and can implement to consider the display of the maintenance of analysis action.
Brief description of the drawings
Fig. 1 is the overall summary construction diagram using the automatic analysing apparatus of one embodiment of the present of invention.
Fig. 2 is to represent the shown figure of one for safeguarding picture.
Fig. 3 is represented Fig. 2 figure for safeguarding picture safeguarded picture and be extended.
Fig. 4 is the addition explanation figure of Fig. 3 display.
Fig. 5 is the figure for the database for representing the information for managing each Maintenance Significant Items.
Fig. 6 is the algorithm of the Maintenance Significant Items shown by selected display field A.
Fig. 7 is the algorithm of the Maintenance Significant Items shown by selected display field B.
Fig. 8 is the figure for representing to safeguard details picture 1803.
Fig. 9 is will to safeguard that details picture is shown in the figure safeguarded on picture 1802 as sprite 1804.
Figure 10 is the figure for representing the schedule setting picture 1805 shown when pressing schedule setting button.
Figure 11 is the figure for the schedule setting picture 1805 for representing the not specified situation for implementing time next time.
Figure 12 is the figure for the algorithm for representing schedule setting.
Figure 13 is the FBD in computer 3.
In figure:1- detection body containers, 2- detection body carrying disks, 3- microcomputers, 4- interfaces, 5- detection body dispensers, 6- reaction vessels, 7- detection body syringe pumps, 8A, 8B- reagent dispensing pipette, 9- reaction baths, 10- constant temperature liquid supply units, 11- reagent syringe pumps, 12- reagent bottles, 13- rabbling mechanisms, 14- multi-wavelength photometer light sources, 15- multiwave length spectro devices, 16- A/D converter, 17- reaction workbench, 18-CRT, 19- wiper mechanisms, 21- keyboards, 23A, 23B- apparatus for reading of bar code, 24- CD, 25- storage parts, 26A, 26B- reagent disc, 27- printers, 28- apparatus for reading of bar code, 1801,1802- safeguard picture, 1803- safeguards details picture, 1804- sprites, 1805- schedule setting pictures.
Embodiment
To embodiments of the present invention, it is described in detail referring to the drawings.
Embodiment
Fig. 1 is the overall summary construction diagram using the automatic analysing apparatus of one embodiment of the present of invention.
In Fig. 1, the multiple detection body containers 1 for accommodating detection body are arranged on detection body carrying disk 2.Detect body dispensing The suction nozzle of mechanism 5 is connected with detection body syringe pump 7.Pump 7 and the action for dispensing mechanism 5, are carried out using via interface 4 The microcomputer (calculation control unit) 3 of the computing of the action control and determination data of each mechanism part controls.Relative to Multiple reaction vessels 6 are arranged on the reaction workbench 17 that reaction bath 9 is rotatably arranged, so as to form response line.From constant temperature Liquid supply unit 10 maintains 37 degree Celsius of constant temperature liquid to the reaction supply of bath 9.
Multi-wavelength photometer has light source 14 and multiwave length spectro device 15, and light source 14 is come from so that the row of reaction vessel 6 are crosscutting Light beam mode rotate transfer reaction workbench 17.The reaction vessel 6 used is cleaned and supplied using wiper mechanism 19 In reusing.Rabbling mechanism 13 mixes detection body and the reagent solution corresponding with its analysis project made an addition in reaction vessel 6. Measure signal based on the reaction solution obtained by multiwave length spectro device 15, is converted from analog into counting using A/D converter 16 Word signal, and be input into microcomputer 3.
On the reagent disc 26A of the first reagent and the reagent disc 26B of the second reagent, circumferentially respectively set with The corresponding plurality of reagents bottle 12 of each analysis project.That is, reagent disc 26A, 26B is that the reagent bottle optionally rotated holds Receive portion.Apparatus for reading of bar code 23A is arranged near disk 26A, apparatus for reading of bar code 23B is arranged near disk 26B.Examination Agent dispenser includes reagent dispensing pipette 8A, 8B and reagent syringe pump 11.These pipettes 8A, 8B will stop at suction Reagent solution in the reagent bottle 12 of position sucks scheduled volume and is held in suction nozzle, and these suctions are rotated on reaction vessel row Nozzle is arranged, the reagent solution kept is discharged in the reaction vessel 6 for stopping at reagent receiving position.The reagent solution now dispensed It is the reagent solution of the species corresponding with the analysis project being allocated in each reaction vessel.
Disk 2, reaction vessel 6, pump 7, reagent dispensing pipette 8A, 8B, reagent syringe pump 11, dispensing are carried by detection body Mechanism 5, reaction bath 9, constant temperature liquid supply unit 10, rabbling mechanism 13, light source 14, reaction workbench 17, wiper mechanism 19, bar shaped The formation detection body such as code reading device 23A, 23B, reagent disc 26A, 26B, multiwave length spectro device 15 and microcomputer 3 Analysis portion.
The reagent bar coded sticker for being printed with bar code is pasted with the outer wall of each reagent bottle 12.As the bar code And to be, for example, each bottle for being formed by sequence number intrinsic reagent bottle code, the size of this bottle, the reagent solution have the information shown The effect time limit, represent it is that the first reagent or the reagent dispensing of the second reagent or the 3rd reagent order, the maximum of the reagent solution can be analyzed Number, the reagent dispensing amount of the dispensing usage amount of expression once and product batch number etc..
The reagent information read from each reagent bottle 12 using apparatus for reading of bar code 23A, 23B, it is stored in storage part (storage Device) 25 or microcomputer 3 each self-corresponding storage region.As reagent bottle 12 is contained in reagent disc 26A, 26B, profit With apparatus for reading of bar code 23A, 23B reading reagent information, and now, the rotation being arranged on each reagent disc 26A, 26B is utilized Angle test section output represents the information of the riding position of each reagent bottle, and is input into via interface 4 in microcomputer 3.Reagent Information is stored in a corresponding manner with bottle riding position with analysis project.
Operator can input various information using CRT (display part) 18 picture and keyboard 21.The survey of analysis project Determining result can be shown on printer 27 and CRT18.The information of optical recording medium (CD) 24 is by its reading device Read, and be stored in the corresponding storage region of storage part 25 or microcomputer 3.It is stored in optical recording medium 24 Information be, for example, following information.That is, it is the analysis project code shown with five-digit number, the ginseng being used in conjunction with the analysis project Number and the parameter that is stored respectively for each reagent bottle etc..Wherein, as the parameter being used in conjunction with analysis project, be The abnormal inspection critical value of the wavelength that is used in photometer, sample size, calibration method, concentration of standard solution, titer bottle number, analysis Deng.It is reagent type, reagent dispensing order, reagent bottle code, reagent solution appearance in addition, as the parameter for each reagent bottle Amount, reagent dispensing amount, maximum can analysis times and reagent production dates.
In storage part 25 in addition to storing the information read from optical recording medium 24, also storage automatically analyzes dress The operation condition for each mechanism part put, the analytical parameters of each analysis project, carry out each reagent bottle management decision logic, from examination The maximum that agent bottle is read can analysis times and analysis result etc..Reagent information is provided by optical recording medium, the optical profile type Recording medium is to be provided when reagent bottle is delivered goods by manufacturer.In the feelings for not utilizing optical recording medium to prepare reagent information Under condition, CRT18 picture can also be used as the information on the visual confirmation paper affiliated by operator will be stored in reagent bottle It is input to keyboard 21 in automatic analysing apparatus.
The detection body bar coded sticker of printed bar code is pasted with the outer wall of detection body container 1.The bar code shows The information shown is, for example, to uniquely determine the detection body identification number of detection body.The number is read using apparatus for reading of bar code 28, The angle that disk 2 is carried by detecting body is detected, and detection body position is identified with detection the corresponding of body identification number.The opposing party Face, due to advancing with keyboard 21 with the corresponding analysis project of detection body identification number and CRT18 is inputted and stored, therefore When reading bar code before, detection body position and detection body identification number and analysis project are accordingly stored.In addition, according to The upper number of body identification number is detected, is generally possible to identify that the detection body is standard detection body or control detection body or one As detect body.
Automatic analysing apparatus it is overall be analyzed as follows it is described, with sampling, reagent dispensing, stirring, light-metering, reaction vessel it is clear Wash and the order of the data processing such as concentration conversion is implemented.The detection body container 1 for being put into sample is provided with detection body disc 2 It is multiple.Detection body disc 2 is controlled using computer 3 via interface 4.In addition, detection body disc 2 is read with apparatus for reading of bar code 28 The bar code of the outer wall of body container 1 is detected, makes detection body corresponding with analysis project.Afterwards, according to the order for the sample analyzed And the lower section of the probe in rotary moving to detection body dispensing mechanism 5, the detection body of predetermined detection body container 1 pass through with detecting body The action for the detection body pump 7 that mechanism 5 connects is dispensed, the detection body of scheduled volume is dispensed among reaction vessel 6.Examined by dispensing The reaction vessel 6 for surveying body is moved to the first reagent point of addition among bath 9 is reacted.Add in reaction vessel 6 after movement Add by reagent with the action of pump 11 and the reagent of scheduled volume attracted from reagent container 12, the reagent pump 11 and reagent point Note the suction nozzle connection of pipette 8.The position that the reaction vessel 6 after the first reagent is moved to rabbling mechanism 13 is with the addition of, Carry out initial stirring.Laid on reagent disc 26A, 26B until in the case of the 4th reagent, the first~the 4th reagent is entered Addition-stirring of this reagent of row.
The reaction vessel 6 of stirring content detects this by the light beam sent from light source 14 using multiwave length spectro device 15 When absorbance.The absorbance signal detected is input in computer 3 via A/D converter 16, and via interface 4, conversion Into the concentration of detection body.The data for being converted into concentration export via interface 4 from the lettering of printer 27, and are shown in CRT18 picture Face.The reaction vessel 6 for terminating light-metering is moved to the position of wiper mechanism 19, after discharging inside using cleaning container pump, with clear Washing lotion is cleaned, for the analysis of next time.
In the automatic analysing apparatus so formed, safeguard that picture is shown on CRT (display part) 18.In addition, CRT18 is also Can be the display devices such as liquid crystal.
Fig. 2 is to represent to be shown in the figure of one for safeguarding picture 1801 on CRT18.In the picture 1801, for every Individual safeguard recommends the implementation cycle, with guide look show Maintenance Significant Items name 201, each Maintenance Significant Items the remaining valid period (%) 202, Next time implements predetermined time 203, remaining time limit 204 and required time 205, so as to day of operator's prompting as maintenance The information of the reference of journey arrangement.
Above-mentioned Maintenance Significant Items and recommendation implementation cycle are prespecified, and are set in following databases.
In the maintenance picture 1801 shown in Fig. 2, the information for the Maintenance Significant Items that display is classified for each cycle. Day, week are categorized as in Fig. 2 example, the moon, is shown at any time.
These Maintenance Significant Items according to the maintenance that logs in following databases recommend the implementation cycle classified (for example, Day is shown as if recommending the implementation cycle to be 24h).Recommending the implementation cycle to be not logged in the Maintenance Significant Items in database, (next time ties up The project of shield period independent of the measure cycle etc.) it is shown as at any time.
In addition, recommend cycle short situation than implementation in the time limit for implementing predetermined time next time that user (operator) specifies Under, it is shown in predetermined time is implemented the next time that user specifies on the column of " next time implements predetermined time " 203.
In addition, according to the utilization form of automatic analysing apparatus, can also using every two weeks, the cycle such as every two months shows.
In the maintenance picture 1801 shown in Fig. 2, the remaining valid period is shown with percentage for each Maintenance Significant Items (%) 202.So-called remaining valid period (%) is on to safeguarding key element (elapsed time, analysis that implementation period has an impact Number, duration of runs etc.), grace period for being permitted relative to key element final implement time to safeguarding that picture shows from safeguarding When untill variable quantity ratio.For example, in the case of the recommendation implementation cycle that maintenance is set with certain Maintenance Significant Items, the dimension The maintenance of shield project receives the influence in the elapsed time from being safeguarded final implementation time during implementing.In this case, it is remaining Valid period (%) is relative to the ratio for safeguarding the remaining time for recommending the implementation cycle.
According to Maintenance Significant Items it is contemplated that the multiple remaining valid periods (%) of setting.Such as Maintenance Significant Items In the replacing for comparing electrode, the elapsed time is with analysis times on safeguarding that implementation period brings influence.Now, the remaining valid period The display methods of (%) is contemplated that several.As contemplated display methods, can enumerate:(1) display is on Maintenance Significant Items All remaining valid periods (%);(2) the remaining valid period (%) of highest (low) is shown;(3) show all the time on one The remaining valid period (%) of key element, and remaining valid period of the display on remaining key element in pop-up box or other pictures (%) etc..It is important to consider that Land use systems and select appropriate display methods.In addition, in one embodiment of the invention, Contemplate following situation:Relative to corresponding Maintenance Significant Items, calculated by computer 3 and determined according to remaining time and analysis times (2) minimum remaining valid period (%), and be stored in the database of memory 25, and be shown on display part 18.
Fig. 2 remaining valid period (%) safeguarded in picture 1801 is shown using numeral and bar.It is each in simple display In the case of the remaining time of Maintenance Significant Items, the length of bar has no limits stretching, extension, it is contemplated that can not bring situation in picture etc. into.It is logical Cross in the picture 1801 is not to show remaining time merely but show the remaining valid period (%) as ratio, Neng Gouzhen Each Maintenance Significant Items are shown in the region of formed objects.
Due to the remaining time limit of the maintenance that shows each Maintenance Significant Items as described above, therefore it can visually understand maintenance Relative importance value (emergency), and due to the time required to also showing for each Maintenance Significant Items, so can be based on should by user Information, according to the operating schedule of automatic analysing apparatus, the schedule planning to maintenance plays a role.In addition, according to Maintenance Significant Items, should Display can also aid in determining whether the order period of running stores, order number.
In addition, in Fig. 2 maintenance picture 1801, can be according to the value of the remaining valid period (%) of each Maintenance Significant Items Change display.For example, the use " reaction member replacing " of Maintenance Significant Items shown by the column of Fig. 2 moon, " reactive tank cleaning ", " ISE The bar of the remaining valid period (%) of dilution trap cleaning " display is shown, according to remaining valid period (%) value, the display of bar (color) changes respectively.Operator can be visually known the relative importance value or urgent of maintenance by confirming the color of bar Property.The value of the remaining valid period (%) to change is shown, can be set for each Maintenance Significant Items, if can be by grasping Author is changed, more preferably.
In addition, in Fig. 2 maintenance picture 1801, it is predetermined that implementation next time that the display of each Maintenance Significant Items is safeguarded can be directed to Time 203.Next time implementation predetermined time 203 is updated at the time of implementing and safeguarding.
In addition, in Fig. 2 maintenance picture 1801, the remaining time limit 204 that the display of each Maintenance Significant Items is safeguarded can be directed to. The unit of display in the remaining time limit 204 can suitably Date Of Change, time or analysis times etc..
In addition, in Fig. 2 maintenance picture 1801, it can show and be stored in DB (database) for each Maintenance Significant Items Maintenance required time 205.The required time 205 can predefine according to each safeguard, can also be according to actual cost Time calculate after update.In addition, if it is the time required to display and arbitrary, in operator to Land use systems known to maintenance In, it is possible to as numerous and diverse display, therefore do not show can also.
By confirming Fig. 2 maintenance picture 1801, operator can confirm the Maintenance Significant Items on each cycle at a glance Various information.Thus, it is contemplated that to the appropriate schedule for determining to safeguard, or reduce the time until needed for determining.
Fig. 3 is to represent the figure for safeguarding picture 1802 safeguarded picture 1801 and be extended to Fig. 2, except with according to every Outside the viewing area C of the information of the Maintenance Significant Items of individual periodic classification, also with the Maintenance Significant Items that should implement in the same day Viewing area A, recommend the Maintenance Significant Items implemented in the recent period viewing area B.The maintenance picture 1802 can replace safeguarding picture 1801 and show can arbitrarily select which project shown.
It need not must prepare to safeguard the viewing area A and viewing area B of picture 1802, but by based on the remaining time limit Or its ratio, the Maintenance Significant Items that estimation and prompting should be implemented on the same day or at no distant date, it can aid in the schedule of maintenance Planning.
Hereinafter, viewing area A and viewing area B are illustrated.
First, viewing area A is illustrated.
In display area a should be in the Maintenance Significant Items that ought in a few days implement with guide look display.Fig. 6 is to select to be shown in display The algorithm of Maintenance Significant Items in the A of region.Algorithm shown in Fig. 6 is real to all Maintenance Significant Items being set in automatic analysing apparatus Apply.Fig. 5 is the figure for the DB300 for representing the information for managing each Maintenance Significant Items, and DB300 is stored in memory 25.Should DB300 includes:The title 301 respectively safeguarded, recommend the implementation cycle 302, it is final implement time 303, remaining time limit rate threshold value a304, User specifies implementation time 305, remaining time limit rate threshold value b306, required time 307, same day mark 308, recommendation (to recommend recent Interior implementation) mark 309.Mark 308,309 utilize the provisional same day 308, recommendation 309 in the case where user is logged in. In addition, mark 308,309 are by pressing " being appended in the same day ", " being appended in recommendation " for being shown in following pictures 1802 Button, clicked on Maintenance Significant Items can be directed to, it is become effective.For relative importance value, mark 308 is also higher than mark 309. If in addition, carrying out the Maintenance Significant Items after becoming in mark 308,309 effectively, mark becomes invalid.
At the time of have received Fig. 3 display for safeguarding picture 1802 instruction, Fig. 6 algorithm proceeds by.If start into The row algorithm, then obtain current time (step S101) first.
Then, the recommendation implementation cycle 302 of Maintenance Significant Items and the final implementation (step of time 303 are obtained from DB300 S102).According to the current time obtained in step S101 and the final implementation time obtained in step s 102, based on following Formula (1) calculates the elapsed time (step S103) of the Maintenance Significant Items.
Elapsed time=current time-finally implements time ... (1)
Then, according to the elapsed time of above-mentioned formula (1) and the recommendation implementation cycle 302 of Maintenance Significant Items, based on following public affairs Formula (2) calculates the remaining time (step S104) of Maintenance Significant Items.
Remaining time=recommendation implementation cycle-elapsed time ... (2)
According to the remaining time of above-mentioned formula (2), it is (remaining to judge whether Maintenance Significant Items should be shown in the A of viewing area Whether the time is less than 24 hours) (step S105).In the case where remaining time is less than 24 hours, Maintenance Significant Items are shown In the A of viewing area (step S112), end processing.
In step S105, in the case where remaining time is bigger than 24 hours, same day mark 308 (step S106) is obtained, Judge whether same day mark 308 is effective (step S107).If same day mark 308 is effective, that is, sentenced according to remaining time It is disconnected whether be should be in the Maintenance Significant Items that ought in a few days implement, and corresponding Maintenance Significant Items are shown in viewing area A and (are formed at aobvious Show the column (column on the same day) on the same day in portion) in (step S112), end processing.
In step s 107, if same day mark 308 is not effective, judge that user whether has been set in DB300 to be referred to Surely time (step S108) is implemented.If user specifies implementation time to set, terminate to handle.
In step S108, if user specify implement time set, obtain be set in DB300 " user refers to Surely time is implemented " (step S109), calculate user and specify remaining time (step S110), judge that user is at specified remaining time No is less than 24 hours (step S111).
In step S111, if it is less than 24 hours that user, which specifies remaining time, Maintenance Significant Items are shown in viewing area In the A of domain (step S112), end processing.
In step S111, if it is not less than 24 hours that user, which specifies remaining time, terminate to handle.
In addition, user specifies remaining time to be calculated according to following formula (3).
User specifies remaining time in=user's specified implementation time-current time ... (3)
Hereinafter, viewing area B is illustrated.
Fig. 7 is the algorithm of the selected Maintenance Significant Items being shown in the B of viewing area.
If proceeding by the algorithm, current time (step S201) is obtained first.
Then, the recommendation implementation cycle 302 of Maintenance Significant Items and the final implementation (step of time 303 are obtained from DB300 S202)。
The final implementation time obtained according to the current time obtained in step s 201 and in step S202, based on upper State the elapsed time (step S203) that formula (1) calculates the Maintenance Significant Items.
Then, according to the elapsed time of above-mentioned formula (1) and the recommendation implementation cycle 302 of Maintenance Significant Items, based on above-mentioned public affairs Formula (2) calculates the remaining time (step S204) of Maintenance Significant Items.
Then, obtain and be set in recommendation mark (step S205) in DB300, judge acquired recommendation mark whether be Effectively (step S206).If acquired recommendation is masked as effectively, Maintenance Significant Items being shown in into (step in the B of viewing area S210), end is handled.
In step S206, if acquired recommendation mark is not effective (invalid), calculated according to following formula (4) surplus Remaining time limit rate (step S207).
Remaining time limit rate=remaining time/recommendation implementation cycle ... (4)
Then, the remaining time limit rate threshold value a (step S208) being set in DB300 is obtained, judges to fall into a trap in step S207 Whether the remaining time limit rate calculated is remaining more than time limit rate threshold value a (step S209).If remaining time limit rate is remaining time limit rate More than threshold value a, then terminate to handle.If Maintenance Significant Items are shown in viewing area by the remaining time limit rate threshold value a of remaining time limit rate deficiency In the B of domain (step S210), end processing.
Hereinafter, viewing area C is illustrated.Viewing area C be show for week, the moon, Maintenance Significant Items at any time area Domain, it is substantially identical with the display content shown in Fig. 2.Fig. 4 is the addition explanation figure of Fig. 3 display.
In Fig. 4, if clicking on Maintenance Significant Items in the C of viewing area, as clicked on Maintenance Significant Items menu, Display is converted to maintenance and implements picture, safeguards details picture, the button of schedule setting picture.Example shown in Fig. 4 is to safeguard item Mesh is the example for the situation that reaction member is changed.Specified Maintenance Significant Items are appended to the same day or recommend (to push away in addition, showing Recommend the column implemented in the near future) in situation button.
Implement if pressing is safeguarded, show the picture for carrying out specified Maintenance Significant Items.
In addition, if details are safeguarded in pressing, display represents that the details of specified Maintenance Significant Items (state, associate and safeguard item Mesh, objective for implementation maintenance module, association running stores information) picture.
Fig. 8 is the figure for representing to safeguard details picture 1803.Clicked in fig. 8 it is shown that having in the picture 1802 shown in Fig. 4 Object maintenance project and its state.
In addition, in the display of association Maintenance Significant Items, the display Maintenance Significant Items associated with object maintenance project.For example, Object maintenance project be " reaction member replacings " in the case of, it is necessary to continue implementation Maintenance Significant Items, " reaction system Cleaning ", " unit blank determination " show as that must associate Maintenance Significant Items, and, it is not necessary to implement but as being directed to " cleaning of reactive tank filter " of the Maintenance Significant Items of equal modules etc. is shown as any association Maintenance Significant Items.
In addition, associate the running stores presentation of information detergent associated with object maintenance or change the letter of the running stores such as part Breath.Now, it can both show it is only running stores information needed for object maintenance project, can also show comprising maintenance must be associated The running stores of the situation of project.Also, operator can also be made to select these display contents.
In addition, objective for implementation maintenance module visually shows the module of objective for implementation Maintenance Significant Items.In Fig. 8 example In, " analysis portion " turns into the objective for implementation maintenance module in object maintenance project " reaction member replacing ".
The maintenance details picture 1803 being capable of the reference as the auxiliary information in following schedule settings.In addition, should Safeguard that details picture 1803 can also be shown in as sprite in the maintenance picture 1802 shown in Fig. 3, Fig. 4.
Fig. 9 is will to safeguard that details picture is shown in the figure safeguarded in picture 1802 as sprite 1804.The sprite 1804 can be moved by dragging, and size can also be changed.
Hereinafter, the situation of the schedule setting button shown in pressing Fig. 4 is illustrated.
Figure 10 is the figure for representing the schedule setting picture 1805 shown when pressing schedule setting button.In Fig. 10, Object maintenance project shows that the change object of schedule setting is Maintenance Significant Items name.The object maintenance project is to show that schedule is set The Maintenance Significant Items determined button and clicked on.
Implement to choose whether that setting next time carries out predetermined time during time is specified in next time.In addition, implement time in next time Middle input next time carries out predetermined time.In the case of have selected " without " in above-mentioned " next time implements time and specified ", preferentially The display is set to turn into nonactive.Safeguard the setting for recommending to be set for the recommendation on maintenance.Selection is with the process from safeguarding That condition such as time, the duration of runs, pendulous frequency, surplus is recommended.Set the red in being shown with bar, yellow is come The remaining period of validity of display.Setting safeguards the cycle implemented (substantially constant more on the column in cycle.In addition, not additional ratio The low condition of initial value that manufacturer specifies).
In bar is shown, red value is corresponding with the threshold value a being stored in DB300.Red part, which turns into, to be used to make The display of bar reddens and shows the key of Maintenance Significant Items in recommendation.Yellow is corresponding with the threshold value b being stored in DB300.Into For the key of its colour changed into yellow for making bar.Red and yellow value can be according to the cycle value or remaining period of validity (%) To be set.
Figure 11 is the figure for representing the schedule setting picture 1805 in the case where not specifying implement time next time.Such as Figure 11 institutes Show, in the case where not specifying implement time, the column that next time implements time turns into nonactive display next time.This is in cycle time Recommend the setting screen example in the case of safeguarding in addition.
Figure 12 is the figure for the algorithm for representing above-mentioned schedule setting.
In fig. 12, selection wants change implementation next time predetermined time or safeguards the Maintenance Significant Items (step for recommending setting S301).Then, schedule setting button (step S302), display schedule setting picture (step S303) are pressed.Moreover, judgement is No specified next time implements predetermined time (step S304), in the case where specifying implement predetermined time, when implementing next time next time Selection " progress " (step S305) in specifying day, input is next to implement time (step S306).
Next, it is determined whether change, which is safeguarded, recommends setting (step S307).In step s 304, do not specifying implement next time In the case of predetermined time, step S307 is also proceeded to.In step S307, in the case where change safeguards to recommend setting, enter Step S308 is opened up, change, which is safeguarded, recommends setting.Next, it is determined whether reflection setting (step S309).In step S307, Do not change maintenance to recommend in the case of setting, also proceed to step S309.In step S309, in the case where reflecting setting, Confirming button (step S310) is pressed, in the case where not reflecting setting, presses cancel button (step S311).
Figure 13 be for carry out the display control of display picture 1801,1802,1803,1804 and 1805, Fig. 6, Fig. 7 with And the FBD in the computer (transport control unit) 3 of the implementation of Figure 12 algorithm.
In fig. 13, computer 3 has remaining time calculating part 31, safeguards required time extraction unit 34, schedule changing unit 32nd, safeguard and recommend setting changing unit 33 and judging part 35.Clock pulses generating unit 29 shown in Figure 13 plays the work of clock and watch With, remaining time calculating part 31 from clock pulses generating unit 29 obtain current at the time of.In addition, remaining time calculating part 31 is from depositing The DB300 being stored in memory 25 obtains data, carries out Fig. 6 step S101~S104, S109, S110, Fig. 7 step S201 ~S204, S207.
In addition, extraction unit 34 extracts the required time for being stored in DB300 in memory 25 out the time required to safeguarding, via sentencing Disconnected portion 345 is shown on display part 18.Moreover, based on the input from schedule changing unit 32, input unit (keyboard) 21, with judgement Portion 35 together carries out Figure 12 algorithm.
Setting changing unit 33 is recommended together to carry out Fig. 7's with remaining time calculating part 31 and judging part 35 in addition, safeguarding Algorithm.Judging part 35 be based on from remaining time calculating part 31, safeguard the time required to extraction unit 34, schedule changing unit 32 and Safeguard the information for recommending setting changing unit 33 and the display content of display part 18 is controlled.
As described above, according to one embodiment of present invention, by confirming shown in picture 1801 or Fig. 3 shown in Fig. 2 Picture 1802, can at a glance it is confirmed that should in the Maintenance Significant Items that ought in a few days implement, recommend the maintenance item implemented in the near future The information of mesh, the required time of Maintenance Significant Items and each Maintenance Significant Items classified according to each cycle.Thus, operate Person, which can easily hold, considers in the Maintenance Significant Items that ought in a few days implement and should obtaining for determining the same day for analysis action The information of the schedule of later maintenance.
In addition, according to one embodiment of present invention, change maintenance it is predetermined in the case of, also can easily correspond to Display is changed in the change.
Furthermore it is preferred that in picture 1801,1802 and in the picture in other places the association of each Maintenance Significant Items can be prompted to believe Breath.So-called related information, information (model, inventory, price, last time order time), the consumption of the part used can be enumerated The information (model, inventory, price, last time order time) of product, the Maintenance Significant Items (dimension of same module for recommending implementation simultaneously Shield, adjustment work when changing part etc.) etc..The information considers in the schedule of maintenance mostly, by can be once Property reference, it will contribute to schedule.
In addition, in the above-described embodiments, the remaining valid period (%) is shown with bar, it is also possible to using instrument board, Curve map, mark, color show the remaining valid period (%).In the present invention, be referred to as bar, instrument board, curve map, mark, Color and be defined as figure shows.

Claims (7)

1. a kind of automatic analysing apparatus, it is characterised in that have:
Analysis portion, analysis detection body;
Memory, when at least storing the final implementation of multiple Maintenance Significant Items on above-mentioned analysis portion, these each Maintenance Significant Items Day, the required time recommended required for implementation cycle and each above-mentioned Maintenance Significant Items of progress of each above-mentioned Maintenance Significant Items;
Calculation control unit, has a remaining time calculating part, and the remaining time calculating part is every in above-mentioned memory according to being stored in The recommendation implementation cycle of individual Maintenance Significant Items and final implementation time, calculate when the residue untill recommending implementation period is safeguarded Between and above-mentioned remaining time relative to each above-mentioned maintenance recommendation the implementation cycle ratio;And
Display part, for each above-mentioned Maintenance Significant Items, show calculated using above-mentioned remaining time calculating part remaining time, on Remaining time is stated relative to needed for required for the ratio of above-mentioned recommendation implementation cycle and the progress of each above-mentioned Maintenance Significant Items Time.
2. automatic analysing apparatus according to claim 1, it is characterised in that
Above-mentioned calculation control unit is for the predetermined Maintenance Significant Items among above-mentioned multiple Maintenance Significant Items, and computing is by above-mentioned analysis portion The remaining valid period that analysis times and above-mentioned remaining time determine, the remaining valid period after computing is set to be stored in above-mentioned storage In device, and above-mentioned display part is shown in as remaining time.
3. automatic analysing apparatus according to claim 1 or 2, it is characterised in that
Above-mentioned display part visually shows above-mentioned remaining time relative to the above-mentioned recommendation implementation cycle by figure shows Ratio.
4. automatic analysing apparatus according to claim 3, it is characterised in that
Above-mentioned figure shows are bar, instrument board, curve map, mark or color.
5. automatic analysing apparatus according to claim 1 or 2, it is characterised in that
Above-mentioned calculation control unit is judged according to above-mentioned remaining time should be in the Maintenance Significant Items that ought in a few days implement, and will be judged The Maintenance Significant Items gone out be shown in be formed on above-mentioned display part should be in the viewing area for the Maintenance Significant Items that ought in a few days implement.
6. automatic analysing apparatus according to claim 1 or 2, it is characterised in that
The Maintenance Significant Items that above-mentioned calculation control unit is judged in the near future implement according to above-mentioned remaining time, and will be judged The Maintenance Significant Items gone out are shown in be formed in the viewing area for the Maintenance Significant Items that the recommendation on above-mentioned display part is implemented in the near future.
7. automatic analysing apparatus according to claim 1, it is characterised in that
In above-mentioned memory, be stored with for each above-mentioned Maintenance Significant Items by the prespecified same day mark of operator and The specified implementation predetermined time of the Maintenance Significant Items selected among above-mentioned Maintenance Significant Items by aforesaid operations person,
Above-mentioned calculation control unit,
For each Maintenance Significant Items being stored in above-mentioned memory, whether the above-mentioned remaining time for judging to calculate is 24 small When below, remaining time be less than 24 hours in the case of, the Maintenance Significant Items judged are shown in be formed it is above-mentioned show Show in portion in the viewing area for the Maintenance Significant Items that ought be in a few days implemented,
In the case of the above-mentioned remaining time calculated is small more than 24, when the Maintenance Significant Items being stored in above-mentioned memory When same day mark shows effective, be formed at above-mentioned display part in the viewing area for the Maintenance Significant Items that ought be in a few days implemented Middle display,
When the same day mark for the Maintenance Significant Items being stored in above-mentioned memory does not show effective, judge whether to be stored with above-mentioned finger Surely predetermined time is implemented,
In the case where being stored with above-mentioned specified implementation predetermined time, calculate from current time to the above-mentioned specified pre- timing of implementation The remaining time of day, in the case where remaining time is less than 24 hours, the Maintenance Significant Items judged are shown in be formed Above-mentioned display part in the viewing area for the Maintenance Significant Items that ought be in a few days implemented.
CN201710677027.8A 2016-09-06 2017-08-09 Automatic analyzer Active CN107796949B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2016173590A JP6815794B2 (en) 2016-09-06 2016-09-06 Automatic analyzer
JP2016-173590 2016-09-06

Publications (2)

Publication Number Publication Date
CN107796949A true CN107796949A (en) 2018-03-13
CN107796949B CN107796949B (en) 2021-03-16

Family

ID=61531606

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710677027.8A Active CN107796949B (en) 2016-09-06 2017-08-09 Automatic analyzer

Country Status (2)

Country Link
JP (1) JP6815794B2 (en)
CN (1) CN107796949B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111108391A (en) * 2018-03-29 2020-05-05 株式会社日立高新技术 Automatic analysis system
CN111537756A (en) * 2019-02-07 2020-08-14 株式会社日立高新技术 Automatic analysis device and analysis method
CN113196065A (en) * 2018-12-19 2021-07-30 株式会社日立高新技术 Automatic analysis device and analysis method

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3892999B1 (en) * 2018-12-06 2024-01-10 Hitachi High-Tech Corporation Automatic analysis device
US20230131173A1 (en) 2020-06-16 2023-04-27 Fanuc Corporation Robot control device
WO2022070460A1 (en) * 2020-09-29 2022-04-07 株式会社日立ハイテク Automatic analysis device

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09211003A (en) * 1996-02-01 1997-08-15 Hitachi Ltd Automatic analyzer
JP2002327467A (en) * 2001-05-02 2002-11-15 Komatsu Ltd Display device for working machine
EP1376138A2 (en) * 2002-06-28 2004-01-02 Hitachi High-Technologies Corporation Automatic analyzer
CN101131386A (en) * 2006-08-22 2008-02-27 希森美康株式会社 Sample analyzer
CN101294973A (en) * 2007-04-27 2008-10-29 希森美康株式会社 Sample analyzing apparatus
JP2010156649A (en) * 2009-01-05 2010-07-15 Hitachi High-Technologies Corp Specimen pretreatment system
JP2012018103A (en) * 2010-07-09 2012-01-26 Hitachi High-Technologies Corp Automatic analyzing device

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6073103A (en) * 1996-04-25 2000-06-06 International Business Machines Corporation Display accessory for a record playback system
JP2004219352A (en) * 2003-01-17 2004-08-05 Toshiba Corp Analyzer and management system
US9978044B2 (en) * 2011-03-04 2018-05-22 Hitachi High-Technologies Corporation Analyzing device
JP5806900B2 (en) * 2011-09-30 2015-11-10 シスメックス株式会社 Sample analyzer and computer program

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09211003A (en) * 1996-02-01 1997-08-15 Hitachi Ltd Automatic analyzer
JP2002327467A (en) * 2001-05-02 2002-11-15 Komatsu Ltd Display device for working machine
EP1376138A2 (en) * 2002-06-28 2004-01-02 Hitachi High-Technologies Corporation Automatic analyzer
CN101131386A (en) * 2006-08-22 2008-02-27 希森美康株式会社 Sample analyzer
CN101294973A (en) * 2007-04-27 2008-10-29 希森美康株式会社 Sample analyzing apparatus
JP2010156649A (en) * 2009-01-05 2010-07-15 Hitachi High-Technologies Corp Specimen pretreatment system
JP5166293B2 (en) * 2009-01-05 2013-03-21 株式会社日立ハイテクノロジーズ Sample pretreatment system
JP2012018103A (en) * 2010-07-09 2012-01-26 Hitachi High-Technologies Corp Automatic analyzing device
JP5303515B2 (en) * 2010-07-09 2013-10-02 株式会社日立ハイテクノロジーズ Automatic analyzer

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111108391A (en) * 2018-03-29 2020-05-05 株式会社日立高新技术 Automatic analysis system
US10962559B2 (en) 2018-03-29 2021-03-30 Hitachi High-Tech Corporation Automated analysis system
CN111108391B (en) * 2018-03-29 2021-06-29 株式会社日立高新技术 Automatic analysis system
CN113196065A (en) * 2018-12-19 2021-07-30 株式会社日立高新技术 Automatic analysis device and analysis method
CN113196065B (en) * 2018-12-19 2023-09-29 株式会社日立高新技术 Automatic analysis device and analysis method
CN111537756A (en) * 2019-02-07 2020-08-14 株式会社日立高新技术 Automatic analysis device and analysis method
CN111537756B (en) * 2019-02-07 2023-12-22 株式会社日立高新技术 Automatic analysis device and analysis method

Also Published As

Publication number Publication date
JP2018040621A (en) 2018-03-15
CN107796949B (en) 2021-03-16
JP6815794B2 (en) 2021-01-20

Similar Documents

Publication Publication Date Title
CN107796949A (en) Automatic analysing apparatus
CN101275963B (en) Sample analyzer
JP3156550B2 (en) Reagent management method and apparatus
JP5123111B2 (en) Automatic analyzer
CN100523817C (en) Automatic analyzer
CN104246510B (en) Automatic analysing apparatus
CN107407686B (en) Automatic analyzer
US8040757B2 (en) Sample analyzing apparatus
CN101452005A (en) Automatic analyzer
CN101393225A (en) Sample analyzer and sample analyzing method
JP5806900B2 (en) Sample analyzer and computer program
CN103308701B (en) Sample processing apparatus
JP5331056B2 (en) Automatic analyzer
CN102539797A (en) Analyzer and method of analyzing
CN102023222A (en) Sample processing apparatus and sample rack transporting method
JP5535047B2 (en) Automatic analyzer
EP2116850A1 (en) Analyzer
EP1260818A1 (en) Method of management of analytical data and system for management of analytical data
JP7038734B2 (en) Automatic analyzer
JP2007315784A (en) Automatic analyzer, reagent inventory control method for automatic analyzer, and reagent inventory control program for automatic analyzer
JP4068772B2 (en) Automatic analyzer
JP2010164332A (en) Automatic analysis device and method of managing reagent for the same
JP5260156B2 (en) Automatic analyzer management system
CN102221621A (en) Checked body analyzing device and analyzing control method
CN109690322B (en) Automatic analyzer

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant