CN107782984A - 一种测量电网中各序分量的方法 - Google Patents

一种测量电网中各序分量的方法 Download PDF

Info

Publication number
CN107782984A
CN107782984A CN201711294157.XA CN201711294157A CN107782984A CN 107782984 A CN107782984 A CN 107782984A CN 201711294157 A CN201711294157 A CN 201711294157A CN 107782984 A CN107782984 A CN 107782984A
Authority
CN
China
Prior art keywords
mrow
msub
mtr
mtd
msubsup
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711294157.XA
Other languages
English (en)
Inventor
郭磊
周志清
李成
李林杰
王宗耀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Power Supply Branch Of Gaocheng District Shijiazhuang City Hebei Electric Power Co Ltd
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Original Assignee
Power Supply Branch Of Gaocheng District Shijiazhuang City Hebei Electric Power Co Ltd
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Power Supply Branch Of Gaocheng District Shijiazhuang City Hebei Electric Power Co Ltd, State Grid Corp of China SGCC, State Grid Hebei Electric Power Co Ltd filed Critical Power Supply Branch Of Gaocheng District Shijiazhuang City Hebei Electric Power Co Ltd
Priority to CN201711294157.XA priority Critical patent/CN107782984A/zh
Publication of CN107782984A publication Critical patent/CN107782984A/zh
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R29/00Arrangements for measuring or indicating electric quantities not covered by groups G01R19/00 - G01R27/00
    • G01R29/16Measuring asymmetry of polyphase networks

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Other Investigation Or Analysis Of Materials By Electrical Means (AREA)

Abstract

本发明涉及一种测量电网中各序分量的方法,属于电变量测量领域,采用通用自适应陷波器同时消除频率、幅值对检测性能的影响,因此本检测方法上对输入信号的频率和幅值变化具有很好的抗干扰性,比现有的自适应陷波器具有更广泛的适用范围。

Description

一种测量电网中各序分量的方法
技术领域
本发明属于电变量测量领域,具体涉及一种测量电网中各序分量的方法。
背景技术
三相不平衡度是电能质量的一个重要指标,随着负荷种类的增多,电网中三相不平衡的现象突出,电网如果长期处于三相不平衡运行将会给电网经济运行和安全稳定运行带来较大的负面影响。为了能够分析电网的三相不平衡情况,需要实时的检测电网的正序分量、负序分量和零序分量等参数。目前测量各序分量的方法中需要借助采集装置采集待测信号,再将待测信号经过陷波器进行处理以提取需要的各种分量,依据自适应陷波器(ANF)的检测方法考虑了频率对性能的影响,依据幅值自适应陷波器(AANF)的检测方法考虑了输入信号幅值对性能的影响,但是两种方法都不能同时消除频率、幅值对性能的影响,因此,如何提供一种通用的、准确的检测方法是值得人们关注的问题。
发明内容
本发明为了解决上述现有技术中存在的问题,本发明提供了一种测量电网中各序分量的方法,能够同时消除频率、幅值对性能的影响,并提供准确的测量结果。
本发明采用的具体技术方案是:
一种测量电网中各序分量的方法,包括如下步骤,
a、借助三相电压电流测量模块测得电网的三相电压作为输入信号uA(t)、uB(t)、uC(t),将其通过通用自适应陷波器;
b、通用自适应陷波器的动态方程为:
其中,ζ和ε分别为通用自适应陷波器的两个参数,A为输入信号的幅值,θ为输入信号的频率;
动态方程的解为
x为方程变量,为x的一次导数,为x的二次导数,ζ为准确度参量,γ为优化后的速度参量,ε为原有的速度参量,e(t)为误差量,ω1为基波频率,为基波的初相角;
通用自适应陷波器输出包括输入信号原样输出uA(t)、uB(t)、uC(t)及其正交变换值uA(t)90、uB(t)90、uC(t)90
c、步骤b中的计算结果经过含有序分量计算软件的序分量计算模块得到正序分量、负序分量、零序分量。
所述的步骤b(1)式中的第一个方程代入第二个方程中得到
其中,和状态变量x相比,频率θ的变化为慢变量,故采用平均理论将上式转化为线性时不变系统:
对上式进行化简可得:
当θav=ω0,上式可简化为:
频率检测响应的时间常数为:
当通用自适应陷波器的参数ε和ζ为定值时,τ也为定值,即通用自适应陷波器的动态响应时间不变,其性能与输入信号的频率和幅值无关。
所述的步骤c中,当电网中三相不平衡时,将输入信号分解为正序分量、负序分量和零序分量之和,它们的关系可用公式表示为:
本发明的有益效果是:
本发明采用通用自适应陷波器同时消除频率、幅值对检测性能的影响,因此本检测方法上对输入信号的频率和幅值变化具有很好的抗干扰性,比现有的自适应陷波器具有更广泛的适用范围。
附图说明
图1为本发明中数据运算流向的示意图;
图2为通用自适应陷波器的结构图;
图3为本发明方法对正序分量的检测;
图4为本发明方法对负序分量的检测;
图5使用传统ANF的方法检测的负序分量;
图6使用本发明方法检测的负序分量;
图7使用传统ANF的方法检测的幅值变化;
图8使用本发明方法检测的幅值变化;
具体实施方式
下面结合附图及具体实施例对本发明作进一步说明:
如图1及图2所示,本发明提供了一种测量电网中各序分量的方法,包括如下步骤,
a、借助三相电压电流测量模块测得电网的三相电压作为输入信号uA(t)、uB(t)、uC(t),将其通过通用自适应陷波器;
b、通用自适应陷波器的动态方程为:
其中,ζ和ε分别为通用自适应陷波器的两个参数,A为输入信号的幅值,θ为输入信号的频率;
动态方程的解为
x为方程变量,为x的一次导数,为x的二次导数,ζ为准确度参量,γ为优化后的速度参量,ε为原有的速度参量,e(t)为误差量,ω1为基波频率,为基波的初相角;
通用自适应陷波器输出包括输入信号原样输出uA(t)、uB(t)、uC(t)及其正交变换值uA(t)90、uB(t)90、uC(t)90
c、步骤b中的计算结果经过含有序分量计算软件的序分量计算模块得到正序分量、负序分量、零序分量,其中,为A相正序分量,为A相负序分量,B、C相同理,u0(t)为零序分量。
所述的步骤b(1)式中的第一个方程代入第二个方程中得到
其中,和状态变量x相比,频率θ的变化为慢变量,故采用平均理论将上式转化为线性时不变系统:
对上式进行化简可得:
当θav=ω0,上式可简化为:
频率检测响应的时间常数为:
当通用自适应陷波器的参数ε和ζ为定值时,τ也为定值,即通用自适应陷波器的动态响应时间不变,其性能与输入信号的频率和幅值无关。
所述的步骤c中,当电网中三相不平衡时,将输入信号分解为正序分量、负序分量和零序分量之和,它们的关系可用公式表示为:
其中
对本发明所公开方法进行仿真验证:
(1)首先分析该方法对正序、负序分量的检测。条件设定为初始时,输入信号的频率为50Hz,初相角为0,只包含正序分量,幅值为1.0pu。t=0.2s时,正序分量保持不变,增加负序分量,幅值为0.2pu。由图3,表明该方法能够准确的检测系统的正序分量。图4为本发明方法所检测到的负序分量,与仿真参数设置相同,仿真参数设置为t=0.2s时,增加负序分量,表明该方法能够准确的检测系统的负序分量。
(2)在频率变化时,该方法与使用传统ANF的方法比较。条件设定为初始时,输入信号的频率为400Hz,初相角为0,只包含正序分量,幅值为1.0pu。t=0.6s时,输入信号频率增加10Hz,正序分量保持不变,同时增加负序分量,幅值为0.2pu。由图5、图6可知,当输入频率偏离标准频率较大时,并且频率发生变化时,本方法检测负序分量误差较小,所需时间较短,而使用传统ANF的方法存在明显的误差,且追踪速度较慢。
(3)在幅值变化时,该方法与使用传统ANF的方法比较。条件设定为初始时,输入信号的频率为50Hz,初相角为0,只包含正序分量,幅值为2.0pu。t=0.2s时,输入信号正序分量幅值增加0.2pu,同时增加负序分量,幅值为0.5pu。由图7、图8可知,当输入信号幅值偏离标准值时,并且幅值发生变化时,本方法能快快速的跟踪负序分量的变化,而使用传统ANF的方法存在明显的误差,且追踪速度较慢。
图3到图8中深色粗线为A相波形,浅色粗线为B相波形,细线为C相波形。

Claims (3)

1.一种测量电网中各序分量的方法,其特征在于:包括如下步骤,
a、借助三相电压电流测量模块测得电网的三相电压uA(t)、uB(t)、uC(t)作为输入信号,将其通过通用自适应陷波器;
b、通用自适应陷波器的动态方程为:
<mrow> <mfenced open = "{" close = ""> <mtable> <mtr> <mtd> <mrow> <mover> <mi>x</mi> <mo>&amp;CenterDot;&amp;CenterDot;</mo> </mover> <mo>+</mo> <msup> <mi>&amp;theta;</mi> <mn>2</mn> </msup> <mi>x</mi> <mo>=</mo> <mn>2</mn> <mi>&amp;zeta;</mi> <mi>&amp;theta;</mi> <mi>e</mi> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <mover> <mi>&amp;theta;</mi> <mo>&amp;CenterDot;</mo> </mover> <mo>=</mo> <mo>-</mo> <mi>&amp;gamma;</mi> <mi>x</mi> <mi>&amp;theta;</mi> <mi>e</mi> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <mi>e</mi> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>=</mo> <mi>u</mi> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>-</mo> <mover> <mi>x</mi> <mo>&amp;CenterDot;</mo> </mover> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <mi>&amp;gamma;</mi> <mo>=</mo> <mfrac> <mrow> <mi>&amp;epsiv;</mi> <mi>&amp;theta;</mi> </mrow> <msup> <mi>A</mi> <mn>2</mn> </msup> </mfrac> </mrow> </mtd> </mtr> </mtable> </mfenced> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>1</mn> <mo>)</mo> </mrow> </mrow>
其中,ζ和ε分别为通用自适应陷波器的两个参数,A为输入信号的幅值,θ为输入信号的频率;
动态方程的解为
x为方程变量,为x的一次导数,为x的二次导数,ζ为准确度参量,γ为优化后的速度参量,ε为原有的速度参量,e(t)为误差量,ω1为基波频率,为基波的初相角;
通用自适应陷波器输出包括输入信号原样输出uA(t)、uB(t)、uC(t)及其正交变换值uA(t)90、uB(t)90、uC(t)90
c、步骤b中的计算结果经过含有序分量计算软件的序分量计算模块得到正序分量、负序分量、零序分量。
2.根据权利要求1所述的一种测量电网中各序分量的方法,其特征在于:所述的步骤b(1)式中将第一个方程代入第二个方程中得到
<mrow> <mover> <mi>&amp;theta;</mi> <mo>&amp;CenterDot;</mo> </mover> <mo>=</mo> <mo>-</mo> <mfrac> <mrow> <mi>&amp;epsiv;</mi> <mi>&amp;theta;</mi> </mrow> <mrow> <mn>2</mn> <msup> <mi>&amp;zeta;A</mi> <mn>2</mn> </msup> </mrow> </mfrac> <mi>x</mi> <mrow> <mo>(</mo> <mover> <mi>x</mi> <mo>&amp;CenterDot;&amp;CenterDot;</mo> </mover> <mo>+</mo> <msup> <mi>&amp;theta;</mi> <mn>2</mn> </msup> <mi>x</mi> <mo>)</mo> </mrow> </mrow>
其中,和状态变量x相比,频率θ的变化为慢变量,故采用平均理论将上式转化为线性时不变系统:
<mrow> <msub> <mover> <mi>&amp;theta;</mi> <mo>&amp;CenterDot;</mo> </mover> <mrow> <mi>a</mi> <mi>v</mi> </mrow> </msub> <mo>=</mo> <mfrac> <mrow> <mo>-</mo> <mi>&amp;epsiv;</mi> <mi>&amp;theta;</mi> </mrow> <mrow> <mn>2</mn> <msup> <mi>&amp;zeta;A</mi> <mn>2</mn> </msup> </mrow> </mfrac> <msub> <mi>f</mi> <mrow> <mi>A</mi> <mi>V</mi> <mi>G</mi> </mrow> </msub> <mo>&amp;lsqb;</mo> <mi>x</mi> <mrow> <mo>(</mo> <mi>t</mi> <mo>,</mo> <msub> <mi>&amp;theta;</mi> <mrow> <mi>a</mi> <mi>v</mi> </mrow> </msub> <mo>)</mo> </mrow> <mrow> <mo>(</mo> <mover> <mi>x</mi> <mo>&amp;CenterDot;&amp;CenterDot;</mo> </mover> <mo>(</mo> <mrow> <mi>t</mi> <mo>,</mo> <msub> <mi>&amp;theta;</mi> <mrow> <mi>a</mi> <mi>v</mi> </mrow> </msub> </mrow> <mo>)</mo> <mo>+</mo> <msubsup> <mi>&amp;theta;</mi> <mrow> <mi>a</mi> <mi>v</mi> </mrow> <mn>2</mn> </msubsup> <mi>x</mi> <mo>(</mo> <mrow> <mi>t</mi> <mo>,</mo> <msub> <mi>&amp;theta;</mi> <mrow> <mi>a</mi> <mi>v</mi> </mrow> </msub> </mrow> <mo>)</mo> <mo>)</mo> </mrow> <mo>&amp;rsqb;</mo> </mrow>
对上式进行化简可得:
<mrow> <msub> <mover> <mi>&amp;theta;</mi> <mo>&amp;CenterDot;</mo> </mover> <mrow> <mi>a</mi> <mi>v</mi> </mrow> </msub> <mo>=</mo> <mo>-</mo> <mfrac> <mi>&amp;epsiv;</mi> <mrow> <mn>2</mn> <mi>&amp;zeta;</mi> </mrow> </mfrac> <mfrac> <mi>&amp;theta;</mi> <mrow> <mn>2</mn> <msubsup> <mi>&amp;omega;</mi> <mn>0</mn> <mn>2</mn> </msubsup> </mrow> </mfrac> <mrow> <mo>(</mo> <msubsup> <mi>&amp;theta;</mi> <mrow> <mi>a</mi> <mi>v</mi> </mrow> <mn>2</mn> </msubsup> <mo>-</mo> <msubsup> <mi>&amp;omega;</mi> <mn>0</mn> <mn>2</mn> </msubsup> <mo>)</mo> </mrow> </mrow>
当θav=ω0,上式可简化为:
<mrow> <msub> <mover> <mi>&amp;theta;</mi> <mo>&amp;CenterDot;</mo> </mover> <mrow> <mi>a</mi> <mi>v</mi> </mrow> </msub> <mo>=</mo> <mo>-</mo> <mfrac> <mrow> <mi>&amp;epsiv;</mi> <mi>&amp;theta;</mi> </mrow> <mrow> <mn>2</mn> <msub> <mi>&amp;zeta;&amp;omega;</mi> <mn>0</mn> </msub> </mrow> </mfrac> <mrow> <mo>(</mo> <msub> <mi>&amp;theta;</mi> <mrow> <mi>a</mi> <mi>v</mi> </mrow> </msub> <mo>-</mo> <msub> <mi>&amp;omega;</mi> <mn>0</mn> </msub> <mo>)</mo> </mrow> </mrow>
频率检测响应的时间常数为:
<mrow> <mi>&amp;tau;</mi> <mo>=</mo> <mfrac> <mrow> <mn>2</mn> <msub> <mi>&amp;zeta;&amp;omega;</mi> <mn>0</mn> </msub> </mrow> <mrow> <mi>&amp;epsiv;</mi> <mi>&amp;theta;</mi> </mrow> </mfrac> <mo>=</mo> <mfrac> <mrow> <mn>2</mn> <mi>&amp;zeta;</mi> </mrow> <mi>&amp;epsiv;</mi> </mfrac> </mrow>
当通用自适应陷波器的参数ε和ζ为定值时,τ也为定值,即通用自适应陷波器的动态响应时间不变,其性能与输入信号的频率和幅值无关。
3.根据权利要求1所述的一种测量电网中各序分量的方法,其特征在于:所述的步骤c中,当电网中三相不平衡时,将输入信号分解为正序分量、负序分量和零序分量之和,它们的关系可用公式表示为:
<mrow> <mfenced open = "(" close = ")"> <mtable> <mtr> <mtd> <msubsup> <mi>u</mi> <mi>A</mi> <mo>+</mo> </msubsup> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mtd> </mtr> <mtr> <mtd> <msubsup> <mi>u</mi> <mi>B</mi> <mo>+</mo> </msubsup> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mtd> </mtr> <mtr> <mtd> <msubsup> <mi>u</mi> <mi>C</mi> <mo>+</mo> </msubsup> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mtd> </mtr> </mtable> </mfenced> <mo>=</mo> <msub> <mi>S</mi> <mn>1</mn> </msub> <mfenced open = "(" close = ")"> <mtable> <mtr> <mtd> <msub> <mi>u</mi> <mi>A</mi> </msub> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mtd> </mtr> <mtr> <mtd> <msub> <mi>u</mi> <mi>B</mi> </msub> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mtd> </mtr> <mtr> <mtd> <msub> <mi>u</mi> <mi>C</mi> </msub> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mtd> </mtr> </mtable> </mfenced> <mo>+</mo> <msub> <mi>S</mi> <mn>2</mn> </msub> <mfenced open = "(" close = ")"> <mtable> <mtr> <mtd> <mrow> <msub> <mi>u</mi> <mi>A</mi> </msub> <msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mn>90</mn> </msub> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <msub> <mi>u</mi> <mi>B</mi> </msub> <msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mn>90</mn> </msub> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <msub> <mi>u</mi> <mi>C</mi> </msub> <msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mn>90</mn> </msub> </mrow> </mtd> </mtr> </mtable> </mfenced> </mrow>
<mrow> <mfenced open = "(" close = ")"> <mtable> <mtr> <mtd> <msubsup> <mi>u</mi> <mi>A</mi> <mo>-</mo> </msubsup> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mtd> </mtr> <mtr> <mtd> <msubsup> <mi>u</mi> <mi>B</mi> <mo>-</mo> </msubsup> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mtd> </mtr> <mtr> <mtd> <msubsup> <mi>u</mi> <mi>C</mi> <mo>-</mo> </msubsup> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mtd> </mtr> </mtable> </mfenced> <mo>=</mo> <msub> <mi>S</mi> <mn>2</mn> </msub> <mfenced open = "(" close = ")"> <mtable> <mtr> <mtd> <msub> <mi>u</mi> <mi>A</mi> </msub> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mtd> </mtr> <mtr> <mtd> <msub> <mi>u</mi> <mi>B</mi> </msub> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mtd> </mtr> <mtr> <mtd> <msub> <mi>u</mi> <mi>C</mi> </msub> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mtd> </mtr> </mtable> </mfenced> <mo>-</mo> <msub> <mi>S</mi> <mn>1</mn> </msub> <mfenced open = "(" close = ")"> <mtable> <mtr> <mtd> <mrow> <msub> <mi>u</mi> <mi>A</mi> </msub> <msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mn>90</mn> </msub> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <msub> <mi>u</mi> <mi>B</mi> </msub> <msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mn>90</mn> </msub> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <msub> <mi>u</mi> <mi>C</mi> </msub> <msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mn>90</mn> </msub> </mrow> </mtd> </mtr> </mtable> </mfenced> </mrow>
<mrow> <msub> <mi>u</mi> <mn>0</mn> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>=</mo> <msub> <mi>u</mi> <mi>A</mi> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>-</mo> <msubsup> <mi>u</mi> <mi>A</mi> <mo>+</mo> </msubsup> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>-</mo> <msubsup> <mi>u</mi> <mi>A</mi> <mo>-</mo> </msubsup> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>.</mo> </mrow>
CN201711294157.XA 2017-12-08 2017-12-08 一种测量电网中各序分量的方法 Pending CN107782984A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711294157.XA CN107782984A (zh) 2017-12-08 2017-12-08 一种测量电网中各序分量的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711294157.XA CN107782984A (zh) 2017-12-08 2017-12-08 一种测量电网中各序分量的方法

Publications (1)

Publication Number Publication Date
CN107782984A true CN107782984A (zh) 2018-03-09

Family

ID=61431169

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711294157.XA Pending CN107782984A (zh) 2017-12-08 2017-12-08 一种测量电网中各序分量的方法

Country Status (1)

Country Link
CN (1) CN107782984A (zh)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104868499A (zh) * 2015-06-10 2015-08-26 国家电网公司 三相不平衡情况下的基于自适应陷波器的三相pq控制方法及系统
CN104897250A (zh) * 2015-06-25 2015-09-09 华南理工大学 一种抗强谐波干扰的多台位流量计脉冲计数补偿方法
CN104990616A (zh) * 2015-06-26 2015-10-21 广州能源检测研究院 基于级联自适应陷波器的多路不同步脉冲计数补偿方法
CN106209031A (zh) * 2016-07-18 2016-12-07 珠海格力电器股份有限公司 时钟电路、时钟信号生成方法以及包括该时钟电路的控制芯片

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104868499A (zh) * 2015-06-10 2015-08-26 国家电网公司 三相不平衡情况下的基于自适应陷波器的三相pq控制方法及系统
CN104897250A (zh) * 2015-06-25 2015-09-09 华南理工大学 一种抗强谐波干扰的多台位流量计脉冲计数补偿方法
CN104990616A (zh) * 2015-06-26 2015-10-21 广州能源检测研究院 基于级联自适应陷波器的多路不同步脉冲计数补偿方法
CN106209031A (zh) * 2016-07-18 2016-12-07 珠海格力电器股份有限公司 时钟电路、时钟信号生成方法以及包括该时钟电路的控制芯片

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
冯浩等: "采用自适应陷波器的电压暂降检测方法", 《电测与仪表》 *
杜雄等: "一种具有频率响应自适应性的电压同步信号提取方法", 《中国电机工程学报》 *
郭磊: "基于自适应陷波器的微电网信息提取及应用", 《中国优秀硕士学位论文全文数据库 工程科技II辑》 *

Similar Documents

Publication Publication Date Title
CN103401238B (zh) 一种基于总体测辨法的电力负荷建模方法
Li et al. An innovative software tool suite for power plant model validation and parameter calibration using PMU measurements
CN107677960B (zh) 基于pmu量测的同步发电机参数辨识方法
CN103018632B (zh) 基于费歇信息的小电流接地系统单相接地故障选线方法
CN109828163A (zh) 一种用于电网的三相不平衡检测方法
CN104407214A (zh) 一种谐波源辨识方法
CN102062803B (zh) 基于正交正弦波积分调制的有功电流提取方法
CN104678152A (zh) 利用频域信息滤除衰减直流的电力信号同步相量测量方法
CN102570428A (zh) 基于电子式互感器微分输出的故障测距与距离保护方法
CN103149478B (zh) 一种直流偏磁条件下电流互感器工作点检测方法
CN106802368A (zh) 一种基于频域插值的广域电网相量测量方法
CN106154037A (zh) 一种基于校验的同步相量自适应计算方法
CN103033716A (zh) 一种电网综合负荷模型中各负荷成分所占比例的计算方法
CN104967097B (zh) 基于支持向量分类机的励磁涌流识别方法
CN115980513A (zh) 基于粒子群算法的配电网单相接地故障判别方法及装置
CN102842906B (zh) 一种综合负荷模型中电动机功率比例的计算方法
Abasi et al. Location of double-circuit grounded cross-country faults in GUPFC-compensated transmission lines based on current and voltage phasors analysis
CN109375048B (zh) 一种基于故障录波数据的输电线路参数辨识方法及装置
Constantin et al. Open loop Q (U) stability investigation in case of PV power plants
CN107782984A (zh) 一种测量电网中各序分量的方法
CN110098610B (zh) 故障扰动下电力系统振荡主导模式的实时辨识方法及系统
CN104297604A (zh) 一种谐波对并联电容器温升及损耗影响的试验系统及方法
CN116482571A (zh) 一种基于cnn的小电流单相接地故障多判据融合选线方法
CN102654754B (zh) 用负载模拟器检测振动控制动态范围的方法及负载模拟器
CN104360153B (zh) 电网谐波在线检测与分析方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180309

RJ01 Rejection of invention patent application after publication